OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf
PDF 20 MB Posted
- Attached to
- OR DOT 26(2), Mirror Lake Trailhead Relocation Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00022
About this file
Preliminary Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Mirror_Lake.pdf | ||
| Amendment_No._A001.pdf | ||
| Q&A_-_05-23-17.pdf | ||
| Mirror_Lake_Trailhead_Plans_Revised_Final_4-24-17.pdf | ||
| SWPPP_OR_DOT_26(2)_Mirror_Lake_Tralhead_Relocation.pdf | ||
| Mirror_Lake_Trailhead_Design_Cross_Sections_Final_3-20-17.pdf | ||
| Extg_Trailhead_Rehab_Earthwork_100_.pdf | ||
| Plan_Request_form_Mirror_Lake.pdf | ||
| Mirror_Lake_Lot_Earthwork_100_.pdf | ||
| Geotechnical_Memo_GM39-16.PDF | ||
| Geotechnical_Report_GR16-16.pdf | ||
| Glacier_View_Earthwork_100_.pdf | ||
| IFB_Mirror_Lake.pdf | ||
| OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf | ||
| Prelim_Letter_OR_DOT_26(2).pdf | ||
| PROJECT_DESCRIPTION_OR_DOT_26(2).pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEDERAL HIGHWAY ADMINISTRATION
U. S. DEPARTMENT OF TRANSPORTATION
Project Location
Projects, FP-14 US Customary Units of Roads and Bridges on Federal Highway
Standard Specifications for Construction
APPROVED:
DATE
structures and paving drainage and aggregate base, Excavation and embankment, FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
TYPE OF CONSTRUCTION:
DESIGN DESIGNATION:
SPECIFICATION:
A.1
A.2
A.3
C.4
H.2
TITLE SHEET
PLAN SYMBOLS AND ABBREVIATIONS
SUMMARY OF QUANTITIES
STANDARD DRAWINGS
A. GENERAL INFORMATION
B. SUMMARIES
C. TYPICAL SECTION(S)
D. PLAN-PROFILE
G. EROSION CONTROL
I. DRAINAGE
J. TEMPORARY TRAFFIC CONTROL PLAN
Western Federal Lands Highway Division
Director, Project Delivery, INDEX TO SHEETS
PROJECT MANAGER
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
PLANS PREPARED BY
OREGON
CLACKAMAS COUNTY
MT. HOOD NATIONAL FOREST
PLANS FOR PROPOSED PROJECT
COMMITMENT TO EXCELLENCE
FEDERAL LANDS HIGHWAY
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
P A
C F
I C
I O
E C
A N
C
OLUMBIA R
IV
ER
S N
A K E
R
IV
E R
Lake
Malheur Lake
Harney
Lake
Summer
D E S
C H
U T
E S
R I
V E
R
Lake
Klamath
Upper
Abert
Lake
OREGON KEY MAP
LAKE N.P.
CRATER
REFUGE
WILDLIFE
NATIONAL
MALHEUR
RANGE
ANTELOPE
NATIONAL
HART MT.
Grants Pass
MEDFORD
Ashland
Roseburg
EUGENE
Bend
Corvallis
Newport
SALEM
PORTLAND
Astoria
Pendleton
La Grande
Ontario
Burns
Falls
Klamath
Bend
North
City
Baker
Dalles
The
WASHINGTON
I D
A H
O
NEVADACALIFORNIA
20 26
OR DOT 26(2)
PROJECT SITE
SEE VICINITY MAP
N
Scale in miles
0 6
T. 3 S. R. 8 E.
T. 4 S. R. 8 E.
T S
R E
T S
R E
T. 3 S. R. 8 E.
T. 2 S. R. 8 E.
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T S
R E
T. 3 S. R. 7 E.
T. 4 S. R. 7 E.
54321
17 miles
To Sandy
Mike Odom
A.4 ALIGNMENT DATA
D.2-5
E.2-3
US 26 PLAN AND PROFILE
ACCESS ROADS PLAN AND PROFILE
E.4
E.5
MIRROR LAKE PARKING LOT SITE PLAN
J.2-4
J.5-7
TEMPORARY TRAFFIC CONTROL STAGE I
TEMPORARY TRAFFIC CONTROL STAGE II
US 26 TYPICAL SECTION
MIRROR LAKE PARKING LOT TYPICAL SECTION
EAST SKI BOWL PARKING LOT TYPICAL SECTION
SKI BOWL PARKING LOT PLAN AND PROFILE
E.9 EXISTING MIRROR LAKE DECOMISSIONED TRAIL
I.6-10
I.11
C.2-3
E.6 MIRROR LAKE TRAIL SITE PLAN
H.3
H.4
H.5
C.5
TRAIL TYPICAL SECTION
NORTH AND SOUTH ACCESS ROAD AND
G.8
G.9
G.10
CONSTRUCTION ENTRANCE DETAIL
CHECK DAM DETAIL
SEDIMENT FENCE DETAIL
VICINITY MAP
LENGTH 0.44 MILES
G.2-7 EROSION CONTROL PLANS
e (max)
V
ADT (2033)
ADT (2013)
0.040
55 MPH
15,300
10,800
SEDIMENT TRAP DETAILS
C.1 TABULATION OF TYPICAL SECTION QUANTITIES
TABULATION OF TYPICAL SECTION QUANTITIESD.1
E. ACCESS ROADS AND PARKING AREAS
E.1
PARKING AREA QUANTITIES
TABULATION OF ACCESS ROADS AND
E.7-8
F.1
LANDSCAPE ARCHITECT CONCEPT
MIRROR LAKE PARKING LOT
G.1 TABULATION OF EROSION CONTROL QUANTITIES
I.1 TABULATION OF DRAINAGE QUANTITIES
I.2-3 NORTH AND SOUTH WATER QUALITY SWALES
I.4
I.5 DRAINAGE DETAILS
CAMP CREEK BRIDGE PLAN AND ELEVATIONH.1
H. STRUCTURES AND RETAINING WALL(S)
NORTH ACCESS ROAD WALL PLAN AND ELEVATION
MIRROR LAKE PARKING LOT WALL PLAN AND ELEVATION
MIRROR LAKE PARKING LOT PLAN AND PROFILE
SKI BOWL PARKING LOT DRAINAGE PLAN AND PROFILE
J.1
F. LANDSCAPE ARCHITECT CONCEPT
B.1-3
QUANTITIES
TABULATION OF TEMPORARY TRAFFIC CONTROL
QUANTITIES
BRIDGE GENERAL NOTES AND TABULATION OF
TABULATION QUANTITIES
RETAINING WALL GENERAL NOTES AND
45 miles
Springs
To Warm
40 miles
River
To Hood
RELOCATION
MIRROR LAKE TRAILHEAD
A.1
STATE PROJECT
NUMBER
SHEET
A
M u g u s t
I n t_ ft
D
P F F
H A
X
C A
D R
H S
H E
E T S O
R a a .d g n
OR OR DOT 26(2)
