FP96.pdf
PDF 2 MB Posted
- Attached to
- Blue Ridge Parkway 2P14 Federal contract opportunity
- Solicitation number
- DTFH71-08-R-00014
About this file
FP-96
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 002.pdf | ||
| SF 30 Amend 001.pdf | ||
| Example__SB subcontract plan RFP-Negotiation.pdf | ||
| ADV_Offeror's Qualifications Form.pdf | ||
| Soils and Foundation Report.pdf | ||
| Hydraulics Data Summary.pdf | ||
| Plans.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Lands Highways
"Commitment to Excellence" i
Standard Specifications For Construction of
Roads and Bridges on Federal Highway Projects
English Units
U.S. DEPARTMENT
OF TRANSPORTATION
Federal Highway Administration iii
PREFACE
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for construct-ing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifi-cations are cited as "FP-96 English Units" indicating Standard Specifications issued in 1996 and converted to United States standard measure units in 2001.
When designated in a contract, the FP-96 becomes part of the contract and binding upon all parties to the contract. All construction contracts of the Federal Highway Administration are also governed by the following regulations.
` Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1.
` Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.
The FAR and TAR regulations are not included in the FP-96. How-ever, some FAR and TAR clauses are supplemented in the FP-96. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.
United States standard measure units are used in the FP-96 English Units as authorized by the Waiver Request of DOT Metric Policy approved on May 5, 1999.
iv
SISISISI (1)(1)(1)(1) (METRIC) TO ENGLISH CONVERSION FACTORS (METRIC) TO ENGLISH CONVERSION FACTORS (METRIC) TO ENGLISH CONVERSION FACTORS (METRIC) TO ENGLISH CONVERSION FACTORS (approximate)
SymbolSymbolSymbolSymbol When YouWhen YouWhen YouWhen You
KnowKnowKnowKnow MultiplyMultiplyMultiplyMultiply
ByByByBy ToToToTo
FindFindFindFind SymbolSymbolSymbolSymbol
LENGTHLENGTHLENGTHLENGTH
cm micrometers 3.9 x 10-5 inches in mm millimeters 0.039 inches in m meters 3.28 feet ft m meters 1.09 yards yd km kilometers 0.621 miles mi
AREAAREAAREAAREA
mm2 square millimeters 0.0016 square inches in2 m2 square meters 10.764 square feet ft2 m2 square meters 1.195 square yards yd2 ha hectares 2.47 acres ac km2 square kilometers 0.386 square miles mi2
VOLUMEVOLUMEVOLUMEVOLUME
mL milliliters 0.034 fluid ounces fl oz L liters 0.264 gallons gal m3 cubic meters 35.71 cubic feet ft3 m3 cubic meters 1.307 cubic yards yd3
MASSMASSMASSMASS
g grams 0.035 ounces oz kg kilograms 2.202 pounds lb Mg megagrams 1.103 short tons T (or "t") (or "metric ton") (2000 lb)
TEMPERATURE (exact)TEMPERATURE (exact)TEMPERATURE (exact)TEMPERATURE (exact) bC Celcius 1.8C + 32 Fahrenheit bF temperature temperature
ILLUMINATIONILLUMINATIONILLUMINATIONILLUMINATION
lx lux 0.0929 foot-candles fc cd/m2 caldela/m2 0.2919 foot-Lamberts fl
FORCE and PRESSURE or STRESSFORCE and PRESSURE or STRESSFORCE and PRESSURE or STRESSFORCE and PRESSURE or STRESS
J joule 0.7376 foot·poundforce ft·lbf N newtons 0.225 poundforce lbf kPa kilopascals 0.145 poundforce lbf/in2 per square inch
(1) SI is the symbol for the International System of Units.
Appropriate rounding should be made to comply with Section 4 of ASTM E 380.
v
TABLE OF CONTENTS
Page
DIVISION 100 GENERAL REQUIREMENTS
Section 101 TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms
101.02 Specifications Format
101.03 Abbreviations
101.04 Definitions
Section 102 BID, AWARD, AND
EXECUTION OF CONTRACT
102.01 Acquisition Regulations
102.02 Preparation of Bids
102.03 Bid Guarantee
102.04 Individual Surety
102.05 Public Opening of Bids
102.06 Performance and Payment Bonds
Section 103 SCOPE OF WORK
103.01 Intent of Contract
103.02 Disputes
103.03 Value Engineering
103.04 Contractor Records
103.05 Partnering
Section 104 CONTROL OF WORK
104.01 Authority of the Contracting Officer
104.02 Authority of Government Inspectors
104.03 Specifications and Drawings
104.04 Coordination of Contract Documents
104.05 Load Restrictions
Section 105 CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements
105.02 Local Material Sources
105.03 Material Source Management
105.04 Storing and Handling Material
105.05 Use of Material Found in the Work
vi
Page
Section 106 ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
106.03 Certification
106.04 Measured or Tested Conformance
106.05 Statistical Evaluation of Work and
Determination of Pay Factor (Value of Work)
106.06 Inspection at the Plant
106.07 Partial and Final Acceptance
Section 107 LEGAL RELATIONS AND RESPONSIBILITY
TO THE PUBLIC
107.01 Laws to be Observed
107.02 Protection and Restoration of Property
and Landscape
107.03 Bulletin Board
107.04 Railroad Protection
107.05 Responsibility for Damage Claims
107.06 Contractor's Responsibility for Work
107.07 Furnishing Right-of-Way
107.08 Sanitation, Health, and Safety
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.11 Protection of Forests, Parks, and Public Lands
Section 108 PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and
Completion of Work
108.02 Subcontracting
108.03 Determination and Extension of Contract Time
108.04 Failure to Complete Work on Time
108.05 Stop Order
Section 109 MEASUREMENT AND PAYMENT
109.01 Measurement Methods
109.02 Measurement Terms and Definitions
109.03 Weighing Procedures and Devices
109.04 Receiving Procedures
109.05 Scope of Payment
109.06 Pricing of Adjustments
109.07 Eliminated Work
109.08 Progress Payments
109.09 Final Payment
vii
DIVISION 150 PROJECT REQUIREMENTS
Section 151 Mobilization 152 Construction Survey and Staking 153 Contractor Quality Control 154 Contractor Sampling and Testing 155 Schedules for Construction Contracts 156 Public Traffic 157 Soil Erosion Control 158 Watering for Dust Control
DIVISION 200 EARTHWORK
Section 201 Clearing and Grubbing 202 Additional Clearing and Grubbing 203 Removal of Structures and Obstructions 204 Excavation and Embankment 205 Rock Blasting 206 Reserved 207 Earthwork Geotextiles 208 Structure Excavation and Backfill for
Selected Major Structures 209 Structure Excavation and Backfill 210 Permeable Backfill 211 Roadway Obliteration 212 Linear Grading 213 Subgrade Stabilization
DIVISION 250 STRUCTURAL EMBANKMENTS
Section 251 Riprap 252 Special Rock Embankment and Rock Buttress 253 Gabions and Revet Mattresses 254 Crib Walls 255 Mechanically Stabilized Earth Walls 256 Permanent Ground Anchors 257 Alternate Retaining Walls 258 Reinforced Concrete Retaining Walls viii
DIVISION 300 AGGREGATE COURSES
Section 301 Untreated Aggregate Courses 302 Treated Aggregate Courses 303 Road Reconditioning 304 Aggregate Stabilization 305 Aggregate-Topsoil Course 306 Dust Palliative 307 Stockpiled Aggregates 308 Minor Crushed Aggregate 309 Emulsified Asphalt Treated Base Course
DIVISION 400 ASPHALT PAVEMENTS AND
SURFACE TREATMENTS
Section 401 Hot Asphalt Concrete Pavement 402 Minor Hot Asphalt Concrete 403 Hot Recycled Asphalt Concrete Pavement 404 Open-Graded Asphalt Friction Course 405 Hot Asphalt Treated Base Course 406 Dense-Graded Emulsified Asphalt Pavement 407 Open-Graded Emulsified Asphalt Pavement 408 Cold Recycled Asphalt Base Course 409 Asphalt Surface Treatment 410 Slurry Seal 411 Asphalt Prime Coat 412 Asphalt Tack Coat 413 Asphalt Pavement Milling 414 Asphalt Pavement Crack and Joint Sealing 415 Paving Geotextiles 416 Continuous Cold Recycled Asphalt Base Course 417 Minor Cold Asphalt Mix
DIVISION 500 PORTLAND CEMENT CONCRETE
PAVEMENT
Section 501 Portland Cement Concrete Pavement 502 Portland Cement Concrete Pavement Restoration ix
DIVISION 550 BRIDGE CONSTRUCTION
Section 551 Driven Piles 552 Structural Concrete 553 Prestressed Concrete 554 Reinforcing Steel 555 Steel Structures 556 Bridge Railing 557 Timber Structures 558 Dampproofing 559 Waterproofing 560 Water Stops 561 Structural Concrete Bonding 562 Forms and Falsework 563 Painting 564 Bearing Devices 565 Drilled Shafts
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 601 Minor Concrete Structures 602 Culverts and Drains 603 Structural Plate Structures 604 Manholes, Inlets, and Catch Basins 605 Underdrains, Sheet Drains, and
Pavement Edge Drains 606 Corrugated Metal Spillways 607 Cleaning, Reconditioning, and Repairing
Existing Drainage Structures 608 Paved Waterways 609 Curb and Gutter 610 Horizontal Drains 611 Water Systems 612 Sanitary Sewer Systems 613 Simulated Stone Masonry Surface 614 Lean Concrete Backfill 615 Sidewalks, Drive Pads, and Paved Medians 616 Slope Paving 617 Guardrail 618 Concrete Barriers and Precast Guardwalls 619 Fences, Gates, and Cattle Guards 620 Stone Masonry 621 Monuments and Markers x
Section 622 Rental Equipment 623 General Labor 624 Topsoil 625 Turf Establishment 626 Plants, Trees, Shrubs, Vines, and
Groundcovers
627 Sod 620 628 Sprigging 629 Erosion Control Mats, Roving, and Cellular Confinement Systems 630 Reserved 631 Reserved 632 Reserved 633 Permanent Traffic Control 634 Permanent Pavement Markings 635 Temporary Traffic Control 636 Signal, Lighting, and Electrical Systems 637 Facilities and Services
DIVISION 700 MATERIAL
Section 701 HYDRAULIC CEMENT
701.01 Portland Cement and Masonry Cement
Section 702 ASPHALT MATERIAL
702.01 Asphalt Cement
702.02 Cut-Back Asphalt
702.03 Emulsified Asphalt
702.04 Application Temperatures
702.05 Material for Dampproofing and Waterproofing
Concrete and Masonry Surfaces
702.06 Recycling Agent
702.07 Asphalt Mastic
702.08 Antistrip Additive
702.09 Evaluation Procedures for Asphalt
702.10 Cold Asphalt Mix
Section 703 AGGREGATE
703.01 Fine Aggregate for Portland Cement Concrete
703.02 Coarse Aggregate for Portland Cement Concrete
703.03 Granular Backfill
703.04 Permeable Backfill
703.05 Subbase, Base, and Surface Course Aggregate
xi
Section 703 (continued)
703.06 Crushed Aggregate
703.07 Hot Asphalt Concrete Pavement Aggregate
703.08 Open-Graded Asphalt Friction
Course Aggregate
703.09 Emulsified Asphalt Pavement Aggregate
703.10 Asphalt Surface Treatment Aggregate
703.11 Slurry Seal Aggregate
703.12 Choker Aggregate
703.13 Blotter
703.14 Aggregate for Aggregate-Topsoil Course
703.15 Sand
703.16 Aggregate for Lean Concrete Backfill
703.17 Superpave Asphalt Concrete Pavement Aggregate . . . 679
Section 704 SOIL
704.01 Foundation Fill
704.02 Bedding Material
704.03 Backfill Material
704.04 Structural Backfill
704.05 Topping
704.06 Unclassified Borrow
704.07 Select Borrow
704.08 Select Topping
704.09 Bed Course
704.10 Select Granular Backfill
704.11 Special Grout Backfill
704.12 Crib Wall Backfill
Section 705 ROCK
705.01 Gabion and Revet Mattress Rock
705.02 Riprap Rock
705.03 Rock for Masonry Structures
705.04 Rock for Special Rock Embankment
705.05 Rock for Buttresses
705.06 Stone Curbing
Section 706 CONCRETE AND PLASTIC PIPE
706.01 Non-Reinforced Concrete Pipe
706.02 Reinforced Concrete Pipe
706.03 Perforated Concrete Pipe
706.04 Reinforced Arch-Shaped Concrete Pipe
xii
Section 706 (continued)
706.05 Reinforced Elliptically-Shaped Concrete Pipe
706.06 Reinforced D-Load Concrete Pipe
706.07 Precast Reinforced Concrete Box Sections
706.08 Plastic Pipe
Section 707 METAL PIPE
707.01 Ductile Iron Culvert Pipe
707.02 Metallic-Coated Corrugated Steel Pipe
707.03 Aluminum-Alloy Corrugated Pipe
707.04 Asphalt-Coated Pipe
707.05 Steel Structural Plate Structures
707.06 Aluminum-Alloy Structural Plate Structures
707.07 Asphalt-Coated Structural Plate Structures
707.08 Polymer-Coated Steel Pipe
707.09 Fiber-Bonded Asphalt Coated Steel Pipe
707.10 Slotted Drain Pipe
707.11 Metallic-Coated Spiral Rib Pipe
707.12 Aluminum-Alloy Spiral Rib Pipe
707.13 Concrete-Lined Corrugated Steel Pipe
707.14 Invert-Paved Corrugated Steel Pipe
Section 708 PAINT
708.01 General
708.02 Paint for Timber Structures
708.03 Paint for Concrete and Masonry Block Structures
708.04 Paint for Steel Structures
708.05 Penetrating Stain
Section 709 REINFORCING STEEL AND WIRE ROPE
709.01 Reinforcing Steel
709.02 Wire Rope or Wire Cable
709.03 Prestressing Steel
Section 710 FENCE AND GUARDRAIL
710.01 Barbed Wire
710.02 Woven Wire
710.03 Chain Link Fence
710.04 Fence Posts
710.05 Fence Gates
710.06 Metal Beam Rail
710.07 Box Beam Rail
xiii
Section 710 (continued)
710.08 Steel-Backed Timber Rail
710.09 Guardrail Posts
710.10 Guardrail Hardware
710.11 Temporary Plastic Fence
710.12 Crash Cushion Barrels
Section 711 CONCRETE CURING MATERIAL
AND ADMIXTURES
711.01 Curing Material
711.02 Air-Entraining Admixtures
711.03 Chemical Admixtures
711.04 Latex Modifier
Section 712 JOINT MATERIAL
712.01 Sealants, Fillers, Seals, and Sleeves
712.02 Joint Mortar
712.03 Watertight Gaskets
712.04 Reserved
712.05 Mortar for Masonry Beds and Joints
712.06 Copper Water Stops or Flashings
712.07 Rubber Water Stops
712.08 Plastic Water Stops
Section 713 ROADSIDE IMPROVEMENT MATERIAL
713.01 Topsoil
713.02 Agricultural Limestone
713.03 Fertilizer
713.04 Seed
713.05 Mulch
713.06 Plant Material
713.07 Erosion Control Mats, Roving, and Geocell
713.08 Miscellaneous Planting Material
713.09 Sprigs
713.10 Sod
713.11 Pegs for Sod
713.12 Stabilizing Emulsion Tackifiers
713.13 Bales
713.14 Sandbags
713.15 Erosion Control Culvert Pipe
713.16 Silt Fence
xiv
Section 714 GEOTEXTILE AND GEOCOMPOSITE
DRAIN MATERIAL
714.01 Geotextile
714.02 Geocomposite Drains
Section 715 PILING
715.01 Untreated Timber Piles
715.02 Treated Timber Piles
715.03 Concrete Piles
715.04 Steel Shells
715.05 Steel Pipes
715.06 Steel H-Piles
715.07 Sheet Piles
715.08 Pile Shoes
715.09 Splices
Section 716 MATERIAL FOR TIMBER STRUCTURES
716.01 Untreated Structural Timber and Lumber
716.02 Hardware
716.03 Treated Structural Timber and Lumber
Section 717 STRUCTURAL METAL
717.01 Structural Steel
717.02 Steel Forgings
717.03 Pins and Rollers
717.04 Castings
717.05 Welded Stud Shear Connectors
717.06 Steel Pipe
717.07 Galvanized Coatings
717.08 Sheet Lead
717.09 Steel Grid Floors
717.10 Elastomeric Bearing Pads
717.11 Tetrafluoroethylene Surfaces for Bearings
717.12 Structural Aluminum Alloy
717.13 Aluminum Alloy for Bridge Rail
717.14 Aluminum Bolt Heads and Nuts
717.15 Aluminum Welding Wire
717.16 Elastomeric Compression Joint Seals
xv
Section 718 TRAFFIC SIGNING AND MARKING MATERIAL . 750
718.01 Retroreflective Sheeting
718.02 Test Procedures
718.03 Plywood Panels
718.04 Steel Panels
718.05 Aluminum Panels
718.06 Plastic Panels
718.07 Extruded Aluminum Panels
718.08 Signposts
718.09 Object Marker and Delineator Posts
718.10 Hardware
718.11 Letters, Numerals, Arrows, Symbols, and Borders . . . 754
718.12 Delineator and Object Marker Retroreflectors
718.13 Conventional Traffic Paint
718.14 Waterborne Traffic Paint
718.15 Epoxy Markings
718.16 Polyester Markings
718.17 Thermoplastic Markings
718.18 Preformed Plastic Markings
718.19 Glass Beads
718.20 Raised Pavement Markers
718.21 Temporary Pavement Markings
718.22 Temporary Traffic Control Devices
718.23 Epoxy Resin Adhesives
Section 719 Reserved
Section 720 STRUCTURAL WALL AND STABILIZED
EMBANKMENT MATERIAL
720.01 Mechanically Stabilized Earth Wall Material
720.02 Gabion and Revet Mattress Material
720.03 Metal Bin Type Crib Walls
Section 721 ELECTRICAL AND ILLUMINATION MATERIAL 769
721.01 Electrical Material
721.02 Lighting Material
Section 722 ANCHOR MATERIAL
722.01 Anchorage Devices
722.02 Ground Anchors
xvi
Section 723 Reserved
Section 724 Reserved
Section 725 MISCELLANEOUS MATERIAL
725.01 Water 778
725.02 Calcium Chloride and Magnesium Chloride
725.03 Lime
725.04 Pozzolans
725.05 Mineral Filler
725.06 Precast Concrete Curbing
725.07 Clay or Shale Brick
725.08 Concrete Brick
725.09 Concrete Masonry Blocks
725.10 Cellular Concrete Blocks
725.11 Precast Concrete Units
725.12 Frames, Grates, Covers, and Ladder Rungs
725.13 Corrugated Metal Units
725.14 Protective Coatings for Concrete
725.15 Polyvinyl Chloride (PVC) Pipe for
Water Distribution Systems
725.16 Polyethylene (PE) Pipe for
Water Distribution Systems
725.17 Cast Iron Soil Pipe and Fittings
725.18 Seamless Copper Water Tube and Fittings
725.19 Plastic Lining
725.20 Lignin Sulfonate
725.21 Epoxy Resin Adhesives
725.22 Grout
725.23 Reserved
725.24 Color Coating
725.25 Explosives and Blasting Accessories
725.26 Mineral Slurry (Drillers Mud)
725.27 Form Liner
725.28 Aluminum-Impregnated Caulking Compound
INDEX
DIVISION 100
General Requirements
Section 101. )))) TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor", is implied. Also implied in this language is "shall", "shall be", or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.
Wherever "directed", "required", "prescribed", or other similar words are used, the "direction", "requirement", or "order" of the Contracting Officer is intended. Similarly, wherever "approved", "acceptable", "suitable", "satisfac-tory", or similar words are used, the words mean "approved by", "acceptable to", or "satisfactory to" the Contracting Officer.
The word "will" generally pertains to decisions or actions of the Contracting Officer.
101.02 Specifications Format. These specifications are divided into 10 Divisions.
Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.
Division 150 consists of project contract requirements that are applicable to all contracts. Work under Division 150 is paid for directly when there is a pay item in the bid schedule. When there is no pay item in the bid schedule, no direct payment is made.
Divisions 200 through 600 consist of construction contract requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work.
Division 700 contains the material requirements for Divisions 150 through
600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.
The first three digits of the pay item number identify the Section under which the work is performed.
Section 101
101.03 Abbreviations. Whenever these abbreviations are used in the specifi-cations, they represent the following:
(a) Acronyms.
