East Shade Shelters Shoreline Stabilization GESC Plan.pdf

PDF 5 MB Posted

Attached to
East Shade Shelter Shoreline Stabilization
Solicitation number
IFB 09-12-2024
Issued by
Arapahoe County, Aurora City, Colorado

About this file

This is a Grading, Erosion & Sediment Control (GESC) Plan prepared by RESPEC Company LLC for the Cherry Creek Basin Water Quality Authority (CCBWQA) and Colorado Parks and Wildlife (CPW) for the East Shade Shelters Shoreline Stabilization Project located at Cherry Creek Reservoir in Arapahoe County, Colorado. The project involves shoreline stabilization work spanning approximately 561 linear feet, with multiple phases including initial, interim, and final erosion control measures. The plan details specific erosion control techniques such as construction fencing, silt fencing, sediment control logs, stabilized staging areas, and slope protection methods. The project is scheduled for implementation in July 2024, with comprehensive documentation submitted to Arapahoe County under case number EE24-030.

The GESC plan focuses on controlling potential pollutants during construction and ensuring final site stabilization through various engineering and environmental control measures. The project area includes a group picnic access area, concrete staircase, and shade shelter, with careful attention to maintaining slopes at 3:1 or less and implementing seeding and mulching of disturbed areas within 14 days if sites will remain undisturbed for over 30 days. The United States of America is listed as the property owner, with the project area located at 6060 Broadway, Denver, CO 80216. The plan emphasizes ongoing erosion control, sediment management, and water quality enhancement throughout the construction process, with specific requirements for installing and maintaining control measures to prevent environmental degradation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAST SHADE SHELTERS

SITE LOCATION

TOW

ER LOOP

SWIM BEACH ACCESS

SWIM

BEACH

CHERRY CREEK

RESERVOIR

CHERRY CREEK

STATE PARK

GROUP PICNIC

AREA ACCESS

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

G

ES

C C

O

VE

R

EC-1

JM

R

JM

R

JH

N

5/

/2

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -C

O

VE

R -G

ES

C

.D W

G

PL

O T

D

AT

E:

J ul y

, 2

7:

P M

, B Y:

J

ER

IC

H

O R

AP

P

GRADING, EROSION & SEDIMENT CONTROL PLANS FOR

EAST SHADE SHELTERS SHORELINE STABILIZATION

6060 BROADWAY, DENVER CO 80216

JULY 2024

PREPARED FOR:

LOCATION MAP

1" = 500'

CCBWQA

PO BOX 3166

CENTENNIAL, CO 80161

0 500 1,000

SCALE IN FEET

THIS GRADING, EROSION AND SEDIMENT CONTROL (GESC) DOCUMENT HAS

BEEN PLACED IN THE ARAPAHOE COUNTY FILE FOR THIS PROJECT AND

APPEARS TO FULFILL THE LATEST VERSION OF THE ARAPAHOE COUNTY

GRADING, EROSION AND SEDIMENT CONTROL MANUAL. ADDITIONAL

GRADING, EROSION AND SEDIMENT CONTROL MEASURES MAY BE

REQUIRED OF THE OWNER AND HIS/HER AGENTS, DUE TO UNFORESEEN

EROSION PROBLEMS OR IF THE SUBMITTED GESC PLAN DOES NOT

FUNCTION AS INTENDED. THE REQUIREMENTS OF THIS GESC PLAN SHALL

RUN WITH THE LAND AND BE THE OBLIGATION OF THE LAND OWNER, OR

HIS/HER DESIGNATED REPRESENTATIVE(S) UNTIL SUCH TIME AS THE PLAN

IS PROPERTY COMPLETED, MODIFIED OR VOIDED.

ARAPAHOE COUNTY CASE NUMBER: EE24-030

I HEREBY ATTEST THAT THIS GRADING, EROSION AND SEDIMENT CONTROL

(GESC) DOCUMENT FOR THE EAST SHADE SHELTERS SHORELINE

STABILIZATION HAS BEEN PREPARED BY ME OR UNDER MY DIRECT

SUPERVISION, AND TO THE BEST OF MY KNOWLEDGE AND ABILITY HAS BEEN

PREPARED IN ACCORDANCE WITH THE LATEST VERSION OF THE ARAPAHOE

COUNTY GESC MANUAL. THE SIGNATURE AND STAMP AFFIXED HEREON

CERTIFIES THAT THIS GESC DOCUMENT WAS PREPARED IN ACCORDANCE

WITH THE REQUIRED REGULATIONS AND CRITERIA; HOWEVER, THE STAMP

AND SIGNATURE DO NOT CERTIFY OR GUARANTEE FUTURE PERFORMANCE

OF THE EXECUTION OF THE PLAN BY THE CONTRACTOR. THE CONTRACTOR

IS RESPONSIBLE FOR EXECUTING THE CONSTRUCTION WORK ACCORDING

TO THE INFORMATION SET FORTH IN THE PLAN AND IN ACCORDANCE WITH

ALL APPLICABLE REQUIREMENTS.

JESSICA NOLLE, P.E. DATE

COLORADO NO. 38238

FOR AND ON BEHALF OF RESPEC COMPANY LLC

I HEREBY CERTIFY THAT THE GRADING, EROSION, AND SEDIMENT CONTROL

(GESC) MEASURES FOR THE EAST SHADE SHELTERS SHORELINE

STABILIZATION SHALL BE CONSTRUCTED ACCORDING TO THE DESIGN

PRESENTED IN THIS REPORT. I UNDERSTAND THAT ADDITIONAL EROSION

CONTROL, SEDIMENT CONTROL AND WATER QUALITY ENHANCING MEASURES

MAY BE REQUIRED OF THE OWNER AND HIS/HER AGENTS DUE TO

UNFORESEEN POLLUTANT DISCHARGES OR IF THE SUBMITTED PLAN DOES

NOT FUNCTION AS INTENDED. THE REQUIREMENTS OF THE PLAN SHALL BE

THE OBLIGATION OF THE LAND OWNER AND/OR HIS/HER SUCCESSORS OR

HEIRS; UNTIL SUCH TIME AS THE PLAN IS PROPERLY COMPLETED, MODIFIED

OR VOIDED.

AUTHORIZED SIGNATURE DATE

OWNER OR AUTHORIZED AGENT

THESE GESC PLANS HAVE BEEN REVIEWED BY

ARAPAHOE COUNTY FOR GRADING, EROSION AND

SEDIMENT CONTROL IMPROVEMENTS ONLY.

SHEET LIST INDEX

SHEET DRAWING TITLE

1 EC-1 GESC COVER

2 EC-2 GESC DRAWING INDEX SHEET

3 EC-3 INITIAL & INTERIM GESC DRAWING (1 OF 2)

4 EC-4 INITIAL & INTERIM GESC DRAWING (2 OF 2)

5 EC-5 FINAL GESC DRAWING (1 OF 2)

6 EC-6 FINAL GESC DRAWING (2 OF 2)

7 EC-7 GESC NOTES & DETAILS 1

8 EC-8 GESC NOTES & DETAILS 2

9 EC-9 GESC NOTES & DETAILS 3

10 EC-10 GESC NOTES & DETAILS 4

ENGINEER:

CLIENT:

PARK MANAGER:

RESPEC COMPANY, LLC

720 SOUTH COLORADO

BOULEVARD, SUITE 410-S

DENVER, CO 80246

PHONE: (720)775-6412

CHERRY CREEK BASIN WATER

QUALITY AUTHORITY

P.O. BOX 3166

CENTENNIAL, CO 80122

PHONE: (303)779-4525

CONTACT ELYSA LOEWEN, PE, CFM

COLORADO PARKS AND WILDLIFE

4201 S. PARKER RD.

AURORA, CO 80014

PHONE: (303)263-8424

CONTACT: MICHELLE SEUBERT,

PARK MANAGER

PROJECT TEAM

CPW

6060 BROADWAY

DENVER, CO 80216

SEE SHEET EC-4 & EC-6

SEE SHEET EC-3 & EC-5

3:

3:

2:

CF

SF

VTC

CS

ECB

SSA

SCL

SM

LOC

XX TP

LIMITS OF CONSTRUCTION

CONSTRUCTION FENCE

SILT FENCE

TREE PROTECTION

VEHICLE TRACKING CONTROL

CURB SOCK

EROSION CONTROL BLANKET

STABILIZED STAGING AREA

SEDIMENT CONTROL LOG

SEEDING/MULCHING

FLOW ARROW

LEGEND

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -O

VE

R

AL

L-

G

ES

C .D

W G

PL

O

T D

AT

E:

J ul y

, 2

7:

P

M , B

Y:

J

ER

IC

H O

R

AP

P

0 20 40

SCALE IN FEET

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

G

ES

C D

R

AW

IN

G

IN

D

EX

SH

EE

T

EC-2

JM

R

JM

R

JH

N

5/

/2

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

NOTES

1. ALL INITIAL IMPLEMENTS SHALL REMAIN FOR

INTERIM BESIDES SEDIMENT CONTROL LOGS.

2. CIVIL IMPROVEMENTS SHALL HAPPEN IN THE

INTERIM PHASE & ACT AS GRADING, EROSION,

AND SEDIMENT CONTROL MEASURES.

3. TREE LOCATIONS SHOWN ARE APPROXIMATE.

4. TREES SET FOR REMOVAL MAY BE REVISED

BASED ON FIELD CONDITIONS.

ARAPAHOE COUNTY CASE NUMBER: EE24-030

X

X

X

X

X

X X X X X

X X

X

XX

X

XX

X

X X

X

X X

X

X X

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: 12500 E. BELLEVIEW AVE

AURORA, CO 80011

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: NONE ON FILE

AURORA, CO 80011

CS

CS

SF

SCL

CF

SSA

SCL

LOC

VTC

CF

TP

TP

TP

CS

3:

561 LF

325 LF

534 SY

427 LF

10 LF10 LF

10 LF

10 LF

10 LF

32 LF

78 LF

33 LF

GROUP PICNIC

ACCESS AREA

CONCRETE

STAIRCASE

SHADE SHELTER

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -O

VE

R

AL

L-

G

ES

C .D

W G

PL

O

T D

AT

E:

J ul y

, 2

7:

P

M , B

Y:

J

ER

IC

H O

R

AP

P

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

IN

IT

IA

L

IN

TE

R

IM

G

ES

C

(1 O

F 2)

EC-3

JM

R

JM

R

JH

N

5/

/2

NOTES

1. APPROPRIATE CONTROL MEASURES MUST BE

IMPLEMENTED PRIOR TO THE START OF LAND

DISTURBANCE ACTIVITY, MUST CONTROL

POTENTIAL POLLUTANTS DURING EACH PHASE

OF CONSTRUCTION, & MUST BE CONTINUED

THROUGH FINAL STABILIZATION. APPROPRIATE

STRUCTURAL & NON-STRUCTURAL CONTROL

MEASURES MUST BE MAINTAINED IN

OPERATIONAL CONDITION.

2. SEE STANDARD NOTES & DETAILS (EC-7) FOR

LEGEND OF CONTROL MEASURES NAMES &

SYMBOLS.

3. STAGING AREA SHALL BE PLACED ON EXISTING

ASPHALT AND NOT REQUIRE STABILIZATION.

ASPHALT SHALL BE PROTECTED FROM

DAMAGE.

INITIAL

4. ANY CONTROL MEASURES SHOWN THAT

REQUIRE GRADING, (E.G. SEDIMENT BASINS,

SEDIMENT TRAPS, CONCRETE WASHOUT

AREAS, ETC.), SHALL NOT BE PLACED UNTIL

AFTER THE PRE-CONSTRUCTION MEETING IN

ISSUANCE OF THE GESC PERMIT, BUT MUST BE

FULLY FUNCTIONAL PRIOR TO ANY

LARGE-SCALE GRADING. THE INITIAL PLAN

ILLUSTRATES EXISTING CONDITONS. NO

PROPOSED INFRASTRUCTURE IS SHOWN.

INTERIM

5. CONTROL MEASURES WERE INSTALLED IN THE

INITIAL STAGE & SHALL BE LEFT IN PLACE IN

THE INTERIM STAGE UNLESS OTHERWISE

NOTED.

6. CONTROL MEASURES, INCLUDING SEEDING

AND MULCHING OF DISTURBED AREAS, MUST

BE COMPLETED WITHIN 14 DAYS, IF THE AREA

WILL REMAIN UNDISTURBED FOR A PERIOD

GREATER THAN 30 DAYS.

THESE GESC PLANS HAVE BEEN REVIEWED BY

ARAPAHOE COUNTY FOR GRADING, EROSION AND

SEDIMENT CONTROL IMPROVEMENTS ONLY.