C h e c k e d b y
D e s ig n e d b y D a n I li y n
PRELIM
IN
ARY
Not For
Con str uc tio
STATE PROJECT
NUMBER
SHEET
A.3OR DOT 26(2)OR
N
VICINITY MAP
BEGIN PROJECT END PROJECT
Scale in miles
0 321
20 miles
To Sandy
T. 3 S. R. 8 E.
T. 4 S. R. 8 E.
T S
R E
T S
R E
T. 3 S. R. 8 E.
T. 2 S. R. 8 E.
T S
R E
T S
R E
T S
R E
T S
R E
C h e c k e d b y
D e s ig n e d b y D a n I li y n
M a y
E 7877195.03
N 599203.02
1465+47.00
MIRROR LAKE TRAILHEAD
E 7874864.32
N 599356.90
1442+11.00
MIRROR LAKE TRAILHEAD
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R a c .d g n
Decomissioned Trail
Existing Mirror Lake 45 miles
Springs
To Warm
40 miles
River
To Hood
PRELIM
IN
ARY
Not For
Con str uc
P .C .S
.5
P .T
.5
P .O .T
.4
V
P .O .T
.4
R
W
R
W
R
W
V
V
V
.0
L = 494.01 ft
T = 247.62 ft
R = 2864.79 ft
P .S R
W
.7
P .S .C R
W
.7
P .C .S
V
.7
P .T
V
.7
L = 497.50 ft
T = 249.38 ft
R = 2864.79 ft
"46V-126" Line
P .I
.0
R
W
R
W
R
W
P .I R
W
.3
US HWY 26
US HWY 26
centerline
US 26 Construction alignment)
(Record R/W
"RW" line
R
W
.9
"46V-126" Line
E n d
V L in e
L = 494.01'
T = 247.62'
R = 2864.79'
L = 497.50'
T = 249.38'
R = 2864.79'
"46V-126" Line
STATE PROJECT
NUMBER
SHEET
ALIGNMENT DATA
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R a d .d g
C h e c k e d b y
D e s ig n e d b y D a n I ly n
A.4OR DOT 26(2)OR
PRELIM
IN
ARY
Not For
Con str uc surface pavement
Existing
Sawcut Sawcut Asphalt pavement milling
US 26 TYPICAL
1:4
1:4
L
1:
US26
C on sheet C.4
Parking Lot typical
See Mirror Lake
2'-0" 8'-0"
1:2 1:4
3'-0" 6'-0" 2'-0" 8'-0"
For details, see sheet I.5
Water quality swale
1:2 1:4
3'-0" 6'-0" 2'-0" 8'-0" 7'-0"
Shoulder
2%
12'-0"
Traveled way in two equal lifts
6-inch compacted depth placed
Hot asphalt concrete pavement
8'-0" 8'-0"
4'-0" 12'-0" 12'-0"
Traveled way
2-inch depth
Profile grade
2%
12'-0" 7'-0" 8'-0"
Traveled way Shoulder
2-inch compacted depth
Hot asphalt concree pavement
1:4
3'-0"6'-0"2'-0"8'-0"
For details, see sheet I.5
Water quality swale
1444+45.0 to 1446+45.0
** 1446+51.0 to 1448+07.0
1448+07.0 to 1450+71.0
Shoulder
4'-0" 8'-0" 2'-0" 6'-0"12'-0"
1:
Max
(Secure barrier)
Concrete barrier
M in
1453+50.0 to 1456+20.0 ***1452+06.0 to 1453+50.0
Barrier backfill material
:1
2'-0"9'-0"
(Secure barrier)
Concrete barrier
1456+20.0 to 1457+91.6
2'-0" 9'-0"
Shoulder
1:2
* 1442+11.0 to 1446+51.0
1446+51.0 to 1457+91.6
1:4 Nomin al
1:4 Nomin al
Slope 0
Slope 0
1:4 Nomin al Existing slope Existing slope
0' to 8'
*Varies
0' to 8'
*Varies
Left turn lane
1:4 Nominal
Slope 0
1:3
1:4 Nominal
Sl op e Va rie s1:4 Nominal
Right turn lane
**Varies 0' to 12'
Shoulder
Existing ground
1:3 Nominal
"SCR"
SAWCUT TABLE
STATION
1442+11.0 to 1443+90.0
1443+90.0 to 1446+05.0
1446+05.0 to 1446.60.0
1446.60.0 to 1457+91.6
18'-0"
18'-0"
19'-0"
18'-0" to 19'-0"
27'-0"
26'-0"
21'-1" to 25'-0"
25'-0" to 26'-0"
"SCL"
"SCR"
FOOTNOTE:
1 Superelevate roadway on curves at the rate 'e' as indicated on the plan and profile curve data.
Construct slopes as shown in the Staking Report.
1 1
"SCL"
STATE PROJECT
NUMBER
SHEET
TYPICAL SECTIONS
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R c b .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
C.2OR DOT 26(2)OR
1451+70.0 to 1452+20.0
1442+20.0 to 1444+20.0
2%
2%
*** 17'-0" to 9'-0" 1'-0"
Subsurface drain
1'-0"
6'-0"
12-inch Compacted depth
Aggregate base
1:2
4'-0"
Slope 0
PRELIM
IN
ARY
Not For
Con str uc surface pavement
Existing
Sawcut
US 26 TYPICAL
L
US26
C
STA 1463+77.5 to 1464+47.0
L
US26
C
SawcutUS 26 TYPICAL
(Secure barrier)
Concrete barrier
M in
2-inch compacted depth
Hot asphalt concrete pavement
Varies "SCR"
4'-0" 12'-0" 12'-0" 12'-0" 9'-0" 2'-0" 6'-0"
1:2
2% (Secure barrier)
Concrete barrier
ShoulderTraveled wayTraveled way
2-inch depth
Asphalt pavement milling
1457+91.6 to 1462+95.0
1462+95.0 to 1465+47.0
12'-0"12'-0"
"SCR"
Traveled way Traveled way
Profile grade
Profile grade
2-inch compacted depth
Hot asphalt concrete pavement
2'-0"
Shoulder
"ML" "MR"
Existing EP
Left turn lane
Existing slope Existing slope
1:3 Nominal
"ML"STATION
1457+91.6 to 1458+00.0
1458+00.0 to 1460+20.0
8'-0"
8'-0"
8'-0" to 12'-0"
8'-0"
0'-0"
FOOTNOTE:
1 Superelevate roadway on curves at the rate 'e' as indicated on the plan and profile curve data.
Construct slopes as shown in the Staking Report.
