SF 30 Amend 001.pdf
PDF 958 KB Posted
- Attached to
- Blue Ridge Parkway 2P14 Federal contract opportunity
- Solicitation number
- DTFH71-08-R-00014
About this file
Amendment 001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 002.pdf | ||
| Example__SB subcontract plan RFP-Negotiation.pdf | ||
| FP96.pdf | ||
| ADV_Offeror's Qualifications Form.pdf | ||
| Solicitation.pdf | ||
| Soils and Foundation Report.pdf | ||
| Hydraulics Data Summary.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable debbie debbie pschaad Line
AMENDMENT 001
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment 001 Blue Ridge Parkway
Project PRA-BLRI 2P14
DTFH71-08-R-00014
The purpose of this Amendment is to:
1) Revise the Bid Schedule B-pages of the Solicitation Provisions, to revise pay item description and unit.
2) Revise the Special Contract Requirements (J pages) as follows:
a) Section 109 to clarify asphalt and fuel price adjustment provision.
3) Revise the Plans to replace tabulation of quantity sheet.
Solicitation Provision changes
1. Delete Solicitation Provisions; Bid Schedule page B-23 and substitute revised Bid Schedule page B-23.
Special Contract Requirement changes
1. Delete Subsection 109.06 of the Special Contract Requirements, pages J-12 through J-17, and substitute the following:
109.06 Pricing of Adjustments. Add the following:
ASPHALT CEMENT PRICE ADJUSTMENT PROVISION
GENERAL The Asphalt Cement Price Adjustment Provision contained herein provides for a price adjustment in the form of payment to the Contractor or a rebate to the Government for fluctuations in the cost of asphalt cement consumed in the performance of applicable construction work. The price adjustment provisions are applicable only to the asphalt cement, as defined in Section 702.01, and incorporated in the following eligible contract pay items:
• 41801 Superpave pavement
• 41802 Superpave pavement, wedge and leveling course
The price adjustment provisions are also applicable to these eligible pay items when the Government adds extra work to the Contract.
Typewritten Text
The provision will remain in effect throughout the duration of the contract. Enactment of the Asphalt Cement Price Adjustment Provision will only be considered when the increase or decrease in the price of asphalt cement as defined herein exceeds 10 percent.
The Asphalt Cement Price Adjustment Provision is intended to reduce but not eliminate the cost effects of price uncertainty to the Contractor and the Government for asphalt cement used in the construction of this contract. It provides for sharing by the Government in a portion of the Contractor’s risk, which could result from unusual price fluctuations. The provision is not intended to compensate the Contractor for normal day-to-day fluctuations and seasonal changes or to serve as a guarantee of full compensation for asphalt cement price fluctuations.
PRICE INDEXES The Government will generate a monthly performance price index for asphalt cement using price data obtained from Poten and Partners, Inc. (PPI), which publishes a weekly report (Asphalt Weekly Monitor) on high and low selling prices for states in five regions throughout the United States including the East Coast/Northeast, the Mid-Continent/Midwest, the Gulf Coast/Mid South, the Rocky Mountains and the West Coast/Northwest. Weekly high and low selling price data reported for North Carolina in the East Coast/Northeast Region will be averaged and used to establish a base price index, BPI, for this project and a monthly performance price index, MPPI, for the duration of the contract. These indexes are defined as follows:
• BASE PRICE INDEX The base price index, BPI, is the price index determined by arithmetic average, as specified above, shown in the four weekly publications immediately preceding the bid opening. The BPI will be provided by the Government after contract award. It is as follows:
BASE PRICE INDEX (BPI) FOR ASPHALT CEMENT
PER SHORT TON (TON) = $
• MONTHLY PERFORMANCE PRICE INDEX The monthly performance price index, MPPI, is the monthly price index at the time of performance of applicable work as determined by arithmetic average, as specified above, shown in the four weekly publications issued prior to the last Wednesday of the month (i.e. the monthly performance price index during which asphalt cement is used in the performance of applicable construction work).
PRICE ADJUSTMENTS Price adjustments are calculated by the Government for average conditions and are not intended to reflect the Contractor’s actual purchase price. The ratio of the monthly performance price index and the base price index (MPPI/BPI) is calculated and used to determine price adjustments as follows:
• No Price Adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for any asphalt cement used in construction work performed during the relevant month.
• Government Rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the Government is due a rebate determined in accordance with the following formula:
Government Rebate = [0.90 – (MPPI/BPI)] (BPI) (Q)
• Contractor Payment - When the ratio MPPI/BPI is calculated to be greater than 1.10, the Contractor is due additional payment determined in accordance with the following formula:
Contractor Payment = [(MPPI/BPI) – 1.10] (BPI) (Q)
The following definitions are applicable to both the Government Rebate and the Contractor Payment formulas:
MPPI = Monthly Performance Price Index for the month during which asphalt cement is used in the performance of applicable construction work.
