PROJECT_DESCRIPTION_OR_DOT_26(2).pdf

PDF 20 KB Posted

Attached to
OR DOT 26(2), Mirror Lake Trailhead Relocation Federal contract opportunity
Solicitation number
DTFH70-16-B-00022
Issued by
Department of Transportation Federal Highway Administration

About this file

Project Description

View the file

Other files for this federal contract opportunity

Other files attached to OR DOT 26(2), Mirror Lake Trailhead Relocation, newest first.
File Type Posted
BidSum_Mirror_Lake.pdf PDF
Amendment_No._A001.pdf PDF
Q&A_-_05-23-17.pdf PDF
Mirror_Lake_Trailhead_Plans_Revised_Final_4-24-17.pdf PDF
SWPPP_OR_DOT_26(2)_Mirror_Lake_Tralhead_Relocation.pdf PDF
Mirror_Lake_Trailhead_Design_Cross_Sections_Final_3-20-17.pdf PDF
Extg_Trailhead_Rehab_Earthwork_100_.pdf PDF
Plan_Request_form_Mirror_Lake.pdf PDF
Mirror_Lake_Lot_Earthwork_100_.pdf PDF
Geotechnical_Memo_GM39-16.PDF PDF
Geotechnical_Report_GR16-16.pdf PDF
Glacier_View_Earthwork_100_.pdf PDF
IFB_Mirror_Lake.pdf PDF
OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf PDF
Prelim_Letter_OR_DOT_26(2).pdf PDF
OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR DOT 26(2), Mirror Lake Trailhead Relocation, Clackamas County, Oregon

The work consists of grading, drainage, base, paving, trail bridges, walls, restroom, signing, striping and other small items of work.

Project length: .05 Miles

Tentative Fixed Completion Date: Summer 2018 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)

Estimated Price Range: $3 million to $5 million

Location: 1 Mile W of Government Camp, Oregon

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

_A

DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance

(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices) All 158 Watering for Dust Control 500 mgal

DIVISION 200 – Earthwork 201 Clearing & Grubbing 6 Acre 203 Removal of Pipe Culvert 50 LNFT 203 Saw Cutting Pavement 4,000 LNFT 204 Excavation & Embankment 30,000 CY 207 Earthwork Geosynthetics 1,150 SY 208 Structure Excavation 30 CY

DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap 25 CY 252 Rockery, Special Rock Embankment 1,200 CY 255 Mechanically Stabilized Earth Walls (retaining walls) 4,500 SF 257 Contactor-Designed Retaining Walls (contractor completed designs) All 258 Reinforced Concrete Retaining Walls (retaining walls) 550 SF

DIVISION 300 – Aggregate and Base Courses 301 Untreated Aggregate Courses (crushed aggregate) 8,500 Ton

DESCRIPTION OF WORK in US CUSTOMARY UNITS

FP-14

O ne

S ch ed ul e Sc h N am e

_A

DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 6,500 409 Micro Surfacing 5,000 SY 412 Asphalt Tack Coat (asphalt surface treatment) 12 Ton 413 Asphalt Pavement Milling 12,000 SY 418 Asphalt Concrete Pavement Patching 2,500 SY

DIVISION 550 – Bridge Construction 552 Structural Concrete (concrete – major structures) 150 CY 554 Reinforcing Steel 17,000 lb 556 Bridge Railing (timber) 500 LNFT 557 Timber Structures (timber trail bridges) 200 LNFT 557 Timber Structures (timber pedestrian bridge) 30 LNFT

DIVISION 600 – Incidental Construction 601 Minor Concrete Structures (concrete – minor structures) 50 CY 602 Culverts & Drains (culverts) 1,200 LNFT 604 Manholes, Inlets, & Catch Basins(culverts & drains) (manhole) 3 Each 605 Underdrains, Sheet Drains & Pavement Edge Drains (culverts & drains) (trench drain) 400 LNFT 609 Curb & Gutter (concrete – minor structures) (gutter) 100 LNFT 615 Sidewalks, Pads & Paved Medians (concrete – minor structures) 1,500 SY 617 Guardrail 300 LNFT 618 Concrete Barriers & Precast Guardwalls 1,200 LNFT 620 Stone Masonry Guard wall 400 LNFT 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 625 Seeding and Mulching All 633 Permanent Traffic Control (traffic control devices) 200 SF 634 Permanent Pavement Markings (traffic pavement markings) 10,000 LNFT 635 Temporary Traffic Control – Flagger 2,500 Hours 635 Temporary Traffic Control – Pilot Car 500 Hours 646 Roadside Development (restroom ) 1 Each 646 Roadside Development (kiosk) 1 Each

File details come from the government source that posted it. Updated .