Extg_Trailhead_Rehab_Earthwork_100_.pdf
PDF 11 KB Posted
- Attached to
- OR DOT 26(2), Mirror Lake Trailhead Relocation Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00022
About this file
Extg Trailhead Rehab_Earthwork_100%
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Mirror_Lake.pdf | ||
| Amendment_No._A001.pdf | ||
| Q&A_-_05-23-17.pdf | ||
| Mirror_Lake_Trailhead_Plans_Revised_Final_4-24-17.pdf | ||
| SWPPP_OR_DOT_26(2)_Mirror_Lake_Tralhead_Relocation.pdf | ||
| Mirror_Lake_Trailhead_Design_Cross_Sections_Final_3-20-17.pdf | ||
| Geotechnical_Memo_GM39-16.PDF | ||
| Plan_Request_form_Mirror_Lake.pdf | ||
| Mirror_Lake_Lot_Earthwork_100_.pdf | ||
| Geotechnical_Report_GR16-16.pdf | ||
| Glacier_View_Earthwork_100_.pdf | ||
| IFB_Mirror_Lake.pdf | ||
| OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf | ||
| Prelim_Letter_OR_DOT_26(2).pdf | ||
| PROJECT_DESCRIPTION_OR_DOT_26(2).pdf | ||
| OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross Section Set Name:
Alignment Name:
Input Grid Factor: 1 Note:
Baseline Station
Factor Area Volume Adjusted Factor Area Volume Adjusted 1404+40.000 1 0 0 0 1 0 0 0 1404+60.000 1 0 0 0 1 0 0 0 1404+75.000 1 12.15 3.37 3.37 1 0 0 0 1404+80.000 1 13.67 2.39 2.39 1 0 0 0 1405+00.000 1 15.02 10.62 10.62 1 0 0 0 1405+20.000 1 18.46 12.4 12.4 1 0 0 0 1405+40.000 1 25.32 16.21 16.21 1 0 0 0 1405+60.000 1 33.36 21.73 21.73 1 0 0 0 1405+80.000 1 38.94 26.78 26.78 1 0 0 0 1406+00.000 1 41.69 29.86 29.86 1 0 0 0 1406+20.000 1 48.7 33.48 33.48 1 0 0 0 1406+40.000 1 50.88 36.88 36.88 1 0 0 0 1406+60.000 1 68.18 44.1 44.1 1 0 0 0 1406+80.000 1 75.34 53.16 53.16 1 0 0 0 1407+00.000 1 95.22 63.17 63.17 1 0 0 0 1407+20.000 1 93.92 70.05 70.05 1 0 0 0 1407+40.000 1 83.61 65.75 65.75 1 0 0 0 1407+60.000 1 60.88 53.52 53.52 1 0 0 0 1407+80.000 1 55.46 43.09 43.09 1 0 0 0 1408+00.000 1 55.95 41.26 41.26 1 0 0 0 1408+20.000 1 60.24 43.03 43.03 1 0 0 0
End Area Volume Report Report Created: 2/10/2017
Time: 12:54pm
Extg. Trailhead Rehab 46V-126
- - - - - - - - - - - - - - - - Station Quantities - - - - - - - - - - - - - - - -
- - - - - - - - - - Cut - - - - - - - - - - - - - - - - - - - - Fill - - - - - - - - - -
All units in this report are in feet, square feet and cubic yards unless specified otherwise.
1408+40.000 1 55.5 42.87 42.87 1 0.02 0.01 0.01 1408+60.000 1 61.63 43.38 43.38 1 0.01 0.01 0.01 1408+80.000 1 57.47 44.11 44.11 1 0 0 0 1409+00.000 1 34.2 33.95 33.95 1 2.43 0.9 0.9 1409+20.000 1 30.09 23.81 23.81 1 0 0.9 0.9 1409+40.000 1 32.26 23.1 23.1 1 0 0 0 1409+60.000 1 28.89 22.65 22.65 1 0 0 0 1409+80.000 1 20.49 18.29 18.29 1 0.45 0.17 0.17 1410+00.000 1 18.53 14.45 14.45 1 0.07 0.19 0.19 1410+20.000 1 14.99 12.42 12.42 1 0.04 0.04 0.04 1410+40.000 1 12.46 10.17 10.17 1 0 0.02 0.02 1410+60.000 1 12.47 9.23 9.23 1 0.01 0.01 0.01 1410+80.000 1 0 4.62 4.62 1 0 0.01 0.01 1411+00.000 1 0 0 0 1 0 0 0
SHEET L.1
Cut Vol (CUYD) 974 Fill Vol (CUYD) 3
973.91 973.91 2.26 2.26Grand Total: