EMG Alteration (30 Days).pdf

PDF 43 KB Posted

Attached to
Emergency Commercial Demolition: 3045 Mt Elliot
Solicitation number
300000152836482
Issued by
Michigan

About this file

Summary

This is an Emergency Commercial Demolition project specification document for the property located at 3045 Mt Elliot in Michigan. The project scope involves the alteration and demolition of a commercial structure with a projected completion timeframe of 30 days. The document serves as a technical guide for contractors responding to the emergency demolition contract opportunity, outlining the work requirements and site conditions that bidders must address in their proposals. The emergency nature of this project indicates an accelerated timeline for both execution and contractor mobilization compared to standard demolition contracting procedures.

The document establishes the technical parameters and baseline conditions for the 3045 Mt Elliot property, providing detailed information necessary for contractors to develop accurate bids and project schedules. Specific pricing, set-asides, funding sources, and award criteria should be referenced in the related bid solicitation documents. The 30-day completion requirement represents a critical constraint for contractor scheduling and resource allocation, requiring experienced demolition firms capable of rapid mobilization and execution under time-sensitive conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .