Addendum #1.pdf
PDF 2 MB Posted
- Attached to
- East Shade Shelter Shoreline Stabilization
- Solicitation number
- IFB 09-12-2024
- Issued by
- Arapahoe County, Aurora City, Colorado
About this file
Addendum No. 1 for the East Shade Shelter Shoreline Stabilization Project was issued by the Cherry Creek Basin Water Quality Authority (CCBWQA) on October 1, 2024. The addendum includes documents from a pre-bid meeting held on September 18, 2024, including a sign-in sheet, meeting agenda, and a list of questions and responses. The bid due date remains October 18, 2024, at 10:00 a.m. MST/MDT, with key dates including a question acceptance deadline of October 4, 2024, and a bid intent deadline of October 16, 2024. The project involves bank stabilization to reduce phosphorus loading into the Cherry Creek Reservoir, with planned activities including riprap, boulder armoring, grading, revegetation, and pedestrian access control.
The project is expected to have a 120-day construction schedule, with a Notice to Proceed (NTP) anticipated in January 2025 and construction completion targeted for Memorial Day weekend. Contractors are required to submit a Unit Price Bid Schedule and Bid E Bond Form. Work hours in the park are from 5 a.m. to 10 p.m., and the East Shade Shelter parking lot can be closed only prior to May 1, 2025. The project will require a state stormwater discharge permit, and modifications to the Geologic Environmental Site Control (GESC) Plan will need to be coordinated with the Arapahoe GESC inspector. Boulders must meet specific MHFD specifications, and weekend and holiday work will be assessed on a case-by-case basis.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(85) 5685846.1
00 91 13
ADDENDA
EAST SHADE SHELTER SHORELINE STABILIZATION PROJECT
Cherry Creek Basin Water Quality Authority P.O. Box 3166
Centennial, Colorado 80161
Addendum No.: 1
Addendum Date: 10/01/2024
The following revisions will be incorporated into the CONTRACT DOCUMENTS, for the above-referenced
PROJECT:
Please see the attached:
• Pre-Bid Meeting Agenda (09/18/2024)
• Pre-Bid Meeting Sign-In Sheet
• Contractor Questions and Responses from the Pre-Bid Meeting
• Revisions to Massive 2 rail fence detail
The BID date is/remains October 18th 2024, 10:00 a.m., MST/MDT
(86) 5685846.1
All other terms and conditions of the CONTRACT DOCUMENTS will remain unchanged. BIDDER must acknowledge receipt of this ADDENDUM in the space provided in the BID. Failure to acknowledge receipt of an ADDENDUM may be cause for rejection of the BID.
END OF SECTION
PRE-BID MEETING AGENDA
1. Introductions/Sign-in sheet
2. Important Dates for the Bid Process
• Question Acceptance Deadline: October 4, 2024
• Bid Intent Deadline: October 16, 2024
• Bid Due Date: October 18, 2024
3. Project Overview
This bank stabilization project was identified as a water quality concern to the
CCBWQA; it is a continuous source of phosphorus into the reservoir and was made worse in the 2023 spring/summer storm events. RESPEC started the design of this project in 2021. CCBWQA and CPW collaborated on this project to restore the eroded bank and reduce the phosphorus loading into the reservoir that we are currently seeing. This project includes bank stabilization with riprap, boulder armoring and grading/revegetation as well as pedestrian access control with fencing and defined access points and stabilized social trails.
4. Estimated Schedule o Contract bid review and selection: October 18th – November 1st o CCBWQA approval for contractor selection (November Board Meeting):
November 22nd, 2024 o NTP Expected in January 2025 with 120-day construction schedule o Construction completion by Memorial Day weekend
5. Required Bid Documents o Unit Price Bid Schedule o Bid E Bond Form
6. Project Area Walk
7. Questions
East Shade Shelter Stabilization Pre-Bid Questions/Responses
1. The width of the post on the massive rail fence it appears larger than standard. Can you confirm the dimensions?
Please see revised massive rail fence detail, confirming the park standard size.
2. What is the water surface elevation of Chery Creek Reservoir
All Cherry Creek Reservoir historic and daily water surface elevations can be found at following website as noted in Section 00 31 32 of the contract documents.
https://dwr.state.co.us/Tools/Stations
3. Does this project require state stormwater and dewatering permits?
Per the contract documents, section 00 73 00, contractor shall obtain state stormwater discharge permit. A groundwater discharge permit is not anticipated but will need to be confirmed by the contractor based on their means and methods.
