Drydock_Worksheet.pdf
PDF 64 KB Posted
- Attached to
- Drydock Repairs to NOAA Ship OKEANOS EXPLORER
- Solicitation number
- EA133M-15-RP-0056
About this file
Worksheet
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dry Docking Worksheet
Ship name: Okeanos Explorer Hull No: R334
PART A (to be completed by NOAA) PART B (to be completed by ALL shipyards) Drydock Certification / Classification Info Docking position 1 Shipyard name Drydock No.
Drydock Type Graving Floating Marine Railway
Certified? Yes No
Certifying / Classifying Agency
Certificate No.
Date of expiration
Ship Characteristics Provide data in English Units:
Length, overall 224 ft - 0 in Drydock Characteristics Breadth, molded 43 ft - 0 in Length, overall ft-in
Draft, summer load line 15 ft - 1 in Breadth ft-in
Gross Tonnage (U. S.) T
Displacement, Loadline 2311.5 LT Maximum drydock lift capability
LT
Minimum Displacement/Draft
Displacement, Lightship 1591.2 LT
Draft - forward 13 ft - 0 in Maximum entry draft rating:
LT
Draft - aft 13 ft - 0 in
Max stern trim for graving dock ft - in Water depths around dock ft-in
Docking Position area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/
Draft - forward 14 ft - 0 in leaving the drydock.
Draft - aft 14 ft - 0 in
Depth Over Floor ft-in
Positioning Clearances Depth Over Blocks ft-in
Bottom: keel to drydock floor
6 ft - 0 in Depth Over Sill ft-in
Side: hull to drydock wall 8 ft - 0 in
Loading Pressures
Max block loading 10 LT per sq. ft.
Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.
Max Block Loading Capability
Blocking Requirements Block Capability LT/ft2 Construction Keel & Side Block
Information
Cap material Sft Construction Cap thickness (min) 2 in Cap Material Side blocks (e.g., shaped, wedged, etc.)
Cap Thickness in
Block Age yrs Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in
Blue Gum, American Rock Elm or Preserved Red Oak. Width ft-in Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock
Length ft-in
Minimum Required Services Minimum Available Services
Electrical power Electrical power AC volts 450 VAC AC volts VAC number of phases 3 number of phases amperage (total) 800 amps amperage (total) amps frequency 60 Hz frequency Hz number of lines 2 number of lines
Ground connections Ground connections number 1 number cable size, each 500M cir mils cable size, each cir mils
Sewage connections Sewage connections number 2 number pipe size 2 inch ips pipe size inch ips capacity 6000 gals per day capacity gal/day
Fire Main Fire Main number of connections 1 number of connections connection size 2.5 inch ips connection size inch ips pressure 100 psig pressure psig capacity 500 gals per min capacity gpm
Aux Seawater Aux Seawater pressure 80 psig pressure psig capacity 300 gals per min capacity gpm
Fresh Water Fresh Water pressure 50 psig pressure psig capacity 12 LT per day capacity gpm
Compressed Air Compressed Air pressure 125 psig pressure psig capacity 25 cu ft per min capacity cfm
Shore Steam Shore Steam pressure n/a psig pressure psig capacity lbs per hour capacity lb/hr
High Pressure Water Wash pressure
NTE
10,000 psig High Pressure Water Wash pressure psig
Safety Response Plans Required
Safety Response Plans Available (circle correct answer)
Firefighting Yes X No Firefighting Yes No Flooding (accidental) Yes No Flooding (accidental) Yes No Earthquake Yes No Earthquake Yes No Typhoon Yes No Typhoon Yes No
PART D (to be completed by ALL Shipyards)
1. The Offeror shall provide a list of the vessels (and their principal characteristics) drydocked in this drydock over the past 2 years. (Attach a separate page)
2. The Offeror shall describe the nature and cause of accidents experienced by the shipyard in drydocking operations over the past 5 years. The Offeror shall describe corrective action taken or practices implemented to prevent recurrence of accident. (Attach a separate page)
I hereby certify that the above information is true and accurate.
Name and Title of Shipyard Official
Signature of Shipyard Official
Date
PART C (to be completed by Shipyard if drydock is not certified by IACS or under MIL STD 1625C)
Dockmaster info Contractor name Dockmaster name Certifying Agency Certificate No.
Years experience
Drydock Insurance Info
Is Drydock insured? Yes No Insurer Policy No.
Amount Insured Date of expiration
Blocking Requirements
File details come from the government source that posted it. Updated .