Report__Bridge_Inspection_4780-001P.pdf

PDF 3 MB Posted

Attached to
New River Gorge National River Federal contract opportunity
Solicitation number
DTFH71-17-B-00010
Issued by
Department of Transportation Federal Highway Administration

About this file

Report_ Bridge Inspection_4780-001P

View the file

Other files for this federal contract opportunity

Other files attached to New River Gorge National River, newest first.
File Type Posted
Results_of_Bid_Opening_Schedule_A&B_-_NP-NERI_BMS(1).pdf PDF
Report_NEPA_CE.pdf PDF
Report__Bridge_Inspection_4780-002P.pdf PDF
ADV_Bidder's_Qualifications_Form.doc DOC document
VETS-4212_-_Form.pdf PDF
IFB_Solicitation_-_NP-NERI_BMS(1).pdf PDF
Report__Bridge_Inspection_4780-015P.pdf PDF
Plans_-_NP_NERI_BMS_(1).pdf PDF
FP14_Eng.pdf PDF
Report__Bridge_Inspection_4780-003P.pdf PDF
Synopsis_-_NP_NERI_BMS(1).doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

CAMP BROOKSIDE ACCESS BRIDGE

CAMP BROOKSIDE ACCESS ROAD OVER NEW RIVER SLOUGH

NEW RIVER GORGE NATIONAL RIVER

LW

STRUCTURE NO. 4780-001P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 11/17/15

Report prepared by: SU

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 4780-001P

CAMP BROOKSIDE ACCESS BRIDGE INSPECTION DATE: 11/17/15

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

MAIN SPAN TYPE:

# OF BEAMS, MAIN SPAN: ..

DECK TYPE:

WEARING SURFACE:

ABUT. FOUNDATIONS:

PIER FOUNDATION(S):

ABUTMENT / PIER MAT'L: ...

PROJ./PLAN REF. NO:

NPS ROAD CLASS:

STRUCTURE HISTORY:

WOOD or TIMBER

STRINGER/MULTI-BEAM or GIRDER

WOOD OR TIMBER

NOT APPLICABLE

SPREAD FTG ON BEARING MAT'L

SPREAD FTG ON BEARING MAT'L

MASONRY

000000000 / NONE

3 - SPECIAL PURPOSE

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

72.0 FT (21.9 M)

19.0 FT (5.8 M)

12.0 FT (3.7 M)

11.0 FT (3.4 M)

N/A

0 °

NO

LOCATION

NEW RIVER GORGE NATIONAL RIVER MILE POINT: ..................... 0.00 (KM PT 0.00)

STATE: ................................. WEST VIRGINIA LOCATION: 6.3 MILES SOUTH OF I-64 ON WV ROUTE 20, THEN 0.4 MILES WEST ON DIRT ROAD. FACILITY CARRIED: ............ CAMP BROOKSIDE ACCESS ROAD

(RIGHT ON N. MULENS RD, FOLLOW PARALLEL TO

FEATURE INTERSECTED: .. NEW RIVER SLOUGH RAIL TRACKS ON LEFT)

STRUCTURE EVALUATION SUMMARY

This timber beam structure is in good condition overall, but has some problems that need attention. These include deterioration of the substructure masonry mortar joints; undersized wingwalls at the west abutment; erosion of the embankment at both approaches; broken timber planks at the west approach ramp; erosion of the east channel bank;

moderate soil accumulation between the deck planks and at the bearing seats; a missing anchor plate and nut on one rail post; and broken reflectors on the ends of bridge railings.

Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. It should be noted that the bridge may be scheduled for repairs in the near future under Project NP NERI BMS(1).

It should also be noted that the structure is too narrow to accommodate 2-way traffic, and that the east approach is located on a sharp turn. However, these geometric problems are not considered serious in view of the low speed and volume of traffic.

INSPECTION TEAM: C. CASTRO, R. SILVESTRY

CONDITION ASSESSMENT:

CARLOS CASTRO, P.E., FIELD TEAM LEADER 571-434-1546

REPORT REVIEW:

MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/14/16

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 4780-001P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

61.3 PLACE ENGINEERED RIPRAP AT ERODED AREAS ALONG EAST BANK AS

NECESSARY.

15 CY

58.1, 59.2, 61.4

REMOVE SOIL, VEGETATION GROWTH AND DEBRIS FROM STRUCTURE. 1 LS

222.4 REPLACE BROKEN TIMBER PLANKS AT WEST APPROACH RAMP. 1 LS

58.6, 59.1,7 CLEAN AND COAT STEEL NON-GALVANIZED CONNECTION HARDWARE WITH

PROTECTIVE SEALANT AS NECESSARY AND TIGHTEN HARDWARE AS NEEDED.

REPLACE MISSING ANCHOR PLATES AND NUTS.

100 SF

222.7 REPLACE BROKEN REFLECTORS AT BOTH ENDS OF BRIDGE RAILING. 3 EA

PRELIM. MAINTENANCE TOTAL : $22,500

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

60.1,6,13 REPOINT MASONRY MORTAR JOINTS AS NECESSARY. 1 LS $0

60.6, 222.5 EXTEND WINGWALLS AT WEST ABUTMENT. 1 LS $0

61.2 REPAIR EROSION AT APPROACH EMBANKMENTS. 1 LS $0

60, 222 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN AND CONSTRUCTION ENGINEERING (APPROXIMATELY70%

TOTAL REHAB COST), PLUS PARK LOCATION FACTOR.

1 LS $0

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $0

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ..

TOTAL ITEMIZED COSTS:

$0

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that the recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 4780-001P

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

N

58. DECK

ITEM REFERENCE AND REMARKS

OTHER

ALIGNMENT

DEFLECTION AND/OR VIBRATION

FASCIA(E)

DIAPHRAGMS AND BRACING

TRUSSES

FLOOR BEAMS AND STRINGERS

ARCH(ES) OR SLAB(S)

GIRDERS OR BEAMS

BEARING DEVICES

59. SUPERSTRUCTURE

OTHER

DEFLECTION AND/OR VIBRATION

UTILITIES

DRAINS AND DRAINAGE

PARAPETS AND/OR RAILINGS

CURBS, SIDEWALKS, AND MEDIAN

RIDEABILITY

WEARING SURFACE

EXPANSION JOINTS

DECK SLAB

ABUTMENTS

60. SUBSTRUCTURE

1.

10.

2.

3.

4.

5.

6.

7.

8.

9.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

PAINT

11.

F F N N N N N N G

N G

G G G G G N

N

N

G

G

58.1 MINOR CHECKING OF 3" X 6" ROUGH CUT S.Y.P. DECK PLANKS.

HEAVY ACCUMULATION OF DEBRIS ON DECK SURFACE, AND AT

EAST END. SEVERAL AREAS OF LIGHT MOLD ON UNDERSIDE OF

DECK.

58.1,3 MINOR CHECKING OF 2" X 8" ROUGH CUT S.Y.P. RUNNER PLANKS.

MODERATE SOIL AND GRAVEL ACCUMULATION BETWEEN DECK

AND RUNNER PLANKS.

58.6 MINOR TO MODERATE RUSTING OF RAILING CONNECTION

HARDWARE WITH SEVERAL BOLT HEADS TURNED OVER OR

MISALIGNED.

MISSING UPPER ANCHOR PLATE AND NUT ON RAIL POST #3 FROM

EAST END OF NORTH RAILING. MISSING ANCHOR PLATES AT

OTHER LOCATIONS.

59.1 MINOR RUSTING OF STEEL PLATE BEARINGS. BEARING PLATES

ARE MISSING IN SEVERAL LOCATIONS. SOME BEARING PLATES

HAVE INSUFFICIENT BEARING AREA AT ENDS OF PIERS. MINOR

SHIFTING OF BEARING SHIMS FOR SOUTH EXTERIOR BEAM AT

EAST PIER.

59.2 MINOR TO MODERATE CHECKING OF 10" X 12" TIMBER BEAMS.

MINOR SPLINTERING IN SOME AREAS. FULL CHECKING OF

EXTERIOR BEAMS; MINOR DECAY ALONG SOUTH BEAM IN WEST

SPAN ALONG CHECKING. EXTERIOR BEAMS ARE STAINED FOR

AESTHETIC TREATMENT.

SOIL ACCUMULATION ON TOPS OF BEAMS, PACKED BETWEEN

DECK PLANKS; MINOR VEGETATION GROWTH FROM SOIL.

60.1,5,13,16 ABUTMENTS AND PIERS APPEAR TO BE FOUNDED ON SOLID ROCK.

CONCRETE BLOCK PILASTERS AT EAST ABUTMENT SUPPORT

TIMBER CAP BEAM.

MINOR MORTAR JOINT DETERIORATION AND CRACKING OF

STONES FROM IMPACT DAMAGE ON EAST AND CENTER PIERS.

MINOR SHRINKAGE AND CRACKING OF PIER MASONRY MORTAR

JOINTS PARTICULARLY AT TOP OF PIERS.