4. Are modifications to the GESC Plan allowed?
Contractor will be required to coordinate with the Arapahoe GESC inspector during construction. Modifications to the approved GESC will need to be coordinated with the inspector and documented/redlined on the plans. GESC plans are intended to be current
“living” documents that evolved to best protect the site from construction stormwater discharges.
5. Is Holiday/Weekend work allowed?
This will be assessed on a case-by-case basis, however, based on the construction schedule, we don’t anticipate work on holidays between January and May that will be prohibited. All work does need to be completed by Memorial Day weekend. Weekend work is also allowed during this expected work period.
6. What are work hours in the park?
5am to 10pm
7. Can the East Shade Shelter Parking Lot be closed during construction?
Yes only prior to May 1, 2025. After May 1, 2025, no closure to the parking lot is allowed.
8. What types of Boulders are permitted for the project.
Boulders must meet MHFD Specification 31 37 00 RIPRAP, BOULDERS, AND BEDDING
MASSIVE 2 RAIL FENCE SECTION
SCALE: NTS
8'-0" 8'-0"
6"
2' -0
M
IN
5"
5"
NOTES:
1. USE A TOP STRING TO PREVENT A SEE-SAW EFFECT OF FENCE
ON UNEVEN TERRAIN.
2. INSTALL FENCE ALONG TOP OF UNDISTURBED BANK TO BLOCK
PEDESTRIAN ACCESS TO SHORELINE OUTSIDE OF DESIGNATED
STAIRCASES.
STANDARD WRC GIRTH 2 RAIL POST (7"-8" DIA.)
STANDARD WRC GIRTH RAIL (4"-5" DIA.)
GROUND
SUBGRADE
HOLE
COMPACT BACKFILL OR SET IN
CONCRETE IF SITE WARRANTS
CRUSHER FINES HABIT PATH LOCALIZED GRADING PROFILE
SCALE: 1" = 1'
10H:1V LOCALIZED GRADE
4" 6"
4H:1V PREVAILING GRADE
WIDTH VARIES TO TRANSFORM GRADES
STEEPER THAN 10H:1V INTO 10H:1V
WIDTH VARIES
1'
NOTES:
1. FOR HABIT PATHS WITH A PREVAILING SLOPE STEEPER
THAN 10H:1V, A LOCALIZED MAX SLOPE OF 10H:1V IS
REQUIRED TO STABILIZE WITH CRUSHER FINES.
COMPACTED SUBGRADE
CRUSHER FINES HABIT PATH
SUBGRADE
APPROXIMATELY 2' x 2' x 2' BOULDER STEP
CRUSHER FINES HABIT PATH TYPICAL SECTION
SCALE: 1" = 1'
2'
4" 6"
NOTES:
1. TREATMENT OF CRUSHER FINES HABIT PATHS VARY. SEE
SHEETS C-3 TO C-5.
2. CRUSHER FINES SHALL BE USED TO STABILIZE REVISED HABIT
PATHS AND STAIRCASE LANDINGS.
2% MAX
COMPACTED SUBGRADESUBGRADE
CRUSHER FINES
Know what's below.
before you dig.Call
R
PAGE
SHEET NUMBER:
REVISION
STAMP
R
ES
PE
C
S C
O
LO
R
AD
O B
LV
D
SU
IT
E
0S D
EN
VE
R , C
O
PH
O
N E
(3
) 7
-3
D
ES
IG
N
ED
D
R A
W N
C H
EC
K
ED
D
A
TE
BID SET
NOT FOR CONSTRUCTION
N
AM
E:
N
:\P R
O
JE
C
TS
\W
C C
BW
Q
A\ W
.2
- E
SS
TL
IM
PR
O
VE
M
EN
TS
\C
AD
\S
H
EE
TS
\2
-S -D
ET
AI
LS
.D
W G
PL
O
T D
AT
E:
S ep te m be r 3
0, :5
PM
, B Y:
W
IL
LI
AM
(M
IC
H
AE
L) T
H O
M
PS
O N E
AS
T
SH
AD
E
SH
EL
TE
R S
SH
O
R
EL
IN
E
ST
AB
IL
IZ
AT
IO
N
D
ET
AI
LS
(1 O
F 3)
D-1
JM
R
JM
R
JH
N
7/ 1/
C
EN
TE
N
N
IA
L, C
O
P.
O
. B O
X
C
C
BW
Q A
ElysaLoewen Cloud
File details come from the government source that posted it. Updated .