AA ) Aluminum Association AAN ) American Association of Nurserymen AAR ) Association of American Railroads AASHTO ) American Association of State Highway and
Transportation Officials ACI ) American Concrete Institute ACPA ) American Concrete Pavement Association ADA ) Americans with Disabilities Act AGC ) Associated General Contractors of America AI ) Asphalt Institute AIA ) American Institute of Architects AISC ) American Institute of Steel Construction AISI ) American Iron and Steel Institute ANSI ) American National Standards Institute APWA ) American Public Works Association ARA ) American Railway Association AREA ) American Railway Engineering Association ARTBA ) American Road and Transportation Builders
Association ASCE ) American Society of Civil Engineers ASLA ) American Society of Landscape Architects ASTM ) American Society for Testing and Materials ATSSA ) American Traffic Safety Services Association AWPA ) American Wood Preservers Association AWS ) American Welding Society AWWA ) American Water Works Association CFR ) Code of Federal Regulations CO ) Contracting Officer and all representatives CRSI ) Concrete Reinforcing Steel Institute FAR ) Federal Acquisition Regulations (48 CFR Chapter 1) FHWA ) Federal Highway Administration FLH ) Federal Lands Highways FSS ) Federal Specifications and Standards FTMS ) Federal Test Method Standard GSA ) General Services Administration
ISSA ) International Slurry Surfacing Association ITE ) Institute of Transportation Engineers MIL ) Military Specifications MUTCD ) Manual on Uniform Traffic Control Devices
(for Streets and Highways) NEMA ) National Electrical Manufacturer's Association NFPA ) National Forest Products Association NIST ) National Institute of Standards and Technology OSHA ) Occupational Safety and Health Administration PCA ) Portland Cement Association PCI ) Prestressed Concrete Institute PTI ) Post-Tensioning Institute SAE ) Society of Automotive Engineers SF ) Standard Form SI ) International System of Units SSPC ) Steel Structures Painting Council TAR ) Transportation Acquisition Regulations
(48 CFR Chapter 12) UL ) Underwriter's Laboratory U.S. ) United States of America USC ) United States Code USGS ) United States Geologic Survey USPS ) United States Postal Service
(b) SI symbols.
A ) ampere electric current cd ) candela luminous intensity bbbbC ) degree Celsius temperature d ) day time g ) gram mass h ) hour time H ) Henry inductance ha ) hectare area Hz ) hertz (s-1) frequency J ) joule (N]m) energy K ) kelvin temperature L ) liter volume lx ) lux illuminance m ) meter length m2
) square meter area m3
) cubic meter volume min ) minute time N ) newton (kg]m/s2) force Pa ) pascal (N/m2) pressure s ) second time t ) metric ton mass V ) volt (W/A) electric potential W ) watt (J/s) power Ω ) ohm V/A electric resistance bbbb ) degree plane angle kkkk ) minute plane angle llll ) second plane angle
(c) SI prefix symbols.
E ) exa 1018
P ) peta 1015
T ) tera 1012
G ) giga 109
M ) mega 106 k ) kilo 103 c ) centi 10-2 m ) milli 10-3 µ ) micro 10-6 n ) nano 10-9 p ) pico 10-12 f ) femto 10-15 a ) atto 10-18
(d) English slope notation (horizontal : vertical). Express the slope as the ratio of a number of units horizontal to one unit vertical.
101.04 Definitions. FAR Clause 52.202-1, Definitions, is supplemented as follows:
Award ) The written acceptance of a bid by the CO.
Backfill ) Material used to replace or the act of replacing material re-moved during construction. Material placed or the act of placing material adjacent to structures.
Base ) The layer or layers of material placed on a subbase or subgrade to support a surface course.
Bid ) A written offer by a bidder to perform work at a quoted price.
Bid Bond ) The security executed by the bidder and surety or sureties fur-nished to the Government to guarantee execution of the contract.
Bidder ) Any individual or legal entity submitting a bid.
Bid Forms ) The Government forms required for preparing and submitting a bid.
Bid Guarantee ) A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.
Bid Schedule ) The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.
Bridge ) A structure more than 20 feet long, including supports, spanning and providing passage over a depression, waterway, railroad, highway, or other obstruction.
Commercial Certification ) See Subsection 106.03.
Construction Limits ) The limits on each side of the project which establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required under Section 202.
Contract ) The written agreement between the Government and the Contrac-tor setting forth the obligations of the parties for the performance of and pay-ment for the prescribed work.
Contracting Officer (CO) ) An official of the Government with the authority to enter into, administer, and/or terminate contracts and make related determi-nations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Contract Modification ) Any written change in the terms of the contract.
Contract modifications are of the following forms:
(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (e.g., a change in the paying office or the appropriation data).
(b) Change order. A written order, signed by the CO, directing the Con-tractor to make a change that FAR Clause 52.243-4 - Changes authorizes the CO to order without the Contractor's consent.
(c) Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.
Contractor ) The individual or legal entity contracting with the Government for performance of prescribed work.
Contract Time ) The specified time allowed for completion of all contract work.
Cross-Section ) A vertical section of the ground or structure at right angles to the centerline or baseline of the roadway or other work.
Culvert ) Any structure, not classified as a bridge, that provides an opening under the roadway.
Day ) Each and every day shown on the calendar, beginning and ending at midnight.
Density ) Mass per unit volume of material. Specific gravity multiplied by the unit mass of water.
Drawings ) Design sheets or fabrication, erection, or construction details submitted to the Government by the Contractor according to FAR Clause 52.236-21, Specifications and Drawings for Construction.
Falsework ) Any temporary construction work used to support the permanent structure until it becomes self-supporting. Falsework includes steel or timber beams, girders, columns, piles, foundations, and any proprietary equipment including modular shoring frames, post shores, and adjustable horizontal shoring.
Forms ) Temporary structures or molds used to retain plastic or fluid concrete in its designated shape until it hardens. Forms shall have enough strength to resist the fluid pressure exerted by plastic concrete and all additional fluid pressure effects generated by vibration.
Government ) The Government of the United States of America.
Highway, Street, or Road ) A general term denoting a public way for pur-poses of vehicular travel, including the entire area within the right-of-way.
Layer ) See "lift."
Lift ) When placing and compacting soils and aggregates, a lift is any single, continuous layer of material which receives, during a single work operation, the same compactive effort throughout. When installing culvert pipe less than or equal to 48 inches in diameter, the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied to the other, and the compactive effort is applied to both sides of the pipe in a continuous operation.