MEDIAN WIDTH TABLE
"MR"
1460+20.0 to 1462+40.0
1462+40.0 to 1462+95.0 12'-0" to 13'-0"
8'-0" to 4'-0"
4'-0" to 0'-0"
Shoulder
2'-0"
Existing ground
1'-0"
2%
2%
6'-0"
1'-0"
Subsurface drain
12-inch compacted depth
Aggregate base milling 2-inch depth
Asphalt pavement
STATION
1457+91.6 to 1458+00.0
1458+00.0 to 1462+95.0
26'-0"
1462+95.0 TO 1465+47.0
SAWCUT TABLE
"SCR"
26'-0" to 17'-0"
17'-0"
12-inch compacted depth
Aggregate base
STATE PROJECT
NUMBER
SHEET
TYPICAL SECTIONS
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R c c .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
C.3OR DOT 26(2)OR
placed in two equal lifts
6-inch compacted depth
Hot asphalt concrete pavement
Varies
1:3 Nominal 1:2
Guardrail placed in two equal lifts
6-inch compacted depth
Hot asphalt concrete pavement
:1
1:
Max
Varies 9'-0" to 2'-0"
PRELIM
IN
ARY
Not For
Con str uc
Varies
Sawcut
1:3
12'-6"
12'-6"
TYPICAL
MIRROR LAKE PARKING LOT
Shoulder ShoulderParking stall Parking stall
L
L grade
Profile
1:1.5
C
"S"
"M"
C
See US26 typicals on sheet C.2
Retaining wall
For details, see sheet H.4 grade
Ditch profile
1'
Varies grade
Ditch profile
C
"S"
L
Traveled wayTraveled way
18'-0"5'-0"1'-6"3'-0"Varies6'-0"
Sl op e va rie s
18'-0" 5'-0" 5'-0"
1.5% 1.5%
"M" 4+43.0 to 5+69.0
6-inch compacted depth
Aggregate base placed in two equal lifts
4-inch compacted depth
Hot asphalt concrete pavement
6-inch compacted depth
Aggregate base placed in two equal lifts
4-inch compacted depth
Hot asphalt concrete pavement
TYPICAL 2
EAST SKIBOWL PARKING LOT WIDENING
"S" 27+26.5 to 33+07.0
1:
2.0%
4'-0" Varies2'-0"
Existing EP
18'-0"
Parking stall
25'-0"
Traveled way
18'-0"
Parking stall
18'-0"
Parking stall
12'-6"
Depth 0" to 2"
Asphalt pavement milling crown
Existing
* "S" 24+30.0 to 24+80.0
"S" 24+80.0 to 27+26.5
TYPICAL 1
EAST SKIBOWL PARKING LOT WIDENING
1:2 1:
Existing EP
4'-0"
*10'-0"
Varies2'-0"
Traveled way
2-inch compacted depth
Hot asphalt concrete pavement overlay
FOOTNOTE:
Construct slopes as shown in the Staking Report.
**Varies 12'-6" to 26'-6"
** "M" 3+00.0 to 4+43.0
STATE PROJECT
NUMBER
SHEET
TYPICAL SECTIONS
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R c d .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
C.4OR DOT 26(2)OR
36-inch depth embankment special rock
Reinforced
For details, see sheet H.4 wall with pedestrian railing
Stone masonry rock seat
PRELIM
IN
ARY
Not For
Con str uc
LC
"NA"
LC
"SA"
4' 4'
Sl . 1 :2
Sl. 1:2
Sl. 1:2
Sl . 1 :2
LC
"T"
"T" 2+40.0 to 14+84.9
6-inch compacted depth
Aggregate base
"SA" 10+43.4 to 11+53.5
* "SA" 11+53.5 to 12+48.0 placed in two equal lifts
4-inch compacted depth
Hot asphalt concrete pavement 6-inch compacted depth
Aggregate base
1:2
1:3 2.0%
2.0%
1:3 1:2
1'-6"3'-0"2'-0" 14'-0" 14'-0"
*8'-0" *8'-0"
Traveled way Traveled way
2'-0"3'-0"
"NA" 5+89.0 to 9+80.0
6-inch compacted depth
Aggregate base placed in two equal lifts
4-inch compacted depth
Hot asphalt concrete pavement
1:2 1:3
2.0% 2.0%
1:3
1:2
1'-6"3'-0"2'-0" 14'-0" 14'-0" 2'-0"3'-0"
Traveled way Traveled way
"NA" 8+78.0 to 9+38.0
2'-0"
1:3
1:2
2'-0"3'-0"
Guardrail
"NA" 5+89.0 to 7+50.0
3-inch compacted depth
Sidewalk, decomposed granite
TYPICAL
NORTH ACCESS ROAD
TYPICAL
SOUTH ACCESS ROAD
TRAIL TYPICAL
Shoulder Shoulder
Shoulder Shoulder
STATE PROJECT
NUMBER
SHEET
TYPICAL SECTIONS
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R c e .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
C.5OR DOT 26(2)OR
sheet H.5
For details, see
Retaining wall
"T" 14+84.9 to 15+15.9 (Bridge Section)
PRELIM
IN
ARY
Not For
Con str uc
CP15105
CP15106
CP
CP
P .C .S
.5
T
TR
N
1443+001442+00
US HWY 26
1444+00 1445+001441+001440+001439+001438+00
Cut slope
Fill slope
Existing ground at CL
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15105
15106
599386.062
599370.345
7874831.286
7875104.621
3603.18
3623.61
LEGEND
DEVICE SYMBOL
Check dam
Sediment trap
Riprap slope protection Sawcut
B e g in t a p e r
Sawcut
Taper 55:1
Paving limit
B e g in t a p e r
Taper 55:1
24"-75'
Area of potential effect
Area of potential effect
Profile grade at sawcut rt.
CUYD
EXC.
CUYD
EMB.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R d b .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR D.2OR DOT 26(2)
check dam, (Typ.)
Construct permanent
For details, see sheet I.2
Construct water quality swale - 200'
For details, see sheet I.3
Construct water quality swale - 200' For details, see sheet I.11
Construct sediment trap
1444+25 to 1444+45
Guardrail)
Terminal (Concrete Barrier/
(class 2)- 5.5 CuYd slope protection
Construct riprap match to existing ditch
(class 2) - 11.1 CuYd
Construct riprap slope protectionto Guardrail)
Transition (Concrete Barrier
For details, see sheet I.11
Construct sediment trap
1442+19 to 1442+39
BEGIN PROJECT
El 3606.72'
E 7874864.32
N 599356.90
1442+11.00
OR DOT 26(2)
PRELIM
IN
ARY
Not For
Con str uc
CP15107
CP15115
CP15116
CP15117
CP15119
CP
CP
CP
CP
CP
CP
"N A
N
A
N
A
N
A
N
A
N
A
P .T N
A
.4
P .C N
A
.1
P .T N
A
.7
P .C N
A
.3
P .T N
A
.9
P .C N
A
.0
P.T.
"NA" 9+
66.04
"NA" 10
+00.00
"SA" 10+00.00
L = 233.43'
T = 123.45'
R = 290.00'
L = 71.62'
T = 36.20'
R = 200.00'
L = 62.60'
T = 31.42'
R = 300.00'
L
.0
T
.3
R
.0
M
T
N
1450+001449+00
US HWY 26
1451+00 1452+001448+001447+001446+00
LExisting ground at C
340 Riparian reserve
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15107
15115
15116
15117
15119
599259.782
599332.096
599243.367
599426.592
599430.648
599375.147
7875300.883
7875552.630
7875694.833
7875610.522
7875724.574
7875847.876
3637.13
3647.20
3656.19
3657.45
3660.70
3669.88
Barlow road
Sawcut
Sawcut
Cut slope E n d t a p e r
Taper 13:1
NORTH ACCESS ROAD
24"-160' 24"-10'
24"-110' by others power and communications
Relocate underground communications by others
Relocate underground
End taper 1448+07.0
.0
P .T
.5
Profile grade at sawcut rt.
Taper 18:1
1433+50, 52' rt.
Begin taper barrier rt.
Concrete
P .O .T
.4
V
P .O .T
.4
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R d c .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR D.3OR DOT 26(2)
check dam (Typ.)
Construct permanent buried in backslope
Concrete barrier grate and 2' sump type I, with type A
Construct catch basin
1452+29.75
Protect Barlow Road
For details, see sheet H.5
Construct retaining wall by others
Relocate utility pole grate and 2' sump type I, with type A
Construct catch basin
1452+19.75
1446+90.0
Begin taper 1446+51.0
End taper profile for plan and
See sheet E.2
"NA" line for plan and profile
See sheet E.3
"SA" line
For details, see sheet I.11
Sediment trap
1450+41 to 1450+61
For details, see sheet I.11
Construct sediment trap
1450+31 to 1450+51
PRELIM
IN
ARY
Not For
Con str uc
CP
CP
N
1457+001456+00
US HWY 26
1458+00 1459+001455+001454+001453+00
Cut slope
Fill slope
LExisting ground at C
Existing permanent easement
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
599242.184
599277.501
7876027.378
7876444.999
3671.71
3686.50
24"-21'
Sawcut
Sawcut
Begin taper rt.
Taper 55:124"-10'
24"-66'
Area of potential effect
1458+00
Taper 18:1
1433+50
End taper rt.
Concrete barrier rt.
Protect Barlow road
Profile grade at sawcut rt.
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R d d .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR D.4OR DOT 26(2)
check dam (Typ.)
Construct permanent
Barlow road
Protect Barlow road type A grate and 2' sump
Construct catch basin, type I with
1456+39.15 type A grate and 2' sump
Construct catch basin, type I with
1456+49.15
For details, see sheet I.11
Construct sediment trap
1457+10 to 1457+30
PRELIM
IN
ARY
Not For
Con str uc
CP15108
CP
CP
P .I
.0
TR T
N
1464+001463+00
US HWY 26
1465+00 1466+001462+001461+001460+00
Fill slope
LExisting ground at C
340' Riparian reserve
Existing permanent easement
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15108
599253.871
599273.008
7877036.257
7876694.499
3698.42
3693.26
Taper 55:1 sign existing
Protect
Sawcut
Paving limit
24"-10'
24"-105'
Area of potential effect
Area of potential effect
Profile grade at sawcut rt.
Concrete barrier rt. Guardrail rt.
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R d e .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR D.5OR DOT 26(2)
with type A grate and 2' sump
Construct catch basin, type I
1462+34.82 with type A grate and 2' sump
Construct catch basin, type I
1462+24.82
.0
E n d B e g in t a p e r
.0
E n d t a p e r
Taper 25:1
END PROJECT
El 3702.87'
E 599203.02
N 7877194.97
1465+47.0
OR DOT 26(2)
PRELIM
IN
ARY
Not For
Con str uc
CP15107
CP15116
CP15117
CP
CP
CP
CP
CP
P .O .T
.4
V
P .O .T
.4
"N A
N
A
N
A
N
A
N
A
N
A
P .T N
A
.4
P .C N
A
.1
P .T N
A
.7
P .C N
A
.3
P .T N
A
.9
P .C N
A
.0
P.T.
"NA" 9+
66.04
"NA" 10
+00.00
M
.0
"SA" 10+00.00
P .T
.5
L = 233.43'
T = 123.45'
R = 290.00'
L = 71.62'
T = 36.20'
R = 200.00'
L = 62.60'
T = 31.42'
R = 300.00'
L
.0
T
.3
R
.0
.0
.0
.0
.7
.0
.9
.0
.1
.0
.9
1.0000%
6.0
-1.0000% 2.0000%
130' VC
K=26
84' VC
K=12
60' VC
K=20
TT
N
US HWY 26
10+008+007+006+005+004+00
9+00
Cut slope
Fill slope
Profile grade at CL
Existing ground at CL
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15107
15115
15116
15117
599332.096
599243.367
599426.592
599430.648
7875552.630
7875694.833
7875610.522
7875724.574
3647.20
3656.19
3657.45
3660.70
Match existing
Barlow road
"NA" line
P.I. "SA" 10+00.0
P.I. "NA" 10+00.0=
P.O.T. 1451+14.0=
NORTH ACCESS ROAD
"N A
Area of potential effect
"NA" Line
Paving limits
R4 0'
R18'
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e b .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR E.2OR DOT 26(2)
Guardrail rt.
See sheet E.3 for plan and profile
"SA" line by others
Relocate utility pole
For details, see sheet H.5
Construct retaining wall road
Barlow
Protect
PRELIM
IN
ARY
Not For
Con str uc
P G
E
S S
M H
S S
M H
S S
M H
C P
C P
C P
C P
E M
H
P .C S
A
.5
N
A
.0
"M" 6+00 S
A
S
A
S
A
S
A
.0
P .T S
A
.8
L = 71.32'
T = 36.04'
R = 200.00'
.4
.8
.5
.2
.2
.8
.0
.2
.0
.2
-2.0000% 2.0000%
-14.0000%
-12.5000%
60' VC
K=15
30' VC
K=2
12' VC
K=8
N
U S H
W Y
14+009+00
10+00 11+00 12+00 13+00 slope
Cut
Profile grade at CL
Existing ground at CL
3635 3635
340' Riparian reserve easement permanent
Existing
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15115
15128
599243.367
599092.560
7875694.833
7875721.811
3656.19
3652.36
Match existing
P.I. "SA" 10+00.0
P.O.T. 1451+14.0=
"SA" line
SOUTH ACCESS ROAD
P.O.C. "M" 6+03.93
P.O.C. "SA" 11+38.52=
limit
Paving existing gate
Remove and replace
Area of potential effect
R4 0'
R
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e c .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR E.3OR DOT 26(2)
S
A for plan and profile
See sheet E.4
"M" line
PRELIM
IN
ARY
Not For
Con str uc
TV
CP15114
CP15115
CP15120
CP15121
CP15122
CP15128
CP
CP
CP
CP
CP
CP
T
"T" 4+00
"T
M
M
M
M
M
M
.0
P .C
M
.0
P .R .C
M
.0
P .T
M
.3
M
.3
"SA" 11+00
"SA" 12+00
L = 225.00'
T = 113.48'
R = 700.00'
L = 108.31'
T = 54.75'
R = 300.00'
M
.0
.0
.0
.2
.5
.3
.0
.1
.0
.6
2.0000%
3.000 0%
5.5
2.5000
65' VC
K=26
36' VC
K=12
N
4+00
3+00 5+00 6+00 7+00 8+00 9+00
Fill slope
LProfile grade at C
LExisting ground at C
MIRROR LAKE PARKING LOT
PARKING
LOT
SKI BOWL
easement permanent
Existing
340' Riparian reserve
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15115
12120
15121
15122
15128
599102.693
599243.367
599163.245
599121.573
599170.807
599092.560
7875852.976
7875694.833
7875637.807
7875525.595
7875377.030
7875721.811
3665.47
3656.19
3656.26
3643.99
3642.210
3652.36
15114
Sawcut
Match existing
"M" line restroom vault
Construct
"SA line"
S O
U T
H A
C C
E S S
R O
A D
N O
R T
H A
C C
E S
S R
O A
D
P.O.C. "SA" 11+38.52
P.O.C. "M" 6+03.94=
24"-78'
Area of potential effect road
Barlow manhole sanitary
Protect vault communications
Protect
"M" Line
Cut slope gutter concrete
Construct kiosk
Construct table
Picnic
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e d .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR E.4OR DOT 26(2)
M
.0 with pedestrian railing masonry guard wall
Construct stone For details, see sheet H.4
Construct retaining wall
PRELIM
IN
ARY
Not For
Con str uc
CP15120
CP15121
CP15122
CP15128
CP
CP
CP
CP
CP
N
Cut slope
MIRROR LAKE PARKING LOT
340' Riparian reserve
Existing permanent easement
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15115
12120
15121
15122
15128
599243.367
599163.245
599121.573
599170.807
599092.560
7875694.833
7875637.807
7875525.595
7875377.030
7875721.811
3656.19
3656.26
3643.99
3642.210
3652.36 spaces parking
Handicap
T y p
Typ.
9'
Fill slope
5'
5'
"M" Line
Protect trees
M
M
M
M
"SA" Line
US HWY 26
S O
U T
H A
C C
E S
S R
O A
D
Area of potential effect restroom vault
Construct table
Picnic kiosk
Construct gutter concrete
Construct
R
R1 0'
R
R
R
R10'
STATE PROJECT
NUMBER
SHEET
SITE PLAN
MIRROR LAKE PARKING LOT
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e e .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
E.5OR DOT 26(2)OR
plaza
Stone sidewalk granite
Decomposed
See sheet E.6
"T" Line
PRELIM
IN
ARY
Not For
Con str uc
CP15122
CP15123
CP15124
CP15125
CP15126
CP15127
CP
CP
CP
CP
CP
CP
CP15129
CP
CP
CP15130
CP15131
CP
N Cut slope
Existing Permanent easement
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
15122 599170.807 7875377.030 3642.21
15123 599067.778 7875318.713 3625.95
15124 598970.865 7875270.721 3613.40
15125 599040.016 7875194.537 3605.67
15126 599154.982 7875218.116 3622.81
15127 599198.635 7875116.760 3620.36
15129 599062.207 7875063.790 3597.90
15130 599144.807 7875000.431 3605.52
"T
"T
"T " 1
"T " 1
T
"T " 1
0+
"T" 9+00
"T" 8+
T
"T
"T
"T" 4+00
T
(typ.)
Grade break
(typ.)
7.5% w/ 2% landings
Construct 30' ramp @
Grade break
"T" Line
340' Riparian reserve
Area of potential effect
Area of potential effect
Area of potential effect
S lo p e .5
Slope 2%
See sheet H.1
Proposed bridge
STATE PROJECT
NUMBER
SHEET
SITE PLAN
MIRROR LAKE TRAIL
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e f.
d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
E.6OR DOT 26(2)OR
PRELIM
IN
ARY
Not For
Con str uc
EV
TV
TV
CP1511
CP
W
W
W
W
W
W
S
S
S
S
S
S
P .C S
.4
P .T S
.8
P .C S
.1
P .T S
.3
P .C S
.9
P .C .C S
.8
"C " 2
+00
"C " 3
+00
L = 22.40' T = 11.21' R = 300.0
0'
L = 55.24' T = 27.70' R = 300.00'
L = 37.87'
T = 18.96'
R = 300.00'
L =
4.2 2'T =
9.5
2' R =
9.0 0'
.0
.8
.0
.8
.0
.8
.0
.4
.1
.7
.1
.0
-10.0000% 0.0000%
.0
0%
1.1000%
2.3000%
N
Cut slope
Existing permanent ea sement
340' Riparian Reserve
SKI BOWL PARKING LOT
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
Existing ground at EP
Profile grade at EP
L
15112 599017.280 7876538.815 3671.56
Profile grade at Ditch C
Barlow road
"S" Line
24+00 25+00 26+00 27+00 28+00 29+00
S
Sawcut
Paving limit
' T y p
Typ.
9'
' T y p
' T y p
Area of potential effect by others
Relocate utility pole valve water
Protect
"S" Line
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e g .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR E.7OR DOT 26(2)
"C " 1
+00 .00
Construct permanent check dam typ.
"C" Line
For details, see sheet I.4
Construct 18" storm system
For details, see sheet I.5
Construct water quality pond
For details, see shee I.11
Construct sediment trap
"S" 25+16 to "S" 25+36
PRELIM
IN
ARY
Not For
Con str uc
CP15109
CP15110
CP15111
CP
CP
CP
W
W
W
W
W
S
S
S
S
S
S
P .T S
.0
P .C S
.7
P .T S
.2
P .I S
.1
S
.5
L = 254.22'
T = 129.52'
R = 539.00'
L = 85.48'
T = 43.40'
R = 200.00'
.1
.7
.2
.6
.5
.9
3.90 00%
4.30 00%
6.0
N
Cut slope
Existing permanent easement
SKI BOWL PARKING LOT
NAME NORTHING EASTING ELEVATION
CONTROL POINTS
599063.762 7877102.740 3691.5315110
Existing ground at EP
Profile grade at EP
L
15111 598987.526 7876812.792 3680.25
Profile grade at Ditch C
"S" Line
Sawcut
30+00 31+00 32+00 33+00 34+0029+00
15109 599155.600 7877334.970 3704.05
US HWY 26
Paving limit
Area of potential effect valve by others
Adjust water
S pole by others
Relocate utility
.5
.9
"S" Line
CUYD
EXC.
SHEET
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e h .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
OR E.8OR DOT 26(2)
(class 2) protection - 5.8 Cu Yd
Construct riprap slope check dam typ.
Construct permanent
For details, see sheet I.11
Construct sediment trap
"S" 30+19 to 30+39
PRELIM
IN
ARY
Not For
Con str uc
N
US HWY 26
Ca mp c re ek
Area of potential effect
STATE PROJECT
NUMBER
SHEET
DECOMISSIONED TRAIL
EXISTING MIRROR LAKE
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R e i.
d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
E.9OR DOT 26(2)OR
V
V
V
L = 610.58 ft
T = 337.89 ft
R = 572.96 ft
P .C .S
V
.6
V
V
V
P .T
V
.6
V
V
V guardrail
Connect to existing along shoulder
Extend guardrail
Remove existing bridge
"46V-126" Line guardrail
Connect to existing
PRELIM
IN
ARY
Not For
Con str uc
Joint Ski Bowl + NFS Trailhead Sign Monument Special Rock Embankment
(allows Snow Storage and Drainage)
Info Kiosk w Interpretive Panel Restroom
Heavy Timber Picnic Table
(12) Stone Seat w Etched Symbols
Joint Ski Bowl + NFS Trailhead Directional Sign
Info Kiosk w Interpretive Panel Restroom Directional Sign
Stone Masonry Guard Wall with Pedestrian Railing
F R O N T S I D E
Preserve Existing Trees, if possible
Buffer Plantings
Stone Seat, typ.
Decomposed Granite Paving
Stone Sidewalk Paving
S I L C O X H U T S T Y L E
Interpretive Panel (one side)
2.5’
5’
8’
8’
F.1
MIRROR LAKE PARKING LOT
LANDSCAPE ARCHITECT
CONCEPT
PRELIM
IN
ARY
Not For
Con str uc
CONSTRUCTION ENTRANCE - TYPE 1
CONSTRUCTION ENTRANCE - TYPE 2
SECTION B-B
SECTION A-A
SECTION C-C
(TYPE 1 OR 2 WITH EXISTING CURB)
CONSTRUCTION ENTRANCE - TYPE 3
WOODEN CURB RAMP SECTION D-D
Subgrade geotextile aggregate min 8" thick 4"-1" Open graded drain to sediment settling basin Slope construction entrance to
Subgrade geotextile
Roadway construction entrance grade exceeds 2% Diversion ridge required where
2% or grea ter
8" min
(See RD1070) lined with plastic Sandbags or, straw bales
Spillway settling basin Sediment
(See table) Length settling basin provide a sediment If water is collected
FlowFlow ridge Diversion
Min 20'
Provide water to wash tires
15' Min radius residential 25' Min radius commercial
15' Min radius residential 25' Min radius commercial
(See table) Length
Min 20' lined with plastic Sandbags or, straw bales
Spillway
F lo w F lo w
Sediment settling basin not removed for the construction entrance.
entrances in situations where there is curb and the curb is
2. The wooden ramp may be used on either type 1 or type 2 ridge or settling basin.
1. The type 1 entrance is a simple entrance without a diversion
Notes:
(See table) Length
8" Thick over subgrade geotextile 4"-1" Open-graded aggregate min
15' Min radius residential 25' Min radius commercial ramp Wooden
Curb
R o a d w a y
Leave 3" gap for drainage
Wooden ramp (2X4, 2X8, 2X12)
Paved roadway
Aggregate base
Wooden curb rampConstruction entrance
Curb
Length (FT)
Area Of Exposed Soil (Acre)
0.25
0.25 A 1.0
A > 1.0
B B
B B
Min 20'
A A
R o a d w a y
C C
MINIMUM LENGTH
CONSTRUCTION ENTRANCE TABLE
DD
R o a d w a y
STATE PROJECT
NUMBER
SHEET
ENTRANCES
CONSTRUCTION
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R g h .d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
G.8OR DOT 26(2)OR
PRELIM
IN
ARY
Not For
Con str uc
(SHOWN WITH AGGREGATE)
TYPICAL PROFILE SECTION CHECK DAMS
SANDBAG CHECK DAM - TYPE 4
AGGREGATE CHECK DAM - TYPE 1
BIOFILTER BAG CHECK DAM - TYPE 3
SECTION A-A
PLAN
Elevation "U" equals Elevation "D".
L = Spacing along swale or ditch so that when specified or directed Excavate sediment trap
4' Min. (typ.)
24" Min.
Flat
Sl. 1:2
12"
Top of bank
"U" Elev.
Sl . 1 :2
Sl. 1:2
Flow LC ditch
L "D"
Elev.
Sl . 1 :2
Sl. 1:2
Check dam
Width per plan
Pt "B"
Pt "A"
3" Countersink
H+6"
4" - 1" Rock of 6" higher than Pt "B" Pt "A" must be a minimum
NOTE:
Width per plan
Pt "B" Sandbags
Pt "A"
3" Countersink energy dissipation extending 3' downslope for polyethylene plastic sheeting To prevent erosion, place 10 mil.
of 6" higher than Pt "B" Pt "A" must be a minimum
NOTE:
comply with the typical profile section shown above.
3. Spacing between check dams for all check dam types shall
2. Type 4 - Tightly abut or overlap ends of sandbags at each joint.
surfaces. Overlap bags 6" min at each joint.
flush with the top of the bags. Omit stakes if placed over paved stakes per bag. Drive stakes a minimum of 6" into the ground and
1. Type 3 - stake biofilter bags with two 2" X 2" X 18" (min) wood
NOTES: SPACING "L"
MAXIMUM CHECK DAM
Ditch
Grade
6%
5%
4%
3%
2% 25'
H=6" H=12"
15'
20'
25'
30'
50'
15'
80'
50'
40'
30'
25'
H=18"
H = Min dam height
* * Not Allowed
Width per plan
Pt "B"
Pt "A"
3" Countersink of 6" higher than Pt "B" Pt "A" must be a minimum
NOTE:
T o p o f b a n k
T o p o f b a n k
A
F lo w
A
12" Overlap (typ)
STATE PROJECT
NUMBER
SHEET
TYPE 1, 3 AND 4
CHECK DAMS
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R g i.
d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
G.9OR DOT 26(2)OR
PRELIM
IN
ARY
Not For
Con str uc
POST SPACING OVERLAP CONNECTIONTURNED ENDS CONNECTION
SEDIMENT FENCE AND GEOTEXTILE BURY DETAIL - TYPE 1 SEDIMENT ALTERNATE FENCE W/O TRENCHING - TYPE 2
SECTION A-AFRONT VIEW
PLAN VIEW TERMINATION AT CORNER OR PROPERTY LINE TABLE 2
TABLE 1
FOR GENERAL APPLICATION
FENCE SPACING
5. Wing spacing shall comply with table 1.
to the toe of a slope.
4. Locate fence no closer than three feet and soil on uphill side of fence.
3. Compact filter fabric trench backfill geotextile.
posts to prevent separation from side of sediment fence. Position
2. Posts to be installed on downhill
1. Use 2" X 2" wood fence posts.
NOTES:
of two full wraps.
end posts a minimum fence by wrapping Join two runs of is trapped fence to assure sediment Angle ends of sediment
Flow
Flow end connection or the post spacing overlap either the turned ends Connect fence ends with
Geotextile
A A
4'-0"
2'-6"
6"
1'-6"
Post
2'-6"
4'-0"
1'-6"
6"
6"
Flow Existing ground aggregate (if specified) 3/4"-0" dense graded Compacted native backfill or
Geotextile fencing with sewn-in post pockets.
2. Not approved for use with sediment
1. Use must be approved by the engineer.
NOTES:
1'-6"
2'-6"
Post geotextile Sediment fence soil, or approved equal 3/4" min. rock, mineral Bury 1' flap of fence with geotextile Sediment fence
Existing ground
Flow
1'-0"
1'-0" min.
(see table) grade Spacing on
G rade %Flo w
Flo w of slope break up length Install wings to
1 post spacing min
GEOTEXTILE END CONNECTIONS
Sediment Fence with Geotextile elongation less than 50%
Sediment Fence with Geotextile elongation 50% or more
POST SPACING
6'
4'
CONTOURS AS FOLLOWS
INSTALL PARALLEL ALONG
GRADE
ON GRADE
MAXIMUM SPACING
Grade
Grade
Grade
Grade
Grade
300'
150'
100'
50'
25'
10%
15%
20%
30%
10%
15%
20%
30%
STATE PROJECT
NUMBER
SHEET
SEDIMENT FENCE
M a y
I n t_ ft
F F
H A
X
C A
D R
H S
H E
E T S O
R g j.
d
C h e c k e d b y
D e s ig n e d b y D a n I li y n
G.10OR DOT 26(2)OR
PRELIM
IN
ARY
Not For
Con str uc
WESTERN FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
NO. DATE BY REVISIONS DESIGNED BY DRAWN BY CHECKED BY SCALE PROJECT TEAM LEADER
AS SHOWN ON PLANS
NO. DATE BY REVISIONS
BRIDGE DRAWING
of
DATE DRAWING NO.
OR
STATE PROJECT
SHEET
T. STONESD. ALTENBURGA. BLANKENSHIP T. STONES
NOT FOR CONSTRUCTION
PRELIMINARY
MAY 2016
MOUNT HOOD
NATIONAL FOREST
OR DOT 26(2)
MIRROR LAKE TRAILHEAD
L
C le a r w id th
29'-6"
C Structure
28'-0"
B a c k w a ll w id th
PLAN
" = 1'-0"2
1Scale:
deck planks
3" x 8" Minimum
C a m p C r k running planks
2" x 8" Min.
@ 5'-0" max.
4" x 6" Rail posts
9" 9"
3582.72, Typ.
O.H.W.
Top of bank
C Abut. 2
Sta. "T" 15+15.15
L
Top of bank
LC Abut. 1
Sta. "T" 14+85.65
C StructureL see notes
Solid wood blocking, P o s t le n g th larch S1 stringers @ 2'-6"
3 - 8" x 24" Douglas fir
C Stringer, typ.L
S4S Blocking
4" x 6" x 1'-2" deck planks
3" x 8" Minimum
Clear width
6'-0" running planks
2" x 8" Min.
TYPICAL SECTION
" = 1'-0"4
3Scale: E le v a ti o n i n F e e t
" = 1'-0"2 1Scale:
ELEVATION3580
C Structure
Extg. ground @
L larch stringers
8" x 24" Douglas fir
@ 5'-0" max.
4" x 6" Rail posts
O.H.W El. 3582.72
B a c k w a ll
31'-0"
8" x 18" Timber sill, typ.
El. 3585.7
Low chord
El. 3582.7
Btm. conc. footing
Typ.
1'-6"
Concrete footing
C Abut. 1
Sta. "T" 14+85.65
L
9"
C Abut. 2
Sta. "T" 15+15.15
L
9"
Abut. 2
Abut. 1
N
HYDRAULIC DATA
DISCHARGE (cfs) 65.7
2-YEAR
Elevation - (Feet)
Water Surface
3582.72 3583.55 3583.73 3584.19
50-YEAR
100-YEAR
500-YEAR
Velocity at Bridge - (ft/sec)
Average Channel flow
Velocity Upstream of Bridge - (ft/sec)
Average Channel flow
3.65 5.22 5.52 6.25
4.06 5.74 6.11 6.96
01 XXXXXX-X
PLAN AND ELEVATION
CAMP CREEK BRIDGE
H.1
PRELIM
IN
ARY
Not For
Con str uc
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
DATE DRAWING NO.
OR
STATE PROJECT
PRELIMINARY
MAY 2016
MOUNT HOOD
NATIONAL FOREST
OR DOT 26(2)
MIRROR LAKE TRAILHEAD
U n ti tl e d S h e e t
P d x fs p r o je c t\
F F
H A
X
C A
D E
B S
H E
E T S
M L T F
H A
X
G N
.d g n stringer sides.
suspended in steel hangers that are nailed to blocks and
Wood blocking shall be bolted to stringers with steel angles or 7.
the depth of the beam from the centerline of bearing.
to full depth and placed within a distance of 4 3bracing shall be
Bracing required at the ends of girders and at midspan. The 5.
Do not located more than 1 rail splice and any one post.
Splice rails at posts. Rails shall be continuous for 2 post spaces. 4.
air circulation.
" space between blocking and backwall for 2 1Provide a minimum 3.
2'-0" spacing. Alternate sides with 2 at each end.
Fasten running planks to deck with 40d (5" ring shank) nails at 2.
shank nails per plank at each stinger. Alternate sides.
" dia. x 7" ring 16 5Fasten deck planks to stringers with 2 rows of 1.
CONSTRUCTION NOTES: CAMP CREEK BRIDGE
GENERAL NOTES: CAMP CREEK BRIDGE (CONTINUED)GENERAL NOTES: CAMP CREEK BRIDGE
6'-0"
620 lbs. 680 lbs.
620 lbs. 680 lbs.
No Scale
LIGHT-WEIGHT UTILITY VEHICLE DIAGRAM
the plans.
timber. Field drilling of holes shall not be allowed unless otherwise noted on planks). Show all dimensions and fabrication details for all cut or bored
Submit shop drawing for all bridge components (except timber running
FABRICATION:
intended use or service.
accordance with AWS D1.1 and shall be suitable for the grade of steel and
When structural steel is to be welded, the welding procedure shall be in iron washers against wood unless otherwise noted.
50W, with bolts and nuts conforming to ASTM A325, Type 3. Use malleable steel and hardware shall meet the requirements of AASHTO M270 Grade
36, with nuts and bolts conforming to ASTM A307, Grade A weathering unfinished hardware shall meet the requirements of AASHTO M270, Grade
See project design criteria for steel hardware finish. Galvanized or
HARDWARE AND STRUCTURAL STEEL:
holes shall be filled with preservative prior to inserting the fasteners.
solution. Where approved field drilling of bolt of nail holes is required, the carefully trimmed and given three brush coats of the field treatment wood. All abrasion and field cuts - approved by the C.O.R - shall be
Copper naphthenate (2% solution) shall be furnished for field treating OD
FIELD TREATMENT:
-Copper Naphthenate (CuN) in heavy oil
-Pentachlorophenol in heavy oil (Type C solvent) ground contact-heavy duty (UC4B)
-AWPA Use category system (U1) for use category 4B
Sills,Backing Planks, Cribs, & Timber Walls, if treated
-Copper Naphthenate (CuN) in light oil
-Pentachlorophenol in light oil (Type C solvent) above ground-exposed (UC3B)
-AWPA use category System (U1) for use category 3B
Stringers, Decking, Running Planks, & Railing System, if treated
Aquatic Environments".
(WWPI) " Best Management Practices For The Use Of Treated Wood In requirements of the current edition of Western Wood Preservers Institute treatment materials listed below. Treatment will comply with the
American Wood Protection Association (AWPA) Specifications using the type. Preservative treatment shall be in accordance with the current
See project criteria for members identified to be treated and for treatment
TREATMENT:
02 XXXXXX-X
AND TABULATION OF QUANTITIES
BRIDGE GENERAL NOTES
H.2 agency - WWPA, WCLIB
-Hem-fir/douglas fir, S4S, no. 1 grade, grading rules
Treated:
agency - WWPA, WCLIB
-Western red cedar, select structural grade, grading rules
-Redwood, S4S, no 1 grade, grading rules agency - RIS
Untreated:
Rails & Posts grading rules agency - WWPA, WCLIB
-Coastal region douglas fir-larch rough sawn no.2 grade, Running Planks grading rules agency - WWPA, WCLIB
-Coastal region douglas fir-larch rough sawn no.1 grade, Deck planks, curbs, sills, & backing planks for the species, type, and grade specified below.
Solid sawn timber members shall conform to the requirements of the grading rules agency
TIMBER AND LUMBER:
Horizontal and vertical datum provided by WFLHD control points.
DATUM:
spacing is intended to be maximum unless noted otherwise.
minimum concrete covering to the face of any bar shall be 2", unless shown otherwise. All
All reinforcing steel shall conform to AASHTO M31 or M332, Grade 60 deformed. The
REINFORCING STEEL:
All other timber shall be Douglas Fir Larch Grade #2 or better.
Girders shall be Douglas Fir Larch Grade #1 or better.
TIMBER:
For all new concrete provide a Class 1 finish.
CONCRETE FINISH:
unless otherwise shown on the plans.
", 4 3concrete shall be made with low-alkali cement. Chamfer exposed edges of all concrete f'c=3000 psi. All Class A (AE) concrete shall be made with Type II cement. All Class A (AE)
Provide structural concrete, Class A (AE) with a minimum 28-day compressive strength
CAST-IN-PLACE CONCRETE:
Reinforced concrete designed by Load and Resistance Factor Design Method.
DESIGN CRITERIA:
The bridge is not designed for seismic loading.
SEISMIC LOADS:
Light-weight Utility Vehicle - see detail this sheet
LIVE LOAD:
The bridge is designed for 90 psf pedestrian live load.
PEDESTRIAN LIVE LOAD:
Equivalent to a fluid weighing 40 lbs per cubic foot.
LATERAL EARTH PRESSURE:
TIMBER: 0.06 kips pere cubic foot.
CONCRETE: 0.15 kips per cubic foot.
DEAD LOAD:
shall be notified of any discrepancies that may exist before performing related work.
Contractor to field verify all dimensions and elevations prior to ordering material. The CO
Specifications for Construction of Trails and Trail Bridges on Federal Projects.
Bridges on Federal Highway Projects, FP-14, US Customary Units, and and Standard
Federal Highway Administration Standard Specifications For Construction of Roads and
CONSTRUCTION:
Construction.
2015 Interim Revisions and the 2005 National Design Specification (NDS) for Wood
AASHTO LRFD Guide Specifications for the Design of Pedestrian Bridges, 2nd Edition with
DESIGN:
SPECIFICATIONS:
PRELIM
IN
ARY
Not For
Con str uc
U.S. DEPARTMENT OF TRANSPORTATION
OREGON
DATE DRAWING NO.
OR
STATE PROJECT
PRELIMINARY
MAY 2016
MOUNT HOOD
NATIONAL FOREST
OR DOT 26(2)
MIRROR LAKE TRAILHEAD
U n ti tl e d S h e e t
P d x fs p r o je c t\
F F
H A
X
C A
D E
B S
H E
E T S
M L T F
H A
X
G N
.d g n
For additional geotechnical information, see Geotechnical Memorandum.
For sliding calculations, the coefficient of friction is 0.40 and the geotechnical resistance factor is 1.0.
Contract Officer and all representatives, (C0).
2. Construct wall on suitable foundation materials and backfill with suitable material as directed by the
1. The base of the wall is constructed a minimum of 2 ft below final ground surface.
Nominal bearing resistance is based on the following three conditions:
Nominal Bearing Resistance (based on 9-ft reinforcement length) = 5,500 psf. Apply a resistance factor of 0.65.
(Note: Cohesion neglected for all materials.)
Foundation material = XXX lbs/ft3, Effective Friction Angle = XX°
MSE Select Granular Backfill: Unit weight = XXX lbs/ft3, Effective Friction Angle = XX°
MSE Walls are designed for the following soil property values:
GEOTECHNICAL INFORMATION:
Neglect passive pressure resistance on the toe of the wall.
Live Load surcharge pressure = 200 psf
All welded connections at transverse grid members <= 0.48 Fy
Strip or grid-type reinforcements and connections <= 0.55 Fy
Allowable tensile stress in steel reinforcements shall meet the following limits:
Carbon steel loss = 0.47 mils per year after zinc depletion.
Zinc galvanization loss = 0.16 mils per year for the subsequent years.
Zinc galvanization loss = 0.59 mils per year for the first 2 years.
Use the following loss rates for galvanized steel soil reinforcements:
Provide a minimum service life of 100 years for all wall components.
Extensible soil reinforcements are not permitted.
seismic loads.
responsible for internal, sliding, applied bearing pressure, and overturning stability under static and design
The Engineer has performed global stability, bearing capacity, and settlement calculations. The wall supplier is
DESIGN CRITERIA:
period seismic event. The assumed site factor (Fpga) is X.X.
Design for a ground surface peak ground acceleration of X.XXX g. The design earthquake is a 1000-year return
SEISMIC LOADS:
Manual, Chapter 10, FHWA updated March 2008.
AASHTO LRFD Bridge Design and Specifications with Interims and Errata, and the Project Development & Design
Reinforced Soil Slopes - Volumes I and II (Publication No. FHWA-NHI-10-024, FHWA GEC 011), 4th Edition
Design shall conform to the requirements of Design and Construction of Mechanically Stabilized Earth Walls and
DESIGN:
notified of any discrepancies that may exist before performing related work.
The Contractor shall field verify all dimensions and elevations prior to ordering material. The Engineer shall be
Special Contract Requirements.
Construction of Roads and Bridges on Federal Highway Projects, FP-14, US Customary Units and the Project
All material and workmanship shall conform to the Federal Highway Administration Standard Specifications for
CONSTRUCTION:
GENERAL NOTES: MIRROR LAKE PARKING LOT WALL
03 XXXXXX-X
AND TABULATION OF QUANTITIES
RETAINING WALL GENERAL NOTES
H.3
PRELIM
IN
ARY
Not For
Con str uc
File details come from the government source that posted it. Updated .