Results of Bid - Schedules A&B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| VETS-4212_-_Form.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA_CE.pdf | ||
| IFB_Solicitation_-_NP-NERI_BMS(1).pdf | ||
| Report__Bridge_Inspection_4780-001P.pdf | ||
| Report__Bridge_Inspection_4780-015P.pdf | ||
| Report__Bridge_Inspection_4780-003P.pdf | ||
| Plans_-_NP_NERI_BMS_(1).pdf | ||
| Report__Bridge_Inspection_4780-002P.pdf | ||
| Synopsis_-_NP_NERI_BMS(1).doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
New River Gorge National River
PROJECT: NP-NERI BMS(1)
SOLICITATION NO. DTFH71-17-B-00010
December 20, 2016 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00010 Project: NP-NERI BMS(1) December 20, 2016, 2:00 p.m. local time
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Aspen Construction SCHEDULE A
$603,223.00
OPTION 1
$132,616.00
SCHEDULE A
SCHEDULE A + OPTION 1
$735,839.00
Bluegrass Contracting Corp. SCHEDULE A
$676,240.50
OPTION 1
$149,382.60
$825,623.10
Massillon Construction and Supply, LLC
SCHEDULE A
$658,385.00
OPTION 1
$168,251.20
$826,636.20
Khotol Services Corp. SCHEDULE A
$268,416.11
OPTION 1
$34,916.70
$303,332.81
Pavkov Contracting SCHEDULE A
$563,424.00
OPTION 1
$197,675.00
OPTION 1
$761,099.00
Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time will be 130 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00010 Project: NP-NERI BMS(1) May 6, 2014, 2:00 p.m. local time
Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time will be 130 calendar days.
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Engineer’s Estimate
$485,000.00
OPTION 1
$58,000.00
$543,000.00
| Slide Number 1 |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. DTFH71-17-B-00010 Project: NP-NERI BMS(1)�December 20, 2016, 2:00 p.m. local time � |
| FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION� BID OPENING for SOLICITATION NO. DTFH71-17-B-00010 Project: NP-NERI BMS(1)�May 6, 2014, 2:00 p.m. local time �Maximum Time Allowed for the Contract if Schedules A and B are Awarded at the Same Time will be 130 calendar days.� |