Material ) Any substances specified or necessary to satisfactorily complete the contract work.
Measurement ) The process of identifying the dimensions, quantity, or capacity of an item. See Section 109 for measurement methods, terms, and definitions.
Notice to Proceed ) Written notice to the Contractor to begin the contract work.
Pavement Structure ) The combination of subbase, base, and surface courses placed on a subgrade to support and distribute the traffic load to the roadbed.
Pay Item ) A specific item of work for which a unit and price is provided in the contract.
Payment Bond ) The security executed by the Contractor and surety or sure-ties furnished to the Government to assure payments as required by law to all persons supplying labor or material according to the contract.
Performance Bond ) The security executed by the Contractor and surety or sureties and furnished to the Government to guarantee completion of the con-tract work.
Plans ) The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.
Production Certification ) See Subsection 106.03.
Profile Grade ) The trace of a vertical plane intersecting a particular surface of the proposed road construction located as shown on the plans, usually along the longitudinal centerline of the roadbed. Profile grade means either eleva-tion or gradient of the trace according to the context.
Project ) The specific section of the highway or other property on which construction is to be performed under the contract.
Right-of-Way ) Real property used for transportation purposes.
Roadbed ) The graded portion of a highway prepared as a foundation for the pavement structure and shoulders.
Roadside ) All area within the right-of-way excluding the traveled way and shoulders.
Roadway ) In general, the portion of a highway, including shoulders, for vehicular use. A divided highway has two or more roadways. In construction specifications, the portion of a highway within the construction limits.
Roadway Prism ) The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance along the centerline of the roadway.
Roller Pass ) One trip of a roller in one direction over any one spot.
Shoring ) This term is used interchangeably with falsework.
Shoulder ) The portion of the roadway contiguous to the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of the pavement structure.
Sieve ) See AASHTO M 92.
Solicitation ) The complete assembly of related documents (whether attached or incorporated by reference) furnished to prospective bidders.
Special Contract Requirements ) Additions and revisions to the standard and supplemental specifications applicable to an individual project.
Specifications ) The written requirements for performing work.
Standard Forms ) Numbered forms issued by the General Services Adminis-tration for use as contract documents.
Standard Plans ) Detailed plans approved for repetitive use and included as part of the plans.
Standard Specifications ) The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects approved for general appli-cation and repetitive use.
Station ) (1) A measure of distance used for highways and railroads. A sta-tion is equal to 100 feet. (2) A precise location along a survey line.
Structures ) Bridges, culverts, catch basins, drop inlets, retaining walls, crib-bing, manholes, endwalls, buildings, sewers, service pipes, underdrains, foun-dation drains, and other features that may be encountered in the work.
Subbase ) The layer or layers of material placed on a subgrade to support a base.
Subcontract ) The written agreement between the Contractor and an indi-vidual or legal entity prescribing the performance of a specific portion of the work.
Subcontractor ) An individual or legal entity with whom the Contractor sublets part of the work. This includes all subcontractors in any tier.
Subgrade ) The top surface of a roadbed upon which the pavement structure, shoulders, and curbs are constructed.
Substantial Completion ) The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments. For conventional bridge and highway work, the point at which all bridge deck, parapet, pavement structure, shoulder, drainage, sidewalk, permanent signing and markings, traffic barrier, safety appurtenance, utility, and lighting work is complete.
Substructure ) All of the bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.
Suitable Material ) Rock or earth material that will provide stable founda-tions, embankments, or roadbeds, and is reasonably free of organic matter, roots, muck, sod, or other detrimental material.
Superintendent ) The Contractor's authorized representative in responsible charge of the work.
Superstructure ) The entire bridge except the substructure.
Supplemental Specifications ) Additions and revisions to the standard specifications.
Surety ) An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.
Surface Course ) The top layer or layers of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.
Target Value (TV) ) A number established as a center for operating a given process. Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well controlled process should cluster closely around the established target value and the mean of the test results should be equal to or nearly equal to the established target value.
Traveled Way ) The portion of the roadway designated for the movement of vehicles, exclusive of shoulders.
Unsuitable Material ) Material that is earth, gravel, or sand not adequate (i.e.
stability, drainage, etc.) to use in the construction of stable foundations, em-bankments, or roadbeds.
Work ) The furnishing of all labor, material, equipment, and other incidentals necessary to successfully complete the project according to the contract.
Section 102. )))) BID, AWARD, AND
EXECUTION OF CONTRACT
102.01 Acquisition Regulations. Bid, award, and execution of the contract are governed by the FAR and TAR.
102.02 Preparation of Bids. FAR Clause 52.214-18 - Preparation of Bids ) Construction is supplemented as follows.
Execute and submit all required standard forms, bid schedules, and solicitation provisions contained in the solicitation as part of the bid.
Complete SF 1442, Solicitation, Offer, and Award, and sign as follows:
(a) Individuals. Sign your individual signature. For individuals doing business as a firm, follow the individual signature with the individual's typed, stamped, or printed name and the words, "an individual doing busi-ness as (name of firm) ".
(b) Partnerships. Submit a list of all partners having authority to bind the partnership. One of the listed partners must sign on behalf of the partnership.
(c) Corporations. Sign in the corporate name, followed by the word "by" and the signature and title of the person authorized to sign. Submit evidence from the corporation that the person signing has authority to bind the corporation.
(d) Joint ventures. All participants in the joint venture shall sign in the manner prescribed in (a) through (c) above. Corporations shall also submit a certificate stating that the corporation is authorized to participate in the joint venture.
