MOC-300-3_General_Requirements_for_Electrical-_Electronic_Items_(2_pages).pdf

PDF 26 KB Posted

Attached to
FY17 DOCKSIDE REPAIRS TO NOAA SHIP NANCY FOSTER
Solicitation number
EA-133M-16-RP-0137
Issued by

About this file

REFERENCE DOCUMENT

View the file

Other files

File Type Posted
Rev._rfp_pages.pdf PDF
FY_17_Nancy_Foster_Dockside_Specification_Rev_1_22Nov.pdf PDF
Amendment_0003.pdf PDF
6500998_Tank_Arrangement.pdf PDF
Amendment_0002 _SF30.pdf PDF
Amendment_0001 _SF30.pdf PDF
EATON 9X55 - 20-40kVA UPS.pdf PDF
Drawing 101-6500836H Bridge and Fosc'le Quarters —
NF-256-6500974 - Diesel Exhaust System.pdf PDF
Drawing 211-MS —
NF-085-001 Booklet of General Plans NANCY FOSTER.pdf PDF
NF-573-001 Aft Crane Installation _ Details.pdf PDF
YTT-505-6501097 Standard Piping Details —
Peck _ Hale Interface Control Sheet PH285L-14 or M-14 Socket.pdf PDF
NF-505-6501097 Standard Piping Details.pdf PDF
EATON 9X55 - 8-40kVA - External Battery.pdf PDF
YTT-505-6501097 Standard Piping Details —
Drawing 109-MS —
NF-556-006 _Deck_Equipment_Hydraulic_Piping_System).pdf PDF
EATON Wiring Diagram Preliminary_9355 30kVA 450V_120V.pdf PDF
NF-529-002 —
NOAA Std Spec 631-2D Coating Systems for Steel Surfaces.pdf PDF
Std Spec 583-1B General Requirements for Liferaft Inspections.pdf PDF
Standard Specification amc-000-1f General Requirements For Ship Repair —
NF-555-001 Fire Control Plan.pdf PDF
NF-512-003 HVAC System.pdf PDF
NF 512-003 HVAC Diagram.pdf PDF
NF-555-001-1I-SHT 1 Fire Plan.pdf PDF
Location Sketch No. 1 Additional Transverse Platform.pdf PDF
NF-555-6500976 AFFF System.pdf PDF
NF-555-6500975 Halon 1301 Fire Suppression System.pdf PDF
YTT-611-6500999 Deck Socket _ Tie Down Arrg't _ Dets.PDF PDF
Gauges Calibrations Listing - 2017.xlsx XLSX spreadsheet
NF-555-001-2I-SHT 2 Fire Plan.pdf PDF
Drawing Doors 1610 ProductLayout 20121101.pdf PDF
Rescue Boat Embarkation Platform Sketch.pdf PDF
RFP_ATTACHMENT_J.4.pdf PDF
RFP_ATTACHMENT_J.3.pdf PDF
RFP.pdf PDF
RFP_ATTACHMENT_J.6.pdf PDF
RFP_ATTACHMENT_J.1.pdf PDF
RFP_ATTACHMENT_J.7.pdf PDF
RFP_ATTACHMENT_J.7_AS_WORD_DOC.doc DOC document
RFP_ATTACHMENT_J.5.pdf PDF
RFP_ATTACHMENT_J.2.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOC-300-3

September 2000

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

MARINE OPERATIONS CENTER

STANDARD SPECIFICATION MOC-300-3

GENERAL REQUIREMENTS FOR ELECTRICAL/ELECTRONIC ITEMS

1. SCOPE. This specification provides general requirements for work performed on electrical and electronic systems.

2. REFERENCES.

2.1 IEEE STD 45-1988, Recommended Practice for Electric

Installations on Shipboard (series)

2.2 U. S. Coast Guard 46 CFR 110 through 113, “Subchapter J - Electrical Engineering”

3. REQUIREMENTS.

3.1 The contractor shall accomplish all work in these

specifications in accordance with the requirements of References

2.1 and 2.2, and using the best marine and shipbuilding practices.

3.2 The quality of all materials provided by the contractor

shall be in accordance with References 2.1 and 2.2, suitable for marine service, and have the same shape, color, and finish as the existing or damaged materials when they were new.

3.3 All new cabling shall be low smoke and sized for the cable’s intended use.

3.4 All machinery, piping, cabling, ducts, insulation, paint

work, deck tile, or any other article removed, disturbed, or damaged in the process of accomplishing the work required by these specifications shall be replaced, renewed, or repaired.

All paneling removed shall be replaced, including any required alterations. Paneling damaged by the contractor shall be renewed equal to the original when new. All flanges and joints broken or loosened shall be properly remade using new gaskets of the proper size and material.

3.5 All electronic racks installed shall be securely fastened to overhead and deck structural or steel members to prevent movement.

3.6 Any disturbed painted or varnished surfaces shall be

cleaned, painted, and/or varnished with original type and color of paint or varnish.

MOC-300-3

September 2000

3.7 Any extension of electrical cabling shall be through a

junction box. Any removal of electrical cabling shall be to the nearest junction box.

3.8 All electrical junction boxes, receptacles, hangers, and

miscellaneous electrical fittings shall be in accordance with References 2.1 and 2.2.

3.9 All electrical cabling installed by the contractor shall be run behind paneling in existing cableways and shall be securely banded to the hangers. If existing cableways are not available, new cableways shall be established.

3.10 All electrical cabling installed by the contractor shall be identified at each end with embossed metal tags. Where cables are marked within a junction or terminal box, nonconductive labels shall be used. The contractor shall number cabling with a marking system similar to that used on the ship.

3.11 All manufacturer's or supplier's standard warranties on

equipment installed on the ship shall be assigned in writing by the contractor to the Government.

3.12 Three copies all manufacturer's technical manuals, prints, and drawings shall be delivered to the COTR. Spare parts and surplus installation materials shall be delivered to the COTR.

4. QUALITY ASSURANCE.

4.1 All items disturbed and all devices used, repaired, altered, furnished, or installed by the contractor shall be demonstrated to be fully operational upon completion of work.

END OF SPECIFICATION