PROJECT_DESCRIPTION_Fall_Creek.pdf
PDF 17 KB Posted
- Attached to
- OR PFH 46(13), Fall Creek Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00021
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Fall_Creek.pdf | ||
| Q&A_4-10-2017.pdf | ||
| Q&A_4-7-2017.pdf | ||
| Q&A_4-6-2017.pdf | ||
| A001_Fall_Creek.pdf | ||
| Q&A.pdf | ||
| Plan_Request_form_Fall_Creek.pdf | ||
| of04613_100__xs_layout_mainline_labeled.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_Inspection_Report.pdf | ||
| ESCP_OR_PFH_46(13)_Erosion_and_Sediment_Control_Plan.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_As-builts.pdf | ||
| Fall_Creek_Bridge.FINAL.pdf | ||
| Plan-Set_100_.pdf | ||
| GR18-15_Fall_Creek_Bridge,_Final_Foundation_and_Geotech_Rpt.pdf | ||
| IFB_Fall_Creek.pdf | ||
| of04613xs01_EW.pdf | ||
| PROJECT_DESCRIPTION_Fall_Creek.pdf | ||
| FALL_CREEK_Preliminary-Letter.pdf | ||
| Plans_Fall_Creek.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR PFH 46(13), Fall Creek Bridge Replacement, Deschutes County, Oregon
The work consists of bridge replacement, grading, pavement, base, minor drainage and other small items of work.
Bridge replacement includes construction of a 65-foot span, reinforced concrete Girder Bridge with cast-in-place concrete deck. Abutments are founded on bedrock. The work includes demolition of the existing concrete girder bridge prior to completion of the new structure.
Project length: 0.228 miles
Tentative Solicitation Date: Winter 2017 Tentative Fixed Completion Date: Fall 2017 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: Between $1million and $2 million
Location: Approximately 24 miles east of Bend Oregon.
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
One Schedule
Schedule A
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance (yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)
- Temporary Soil Tackifier
- Silt Fence
- Fiber Roll
- Temporary Diversion Berm
0.8 ACRE
1300 LNFT
2060 LNFT
310 LNFT
158 Watering for Dust Control 4000 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 1 ACRE
FP-14
One Schedule Schedule
A 203 Removal of Structures & Obstructions (structures, demolition)
- Removal of sign
- Removal of guardrail
- Removal of bridge
5 EACH
288 LNFT
LPSM
204 Excavation & Embankment
- Roadway Excavation
- Subexcavation
- Unclassified Borrow
- Select Borrow
840 LNFT
620 CUYD
2400 TON
2000 TON
205 Blasting Consultant (Consultant/Engineering Services) (yes/no) No 207 Earthwork Geosynthetics 2470 SQYD 208 Structure Excavation 200 CUYD
DIVISION 250 – Slope Reinforcement and Retaining Walls 251 Riprap
- Ditch, Class 1
- Method A, Class 3
- Remove and reset boulder
9 LNFT
245 CUYD
60 EACH
DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate
- Roadway Aggregate Method 2
- Roadway Aggregate Method 1, Subexcavation Backfill
2630 TON
1810 TON
DIVISION 400 – Asphalt Pavements & Surface Treatments 403 Asphalt Concrete 960 TON 412 Asphalt Tack Coat (asphalt surface treatment) 1.9 TON
DIVISION 550 – Bridge Construction 551 Driven Piles 680 LNFT 552 Structural Concrete (concrete – major structures)
- Class A (AE)
- Class D (AE)
- Class D (AE) for Approach Slabs Type 2
80 CUYD
55 CUYD
100 SQYD
FP-14
One Schedule Schedule
A 553 Prestressed Concrete
- Precast Prestressed Concrete Slabs 564 LNFT 554 Reinforcing Steel
- Reinforcing Steel, Standard
- Reinforcing Steel, Epoxy Coated
12700 LB
4800 LB
556 Bridge Railing 170 LNFT 559 Waterproofing (concrete – major structures) 329 SQYD 564 Bearing Devices 36 EACH
DIVISION 600 – Incidental Construction 609 Curb & Gutter (concrete – minor structures) (indicate which)
- Concrete curb, 12-inch depth 20 LNFT 617 Guardrail
- Structure Transition Rail
- Flared Terminals
90 LNFT
4 EACH
621 Monuments & Markers (construction survey & staking) (yes/no) No 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items)
- Placing Conserved Topsoil 0.8 ACRE 633 Permanent Traffic Control (traffic control devices)
- Sign System
- Snow Poles
- Snow Pole Holders and Caps
21 SQFT
38 EACH
38 EACH
634 Permanent Pavement Markings (traffic pavement markings) 10120 LNFT 635 Temporary Traffic Control – Flagger 600 FXHR 635 Temporary Traffic Control – Traffic Signal System 1 EACH 650 Temporary Diversions LPSM