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

0 10 20

SCALE IN FEET

X

X X

X

X X

X X

X

X X

X X

X

X X

X X

X

X X

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: NONE ON FILE

AURORA, CO 80011

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: 12500 E. BELLEVIEW AVE

AURORA, CO 80011

GROUP PICNIC

ACCESS AREA

SCL

SCL

SCL

SF

LOC

CS

CF

TP

TP

TP

CS

X X

X

X X

TP

3:

2:

561 LF

427 LF

10 LF

10 LF

10 LF

10 LF

10 LF

32 LF

64 LF

64 LF

32 LF

CHERRY

CREEK

RESERVOIR

CONCRETE

STAIRCASE

SHADE

SHELTER

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -O

VE

R

AL

L-

G

ES

C .D

W G

PL

O

T D

AT

E:

J ul y

, 2

7:

P

M , B

Y:

J

ER

IC

H O

R

AP

P

0 10 20

SCALE IN FEET

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

IN

IT

IA

L

IN

TE

R

IM

G

ES

C

(2 O

F 2)

EC-4

JM

R

JM

R

JH

N

5/

/2

THESE GESC PLANS HAVE BEEN REVIEWED BY

ARAPAHOE COUNTY FOR GRADING, EROSION AND

SEDIMENT CONTROL IMPROVEMENTS ONLY.

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

NOTES

1. APPROPRIATE CONTROL MEASURES MUST BE IMPLEMENTED PRIOR TO

THE START OF LAND DISTURBANCE ACTIVITY, MUST CONTROL

POTENTIAL POLLUTANTS DURING EACH PHASE OF CONSTRUCTION, &

MUST BE CONTINUED THROUGH FINAL STABILIZATION. APPROPRIATE

STRUCTURAL & NON-STRUCTURAL CONTROL MEASURES MUST BE

MAINTAINED IN OPERATIONAL CONDITION.

2. SEE STANDARD NOTES & DETAILS (EC-7) FOR LEGEND OF CONTROL

MEASURES NAMES & SYMBOLS.

INITIAL

3. ANY CONTROL MEASURES SHOWN THAT REQUIRE GRADING, (E.G.

SEDIMENT BASINS, SEDIMENT TRAPS, CONCRETE WASHOUT AREAS,

ETC.), SHALL NOT BE PLACED UNTIL AFTER THE PRE-CONSTRUCTION

MEETING IN ISSUANCE OF THE GESC PERMIT, BUT MUST BE FULLY

FUNCTIONAL PRIOR TO ANY LARGE-SCALE GRADING. THE INITIAL PLAN

ILLUSTRATES EXISTING CONDITONS. NO PROPOSED INFRASTRUCTURE

IS SHOWN.

INTERIM

4. CONTROL MEASURES WERE INSTALLED IN THE INITIAL STAGE & SHALL

BE LEFT IN PLACE IN THE INTERIM STAGE UNLESS OTHERWISE NOTED.

5. CONTROL MEASURES, INCLUDING SEEDING AND MULCHING OF

DISTURBED AREAS, MUST BE COMPLETED WITHIN 14 DAYS, IF THE

AREA WILL REMAIN UNDISTURBED FOR A PERIOD GREATER THAN 30

DAYS.

X

X

X

X

X X X X X

X X

X

XX

X

XX

X

X X

X

X X

X

X X

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: 12500 E. BELLEVIEW AVE

AURORA, CO 80011

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: NONE ON FILE

AURORA, CO 80011

CS

CS

SF

111 SY

ECB

SCL

CF

SSA

SM

993 SF

(SEE FINAL

NOTE 4)

SCL

LOC

VTC

CF

TP

TP

TP

CS

REMOVE ALL INITIAL

EROSION CONTROL

MEASURES

3:

GROUP PICNIC

ACCESS AREA

CONCRETE

STAIRCASE

SHADE SHELTER

TO BE

REMOVED

663 SF

(SEE FINAL

NOTE 4)

ECB

SM

74 SY

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -O

VE

R

AL

L-

G

ES

C .D

W G

PL

O

T D

AT

E:

J ul y

, 2

7:

P

M , B

Y:

J

ER

IC

H O

R

AP

P

0 10 20

SCALE IN FEET

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

FI

N

AL

G

ES

C

(1 O

F 2)

EC-5

JM

R

JM

R

JH

N

5/

/2

SEDIMENT CONTROL IMPROVEMENTS ONLY.

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

NOTES

1. APPROPRIATE CONTROL MEASURES MUST BE

IMPLEMENTED PRIOR TO THE START OF LAND

DISTURBANCE ACTIVITY, MUST CONTROL

POTENTIAL POLLUTANTS DURING EACH PHASE

OF CONSTRUCTION, & MUST BE CONTINUED

THROUGH FINAL STABILIZATION. APPROPRIATE

STRUCTURAL & NON-STRUCTURAL CONTROL

MEASURES MUST BE MAINTAINED IN

OPERATIONAL CONDITION.

2. SEE STANDARD NOTES & DETAILS (EC-7) FOR

LEGEND OF CONTROL MEASURES NAMES &

SYMBOLS.

