EMG Professional Rate Schedule Demo 02192021.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Emergency Commercial Demolition: 2425 Bellevue
- Solicitation number
- 300000152281233
- Issued by
- Michigan
About this file
This is a contractor rate schedule for Doe Demolition, Inc., a demolition services provider based in Michigan, submitted in response to the Emergency Commercial Demolition: 2425 Bellevue contract opportunity. The schedule outlines labor and material rates across two primary service categories: demolition and backfill, grade, and site finalization. The demolition services include administration, supervision, and laborer hourly rates, as well as equipment and trucking costs for both regulated and non-regulated materials. Disposal services are priced per ton for asbestos-containing materials and construction and demolition debris, with air monitoring available on a per-parcel basis. The backfill, grade, and site finalization category covers comparable labor categories plus material costs for backfill and topfill materials priced per ton.
All rates in the submitted schedule are currently listed at $0.00 across all service types and unit measures. The contractor point of contact is Jane D. Doe, President, located at 1234 Fifth Street, with communication available via email at jane.doe@doedemolition.com or telephone at 313.313.3113. This rate schedule format appears designed to establish a baseline pricing structure for emergency demolition services, though the rates require completion before execution of any contract work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Rate Schedule
| Organization Name: | Doe Demolition, Inc. |
| Business Address: | 1234 Fifth Street, 48226 |
| Point(s)-of-Contact: | Jane D. Doe, President |
| E-mail Address(es): | jane.doe@doedemolition.com |
| Phone #(s): | 313.313.3113 |
| Service Type | Unit Type | Unit Rate |
| DEMOLITION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Trucking: Regulated Material | Hourly | $0.00 |
| Trucking: Non-Regulated Material | Hourly | $0.00 |
| Disposal: Asbestos Containing Material | Per Ton | $0.00 |
| Disposal: Construction & Demolition | Per Ton | $0.00 |
| Air Monitoring | Per Parcel | $0.00 |
| BACKFILL, GRADE, & SITE FINALIZATION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Backfill Material (Below 12 inches) | Per Ton | $0.00 |
| Topfill Material (Top 12 inches) | Per Ton | $0.00 |
File details come from the government source that posted it. Updated .