U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
WA PFH 29-1(5)
MIDDLE FORK SNOQUALMIE RIVER ROAD SLOPE STABILIZATION
GEOPAK EARTHWORK DATA LISTING
FEBRUARY 2017
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
279+00.00 RDWYEXC
Excavation 37.45 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 7.79 0 0 1.00 0 0
TOPSOIL
Excavation 18.01 0 0 0.00 0 Subsoil Exc 7.27 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.34 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.92 0 0 0.00 0 0
279+18.39 RDWYEXC
Excavation 7.17 15 15 1.00 15 Subsoil Exc 0.00 0 0 1.00 0 Fill 5.83 5 5 1.00 10 5
TOPSOIL
Excavation 0.95 7 0 0.00 7 Subsoil Exc 4.43 4 0 0.00 4 Fill 0.00 0 0 0.00 10 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 4 0 0.00 10 4
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.20 8 0 0.00 10 8
279+50.00 RDWYEXC
Excavation 82.73 52 52 1.00 67 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.99 12 12 1.00 50 17
TOPSOIL
Excavation 25.71 16 0 0.00 23 Subsoil Exc 9.97 8 0 0.00 12 Fill 0.00 0 0 0.00 50 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 6 0 0.00 50 10
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.28 14 0 0.00 50 22
279+80.00 RDWYEXC
Excavation 126.10 116 116 1.00 183 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.25 10 10 1.00 156 27
TOPSOIL
Excavation 21.79 27 0 0.00 50 Subsoil Exc 3.95 8 0 0.00 20 Fill 0.00 0 0 0.00 156 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 6 0 0.00 156 16
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.48 14 0 0.00 156 36
280+00.00 RDWYEXC
Excavation 250.51 140 140 1.00 323 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.16 3 3 1.00 293 30
TOPSOIL
Excavation 20.74 16 0 0.00 66 Subsoil Exc 3.85 3 0 0.00 23 Fill 0.00 0 0 0.00 293 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 4 0 0.00 293 20
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.52 9 0 0.00 293 45
280+50.00 RDWYEXC
Excavation 310.22 519 519 1.00 842 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.98 8 8 1.00 804 38
TOPSOIL
Excavation 22.30 40 0 0.00 106 Subsoil Exc 4.51 8 0 0.00 31 Fill 0.00 0 0 0.00 804 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.13 9 0 0.00 804 29
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.58 23 0 0.00 804 68
281+00.00 RDWYEXC
Excavation 274.69 541 541 1.00 1383 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.83 9 9 1.00 1336 47
TOPSOIL
Excavation 21.45 41 0 0.00 147 Subsoil Exc 4.78 9 0 0.00 40 Fill 0.00 0 0 0.00 1336 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.06 9 0 0.00 1336 38
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.81 24 0 0.00 1336 92
281+50.00 RDWYEXC
Excavation 21.78 275 275 1.00 1658 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.57 6 6 1.00 1605 53
TOPSOIL
Excavation 24.35 42 0 0.00 189 Subsoil Exc 1.57 6 0 0.00 46 Fill 0.00 0 0 0.00 1605 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.25 10 0 0.00 1605 48
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.23 24 0 0.00 1605 116
281+90.00 RDWYEXC
Excavation 165.54 139 139 1.00 1797 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.24 1 1 1.00 1743 54
TOPSOIL
Excavation 17.06 30 0 0.00 219 Subsoil Exc 0.22 1 0 0.00 47 Fill 0.00 0 0 0.00 1743 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 8 0 0.00 1743 56
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.35 19 0 0.00 1743 135
282+00.00 RDWYEXC
Excavation 155.78 60 60 1.00 1857 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.33 0 0 1.00 1803 54
TOPSOIL
Excavation 16.31 6 0 0.00 225 Subsoil Exc 0.27 0 0 0.00 47 Fill 0.00 0 0 0.00 1803 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.51 2 0 0.00 1803 58
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.33 5 0 0.00 1803 140
G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 1857 1857 1.00 Subsoil Exc 0 0 1.00 Fill 54 54 1.00
TOPSOIL
Excavation 225 0 0.00 Subsoil Exc 47 0 0.00 Fill 0 0 0.00
ACP
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 58 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 140 0 0.00