BPI = Base Price Index that is established immediately preceding the bid opening.
Q = Quantity in metric tons of asphalt cement for eligible pay items that were used on the project during the progress payment period. The quantity will be calculated using the asphalt content of the approved mix design and the following formula:
Q = Asphalt Concrete Pavement metric tons placed x (% Asphalt/100)
PRICE ADJUSTMENT COMPENSATION Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for eligible pay items. The Contractor may request in writing a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceeds $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.
No price adjustments will be made for work performed beyond the Government-approved Contract completion date.
The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government is limited to a (MPPI/BPI) ratio of 1.6 and 0.4, respectively.
109.06 Pricing of Adjustments Add the following:
FUEL PRICE ADJUSTMENT PROVISION
GENERAL The Fuel Price Adjustment Provision provides for a price adjustment in the form of payment to the Contractor or a rebate to the Government for fluctuations in the cost of diesel fuel consumed in the performance of applicable construction work. The price adjustment provisions are applicable only to those contract items listed as eligible pay items in Table 1 below, if gasoline and/or diesel are used as the primary fuel in the production of the affected items. The pschaad price adjustment provisions are also applicable to these eligible pay items when the Government adds extra work to the Contract.
The provision will remain in effect throughout the duration of the contract. Enactment of the Fuel Price Adjustment Provision will only be considered when the increase or decrease in the price of motor fuel as defined herein exceeds 10 percent.
PRICE INDEXES The Government will generate a monthly performance price index for Ultra Low Sulfur, No. 2 Diesel Fuel using price data obtained from the Oil Price Information Service (OPIS), which publishes a weekly report on gasoline and distillate reseller prices for major cities in five regions throughout the United States including the East Coast (PADD 1), the Midwest (PADD 2), the Gulf Coast (PADD 3), the Rockies (PADD 4) and the West Coast (PADD 5).
Weekly average rack price data reported for Charlotte, NC in the East Coast Region will be averaged and used to establish a base price index, BPI, for this project and a monthly performance price index, MPPI, for the duration of the contract. These indexes are defined as follows:
• BASE PRICE INDEX The base price index, BPI, is the price index determined by arithmetic average, as specified above, shown in the four weekly publications immediately preceding the bid opening. The BPI will be provided by the Government after contract award. It is as follows:
BASE PRICE INDEX (BPI) FOR ULTRA LOW SULFUR, NO. 2 DIESEL FUEL
PER GALLON = $
• MONTHLY PERFORMANCE PRICE INDEX The monthly performance price index, MPPI, is the monthly price index at the time of performance of applicable work as determined by arithmetic average, as specified above, shown in the four weekly publications issued prior to the last Wednesday of the month (i.e. the monthly performance price index during which motor fuel is consumed in the performance of applicable construction work).
PRICE ADJUSTMENTS Price adjustments are calculated by the Government for average conditions and are not intended to reflect the Contractor’s actual purchase price. The ratio of the monthly performance price index and the base price index (MPPI/BPI) is calculated and used to determine price adjustments for eligible pay items as follows:
• No Price Adjustment – When the ratio MPPI/BPI falls within the range of 0.90 to 1.10, no price adjustment will be made for any motor fuel consumed in construction work performed during the relevant month.
• Government Rebate – When the ratio MPPI/BPI is calculated to be less than 0.90, the
Government is due a rebate determined in accordance with the following formula:
Government Rebate = [0.90 – (MPPI/BPI)] (BPI) (Q) (FUF)
• Contractor Payment - When the ratio MPPI/BPI is calculated to be greater than 1.10, the Contractor is due additional payment determined in accordance with the following formula:
Contractor Payment = [(MPPI/BPI) – 1.10] (BPI) (Q) (FUF)
The following definitions are applicable to both the Government Rebate and the Contractor Payment formulas:
MPPI = Monthly Performance Price Index for the month during which motor fuel is consumed in the performance of applicable construction work.
BPI = Base Price Index that is established immediately preceding the bid opening.
Q = Quantity of work on the project during the progress payment period for eligible pay items shown in Table 1 below. The Government, to agree with the units associated with the applicable Fuel Usage Factor, will convert work quantities, as necessary.
FUF = Fuel Usage Factor shown in Table 1 below applicable to both diesel and gasoline.
Table 1 – Eligible Pay Items For Price Adjustments and Associated Fuel Usage Factors
Eligible Pay Items Fuel Usage Factor U.S. Customary Units
Fuel Usage Factor Metric Units
Earthwork:
Section 204 – Excavation and Embankment 20401 Roadway excavation 20402 Subexcavation 20405 Select borrow
0.30 gallons per cubic yard 0.39 gallons per cubic meter
Aggregate Courses:
Section 301 – Untreated Aggregate Courses 30101 Aggregate base
0.70 gallons per ton 0.77 gallons per metric ton
Section 304 – Aggregate Stabilization 30405 Aggregate stabilization in-place aggregate*
0.70 gallons per ton 0.77 gallons per metric ton
Asphalt Pavements:
Section 418 – Superpave Hot Asphalt Concrete Pavement 41801 Superpave pavement 41802 Superpave pavement wedge and leveling Course
2.40 gallons per ton 2.65 gallons per metric ton
* The Government, to agree with the units associated with the applicable Fuel Usage Factor, will convert work quantities, as necessary.
PRICE ADJUSTMENT COMPENSATION Monthly adjustments will be accrued. The final price adjustment will be paid, or rebated, after completion of all work for eligible pay items. The Contractor may request in writing a partial price adjustment payment once every 12 months, or when the unpaid accrued increase exceed $10,000. The Government will take a rebate when the deductive accrual exceeds $10,000.
pschaad
No price adjustments will be made for work performed beyond the Government-approved Contract completion date.
The maximum allowable monthly and final price adjustment to the Contractor or rebate to the Government is limited to a (MPPI/BPI) ratio of 1.6 and 0.4, respectively.
Plan Sheet changes
1. Delete Plan Sheet 12 and substitute revised Plan Sheet 12.
Pay Item No.
Estimated Quantity Unit Bid Price Amount Bid
B- 23
62006 REMOVE AND RESET STONE MASONRY HEADWALL
EACH $_______________ $___________________
62007AM STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
EACH $_______________ $___________________
62007AP STONE MASONRY HEADWALL FOR 36-INCH PIPE CULVERT (36-INCH
EQUIVALENT)
EACH $_______________ $___________________
62403 FURNISHING AND PLACING TOPSOIL
CUYD $_______________ $___________________
62509 TURF ESTABLISHMENT
1.0
ACRE $_______________ $___________________
63401HA PAVEMENT MARKINGS, TYPE H, SOLID
3,090
LNFT $_______________ $___________________
63401LA PAVEMENT MARKINGS, TYPE POLYUREA, SOLID
12,900
LNFT $_______________ $___________________
63406JH PAVEMENT MARKINGS, TYPE J, HANDICAP SYMBOL
EACH $_______________ $___________________
63501 TEMPORARY TRAFFIC CONTROL (FLOOD LIGHTS)
ALL Lump Sum $___________________
63505C BARRICADE, TYPE 3
EACH $_______________ $___________________
63507 CONSTRUCTION SIGN
SQFT $_______________ $___________________
63508B DRUM, TYPE B
EACH $_______________ $___________________
Project: PRA-BLRI 2P14
OPTION 3: CRAGGY GARDEN ACCESS ROAD AND PICNIC AREA
Bid Schedule D pschaad
| Amendment 1.pdf |
| Amendment No. 1 |
| Fire Island National Seashore |
| J Pages.pdf |
| Special Contract Requirements |
| Division 100 |
| Division 150 |
| Division 200 |
| Division 301 |
| Division 600 |
| Division 700 |
| Amendment #2.pdf |
| Amendment No. 2 |
| Natchez Trace Parkway |
| Amendment #1.pdf |
| Amendment No. 1 |
| Great Smoky Mountains National Park |
| Solicitation Provision changes |
| Special Contract Requirements changes |
| Amendment 2_Final (4).pdf |
| Section 705.—ROCK |
| Amendment 001_Final.pdf |
| June 3, 2008 Pre-Proposal Meeting and Field Review |
| Part 5. Add the following to the Special Contract Requirements: |
| 109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files). |
| IDCode: |
| Page: 1 |
| Pages: 9 |
| AmendNo: 001 |
| EffDate: 8/20/08 |
| ReqNo: |
| ProjNo: PRA-BLRI 2P14 |
| IssCode: |
| IssuedBy: Eastern Federal Lands Highway Division |
21400 Ridgetop Circle Sterling, VA 20166
| AdmCode: |
| AdminBy: |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: DTFH71-08-R-00014 |
| AmendDate: 07/29/08 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: The purpose of this Amendment is to: |
1) Revise the Bid Schedule B-pages of the Solicitation Provisions, to revise pay item description and unit.
2) Revise the Special Contract Requirements (J pages) as follows:
a) Section 109 to clarify asphalt and fuel price adjustment provision.
3) Revise the Plans to replace tabulation of quantity sheet.
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| Text1: |
| Text2: |
File details come from the government source that posted it. Updated .