Std Spec 583-1B General Requirements for Liferaft Inspections.pdf

PDF 23 KB Posted

Attached to
FY17 DOCKSIDE REPAIRS TO NOAA SHIP NANCY FOSTER
Solicitation number
EA-133M-16-RP-0137
Issued by

About this file

REFERENCE DOCUMENT

View the file

Other files

File Type Posted
Rev._rfp_pages.pdf PDF
FY_17_Nancy_Foster_Dockside_Specification_Rev_1_22Nov.pdf PDF
Amendment_0003.pdf PDF
6500998_Tank_Arrangement.pdf PDF
Amendment_0002 _SF30.pdf PDF
Amendment_0001 _SF30.pdf PDF
EATON 9X55 - 20-40kVA UPS.pdf PDF
Drawing 101-6500836H Bridge and Fosc'le Quarters —
MOC-300-3_General_Requirements_for_Electrical-_Electronic_Items_(2_pages).pdf PDF
NF-256-6500974 - Diesel Exhaust System.pdf PDF
Drawing 211-MS —
NF-085-001 Booklet of General Plans NANCY FOSTER.pdf PDF
NF-573-001 Aft Crane Installation _ Details.pdf PDF
YTT-505-6501097 Standard Piping Details —
Peck _ Hale Interface Control Sheet PH285L-14 or M-14 Socket.pdf PDF
NF-505-6501097 Standard Piping Details.pdf PDF
EATON 9X55 - 8-40kVA - External Battery.pdf PDF
YTT-505-6501097 Standard Piping Details —
Drawing 109-MS —
NF-556-006 _Deck_Equipment_Hydraulic_Piping_System).pdf PDF
EATON Wiring Diagram Preliminary_9355 30kVA 450V_120V.pdf PDF
NF-529-002 —
NOAA Std Spec 631-2D Coating Systems for Steel Surfaces.pdf PDF
Standard Specification amc-000-1f General Requirements For Ship Repair —
NF-555-001 Fire Control Plan.pdf PDF
NF-512-003 HVAC System.pdf PDF
NF 512-003 HVAC Diagram.pdf PDF
NF-555-001-1I-SHT 1 Fire Plan.pdf PDF
Location Sketch No. 1 Additional Transverse Platform.pdf PDF
NF-555-6500976 AFFF System.pdf PDF
NF-555-6500975 Halon 1301 Fire Suppression System.pdf PDF
YTT-611-6500999 Deck Socket _ Tie Down Arrg't _ Dets.PDF PDF
Gauges Calibrations Listing - 2017.xlsx XLSX spreadsheet
NF-555-001-2I-SHT 2 Fire Plan.pdf PDF
Drawing Doors 1610 ProductLayout 20121101.pdf PDF
Rescue Boat Embarkation Platform Sketch.pdf PDF
RFP_ATTACHMENT_J.4.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
RFP.pdf PDF
RFP_ATTACHMENT_J.6.pdf PDF
RFP_ATTACHMENT_J.1.pdf PDF
RFP_ATTACHMENT_J.7.pdf PDF
RFP_ATTACHMENT_J.7_AS_WORD_DOC.doc DOC document
RFP_ATTACHMENT_J.5.pdf PDF
RFP_ATTACHMENT_J.2.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-583-1B

DECEMBER 1998

SUPERSEDING

AMC-583-1A

JULY 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-583-1B

GENERAL REQUIREMENTS FOR LIFERAFT INSPECTIONS

1. SCOPE. This specification contains the general requirements and procedures to be used for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

2. REFERENCE.

(a) Code of Federal Regulations Title 46, Part 160, section 151, "Inflatable Liferafts (SOLAS)"

(b) Code of Federal Regulations Title 46, Part 160, Section 062, "Releases. Lifesaving Equipment, Hydraulic, and Manual."

3. REQUIREMENTS.

3.1. General. The following requirements apply to all work.

3.1.1. Except as otherwise specified, the contractor shall

provide all labor, material, services, tools, supervision, and technical expertise needed to accomplish the work required by this specification.

3.1.2. All work shall be performed by an authorized service

facility of the liferaft manufacturer.

3.1.3. Provide and install parts and components during

servicing of the liferafts as required by this specification, the Detail Specification, and other procurement documents. Renewal of other parts and components determined to be needed, as a result of servicing the liferafts will be negotiated by the Contracting Officer as an additional cost to the purchase order or contract. Provide a list of renewal parts and components which have not reached their expiration date to the COTR for disposition.

3.1.4. The Contractor shall remove all the ocean liferafts and associated hydraulic releases from the ship to the contractors facility for inspection.

3.1.5. Service the liferaft in accordance with reference (a)

and this specification.

3.1.6. Stamp the metal inspection plate in accordance with

reference (a).

3.1.7. Reinstall all liferafts and hydraulic releases in their original locations.

3.2. Annual Inspection. Perform an annual U.S. Coast Guard

inspection on the required ocean liferafts in accordance with reference (a). Renew or provide the following items as part of the inspection:

3.2.1. All bands.

3.2.2. All clips.

3.2.3. All required instruction labels.

3.2.4. All certifications (including U.S. Coast Guard) for

inspected items.

3.2.5. Deleted.

3.2.6. All flashlight batteries.

3.2.7. All repair kit cement.

3.2.8. A report for each liferaft with a cost breakdown for

all renewed items and an inventory of all dated items with their expiration date.

3.3. Special Five-Year Inspection. In addition to the above

annual inspection, perform a five-year U.S. Coast Guard inspection on the required ocean liferafts in accordance with reference (a). In addition to all renewals identified in reference (a), provide a CO2 recharge of the inflation cylinder with certification of the cylinder’s weight prior to and after the two week stand period as part of the inspection.

3.4. Hydraulic Release Inspection. Perform an annual U.S. Coast Guard inspection on all hydraulic releases in accordance with reference (b).

4. NOTES.

4.1. The following information will be provided by the Detail Specification or other procurement document:

4.1.1. The quantity, capacity, and manufacturer of each

liferaft being serviced.

4.1.2. The location of each liferaft being services.

4.1.3. The type of servicing (annual inspection or special

five-year inspection) required for each of the liferafts being serviced.

4.1.4. The quantity and manufacturer of the hydraulic

releases being serviced.

END OF SPECIFICATION

Page 1
Page 2
Page 3

File details come from the government source that posted it. Updated .