3. CONTROL MEASURES WERE INSTALLED IN THE

INITIAL OR INTERIM STAGE &, UNLESS

OTHERWISE INDICATED, SHALL BE LEFT IN

PLACE UNTIL APPROVED BY THE GESC

INSPECTOR.

FINAL

4. SCREENED/SHADED BACK CONTROL MEASURES

WERE INSTALLED IN THE INITIAL OR INTERIM

STAGE AND, UNLESS OTHERWISE INDICATED,

SHALL BE LEFT IN PLACE UNTIL APPROVED BY

THE GESC INSPECTOR.

5. ALL INTERIM CONTROL MEASURES, INCLUDING

SEEDING & MULCHING OR DISTURBED AREAS,

MUST BE COMPLETED WITHIN 14 DAYS IF THE

AREAS WILL REMAIN UNDISTURBED FOR A

PERIOD GREATER THAN 30 DAYS.

6. ALL PROPOSED SLOPES ON THIS PLAN HAVE A

MAXIMUM SLOPE OF 3:1. ANY SLOPES BETWEEN

3:1 & 4:1 WILL REQUIRE THE USE OF EROSION

CONTROL BLANKETS OR FLEXIBLE GROWTH

MEDIUM, AS APPROVED BY THE GESC

INSPECTOR.

7. JOINT PLANTING IN RIPRAP WILL ACT AS

SEEDING FOR FINAL STABILIZATION. SEE CIVIL

IMPROVEMENTS FOR DETAILS.

8. CONTRACTOR SHALL SEED & MULCH ANY

PREVIOUSLY VEGETATED AREAS DISTURBED

DURING CONSTRUCTION.

X

X X

X

X X

X X

X

X X

X X

X

X X

X X

X

X X

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: NONE ON FILE

AURORA, CO 80011

PARCEL ID: 2075-01-00-004

OWNER: UNITED STATES OF AMERICA

ADDRESS: 12500 E. BELLEVIEW AVE

AURORA, CO 80011

GROUP PICNIC

ACCESS AREA

SCL

SCL

SCL

SF

1687 SF

(SEE FINAL

NOTE 4)

LOC

CS

CF

ECB

TP

TP

TP

CS

X X

X

X X

TP

REMOVE ALL INITIAL

EROSION CONTROL

MEASURES

SM

3:

2:

1188 SY

CHERRY

CREEK

RESERVOIR

CONCRETE

STAIRCASE

SHADE

SHELTER

3245 SF

(SEE FINAL

NOTE 4)

ECB

SM

361 SY

732 SF

(SEE FINAL

NOTE 4)

ECB

SM

82 SY

Know what's below.

before you dig.Call

R

PAGE

SHEET NUMBER:

REVISION

STAMP

R

ES

PE

C

S C

O

LO

R

AD

O B

LV

D

SU

IT

E

0S D

EN

VE

R , C

O

PH

O

N E

(3

) 7

-3

D

ES

IG

N

ED

D

R A

W N

C H

EC

K

ED

D

A

TE

N

AM

E:

N

:\P R

O

JE

C

TS

\W

C C

BW

Q

A\ W

.2

- E

SS

TL

IM

PR

O

VE

M

EN

TS

\C

AD

\S

H

EE

TS

\2

-S -O

VE

R

AL

L-

G

ES

C .D

W G

PL

O

T D

AT

E:

J ul y

, 2

7:

P

M , B

Y:

J

ER

IC

H O

R

AP

P

0 10 20

SCALE IN FEET

EA

ST

S H

AD

E

SH

EL

TE

R

S

SH

O R

EL

IN

E

ST

AB

IL

IZ

AT

IO

N

FI

N

AL

G

ES

C

(2 O

F 2)

EC-6

JM

R

JM

R

JH

N

5/

/2

SEDIMENT CONTROL IMPROVEMENTS ONLY.

C

EN

TE

N

N

IA

L, C

O

P.

O

. B O

X

C

C

BW

Q A

NOTES

1. APPROPRIATE CONTROL MEASURES MUST BE IMPLEMENTED PRIOR TO THE

START OF LAND DISTURBANCE ACTIVITY, MUST CONTROL POTENTIAL

POLLUTANTS DURING EACH PHASE OF CONSTRUCTION, & MUST BE

CONTINUED THROUGH FINAL STABILIZATION. APPROPRIATE STRUCTURAL &

NON-STRUCTURAL CONTROL MEASURES MUST BE MAINTAINED IN

OPERATIONAL CONDITION.

2. SEE STANDARD NOTES & DETAILS (EC-7) FOR LEGEND OF CONTROL

MEASURES NAMES & SYMBOLS.

3. CONTROL MEASURES, INDICATED WITH SUBTEXT NUMBERS NEXT TO OVAL

ANNOTATIONS, WERE INSTALLED IN THE INITIAL OR INTERIM STAGE &, UNLESS

OTHERWISE INDICATED, SHALL BE LEFT IN PLACE UNTIL APPROVED BY THE

GESC INSPECTOR.

FINAL

4. SCREENED/SHADED BACK CONTROL MEASURES WERE INSTALLED IN THE

INITIAL OR INTERIM STAGE AND, UNLESS OTHERWISE INDICATED, SHALL BE

LEFT IN PLACE UNTIL APPROVED BY THE GESC INSPECTOR.

5. ALL INTERIM CONTROL MEASURES, INCLUDING SEEDING & MULCHING OR

DISTURBED AREAS, MUST BE COMPLETED WITHIN 14 DAYS IF THE AREAS WILL

REMAIN UNDISTURBED FOR A PERIOD GREATER THAN 30 DAYS.

6. ALL PROPOSED SLOPES ON THIS PLAN HAVE A MAXIMUM SLOPE OF 3:1. ANY

SLOPES BETWEEN 3:1 & 4:1 WILL REQUIRE THE USE OF EROSION CONTROL

BLANKETS OR FLEXIBLE GROWTH MEDIUM, AS APPROVED BY THE GESC

INSPECTOR.

7. JOINT PLANTING IN RIPRAP WILL ACT AS SEEDING FOR FINAL STABILIZATION.

SEE CIVIL IMPROVEMENTS FOR DETAILS.

8. CONTRACTOR SHALL SEED & MULCH ANY PREVIOUSLY VEGETATED AREAS

DISTURBED DURING CONSTRUCTION.

GESC

SHEET

CALL BEFORE YOU DIG

Call 2 days prior to any digging, grading or excavating for the marking of underground member utilities

UTILITY NOTIFICATION CENTER

OF COLORADO

GRADING EROSION AND SEDIMENT CONTROL

STANDARD NOTES AND DETAILS

REVISED FEBRUARY 2023

SOUTHEAST METRO STORMWATER AUTHORITY

7437 SOUTH FAIRPLAY STREET

CENTENNIAL COLORADO

80112-4486

(303) 858-8844 - INSPECTION DIVISION

EC-7

GESC

SHEET

CALL BEFORE YOU DIG

Call 2 days prior to any digging, grading or excavating for the marking of underground member utilities

UTILITY NOTIFICATION CENTER

OF COLORADO SOUTHEAST METRO STORMWATER AUTHORITY

7437 SOUTH FAIRPLAY STREET

CENTENNIAL COLORADO

80112-4486

(303) 858-8844 - INSPECTION DIVISION

GRADING EROSION AND SEDIMENT CONTROL

STANDARD NOTES AND DETAILS

REVISED FEBRUARY 2023

EC-8

CALL BEFORE YOU DIG

Call 2 days prior to any digging, grading or excavating for the marking of underground member utilities

UTILITY NOTIFICATION CENTER

OF COLORADO

GESC

SHEET

SOUTHEAST METRO STORMWATER AUTHORITY

7437 SOUTH FAIRPLAY STREET

CENTENNIAL COLORADO

80112-4486

(303) 858-8844 - INSPECTION DIVISION

GRADING EROSION AND SEDIMENT CONTROL

STANDARD NOTES AND DETAILS

EC-9

GESC

SHEET

CALL BEFORE YOU DIG

Call 2 days prior to any digging, grading or excavating for the marking of underground member utilities

UTILITY NOTIFICATION CENTER

OF COLORADO SOUTHEAST METRO STORMWATER AUTHORITY

7437 SOUTH FAIRPLAY STREET

CENTENNIAL COLORADO

80112-4486

(303) 858-8844 - INSPECTION DIVISION

GRADING EROSION AND SEDIMENT CONTROL

STANDARD NOTES AND DETAILS

EC-10

Sheets and Views
1 GESC COVER
2 GESC DRAWING INDEX SHEET
3 INITIAL & INTERIM GESC (1 OF 2)
4 INITIAL & INTERIM GESC (2 OF 2)
5 FINAL GESC (1 OF 2)
6 FINAL GESC (2 OF 2)

File details come from the government source that posted it. Updated .