BREASTWALLS OR COLUMNS1. G

PILE BENTS2. N

CAPS AND/OR BEARING SEATS3. G

BACKWALLS AND/OR BULKHEADS4. G

FOUNDATIONS5. G

WINGWALLS6. F

WEEP HOLES7. N

EXPANSION JOINTS8. N

EROSION AND/OR SCOUR9. G

SETTLEMENT OR DEFLECTION10. G

SLOPE PROTECTION11. N

OTHER 12. N

PIER(S)

G13. WALLS AND/OR COLUMNS

N14. PILE BENTS

G15. CAPS AND/OR BEARING SEATS

G16. FOUNDATIONS

G17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 4780-001P

ITEM REFERENCE AND REMARKS

STREAM BED COMPOSITION : 9.

AVERAGE CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION3.

EROSION AND/OR SCOUR2.

ALIGNMENT1.

61. CHANNEL 7

G G N G N

MED

SUFF

5 FT.

ROCK, STONES, GRAVEL

222. APPROACHES 5

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT 6.

EROSION5.

SURFACING4.

APPROACH GUARDRAIL 3.

2. RELIEF JOINTS

APPROACH SLABS1. N

N N F F G F P N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR4.

FOUNDATION3.

WEEP HOLES2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 0

N N N

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required.

60.6,9 WEST ABUTMENT WINGWALLS ARE TOO SHORT TO FULLY

CONTAIN APPROACH ROADWAY FILL. AREA OF UNDERMINING

(24"H X 36" W X 22" D) OF LOOSELY STACKED STONE EMBANKMENT

PROTECTION AT NORTHEAST WINGWALL END. MINOR SPALLING

AND SCALING OF TOP REAR CORNER OF NORTHEAST WINGWALL.

MINOR CRACKING OF WINGWALLS, LIKELY DUE TO SLIGHT

SETTLEMENT.

61 MINOR TO MODERATE DEBRIS IN CHANNEL UPSTREAM END OF

PIERS.

222.4,5 WEST APPROACH:

SEVERE EROSION AND LOSS OF SURFACING AT BOTH SIDES OF

WEST APPROACH DUE TO INSUFFICIENT LENGTH OF WINGWALLS

(SEE 60.6); TIMBER RAMP INSTALLED AT WEST APPROACH TO SPAN

AREA OF LOST EMBANKMENT; RAMP IS MOSTLY COVERED WITH

STABILIZED SOIL. CRACKED TIMBER RAMP PLANKS AT NORTH AND

SOUTH SIDES.

EAST APPROACH:

LOOSE DECK PLANKS AT NORTH SIDE. SOME BOLTS TOTALLY

LOOSE.

MODERATE EROSION WITH UNDERMINING OF DRY STACKED

RETAINING WALL BEHIND BOTH WINGWALLS. MINOR EROSION AT

SOUTH SIDE APPROACH EMBANKMENT.

222.7 BLUE REFLECTORS ARE BROKEN ON BOTH ENDS OF BRIDGE

RAILINGS.

222.8 EAST APPROACH IS ON SHARP CURVE.

36.A BRIDGE RAILING IS OF INSUFFICIENT STRENGTH AND STIFFNESS

TO SAFELY REDIRECT AN ERRANT VEHICLE.

36.C NO APPROACH GUARDRAIL PRESENT

STRUCTURE LOAD RATING STRUCTURE NO. 4780-001P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 20 18 30 27

HS 38 34 54 49

TYPE 3 29 26 40 36

TYPE 3S2 47 42 64 58

TYPE 3-3 57 51 77 69

DESIGN LOADING: UNKNOWN

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

X ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 11/97

LOAD RATING CONTROLLED BY: MOMENT CAPACITY OF BEAMS

REMARKS:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4780-001P

STRUCTURE IDENTIFICATION

(201) PARK: NEW RIVER GORGE NATIONAL RIVER

(202) STRUCTURE NAME: .......... CAMP BROOKSIDE ACCESS BRIDGE

(203) STRUCTURE KIND: ............ 1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 4780-001P

(205) NPS REGION: .................... 3 - NORTHEAST

(206) ROUTE CODE NUMBER: ... 0

(207) ROAD SECTION NO: .......... 001P

(208) NPS ROAD CLASS: ............ 3 - SPECIAL PURPOSE

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. PARK

(211) PROJECT NO(S):

(212) DRAWING NUMBERS: ....... NONE

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

543 - WEST VIRGINIA (WV)

019 - FAYETTE

161000000

NEW RIVER SLOUGH

CAMP BROOKSIDE ACCESS

4780001P0000000

6.3 MILES SOUTH OF I-64 O

99.99 FT (99.99 M)

0.00 (KM PT 0.00)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

7 - WOOD or TIMBER

02 - STRINGER/MULTI-BEAM or GIRDER

19.0 FT (5.8 M)

72.0 FT (21.9 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

8 - WOOD OR TIMBER

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. N - NOT APPLICABLE

C) TYPE PROTECTION: .............. N - NOT APPLICABLE

(218) IS SALT USED?: ..................... NO

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 38.0 TONS (34.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 54.0 TONS (49.0 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 11/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 4780-001P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°43'21.00" (51) CURB TO CURB WIDTH: ........... 11.0 FT (3.4 M)

(17) LONGITUDE: ......................... 80°53'23.10" (52) DECK WIDTH: ............................ 12.0 FT (3.7 M)

(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 12.0 FT (3.7 M)

(28A) LANES ON STRUCT: .......... 01 (213) APPR. PAVEMENT WIDTH: ..... 12.0 FT (3.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 0.0 FT (0.0 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 0.0 FT (0.0 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 50 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 150 (47) TOTAL HORIZ. CLEARANCE: .... 11.0 FT (3.4 M)

(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... 1 - NAV PROTECTION NOT REQUIRED MATERIAL: .............................. 7 - TIMBER

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.00 FT (0.61 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

8 - Stable; scour above top of fo

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

APPENDIX STRUCTURE NO. 4780-001P

PHOTOGRAPHS STRUCTURE NO. 4780-001P

PHOTO #1 - LOOKING EAST TOWARD ROUTE 20

FLOW

PHOTO #2 - NORTH (DOWNSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING EAST; NOTE DEBRIS

ACCUMULATION ALONG TIMBER RUNNERS AND ALONG CURBS

PHOTO #4 - TYPICAL CHECKING AND WEAR OF TIMBER RUNNERS AND

DECK PLANKS, SOUTHEAST CORNER SHOWN; NOTE TYPICAL DEBRIS

ACCUMULATION ON BEAMS BETWEEN DECK PLANKS

PHOTO #5 - TYPICAL DAMAGE TO DECK LAG BOLTS, SPAN #4 ON TOP

OF PIER #2 SHOWN

PHOTO #6 - MISSING UPPER ANCHOR PLATES ON RAIL POSTS NORTH

RAILING; NOTE ALSO MISSING NUT ON RAIL POST #3 FROM EAST END

PHOTO #7 - UNDERMINING OF EAST APPROACH NEAR SOUTHEAST

WINGWALL; NOTE LOOSE STONES AND ANCHOR BOLTS

PHOTO #8 - BROKEN TIMBER RAMP AT NORTH SIDE OF WEST

APPROACH; CONDITION IS SIMILAR AT SOUTH SIDE

PHOTO #9 - GENERAL UNDERSIDE VIEW, WEST SPAN (SPAN #4)

LOOKING WEST SHOWN

PHOTO #10 - TYPICAL CHECKING OF EXTERIOR TIMBER BEAMS,

SOUTH BEAM IN WEST SPAN SHOWN; NOTE MINOR DECAY

PHOTO #11 - FULL LENGTH CHECKING OF

SOUTH EXTERIOR BEAM ON WEST SPAN;

CONDITION IS SIMILAR AT NORTH EXTERIOR

BEAM

PHOTO #12 - GENERAL VIEW OF WEST

ABUTMENT

PHOTO #13 - DEBRIS ACCUMULATION BETWEEN TIMBER BEAMS ON

BEARING SEAT AT WEST ABUTMENT

PHOTO #14 - GENERAL VIEW OF EAST ABUTMENT

PHOTO #15 - DEBRIS ACCUMULATION AT UPSTREAM END OF PIERS,

PIERS #1 AND #2 SHOWN

PHOTO #16 - OVERHANGING OF BEARING SHIMS, NORTH EXTERIOR

BEAM IN SPAN #3 AT PIER #2 SHOWN

PHOTO #17 - UNDERMINING OF LOOSE STACK WALL RETAINING WALL

ON NORTH WEST WINGWALL

PHOTO #18 - CRACKING (LIKELY DUE TO SETTLEMENT) OF

SOUTHEAST WINGWALL

PHOTO #19 - LOOKING UPSTREAM FROM STRUCTURE

PHOTO #20 - LOOKING DOWNSTREAM FROM STRUCTURE

File details come from the government source that posted it. Updated .