Soils and Foundation Report.pdf
PDF 17 MB Posted
- Attached to
- Blue Ridge Parkway 2P14 Federal contract opportunity
- Solicitation number
- DTFH71-08-R-00014
About this file
Soils and Foundation Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 002.pdf | ||
| SF 30 Amend 001.pdf | ||
| Example__SB subcontract plan RFP-Negotiation.pdf | ||
| FP96.pdf | ||
| ADV_Offeror's Qualifications Form.pdf | ||
| Hydraulics Data Summary.pdf | ||
| Plans.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Imagine the result
Federal Highway Administration
Eastern Federal Lands Highway
Division
Soils and Foundation Report –
Addendum 2
Pavement Analysis
Investigation
Rehabilitation of Park Roads for
Blue Ridge Parkway
Yancey and Buncombe Counties, NC
PRA-BLR1 2P14
Contract No. DTFH71-02-D-00004
Task Order 0003
Soils and Foundation Report – Addendum 2
Pavement Analysis Investigation
Rehabilitation of Park Roads for Blue Ridge Parkway Yancy and Buncombe Counties, North Carolina
Prepared for:
Federal Highway Administration
Eastern Federal Lands Highway Division
Prepared by:
ARCADIS
1210 Premier Drive
Suite 200
Chattanooga
Tennessee 37421
Tel 423.756.7193
Fax 423.756.7197
Our Ref.:
CT052885.0014
Date:
June 2008
This document is intended only for the use of the individual or entity for which it was prepared and may contain information that is privileged, confidential and exempt from disclosure under applicable law. Any dissemination, distribution or copying of this document is strictly prohibited.
g:\wp\ct052885\rpt\soils-foundationreport-addendum2\blueridgeparkwayrehabilitation-addendum2.doc i
Table of Contents
Background 1
FDR Pavement Sections 2
Mainline Parkway 3
Parking Areas 3 g:\wp\ct052885\rpt\soils-foundationreport-addendum2\blueridgeparkwayrehabilitation-addendum2.doc 1
Soils and Foundation
Report – Addendum 2
Blue Ridge Parkway Rehabilitation
Background
The Blue Ridge Parkway is a 469-mile scenic corridor that connects Shenandoah
Valley in Virginia to the Great Smoky Mountains National Park in North Carolina.
Adjacent to the parkway, which ranges in elevation from 649 feet to 6,047 feet, are recreational areas that include picnic facilities, hiking trails, visitor centers, overlooks, and campgrounds. The Blue Ridge Parkway, conceived as a Depression-relief project in the 1930s, took more than 50 years to construct.
The pavement along Blue Ridge Parkway and adjacent access roads and pull-offs is in various stages of deterioration and in need of rehabilitation. Area features such as asphalt paths, granite curbs, rubble and masonry walls and steps are also in need of repair. Under initial Task Order No. 0003, ARCADIS was authorized to investigate
Section 2P14 of the Blue Ridge Parkway and develop plans and specifications to rehabilitate this section of the parkway. Section 2P14 consists of the rehabilitation of the parkway pavement between Milepost 359.8 at the Balsam Gap Overlook and
Milepost 375.3. Also included is the reconstruction, replacement, or rehabilitation of ditches, pipes, walls, sidewalks, and curbs. A soils and foundation report has been previously submitted documenting results of subsurface and pavement investigations along Section 2P14.
Modification Nos. 0006 and 0007 to the Task Order were later issued to cover the investigation and evaluation of alternative pavement rehabilitation techniques. Full
Depth Reclamation (FDR) was determined to be the best alternative to rehabilitate the above referenced roadway. This rehabilitation process would reduce and/or eliminate the amount of excess asphalt material that would be required to be “hauled off site” and disposed. The FDR process would also minimize the net change in pavement surface elevations that are very critical along this roadway.
Full Depth Reclamation
Full Depth Reclamation (FDR) is a rehabilitation technique that uniformly pulverizes and blends the existing asphalt pavement layer, base, subbase and/or subgrade soils to produce a homogeneous base material. The FDR process generally treats and improves 6 in. to 12 in. of the existing pavement structure. The FDR process is performed without heat (similar to cold mix recycling).
The FDR process generally consists of pulverizing the existing pavement materials, adding additional aggregates (if necessary), adding stabilizing additive, mixing, g:\wp\ct052885\rpt\soils-foundationreport-addendum2\blueridgeparkwayrehabilitation-addendum2.doc 2 shaping, compaction, final shaping and placing an asphalt wearing surface. The stabilizing agents generally consist of either Portland cement, lime, fly ash or asphalt emulsion which are used to enhance the mechanical properties and structural strength of the reclaimed base materials. The FDR construction process generally utilizes common roadway construction equipment (i.e., reclaimer or pulverizer, stabilizing additive unit, motor grader and rollers).
Full depth reclamation is an innovative and cost-effective method of rehabilitating and/or reconstructing highly distressed or failed asphalt pavements. This rehabilitation process is best suited for pavements that have reached conditions that are no longer economical to maintain with common maintenance procedures.
Some of the advantages of the FDR process are listed below:
Reuses existing pavement materials
Eliminates asphalt layer distresses (i.e., cracking, rutting, potholes)
Corrects base failures
Reshapes surface profile
Improves surface drainage
Increases structural capacity
Reduces traffic disruptions during construction
FDR Pavement Sections
The FDR rehabilitation process is recommended as an alternative to reconstructing the highly distressed or failed areas along the referenced section of the Blue Ridge
Parkway near Asheville, North Carolina.
Based on the pavement design analysis presented in the Soils and Foundation Report prepared by ARCADIS dated September 2006, the following alternative structural pavement sections developed by Burns Cooley Dennis, Inc., for the Mainline Parkway and the parking areas are provided:
g:\wp\ct052885\rpt\soils-foundationreport-addendum2\blueridgeparkwayrehabilitation-addendum2.doc 3
Mainline Parkway
The station ranges for the Mainline Parkway are as follows:
366/24+10 to 368/20+00
370/2+00 to 374/20+37
374/30+01 to 375 04+56
These areas will receive the following applications:
• 3 inches of asphalt surface course (two 1.5-inch layers)
• 10 inches of FDR Portland cement-treated base (minimum 300 psi, 7-day compressive strength, minimum of 4% Portland cement by total dry mix)
• Design Structural Number (SN): 2.8
Parking Areas
The parking areas include the following:
Craggy Dome
Craggy Garden Visitor Center
Craggy Garden Picnic Area
These areas will receive the following applications:
• 3 inches of asphalt surface course (two 1.5-inch layers)
• 6 inches of FDR Portland cement-treated base (minimum 300 psi, 7-day unconfined compressive strength, minimum of 4% Portland cement by total dry mix)
• Design Structural Number (SN): 2.2
Determine 7-day unconfined compressive strength per ASTM D 1633, Method A.
g:\wp\ct052885\rpt\soils-foundationreport-addendum2\blueridgeparkwayrehabilitation-addendum2.doc 4
The above pavement structures meet or exceed the structural capacity of the reconstructed asphalt pavement sections presented in the original Soils and
Foundation Report for this project.