One party may sign on behalf of a joint venture if documentation is included and signed by all members of the joint venture, authorizing the party with authority to sign for the joint venture.
(e) Agents. When an agent signs, other than as stated in (a) through (d) above, furnish satisfactory evidence that the agent has authority to bind the bidder.
Section 102
Insert a unit bid price, in figures, for each pay item for which a quantity ap-pears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern.
When the words "lump sum" appear as a unit bid price, insert an amount bid for each lump sum pay item.
When the word "contingent sum" or a fixed rate appears as a unit bid price, include the Government inserted amount bid for the item in the total bid amount.
Total all of the amounts bid for each pay item and show the total bid amount.
The quantities shown in the bid schedule are approximate, unless designated as a contract quantity, and are used for the comparison of bids. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. The scheduled quantities may be increased, decreased, or deleted. Bid schedule quantities are considered the original contract quantities.
102.03 Bid Guarantee. FAR Clause 52.228-1 - Bid Guarantee is supple-mented as follows:
(a) General. Submit a bid guarantee of not less than 20 percent of the amount of the bid with any bid in excess of $25,000. Submit the bid guar-antee on SF 24, Bid Bond. If the bid guarantee is other than a corporate or individual surety, sign the SF 24 as the principal and make a statement on the form pledging the security. Make checks or money orders payable to the agency issuing the solicitation.
(b) Power of attorney. A corporate surety shall submit a current power of attorney for the signing agent or attorney-in-fact with each SF 24.
(c) Evidence of guarantee assistance. A surety that has a guarantee of assistance from the Small Business Administration shall submit a copy of its "Surety Bond Guarantee Agreement" with each SF 24. In addition, submit a power of attorney for the surety representative identified in the agreement.
102.04 Individual Surety. FAR Clause 52.228-11 - Pledges of Assets is supplemented as follows.
Complete and date the SF 28, Affidavit of Individual Surety, after the solicita-tion date. The individual surety shall personally sign the SF 28. Execution by power of attorney is not acceptable. Bidders cannot serve as their own surety.
Assets named shall be committed to the project with a bank designated to serve as trustee.
After reviewing the SF 28, the surety may be requested to provide further documentation with respect to any of its assets, debts, or encumbrances. The information may be required to be furnished under oath. Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.
Any material misstatement by the surety, overstatement of assets (either as to ownership or value) or understatement of liabilities is cause for rejection of the surety. Substitution of individual sureties to support a bid bond after the bid opening will not be permitted.
102.05 Public Opening of Bids. Bids will be publicly opened at the time specified in the SF 1442. Their contents will be made public information. The Government reserves the right to reject bids as set forth in the FAR, Part 14.
102.06 Performance and Payment Bonds. Furnish a performance bond in the penal amount of 100 percent of the original contract price and a payment bond as follows:
(a) In the penal amount of 50 percent of the original contract price if the contract price is not more the $1 million.
(b) In the penal amount of 40 percent of the original contract price if the contract is more than $1 million but not more than $5 million.
(c) In the amount of $2.5 million if the contract price is more than $5 million.
Use SF 25, Performance Bond, and SF 25A, Payment Bond, for submitting the bonds.
The requirements contained in Subsections 102.03 and 102.04 relating to power of attorney, evidence of guarantee assistance, and individual sureties also apply to performance and payment bonds.
Section 103. )))) SCOPE OF WORK
103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
103.02 Disputes. FAR Clause 52.233-1 - Disputes is supplemented as follows.
When requesting a CO's decision on an interpretation of contract terms for the recovery of increased costs, quantify the amount and, if required by FAR Clause 52.233-1, certify the amount. Include an explanation of the interpreta-tion of contract terms, the contract clause under which the claim is made, all supporting documentation, and adequate cost data to support the amount claimed.
103.03 Value Engineering. FAR Clause 52.248-3 - Value Engineering ) Construction is supplemented as follows.
Value engineering proposals that delete work without a related enhancement to the project will not be considered.
103.04 Contractor Records. Upon request, provide records related to the contract to the Government for up to 3 years after final payment and for longer periods as provided by law.
Include a provision in all subcontracts at all tiers giving the Government the same rights as provided above with respect to the subcontractor's records.
103.05 Partnering. To facilitate this contract, the Government offers to participate in a formal partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals.
Partnering strives to resolve problems in a timely, professional, and non-a-dversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim pro-cess. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule.
Section 103
Acceptance of this partnering offer by the Contractor is optional and the part-nership is bilateral.
If the partnering offer is accepted, mutually agree with the Government on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor and Government representatives to attend a partnership develop-ment and team-building workshop usually between the time of award and the notice to proceed. Hold additional progress meetings upon mutual agreement.
The direct cost of partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings will be shared by the Contractor and Government. Secure and pay for facilities, professional fees, and miscellaneous requirements. Provide invoices to the Government. The Government will reimburse the Contractor for 50 percent of the agreed costs incurred for the partnering process. The Government's share will not exceed $20,000.
Each party is responsible for making and paying for its own travel, lodging, and meal arrangements. The time allowed for completion of the project is not affected by partnering.
Section 104. )))) CONTROL OF WORK
104.01 Authority of the Contracting Officer (CO). The CO will delegate authority to representatives to decide on acceptability of work, progress of work, suspension of work, interpretation of the contract, and acceptable fulfill-ment of the contract. The term "CO" includes all authorized representatives of the CO, including inspectors, acting within the limits of their authority as delegated by the CO.
104.02 Authority of Government Inspectors. Inspectors are authorized to inspect all work including the preparation, fabrication, or manufacture of material for the project. The inspector is not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreman for the Contractor, or direct the Contractor's operations. The inspector has authority to reject work until the issue can be referred to and decided by the
CO.
104.03 Specifications and Drawings. FAR Clause 52.236-21 - Specifica-tions and Drawings for Construction is supplemented as follows:
(a) General. Prepare drawings as necessary to adequately construct the work. This includes, but is not limited to, traffic control drawings, false-work drawings, stress sheets, anchor bolt layouts, erection drawings, and equipment lists.
Limit drawings to a maximum size of 24 by 36 inches. Include on each drawing and calculation sheet, the project number, name, and other iden-tification as shown in the contract.
Furnish 5 sets of drawings and supporting calculations for acceptance before performing work covered by the drawings. If drawings are returned for revision, correct and resubmit for acceptance. Allow 40 days per submis-sion for railroad structures and 30 days per submission for all other struc-tures. If drawings must be resubmitted, the time for acceptance starts over.
Obtain prior written approval for changes or deviations from the accepted drawings.
Section 104
(b) Specific requirements for concrete and miscellaneous structures.
Furnish drawings for cribs, cofferdams, falsework, erection, temporary support systems, formwork, detour structures, and other temporary work and methods of construction proposed. Furnish drawings bearing the seal and signature of a professional engineer proficient in the pertinent design field.
104.04 Coordination of Contract Documents. The FAR, TAR, special contract requirements, plans, supplemental specifications, and standard speci-fications are contract documents. A requirement in one document is binding as though occurring in all the contract documents. The contract documents are intended to be complementary and to describe and provide for a complete contract. In case of discrepancy, calculated and shown dimensions govern over scaled dimensions. The contract documents govern in the following order:
(a) Federal Acquisition Regulations
(b) Transportation Acquisition Regulations
(c) Special contract requirements
(d) Plans
(e) Supplemental specifications
(f) Standard specifications
104.05 Load Restrictions. FAR Clause 52.236-10 - Operations and Storage Areas, paragraph (c), is supplemented as follows.
Comply with all legal load restrictions when hauling material and equipment on public roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment.
Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures within the project. Repair or replace in an acceptable manner all damages to project work resulting from the use of such equipment or vehicles at no cost to the Government.
On the portions of the project used to accommodate public travel, operate construction equipment and vehicles in a manner that does not conflict with traffic flow and minimizes delays to the traveling public.
Section 105. )))) CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements. FAR Clause
52.236-5 - Material and Workmanship is supplemented as follows.
Select sources and provide acceptable material. Notify the CO of all proposed sources before delivery to the project to expedite material inspection and testing. Do not incorporate material requiring submittal into the work until approved.
Material may be approved at the source of supply before delivery to the pro-ject. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.
105.02 Local Material Sources. Sources of rock, sand, gravel, earth, or other natural material located by the Government in the vicinity of the project may be identified in the contract. These identified sources may be listed as provided for the project or only listed as information to aid the Contractor in locating a source. The decision to use an identified source is solely that of the Contractor.
(a) Government-provided sources. The Government will acquire the permits and rights to remove material from provided sources identified in the contract and to use such property for a plant site and stockpiles. Test reports and available historical performance data verifying the presence of accept-able material are available upon request.
Do not perform work within a Government-provided source until a plan of operation for the development of the source is accepted. Perform all work necessary to produce acceptable material including site development, prepa-ration, erosion control, and restoration.
The quality of material in provided sources is acceptable in general, but may contain layers or pockets of unacceptable material. It is not feasible to as-certain from samples the quality of material for an entire deposit and varia-tions may be expected. Determine the quantity and type of equipment and work necessary to select and produce acceptable material.
Section 105
(b) Government-listed sources. The Government may list possible materi-al sources. The Government makes no representation as to the quality or quantity of material, or rights to the availability of material from these sources. These sources are considered to be Contractor-located sources under (c) below.
(c) Contractor-located sources. The Contractor is responsible for these sources, including established commercial sources. Use sources that fulfill the contract quantity and quality requirements. Determine the quantity and types of equipment and work necessary to select and produce acceptable material. Secure all permits and clearances for use of the source and provide copies of the documents.
Provide laboratory test reports and available historical performance data indicating that acceptable material is available from the source. Do not use material from a source that is unacceptable to the Government. Dispose of unacceptable material and locate another source at no cost to the Government.
105.03 Material Source Management. Notify the CO 14 days before start-ing pit operations. Develop and operate within a material source according to the accepted plan of operation or written agreement for developing the source.
Comply with the following applicable requirements:
(a) Before developing a material source, measure the sediment content of bodies of water adjacent to the work area that will receive drainage from the work area. Control all erosion so the sediment levels in the bodies of water within the drainage area of the work area do not increase.
(b) Strip and stockpile the overburden. After operations are complete, move all waste back into the source. Neatly trim and flatten the side slopes to the extent practicable. Spread the stockpiled overburden uniformly over the sides and bottom of the mined area. Establish a vegetative cover to blend the site into the surrounding area.
Section 105
105.04 Storing and Handling Material. Store and handle material to pre-serve its quality and fitness for the work. Stored material approved before storage may again be inspected before use in the work. Locate stored material to facilitate prompt inspection.
Use only approved portions of the right-of-way for storing material and plac-ing plants and equipment. Provide all additional space needed. Do not use private property for storage without written permission of the owner or lessee.
Furnish copies of all agreements. Restore all Government-provided storage sites to their original condition.
The Contractor is responsible for the security of all…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .