Glacier_View_Earthwork_100_.pdf
PDF 12 KB Posted
- Attached to
- OR DOT 26(2), Mirror Lake Trailhead Relocation Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00022
About this file
Glacier View_Earthwork_100%
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Mirror_Lake.pdf | ||
| Amendment_No._A001.pdf | ||
| Q&A_-_05-23-17.pdf | ||
| Geotechnical_Report_GR16-16.pdf | ||
| IFB_Mirror_Lake.pdf | ||
| Mirror_Lake_Trailhead_Plans_Revised_Final_4-24-17.pdf | ||
| SWPPP_OR_DOT_26(2)_Mirror_Lake_Tralhead_Relocation.pdf | ||
| Mirror_Lake_Trailhead_Design_Cross_Sections_Final_3-20-17.pdf | ||
| Extg_Trailhead_Rehab_Earthwork_100_.pdf | ||
| Plan_Request_form_Mirror_Lake.pdf | ||
| Mirror_Lake_Lot_Earthwork_100_.pdf | ||
| Geotechnical_Memo_GM39-16.PDF | ||
| OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf | ||
| Prelim_Letter_OR_DOT_26(2).pdf | ||
| PROJECT_DESCRIPTION_OR_DOT_26(2).pdf | ||
| OR262_Mirror_Lake_Trailhead_PRELIM_Plans.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cross Section Set Name:
Alignment Name:
Input Grid Factor: 1 Note:
All units in this report are in feet, square feet and cubic yards unless specified otherwise.
Baseline Station
Factor Area Volume Adjusted Factor Area Volume 5+00.000 1 0 0 0 1 0 0 5+10.000 1 0 0 0 1 0 0 5+20.000 1 0 0 0 1 0 0 5+30.000 1 0 0 0 1 0 0 5+40.000 1 0 0 0 1 0 0 5+50.000 1 0 0 0 1 0 0 5+60.000 1 0 0 0 1 0 0 5+70.000 1 50.03 9.26 9.26 1 0 0 5+80.000 1 45.34 17.66 17.66 1 0 0 5+90.000 1 41.11 16.01 16.01 1 0 0 6+00.000 1 36.04 14.29 14.29 1 0 0 6+10.000 1 30.46 12.3 12.32 1 0 0 6+20.000 1 84.5 10.2 21.29 1 0 0 6+30.000 1 65.89 7.65 27.85 1 0 0 6+40.000 1 71.64 6.82 25.47 1 0 0 6+50.000 1 10.62 5.63 15.23 1 0.62 0.11
End Area Volume Report Report Created: 2/10/2017
Time: 9:27am
N_Access Glacier View Loop
- - - - - - - - - - - - - - - - Station Quantities - - - - - - - - - - - - - - - -
- - - - - - - - - - Cut - - - - - - - - - - - - - - - - - - - - Fill - - - - - - - - - -
6+60.000 1 6.79 3.15 3.22 1 8.52 1.42 6+70.000 1 5.5 2.28 2.28 1 18.14 4.67 6+80.000 1 0 1.02 1.02 1 31.19 9.14 6+90.000 1 0 0 0 1 44.38 14 7+00.000 1 0 0 0 1 55.79 18.55 7+10.000 1 0 0 0 1 68.75 23.06 7+20.000 1 6.38 1.18 1.18 1 69.31 25.57 7+30.000 1 18.72 4.65 4.65 1 66.72 25.19 7+40.000 1 33.99 9.76 9.76 1 68.85 25.11 7+50.000 1 13.85 8.86 8.86 1 69.86 25.69 7+60.000 1 20.58 6.38 6.38 1 63.78 24.75 7+70.000 1 29.41 9.26 9.26 1 49.99 21.07 7+80.000 1 26.39 10.33 10.33 1 56.37 19.7 7+90.000 1 14.39 7.56 7.55 1 62.87 22.06 8+00.000 1 21.98 6.9 6.73 1 26.63 16.42 8+10.000 1 30.87 10.33 9.79 1 1.67 5.04 8+20.000 1 26.8 11.76 10.68 1 0.02 0.25 8+30.000 1 32.08 12.25 10.9 1 0.06 0 8+40.000 1 35.96 14.38 12.6 1 0.05 0 8+50.000 1 52.93 19.01 16.46 1 0.06 0 8+60.000 1 63.27 24.65 21.52 1 0.03 0 8+70.000 1 72.94 29.22 25.22 1 0 0 8+80.000 1 94.51 35.84 31.01 1 0 0 8+90.000 1 115.79 44.23 38.94 1 0 0 9+00.000 1 94.18 43.37 38.88 1 0 0 9+10.000 1 126.52 45.03 40.87 1 0 0 9+20.000 1 169.77 60.59 54.87 1 0 0 9+30.000 1 187.22 71.72 66.11 1 0 0 9+40.000 1 174.42 71.26 66.97 1 0 0 9+50.000 1 218.88 67.53 72.83 1 0 0 9+60.000 1 145.35 55.19 67.45 1 0 0 9+70.000 1 0 22.05 26.92 1 0 1.63 9+80.000 1 0 0.1 0 1 0 1.63 9+90.000 1 0 0 0 1 0 0
10+00.000 1 0 0 0 1 0 0 SHEET F.2 Cut Vol (CUYD) 810 Fill Vol (CUYD) 286
810 842.64 286Grand Total: