SF 30 Amend 002.pdf
PDF 905 KB Posted
- Attached to
- Blue Ridge Parkway 2P14 Federal contract opportunity
- Solicitation number
- DTFH71-08-R-00014
About this file
Amendment 002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amend 001.pdf | ||
| Example__SB subcontract plan RFP-Negotiation.pdf | ||
| FP96.pdf | ||
| ADV_Offeror's Qualifications Form.pdf | ||
| Soils and Foundation Report.pdf | ||
| Hydraulics Data Summary.pdf | ||
| Plans.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable debbie debbie pschaad Line
AMENDMENT 002
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment 002 Blue Ridge Parkway
Project PRA-BLRI 2P14
DTFH71-08-R-00014
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J pages) as follows:
a) Section 108 to clarify pavement removal and placement of asphalt pavement requirements.
b) Section 304 to clarify aggregate cement mixtures compaction and finishing time requirements.
2) Revise the Plans to replace traffic control notes sheet to clarify and add traffic control notes.
Special Contract Requirement changes
1. Delete the eighth paragraph of the second Subsection 108.01 of the Special Contract
Requirements, page J-10, and substitute the following:
Do not remove or reclaim more pavement than can be replaced in a work day unless CO approval is obtained. Cover all reclaimed material and aggregate base with a layer of asphalt pavement by the end of the work day. Do not allow reclaimed material or aggregate base to remain exposed for more than one day without CO approval. Remove pavement on days when rain is not in the forecast.
At specific locations with good southern exposure, the CO may approve the use of a temporary traffic signal to close a lane continuously for two days. At these locations reclaimed material and aggregate base may remain uncovered for a maximum of two days.
2. Delete the second sentence of the first paragraph of Subsection 304.08 of the Special
Contract Requirements, page J-37, and substitute the following:
Do not leave uncompacted aggregate cement mixtures undisturbed for more than 30 minutes, and complete their compaction and finishing within 2 hours from the time water is added.
Plan Sheet changes
1. Delete Plan Sheet 77 and substitute revised Plan Sheet 77.
pschaad Typewritten Text jwhelchel Line jwhelchel Line jwhelchel Line jwoody Text Box jwhelchel Line jwhelchel Line jwhelchel Line jwoody Text Box jwhelchel Line jwhelchel Line jwhelchel Line jwoody Text Box jwhelchel Line jwhelchel Line jwhelchel Line jwoody Text Box jwhelchel Line jwhelchel Line jwhelchel Line jwoody Text Box jwhelchel Typewritten Text
REVISIONS
NO. DESCRIPTION BY DATE
2. CLARIFIED NOTES JW 8/25/08
jwhelchel Line jwhelchel Line jwhelchel Line jwhelchel Rectangle jwhelchel Rectangle jwhelchel Rectangle jwhelchel Rectangle jwhelchel Rectangle jwoody Text Box jwhelchel Typewritten Text
AMENDMENT 002
pschaad Typewritten Text
| Amendment 1.pdf |
| Amendment No. 1 |
| Fire Island National Seashore |
| J Pages.pdf |
| Special Contract Requirements |
| Division 100 |
| Division 150 |
| Division 200 |
| Division 301 |
| Division 600 |
| Division 700 |
| Amendment #2.pdf |
| Amendment No. 2 |
| Natchez Trace Parkway |
| Amendment #1.pdf |
| Amendment No. 1 |
| Great Smoky Mountains National Park |
| Solicitation Provision changes |
| Special Contract Requirements changes |
| Amendment 2_Final (4).pdf |
| Section 705.—ROCK |
| Amendment 001_Final.pdf |
| June 3, 2008 Pre-Proposal Meeting and Field Review |
| Part 5. Add the following to the Special Contract Requirements: |
| 109.06. Delete Price Form 02A, 02B, 02C, and 02D of the Special Contract Requirements and substitute the attached forms (See attached files). |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 002 |
| EffDate: 8/27/08 |
| ReqNo: |
| ProjNo: PRA-BLRI 2P14 |
| IssCode: |
| IssuedBy: Eastern Federal Lands Highway Division |
21400 Ridgetop Circle Sterling, VA 20166
| AdmCode: |
| AdminBy: |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: DTFH71-08-R-00014 |
| AmendDate: 07/29/08 |
| ModNo: |
| ModDate: |
| NoCopies: |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: The purpose of this Amendment is to: |
1) Revise the Special Contract Requirements (J pages) as follows:
a) Section 108 to clarify pavement removal and placement of asphalt pavement requirements.
b) Section 304 to clarify aggregate cement mixtures compaction and finishing time requirements.
2) Revise the Plans to replace traffic control notes sheet to clarify and add traffic control notes.
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
| Text1: |
| Text2: |
File details come from the government source that posted it. Updated .