Plan-Set_100_.pdf
PDF 14 MB Posted
- Attached to
- OR PFH 46(13), Fall Creek Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00021
About this file
Plans
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Fall_Creek.pdf | ||
| Q&A_4-10-2017.pdf | ||
| Q&A_4-7-2017.pdf | ||
| Q&A_4-6-2017.pdf | ||
| A001_Fall_Creek.pdf | ||
| Q&A.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_As-builts.pdf | ||
| Fall_Creek_Bridge.FINAL.pdf | ||
| GR18-15_Fall_Creek_Bridge,_Final_Foundation_and_Geotech_Rpt.pdf | ||
| IFB_Fall_Creek.pdf | ||
| Plan_Request_form_Fall_Creek.pdf | ||
| of04613_100__xs_layout_mainline_labeled.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_Inspection_Report.pdf | ||
| ESCP_OR_PFH_46(13)_Erosion_and_Sediment_Control_Plan.pdf | ||
| of04613xs01_EW.pdf | ||
| PROJECT_DESCRIPTION_Fall_Creek.pdf | ||
| FALL_CREEK_Preliminary-Letter.pdf | ||
| Plans_Fall_Creek.pdf | ||
| PROJECT_DESCRIPTION_Fall_Creek.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX TO SHEETSINDEX TO SHEETS
F. STRUCTURES
E. EROSION CONTROL
D. PLAN AND PROFILE
C. TYPICAL SECTION
B. SUMMARIES
A. GENERAL INFORMATION
F.1-17
E.4-5
E.2-3
E.1
D.6
D.5
D.2-4
D.1
C.3
C.2
C.1
B.1-3
A.4
A.3
A.2
A.1
BRIDGE PLANS
STANDARD DRAWINGS AND DETAILS
EROSION CONTROL PLAN
TABULATION OF EROSION CONTROL QUANTITIES
SURVEY CONTROL
TURNOUT LAYOUT
PLAN-PROFILE
TABULATION OF PLAN QUANTITIES
SUBEXCAVATION DETAILS
TYPICAL SECTION
TABULATION OF TYPICAL SECTION QUANTITIES
SUMMARY OF QUANTITIES
VICINITY MAP
PLAN SYMBOLS AND ABBREVIATIONS
INDEX TO SHEETS
TITLE SHEET
J. PERMANENT TRAFFIC CONTROL
I. TEMPORARY TRAFFIC CONTROL
H. SAFETY FEATURES
G. DRAINAGE
J.6
J.5
J.4
J.2-3
J.1
I.5
I.3-4
I.2
I.1
H.3
H.1-2
G.3-4
G.2
G.1
SNOWPOLE HOLDER AND CAP DETAIL
POST DETAILS
PERMANENT SIGN INSTALLATION WOOD
STANDARD DETAILS
PERMANENT TRAFFIC CONTROL PLAN
QUANTITIES
TABULATION OF PERMANENT TRAFFIC CONTROL
BRIDGE WORK ZONE CONTROL DETAIL
STANDARD DRAWINGS
ADVANCE SIGNING PLAN
TABULATION OF TEMPORARY TRAFFIC CONTROL
STRUCTURE TRANSITION RAIL DETAILS
GUARDRAIL STANDARD DRAWINGS
FALL CREEK BRIDGE RIPRAP LAYOUT PLAN
PAVED WATERWAY DETAILS
TABULATION OF DRAINAGE QUANTITIES
A.2
STATE PROJECT
NUMBER
SHEET
B .B a s e .U
S c m y fi le s p w p r o d u c ti o n d
W o r k d d .c e l
OR PFH 46(13)
A
M
M a y
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
INDEX TO SHEETS
WESTERN FEDERAL LANDS HIGHWAY DIVISION
DETAIL APPROVED FOR USE 11/2001
REVISED: 9/2005 1/2007 10/2009 10/2014
W101-1
AND ABBREVIATIONS
PLAN SYMBOLS
W west drwg(s).
dist.
diaph.
diag.
dia.
DHV
D exp. jt.
exc.
EW
ER
EQ or eq.
EP
emb.
elev.
El. 94.16 ft e
E expansion joint excavation edge of water edge of road equation edge of pavement embankment elevation elevation with number superelevation rate east drawing(s) distance diaphragm diagonal diameter design hourly volume diameter galv.
ga.
galvanized gage (gauge)
HW
hex.
hdwl.
high water hexagon headwall ftg.
ft3 ft2 flg.
fin.
footing cubic foot (feet) square foot flange finish jt.
ID
joint inside diameter
LW
lt. or LT
Ls
LPSM
long.
LNFT
lat.
lam.
L low water left length of spiral lump sum longitudinal linear foot (feet) latitude lamination length of curve
NC
N normal crown north
OG
OD
o. to o.
o. c.
original ground outside diameter out to out on center pvmt.
PT
PST
PSC
PS
POT
POS
POC
pl.
PI
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
rdwy.
R/W
R.
R route right required reinforcement roadway right-of-way range radius typ.
Ts
TS
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance
VPI
vph
V vertical point of intersection vehicles per hour design speed yd3 yd2 cubic yard(s) square yard sym.
STS
struc.
stiff.
stgr.
std.
STA, Sta.
ST
SS
SRS
SQYD
SQFT
spa.
SLRY
shldr.
sec.
SC
SADT
S symmetrical point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south
CUYD
culv.
CUFT
cubic yard(s) culvert cubic foot (feet) mon.
min.
MGAL
max.
matl.
monument minimum thousand gallon maximum material
N o v e m b e r
U
S C c m y fi le s p w p r o d u c ti o n d o f0 a c .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
A.3 PFH 46(13) OR
BH
CP GPS
JH
TP
DI
36 31
6 1
36 31
6 1
SEC.
SEC.
EL. 1234.56
N
E
RIP
G G
W W
DI
T T
NOTE:
NO SCALE
on the appropriate plan sheet.
Other symbols used in the plans will be shown in a legend 1.
Property Line w/Found Property Corner
Section Corner (Found, Projected)16
Section Line16
Section Corner (Found, Projected)4
Section Line4
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
Trail
Lake, Pond or Reservoir; Marshland
Spring or Seep
Material Source; Bore Hole; Test Pit
Section Line
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Section Corner (Found, Projected)
Large Creek or River
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Treeline; Individual Trees
Boulder; Well; Satellite Dish; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Silt Fence
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
BLM Lands Boundary
Railroad
Intermittent Drainage or Small Creek
Control Point (Terrestrial and GPS); Jump Hub θs Ø
∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.
AH
ADT
abut.
bearing bridge balance point bench mark back brg.
br.
BP
BM
BK
ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
clr.
cc or c. to c.
centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center mile post main line
M.P.
M.L.
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use,
- no symbol -
EXISTING PROPOSED
Transition
Toe of Fill
Top of Cut wall face
CL
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Concrete Barrier
Slope Stake Limits
Pipe Culvert with Drop Inlet
Box Culvert
Delineators
Underground Utilities
Overhead/Above Ground Utilities
Signs (single, double post; portable)
Miscellaneous Utility Features
Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
Fiber Roll or Wattle
SCALE IN MILES
N
OR PFH 46(13)
808+15.00
OR PFH 46(13)
796+10.00
BEGIN PROJECT
END PROJECT
YRADNUOB
VICINITY MAP
4 3 2
15 14 13 18
10.50.5 0.25
R
E
R
E
T17S
T18S
R
E
A.4
STATE PROJECT
NUMBER
SHEET
I n t_ ft
D m y fi le s p w p r o d u c ti o n d o f0 a d .d g n
OR PFH 46(13)
J u n e
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
W
ILD
ER
N E
S S
LAKE
DEVILS
K E
E
R C
A D
O S
K E
E R
L L
A F
K E
E R
O O
G
SPRINGS
SPRINGS
LAKE
BARE
Bend
25 miles
Y A
W H
GI
H
S E
K A
L E
D A
C S
A C
B O
U N
D A
R Y
W
IL
D E R
N E S S
FOREST
NATIONAL
DESCHUTES
HILL
DEVILS
BUTTE
TALAPUS
CAMPGROUND
SPRINGS
SPRINGS
Y A
W H
G I
H
AL
DACSAC
BIT
CINDER
BUTTE
KATSUK
LAKE
SPARKS
CAMPGROUND
FOREST
NATIONAL
DESCHUTES
Sheet and Description
Section C Section D Section E Section F Section G Section I Section J
Typical Section
Plan & Profile
Erosion Control Structures Drainage
Temporary Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15703-1500 SOIL EROSION CONTROL,
TEMPORARY SOIL TACKIFIER ACRE 0.7 0.1 0.8
A0140 15705-0100 SOIL EROSION CONTROL, SILT
FENCE LNFT 1,270 30 1,300
A0160 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 1,960 100 2,060
A0180 15705-1800 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LNFT 295 15 310
A0200 15801-0000 WATERING FOR DUST CONTROL MGAL 4,000 4,000
A0220 20101-0000 CLEARING AND GRUBBING ACRE 0.9 0.1 1.0
A0240 20301-2400 REMOVAL OF SIGN EACH 4 1 5
A0260 20302-1200 REMOVAL OF GUARDRAIL LNFT 275.0 12.5 287.5
A0280 20304-2000 REMOVAL OF BRIDGE LPSM ALL ALL
A0300 20401-0000 ROADWAY EXCAVATION CUYD 923 47 970
A0320 20402-0000 SUBEXCAVATION CUYD 674 126 800
A0340 20404-0000 UNCLASSIFIED BORROW TON 2,113 317 2,430
A0360 20411-0000 SELECT BORROW TON 1,689 311 2,000
A0380 20701-0800 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 2, TYPE C SQYD 304 16 320
A0400 20701-0900 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 2, TYPE D,
NON-WOVEN SQYD 2,045 105 2,150
A0420 20801-0000 STRUCTURE EXCAVATION CUYD 200 200 Contract Quantity
A0440 20815-0000 COFFERDAMS LPSM ALL ALL
A0460 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1, DOWNDRAIN CUYD 4 1 5
A0480 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3, CHANNEL PROTECTION CUYD 225 20 245
A0500 25126-0000 REMOVE AND RESET BOULDER EACH 60 10 70
A0520 30202-1000 ROADWAY AGGREGATE, METHOD 1,
SUBEXCAVATION BACKFILL TON 1,543 297 1,840
A0540 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,199 431 2,630
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 of
3b a.
xl sx
]S he et
STATE PROJECT
B.1PFH 46(13)OR
NUMBER
Typical Section
Plan & Profile
Erosion Control Structures Drainage
Temporary Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0560 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 819 35 106 960
A0580 41201-0000 TACK COAT TON 1.8 0.1 1.9
A0600 55101-0200 CONCRETE FILLED STEEL PIPE
PILE, IN PLACE (18-inch
Diameter x 0.5-inch Thickness) LNFT 646 34 680
A0620 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2
A0640 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 77 77
A0660 55201-0800 STRUCTURAL CONCRETE, CLASS D Contract Quantity
(AE) CUYD 53 53
A0680 55202-2000 STRUCTURAL CONCRETE, CLASS D Contract Quantity
(AE), FOR APPROACH SLABS,
TYPE 2 SQYD 95 95
A0700 55235-0000 EXPANSION JOINTS (Asphaltic Contract Quantity
Plug Joint) LNFT 73 73
A0720 55302-0500 PRECAST, PRESTRESSED CONCRETE Contract Quantity
SLABS, 48-INCH VOIDED LNFT 564 564
A0740 55401-1000 REINFORCING STEEL LB 12,700 12,700 Contract Quantity
A0760 55401-2000 REINFORCING STEEL, EPOXY Contract Quantity
COATED LB 4,800 4,800
A0780 55601-1200 BRIDGE RAILING, STEEL, THREE Contract Quantity
RAIL(Weathering Steel) LNFT 172 172
A0800 55901-0000 MEMBRANE WATERPROOFING SQYD 332 332 Contract Quantity
A0820 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 36 36 Contract Quantity
A0840 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 19 1 20
A0860 61701-1250 GUARDRAIL SYSTEM G4, TYPE 2,
CLASS A WOOD POSTS,
WEATHERING STEEL LNFT 50 50
A0880 61702-0600 TERMINAL SECTION, TYPE
FLARED, ENERGY ABSORBING,
WEATHERING STEEL EACH 4 4
A0900 61707-1000 STRUCTURE TRANSITION RAILING,
G4 SYSTEM, WEATHERING STEEL LNFT 83 83
A0920 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 20 20
A0940 62201-0600 BACKHOE LOADER, 8 CUBIC FOOT
MINIMUM RATED CAPACITY
BUCKET, 30-INCH WIDTH HOUR 10 10
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 of
3b a.
xl sx
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.2PFH 46(13)OR
Typical Section
Plan & Profile
Erosion Control Structures Drainage
Temporary Traffic Control
Permanent Traffic Control
ALLOWANCE Bid Schedule
A0960 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 10 10
A0980 62201-3750 CHAIN SAW, WITHOUT OPERATOR HOUR 10 10
A1000 62301-0000 GENERAL LABOR HOUR 20 20
A1020 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.7 0.1 0.8
A1040 63302-0000 SIGN SYSTEM SQFT 11.25 9.75 21.00
A1060 63318-1000 SNOW POLE HOLDER AND CAP EACH 36 2 38
A1080 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID DOUBLE YELLOW CENTERLINE LNFT 4,820 240 5,060
A1100 63401-0300 PAVEMENT MARKINGS, TYPE B,
SOLID WHITE EDGE LINE LNFT 4,820 240 5,060
A1120 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 12 12
A1140 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 50 50
A1160 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 4 4
A1180 63502-2000 TEMPORARY TRAFFIC CONTROL,
PORTABLE CHANGEABLE MESSAGE
SIGN EACH 2 2
A1200 63502-3100 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM EACH 1 1
A1220 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS, 12-INCH
STOP LINE LNFT 66 4 70
A1240 63503-0700 TEMPORARY TRAFFIC CONTROL,
PAVEMENT MARKINGS LNFT 2,474 126 2,600
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 132.00 9.50 141.50
A1280 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 150 150
A1300 63509-1000 TEMPORARY TRAFFIC CONTROL,
FLAGGER FXHR 600 600
A1320 65001-1000 CONSTRUCT AND MAINTAIN
DIVERSION LPSM ALL
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-F eb -2
4:
P M c:
\m yf ile s\ pw
_p ro du ct io n\ d0 of
3b a.
xl sx
]S he et
3) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
STATE PROJECT
B.3PFH 46(13)OR
TYPICAL SECTION
TABULATION OF
C.1
STATE PROJECT
NUMBER
SHEET
OR PFH 46(13)
D A
T E
P
A T
H
B
V in c e n t
C h e c k e d b y
P a r k s ig n e d b y
NO SCALE
FOOTNOTE:
NOTE:
ROUNDING DETAIL
CUT SLOPE
.2
D
C le a r in g l im it ti mil g ni r a el C
2.
1.
SAFETY EDGE DETAIL
Profile grade
2% Crown 2% Crown 1:4
1:4
1:4
LC
1 1
Travel lane Travel lane
MAINLINE TYPICAL SECTION
30°
5'
B=5'
11' 11'
Shldr.
3'
Shldr.
3'
8" compacted depth
Roadway aggregate, method 2
Red top hinge point
D
C le a r in g l im it
C le a r in g l im it directed by the CO.
Reduce slope rounding width to avoid removal of trees, as
See Sheet C.3 for subexcavation detail.
two equal lifts)
4" compacted depth (placed in
Asphalt concrete pavement, type 1
S lo p e s ta k e l im it
Va rie s
.2
DD
1:
3 t o 1 :4
P r o p o s e d e d g e o f s h o u ld e r
S e e T y p ic a l S e c ti o n
WIDENING DETAIL
TURNOUT AND GUARDRAIL
1:1.5
1:1.5
See Sheets H.1-3
Guardrail and post.
ROUNDING DETAIL
FILL SLOPE
796+10.00 to 800+85.51
801+71.51 to 808+15.00
S lo p e s ta k e l im it
Embankment construction
P r o p o s e d e d g e o f s h o u ld e r
See Sheets H.1-3
Guardrail and post.
0'-10' 2'
12"
7"
1:1.5
CURB DETAIL
GUARDRAIL AND CURB DETAIL
TURNOUT WIDENING WITH
Tack coat (between lifts)
See Sheet D.5 for layout
Turnout varies
See Sheet D.5 for layout
Turnout varies
Concrete curb
See curb detail
Second lift of asphalt
First lift of asphalt
Aggregate base
(aggregate base)
Shoulder dressing
Red top edge of shoulder
(between lifts)
Tack coat
0' to 10' Varies
1.5' varies apron
Paved
4" depth
Place conserved topsoil
4" depth
Place conserved topsoil
S e e T y p ic a l S e c ti o n
See Fill Slope Rounding Detail.
See Cut Slope Rounding Detail.
See Safety Edge Detail.
Additional widening required for turnouts and guardrail.
proportionally.
dimension and reduce the front slope rounding distance
For cut heights less than 5-feet, reduce "B" to the cut height
Construct slopes as shown in the Staking Report.
curve data of the plan and profile sheets.
Superelevate curves at maximum rate "e" as indicated in the
TYPICAL SECTIONS
C.2
STATE PROJECT
NUMBER
SHEET
U
S S u r ft m y fi le s p w p r o d u c ti o n d o f0 c b .d g n
OR PFH 46(13)
P
J u ly
B
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b
Varies
W
Existing roadway grade
Typical section, see Sheet C.2
Existing toe of slope
Limit of subexcavation class 2, type D, non-woven
Separation-stabilization geotextile, SUBEXCAVATION LOCATIONS
Varies
W
Existing roadway grade
Typical section, see Sheet C.2
Existing toe of slope
Limit of subexcavation class 2, type D, non-woven
Separation-stabilization geotextile, SUBEXCAVATION LOCATIONS
802+31 to 803+50, RT by the CO Reset boulder as directed
DETAILS
SUBEXCAVATION
1'-0" min. overlap m in m in conserve existing boulder Remove and subexcavation, backfill
Roadway aggregate, method 1, subexcavation backfill
Roadway aggregate, method 1, C.3
STATE PROJECT
NUMBER
SHEET
OR PFH 46(13)
J u n e
U
S S u r ft m y fi le s p w p r o d u c ti o n d o f0 c c .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
Embankment construction
Embankment construction
1'-0" min. overlap
802+40 to 803+40, RT
802+09 to 805+50, LT
801+72 to 801+75, LT
799+00 to 800+16, LT
PLAN QUANTITIES
TABULATION OF
D.1
STATE PROJECT
NUMBER
SHEET
OR PFH 46(13)
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 fa .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b
GPS
BEGIN PROJECT
El= 5433.98
E= 3180776.0818
N= 375668.1636
Line to be constructed
Proposed edge of pavement
NOTE:
been adjusted for shrink/swell.
do not include topsoil or subexcavation, and have not
1. Excavation and embankment volumes shown below
Profile grade
Existing ground
796+10.00
OR PFH 46(13)
existing pavement
Top of
CONNECTION DETAIL
.0
Existing edge of pavement
Existing edge of pavement
DESCHUTES NATIONAL FOREST
Tack coat
CUYD
EXC.
CUYD
EMB.
799+00798+00797+00796+00
D.2
STATE PROJECT
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 fb .d g n
OR PFH 46(13)
J u ly
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
DESCHUTES NATIONAL FOREST
S a w c u t
LEGEND:
Temporary Construction Easement
Slope stake limit of pavement
Proposed edge
Slope stake limit
See Sheet C.2 for Typical Section
798+37.62
50.86' LT
P O
T
.0
P O
T
.0
,4
.9
,4
.0
+0.0251%
+0.7387%
200' VC
K = 280
,4
.6
+0.7387%
200' VC
K = 191
SSD = 1129'
T S
.1
4 8
S C
.1
GPS
F A
L L
C R
E E
K
Remove existing guardrail (typ.)
NOTE:
Spiral= C5B f
Ls= 128.00'
Line to be constructed
Profile grade
Existing ground
Proposed edge of pavement
Slope stake limit
Slope stake limit
Proposed edge of pavement
Existing bridge
See Section F
Approach slab.
Reset boulders
FOOTNOTE:
Exact location to be determined by the CO.
Location of boulders are approximately 802+31 to 803+50.
Edge of paved shoulder
Edge of paved shoulder
Proposed edge of pavement
Edge of paved shoulder
Proposed edge of pavement
See Section F for details and piers to be removed.
Existing bridge, abutments
See Sheet C.3
Subexcavation, LT
See Sheet C.3
Subexcavation, RT
Subexcavation, LT
See Sheet C.3
See Section F
Bridge
DESCHUTES NATIONAL FOREST
DESCHUTES NATIONAL FOREST
clearing limit beyond easement.
2. Reduce slope rounding distance where such would put include topsoil, and have not been adjusted for shrink/swell.
1. Excavation and embankment volumes shown below do not
LT and RT See Sheet H.3
Structure Transition Rail, See Sheet C.3 Subexcavation, RT
LT and RT. See Sheet H.3
Structure Transition Rail, Absorbing LT and RT. See Sheet H.2
Terminal Section, Flared, Energy
See Section F for details
Proposed bridge.
See Sheet D.5 for details
Construct turnouts, See Sheet D.5 for details
Construct turnouts.
N
Approach slab. See Section F ditch, method A, class 1, downdrain
Constuct riprap
12" height. See Sheet C.2 for detail
Install concrete curb, Existing edge of pavement
Existing edge of pavement guardrail (typ.)
Remove existing
Conserve existing boulders
CUYD
EXC.
CUYD
EMB.
805+00804+00803+00802+00801+00800+00799+00
D.3
STATE PROJECT
OR
PFH 46(13)
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 fc .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
GPS
Edge of paved shoulder type 2, class A, wood posts
Guardrail system G4, type 2, class A, wood posts
Guardrail system G4, Absorbing, LT and RT. See Sheet H.2
Terminal Section Flared, Energy
799+97.75
109.15' LT
R=180'
800+59.32
120.00' LT
802+03.10
120.00' LT R=180'
802+70.26
107.00' LT
804+13.42
49.60' LT
CUYD
EXC.
CUYD
EMB.
808+80808+00807+00806+00805+00
Curve= C5
D
D
R= 833.00'
Ts= 329.06'
L= 384.79' e= 0.060
CONNECTION DETAIL
.0
GPS
GPS
Spiral= C5A f
Ls= 128.00'
54305430
D.4
STATE PROJECT
NUMBER
SHEET
B .B a s e .U
S c m y fi le s p w p r o d u c ti o n d
W o r k d d .c e l
OR PFH 46(13)
M a y
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
C S
.9
S T
.9
P O
C
.0
54405445
-0.3100%
,4
.6
+0.3013%
200' VC
K = 327
,4
.9
0.3053%
1.3867
Line to be constructed
Profile grade
Existing ground
Slope stake limit
Slope stake limit
Subexcavation LT
NOTE:
El=5437.96
E=3179825.629
N=376120.825
808+15.00
OR PFH 46(13)
END PROJECT
Saw cut
Top of existing pavement of pavement
Existing edge culvert to remain
Existing pipe of pavement
Proposed edge of pavement
Existing edge
5434.00
805+50
5435.04
806+25
5435.62
808+15
DESCHUTES NATIONAL FOREST
DESCHUTES NATIONAL FOREST
Proposed edge of pavement
2.
1.
beyond easement.
Reduce slope rounding distance where such would put clearing limit topsoil or subexcavation, and have not been adjusted for shrink/swell.
Excavation and embankment volumes shown below do not include
Special ditch profile RT for Typical Section
See Sheet C.2
TURNOUT LAYOUT
Bridge deck
Bridge deck
.5
.5
.0
.0
.0
.0
.0
.0
A p p r o a h s la b
A p p r o a h la b
Bridge rail
Bridge rail
Bridge rail
Bridge rail
.5
D.5
NUMBER
SHEET
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 fe .d g n
OR PHF 46(13)
J u n e
V in c e
P a r k
C h e c k e d b y
D e s ig n e d b y
N
N
.2
.2
.7
.7
Edge of shoulder
Edge of shoulder
Edge of turnout
Edge of turnout
Edge of turnout
Edge of turnout
Edge of shoulder
Edge of shoulder
.7
.7
.0
.0
.7
.7
.5
' 2
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
1000 375860.011 3180255.846 5431.789 44°01'48.232841"N 121°44'18.753583"W N/A 0.99991686 GPS Point 1.
1001 375982.235 3179988.861 5433.120 44°01'49.425046"N 121°44'22.416534"W N/A 0.99991687 GPS Point
1002 375730.137 3180681.698 5432.310 44°01'46.973710"N 121°44'12.916004"W N/A 0.99991672 GPS Point
1004 376279.631 3179551.006 5429.400 44°01'52.337409"N 121°44'28.431233"W N/A 0.99991716 GPS Point
1005 376336.616 3179620.758 5436.360 44°01'52.903873"N 121°44'27.480986"W N/A 0.99991681 GPS Point
PROJECT :Fall Creek Bridge Replacement
DATE OF FIELD WORK :11/2013
DATE OF FINAL ADJUSTMENT : 11/2013
PROJECT UNITS : International Foot COORDINATE SYSTEM : Central Oregon Coordinate System
VERTICAL DATUM :NGVD29 determined through differential leveling holding elevation of CP 1000
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
c:
\m yf ile s\ pw
_p ro du ct io n\ d0
Fa llC re ek _C on tr ol S he et .x ls x]
Sh ee t
-M ar
-2
2:
P
M D es ch ut es
C ou nt y
D es ch ut es C ou nt y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.6
SHEET
NUMBER
PFH 46(13)OR
SURVEY CONTROL
EROSION CONTROL
TABULATION OF
E.1
STATE PROJECT
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 d a .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b
BEGIN PROJECT
LEGEND:
Slope stake limit
Slope stake limit
Slope stake limit
Slope stake limit
N
F A
L L
Wetland boundary
Wetland boundary
796+10.00 boundary
Wetland
C R
E E
K
796+10 to 806+00
PLAN
EROSION CONTROL
Edge of existing pavementEdge of proposed pavement
Edge of proposed pavement Edge of existing pavement
Limit of riprap
Temporary diversion berm
Fiber roll across ditch
Silt fence
Fiber roll along slope
E.2
STATE PROJECT
J u ly
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 d b .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b y
4 8
N
Slope stake limit
Slope stake limit
END PROJECT
808+15.00
806+00 to 808+15
PLAN
EROSION CONTROL
Edge of existing pavement Edge of proposed pavement
E.3
STATE PROJECT
J u n e
I n t_ ft m y fi le s p w p r o d u c ti o n d o f0 d c .d g n
B
V in c e n t
K
P a r k e r
C h e c k e d b y
D e s ig n e d b
STANDARD APPROVED FOR USE 6/2005
DRAFT: 3/2014
REVISED: 6/2007
157-1
SILT FENCE
6 ft. (max.) spacing without fence support.
10 ft. (max.) spacing with fence support.
m in m in m in min.
4"
6" min. trench o v e m b e r
U m y fi le s p w p r o d u c ti o n d o f0 d f.
d g n
STATE PROJECT
NUMBER
E.4
FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY STANDARD
STANDARD
NOTE:
fo s p a c in g
S e e n o te
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
See Note 1
SILT FENCE INSTALLATION IN A DRAINAGE DITCH
4.
3.
2.
1.
Fi ll slo pe around the end of the silt fence prevent water from flowing
Provide sufficient length to
Flow
Flow
T o e o f s lo p e
Flow
Limits of clearing
Flow
Support mesh
Backfilled and compacted soil
Steel or wood post
PLAN
ELEVATION
See Note 4 for spacing the ends.
silt fence upgrade to prevent water from running around
Install silt fence along ground contours. Curve ends of does not slide down, supporting posts.
All types must ensure silt fence remains attached to, and manufacturer's recommendations for installation procedures.
as long as specified dimensions are satisfied. Follow
Alternate preassembled silt fence options will be allowed when specified on Erosion Control Plan.
Use drainage ditch installation for low flow conditions only
(undisturbed)
Existing ground
Geotextile
Drive stakes at each end and at 4' spacing
(ft)
(ft)
Excavate trench 2"
REVISED:
DETAIL APPROVED FOR USE 10/2014
W157-21
119.5'
3' min.
3' min. or m in
M in t o
1" x 1" Wood stake
3" to 5"
FIBER ROLL DETAILS
J a n u a r y
U m y fi le s p w p r o d u c ti o n d o f0 d h .d g n
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
STATE PROJECT
NUMBER
SHEET
E.5 PFH 46(13) OR
Fl ow
T o e o f fi ll s lo p e
ELEVATION
PLAN
ELEVATION
Direction of runoff Fi ll slo pe
Flow
PLAN
Spacing Slope
STAKES REQUIRED
disturbed areas
Runoff from
1:1
1:2
1:3
1:4 or flatter as specified in plans
2.
1.
DRAINAGE DITCH INSTALLATION
INSTALLATION BEYOND TOE OF SLOPE
INSTALLATION ALONG SLOPES
Fiber roll length for each roll
Stakes required
FIBER ROLL SPACINGStep 2: Backfill soil against fiber rolls and install fiber rolls
Step 1: Excavate trench
FIBER ROLL STAKING DETAIL
conditions.
Use drainage ditch installation only in low flow permanent installations.
roll while staking. Live stakes may be used for until fiber roll is secure to slope. Do not crush
PROPERLY STAKED AND ENTRENCHED FIBER ROLL
NOTE:
NO SCALE
Fiber roll larger than fiber roll
Existing ground (typ.)
Stagger joints (typ.)
Existing ground
Fiber roll along contours.
Install fiber rolls
Flow direction to end, without overlapping the ends
Abut adjacent fiber rolls tightly, end
Install fiber rolls snugly into trench.
soil to ground level
Backfilled and compacted
Slope
Stake and entrench fiber roll water from flowing around the fiber roll
Provide sufficient length to prevent sp ac in g ch ar t
S ee f ib er r ol l
Direction of runof f from distur bed area
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
PLAN AND ELEVATION
D e fa u lt m y fi le s p w p r o d u c ti o n d F P F
H P
E .D
G N
N
1" = 8'
Elev. 5436.71
Sta. 800+96.01
Begin bridge
Elev. 5437.19
Sta. 801+61.01
End bridge
Existing ground
Elev. 5434.04
Low chord
Top of curb
Sta. 801+71.51
Approach slab
Sta. 800+85.51
Approach slab
Sta. 800+96.01
Begin bridge Sta. 801+61.01
End bridge
(Typ.)
steel pipe piles
Concrete-filled voided slabs
AASHTO Type SIV-48
PLAN
ELEVATION
F a ll C r e e k
(Typ.)
Wingwall
200' VC
K = 280
,4
.0
+0.7387%
Bridge
,4
.6
PROFILE GRADE
Not to scale
+0.0251%
-0.3100%
Roadway
StructureCL
CL
F.1
CL
RG3009-A
A C
T U
A L F I L E F
P
F H
P
E .D
G N
Fix Exp.
Roadway
Proposed grade @ bottom
Proposed channel
R e m o v e e x is ti n g b r id g e
200' VC
K = 191
SSD = 1129'
14'-0"
0.7387%
65'-0"
Bridge length = 65'-0"
Notes:
(Typ.)
Structure transition railing transition rail details.
See Sheet H.3 for structure 2.
See Sheet G.3 for riprap details.1.
(Typ.)
Class 2, Type C
Separation-stabilization geotextile,(Typ.)
method A, class 3
Placed riprap, J u n e
Elev. 5431.3
50-year
Weathering Steel Railing
Oregon 3-Tube
PROJECT TEAM LEADER BRIDGE DRAWING
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
NO.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
DRAWING NO.
AF B. Oltmann
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
OR PFH 46(13)
17 June 2016AR
GENERAL NOTES:
SPECIFICATIONS:
Construction:
Design:
DESIGN LOADING:
Dead Loads:
Live Loads:
AASHTO HL-93, maximum dynamic load allowance, IM=33%
MATERIALS:
Design stresses:
Concrete:
Reinforcing steel:
DRAWING TITLE
2 RG3009-B
F.2
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
G N .D
G N
No Scale
GENERAL NOTES
Future asphalt wearing surface: 25 psf Asphalt wearing surface: 25 psf Concrete: 150 pcf with 2015 Interim Revisions.
AASHTO LRFD Bridge Design Specifications, 2014, 7th Edition
DRAWING INDEX
DRAWING NO.
on Federal Highway Projects, FP-14.
Standard Specifications for Construction of Roads and Bridges A
C T
U A
L F I L E F
P
F H
G
N .D
G N
RG3009-Q
RG3009-P
RG3009-O
RG3009-N
RG3009-M
RG3009-L
RG3009-K
RG3009-J
RG3009-I
RG3009-H
RG3009-G
RG3009-F
RG3009-E
RG3009-D
RG3009-C
RG3009-B
RG3009-A
Approach Slab Details
Epoxy Coated Reinforcing Steel Bar List
Reinforcing Steel Bar List
Bearing Details
Railing Details - 2
Railing Details - 1
Exterior Voided Slab Details
Interior Voided Slab Details
Typical Section and Deck Reinforcement
Framing Plan
Abutment 2 Wingwall Reinforcement
Abutment 1 Wingwall Reinforcement
Abutment Reinforcement
Abutment Layout
Foundation Layout
General Notes
Plan and Elevation
(1) Contract quantity
Structural steel:
Prestressing steel:
Bearings:
estimated losses of 28.28 ksi.
The final estimated effective prestress force per strand is 26,700 lb based on
Pre-tension each strand to a total load of 31,000 lb (f'si = 0.75*f's = 202,500 psi).
steel conforming to AASHTO M 203.
" diameter, seven-wire, low-relaxation, prestressing2 1Furnish grade 270, GEOTECHNICAL REPORT:
No. 18-15, dated 12-2015.
For boring logs and other geotechnical information, see Geotechnical Memorandum method A.
durometer hardness. Bearings are designed according to AASHTO LRFD design
Section 18.2 of the AASHTO LFRD Bridge Construction Specifications, with 60
Provide laminated elastomeric bearing pads conforming to the requirements of
Prestressing Steel:
Reinforcing Steel:
Structural Steel:
Class P (Prestressed) Concrete:
Class D(AE) Concrete:
Class A Concrete:
Class A(AE) Concrete:
fs = 270,000 psi fy = 60,000 psi fy = 45,000 psi f'ci = 5,500 psi at time of release f'c = 7,000 psi at 28 days f'c = 5,000 psi at 28 days f'c = 4,500 psi at 28 days f'c = 4,500 psi at 28 days
Furnish steel pipe piles conforming to ASTM A252, Grade 3.
J u n e
" unless otherwise noted.4 3Chamfer exposed edges of all concrete
Furnish Class A(AE) concrete for all other concrete.
Furnish Class A concrete for steel pipe piles.
Furnish Class D(AE) concrete for deck, approach slabs, curbs, and backwalls.
Furnish Class P (Prestressed) concrete for precast voided slab units, AASHTO Type SIV-48.
Provide 2" cover for reinforcing steel unless otherwise noted.
Provide standard hooks as defined by ACI SP-66 for bends unless otherwise noted.
or anchored in Class D(AE) concrete unless otherwise noted.
Provide epoxy coated reinforcing steel for voided slabs and all reinforcing steel located
Furnish reinforcing steel conforming to AASHTO M 31 or M 322, grade 60 deformed.
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
e fa m y fi le s p w p r o d u c ti o n d F P F
H F L .D
G N
ABUTMENT 1
FOUNDATION PLAN
" = 1'-0"4
SECTION A-A SECTION B-B
A A B B
61'-0"
CL
CL
CL
N
T y p
Elev. 5427.32 Elev. 5427.77
CL
CL
Min. Tip Elev. 5365.00Min. Tip Elev. 5365.00
Abutment 2Abutment 1 m in
3 RG3009-C
F.3
A C
T U
A L F I L E F
P
F H
F
L .D
G N
FOUNDATION LAYOUT
Begin bridge
2'-0" 2'-0"
End bridge
Steel pilesSteel piles
Provide 60° conical driving point (inside flange).3.
Indicates Dynamic Load Test location.2.
Indicates pile location.1.
(Typ.)
(See Note 3) filled with concrete
18" Ø x 0.5" Steel pipe pile
FACTOR
RESISTANCE
Abut. 1
Abut. 2
PILES
LENGTH OF
TOTAL
ESTIMATED
0.65
0.65
322 ft
324 ft
LOCATION
PILE DRIVING INFORMATION
ABUTMENT 2
J u n e
Roadway
(kips/pile)*
RESISTANCE
BEARING
NOMINAL
COMPRESSIVE
REQUIRED
bearing resistance
* Drive piles to the required compressive nominal
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
e fa m y fi le s p w p r o d u c ti o n d F P F
H
L A
Y O
U T .D
G N
PLAN
" = 1'-0" 8 3Scale:
" = 1'-0" 8 3Scale:
ELEVATION
" = 1'-0" 2 1Scale:
SECTION A-A
bridge
Begin/End
B2 B3 B4 B5 B6 B7 B9B8
2'-0"
1'-0" "2 118'-4 "2
118'-4 1'-0"
38'-9"
Piles
BearingsCL
CL
"2 14'-44 Spa. @ 7'-6" = 30'-0""2
14'-4
Bearings LC
PilesCL
ABUTMENT LAYOUT
ELEVATIONS
ELEV. ABUT. 1 ABUT. 2
A
B
C
D
E
5427.32
5436.19
5436.93
5433.78
5434.52
5427.77
5437.38
5436.64
5434.97
5434.23
Elev. A
Elev. C
Elev. E
Elev. D
Elev. B
Elev. F
F 5434.15 5434.60
8" bridge
Begin/End
1'-2" 10"
1'-6"1'-6"2'-0"
Elev. A
Precast slab
5" Concrete deck
(Typ.)
#8 Dowel
(Typ.)
Bearing pad
Constr. joint
(Typ.)
Constr. joint
A
A
(Typ.)
Edge of slab
"2 11 "2
1'-0" 1'-8"
Elev. F
N
A C
T U
A L F I L E F
P
F H
L
A Y
O U
T .D
G N
4 RG3009-D
F.4
2" Asphalt wearing surface
End of slab drain (See Note 4)
Geocomposite sheet drain pipe
3" Ø Perforated drain pipe
3" Ø Perforated joint filler
2" Flexible cellular drain (See Note 4)
Geocomposite sheet weep holes at face of abutment.
perforated abutment pipe and daylight through
Cap ends of pipe. Tie perforated wingwall pipes to perforated drain pipe behind wingwalls and abutment.
Install continuous geocomposite sheet drain and 3" Ø4.
Cast top of abutment cap with 2% slope for drainage.3.
Abutment 2 shown. Abutment 1 similar but mirrored.2.
for wingwall details and elevations.
"ABUTMENT 2 WINGWALL REINFORCEMENT" sheets
See "ABUTMENT 1 WINGWALL REINFORCEMENT" and 1.
As shown
(Looking ahead towards Abutment 2)
(Typ.)
3" Ø Weep hole
3" Ø Weep hole 2%
B1
2 Spa. @ 8'-0" = 16'-0" "2 13'-4"2
13'-4 2 Spa. @ 8'-0" = 16'-0"
J u n e
RoadwayLC
RoadwayLC
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
e fa m y fi le s p w p r o d u c ti o n d F P F
H
A B
R E
B A
R .D
G N
ELEVATION
PLAN
SECTION A-A
#5AD1
V a r ie s
#5A7
2" Clr.
(Typ.)
#8A1
#8A1
#8A1
#8A1
Structure LC
S p a
#7A4
A
#5A8 (match w/ #7A4)
(Typ.)
T y p
A
C lr
S p a
"2 14 "2
14 3 C lr
S p a
T y p
S p a
Structure LC
S p a
#5AD2
1'-6" from slabs (See Note 2)
Extended P/S strands from slabs (See Note 2)
Extended top rebar
ABUTMENT REINFORCEMENT
3"
3"
36 Spa. @ 1'-0" = 36'-0"
Abutment LC
T y p
T y p
S p a
(T y p
A
'-8
(Semi-integral backwall not shown for clarity) w/ #5AD2)
#5ADE2 (match w/ #5AD2)
#6ADE1 (match
S p a
#5A6
(Typ.)
#5A5
(Typ.)
#8A3
"2 12"2
F.5
5 RG3009-E
A C
T U
A L F I L E F
P
F H
A
B R
E B
A R .D
G N
Key:
n.f. = near face f.f. = far face e.f. = each face length of extended reinforcement and P/S strands.
See "INTERIOR VOIDED SLAB DETAILS" sheet for 2.
Abutment 2 shown. Abutment 1 similar but mirrored.1.
(Deck reinforcement not shown for clarity) bridge
Begin/End
3 Spa. @7 Spa. @ 9" = 5'-3" piles)
(Between
#8A3
(2) #5AD2, #6ADE1, #5ADE2
(Typ.)
(2) #5A2
(Typ.)
(2) #5A2
9" = 2'-3"
(Typ.)
#5A10
(Typ.)
#5A9
(Typ.)
(2) #5A9
"2
M in la p
(Typ.)
3'-0" into pile)
(4'-0" x 10", embed
#5A10
As shown
" = 1'-0"2 1Scale:
" = 1'-0"2 1Scale:
" = 1'-0"4 3Scale:
e .f
A e .f
A
CL Abutment
A e .f
A e .f
(Looking ahead towards Abutment 2)
A e .f
A e .f
#5A9
#5A2 or
#8A1
#8A1
S p a
A e .f
(Typ.)
(2) #5A2
(Typ.)
(2) #5A2
(Typ.)
#8A1
#7A11 (e.f.)
#7A11 (e.f.)
J u n e
(Typ.)
Constr. joint
(Typ.)
Constr. joint
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
" = 1'-0"4
W e .f s p li c e w
A
6"3"
#7W1 #7W1
S p a
W e .f s p li c e w
A
S p a
3"6"
WINGWALL REINFORCEMENT
ABUTMENT 1
Elev. 5436.09 Elev. 5436.19
5434.52
Elev.
5433.78
Elev.
Elev. 5436.92 Elev. 5436.82
5427.32
Elev.
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
W W
R E
B A
R .D
G N
PLAN VIEW (UPSTREAM WINGWALL) PLAN VIEW (DOWNSTREAM WINGWALL)
5427.32
Elev.
11 Spa. @ 9" = 8'-3" 11 Spa. @ 9" = 8'-3"
ELEVATION (UPSTREAM WINGWALL) ELEVATION (DOWNSTREAM WINGWALL)
6 RG3009-F
F.6
A C
T U
A L F I L E F
P
F H
W
W R
E B
A R .D
G N
Key:
n.f. = near face f.f. = far face e.f. = each face
#5W2 (e.f.)
#5W3 (e.f.)
#5W3 (e.f.) #5W2 (e.f.)
J u n e
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
" = 1'-0"4
W e .f s p li c e w
A
6"3"
#7W1 #7W1
S p a
W e .f s p li c e w
A
S p a
3"6"
PLAN VIEW (DOWNSTREAM WINGWALL) PLAN VIEW (UPSTREAM WINGWALL)
ELEVATION (DOWNSTREAM WINGWALL) ELEVATION (UPSTREAM WINGWALL)
WINGWALL REINFORCEMENT
ABUTMENT 2
Elev. 5437.48 Elev. 5437.38
5434.97
Elev.
5434.23
Elev.
Elev. 5436.64 Elev. 5436.74
5427.77
Elev.
5427.77
Elev.
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
W W
R E
B A
R .D
G N
11 Spa. @ 9" = 8'-3" 11 Spa. @ 9" = 8'-3"
7 RG3009-G
F.7
A C
T U
A L F I L E F
P
F H
W
W R
E B
A R .D
G N
Key:
n.f. = near face f.f. = far face e.f. = each face
#5W4 (e.f.)
#5W5 (e.f.)
#5W4 (e.f.) #5W5 (e.f.)
J u n e
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
FRAMING PLAN
" Plate2 1" x 62
1" x 62
7" m in tensioning of the transverse ties.
has been completed and prior to the final Grout shear key after all erection work
(Typ.)
Voided slab
1" Ø Backer rod
" Plate 2 1" x 62
1" x 62 post-tensioning rod 3" Ø hole for transverse
3'-3" 19'-2" 17'-8" 3'-3"
5"5" 5" 5"
10" 19'-8" 20'-0" 19'-8" 10"
1'-0"
17'-8"
Bearings CLCL
BearingsCL
CL CL
s p a c e s bridge
Begin bridge
End
10"1'-2"
(Typ.)
CIP Backwall
1'-2"10"
PLAN
AA
Scale: 1" = 1'-0"
Scale: 1" = 1'-0"
SHEAR KEY DETAIL
AT DIAPHRAGM
POST-TENSIONING DETAIL
Scale: 2" = 1'-0"
SECTION A-A
As shown
Notes:
B1
B2
B3
B4
B5
B6
B7
B8
B9
D e fa m y fi le s p w p r o d u c ti o n d F P F
H F P .D
G N
Lifting eye (Typ.)
A
C T
U A
L F I L E F
P
F H
F
P .D
G N
"2 1 "2
" = 1'-0"4 1Scale:
LIFTING EYE DETAIL
Top of girder
3 Cable clamps
Not to Scale
" dia. strand
Double loop
8"
F.8
8 RG3009-H
See Note 1
"4
8"
VERTICAL WATERSTOP DETAILS
Not to scale
CIP Backwall
Wingwall material
Preformed expansion wedge anchors at 12" o.c.
"Ø x 3" galv.8 3Attach with
" Galv. steel plate4 13"x
(See Note 5) butyl rubber sheet
" Thick x 18" 8
(Typical at all corners)
3" 4"
(Typ.)
Wingwall
WATERSTOP DETAIL"
See "VERTICAL
Post-tension each rod to 65 kips.
and nuts at each end of rods.
ends. Provide galvanized washers structural rods with threaded Provide 1" Ø galvanized 150 ksi
1" Ø Post-tensioning rod 1" Ø Post-tensioning rod 1" Ø Post-tensioning rod and immediately anchor plates as shown.
adhesive. Apply a 4" wide strip of adhesive to each side of the rubber
Bond butyl rubber sheets to concrete and plate with an approved 5.
Blockouts for lateral tie anchorages are for the exterior beams only.4.
CO approval.
If desired, equivalent high-strength tendons may be substituted with3.
AASHTO M 232 (ASTM A153).
(ASTM A123). Galvanize hex nuts and washers in accordance with
Galvanize tie rods and plates in accordance with AASHTO M 111
Provide plates conforming to AASHTO M 270 (ASTM A36).
Provide tie rods conforming to AASHTO M 275 (ASTM A722). 2.
transverse rods.
Fill recess with non-shrink grout after final tensioning of 150 ksi1.
J u n e
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
DECK REINFORCEMENT
TYPICAL SECTION AND
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
X S .D
G N
TYPICAL SECTION
Scale: 1/4" = 1'-0"
Scale: 1/2" = 1'-0"
S p a
D E
D
E
A lt e r n a te
"4 39"4
12 "4 12"4
3963 Spa. @ 1'-0" = 63'-0"
#4DE3
3" 43 Spa. @ 18" = 64'-6" 3"
#4DE4 (Typ.)
2'-0"
(Typ.)
2'-0" 2'-0"" = 32'-6"4 38 Spa. @ 4'-0
(Typ.)
voided, prestressed slab
AASHTO Type SIV-48
PLAN
(Typ.)
#4DE4
D E
D E
A
B D bearings
Straight line between
CL
L/2 L/2
CL MidspanBearingCL
CAMBER TABLE (IN.)
Midspan A B C
CAMBER DIAGRAM
Not to Scale
Ext. Beam
Int. Beam
2.78 1.06 1.04
2.78 1.07 1.04
(Typ.)
#4DE1 or #4DE2
36'-6"
11'-0"
Shoulder Lane Lane wearing surface
2" Asphalt
Shoulder
(Looking ahead)
F.9
9 RG3009-I
End bridgeBegin bridge
CL
As Shown
D
0.68
0.67
D = Net final camber railing and wearing surface.
C = Estimated dead load deflection due to concrete deck.
B = Estimated dead load deflection due to self weight of unit only
A = Estimated camber due to prestress and
C deck
5" Concrete
#4DE3
waterproofing
Membrane
A C
T U
A L F I L E F
P
F H
X
S .D
G N
Not to Scale
DETAIL A
2% dimensions.
See "RAILING DETAILS - 1" sheet for #4DE4 3.
Extend membrane waterproofing 3" up face of curb.2.
from approach slab curb into bridge curb.
reinforcement. Place curb reinforcement continuously adjacent splices similar to longitudinal deck
Alternate longitudinal curb reinforcement to avoid1.
20'-0"
CLRoadway
(Longitudinal curb bars not shown for clarity)
(Typ.)
(See Note 1)
#4CE2 (30'-0" long)
#4CE1 spliced 2'-0" w/
Roadway
J u ly
"2 15'-7 "2
11'-711'-0""2 11'-7 " 2
15'-7
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
OR PFH 46(13)
17 June 2016AR
Concrete deck surface
Asphalt wearing
(See Note 2) waterproofing
Membrane
See DETAIL A
Constr. jt.
e fa m y fi le s p w p r o d u c ti o n d F P F
H
G I R
D I
N T .D
G N
4'-0"
(Typ.)
both ends of each void
" Non-ferrous drain at 4
Ø
Ø
Ø
1'-2"10" 1'-2" 10"
Slab unitCL
20 Spa. @ 2" = 3'-4"
19 (0.5" Ø) straight strands, bottom row
3 (0.5" Ø) straight strands, top row
14 (0.5" Ø) straight strands, middle row
4" 4"
7" 7" 7"7"
C lr
Slab unitCL
Slab unitCL
5"2" 4"8" 6"3 Spa.1'-0"5"5"
"2 15 "2
1'-6"
@ 6" =
25 Spa. @ 1'-0" = 25'-0" CL Slab unit (Symm.)
slab unit
InteriorCL
10"
1'-0"10"
CL
CL
tensioning duct
3" Ø post-CL
(See Note 3)
Lifting eyes
18'-8" 10'-0"
CL
tensioning duct
3" Ø post-
(Typ.)
#5SE3
(1) #4SE2
(4) #4SE1
C lr
#4SE1
#4SE2
#4SE2
#4SE2
(Typ.)
#5SE3
1'-0"
S
E
T o p
(Typ.)
Dowel holes
" Ø2 1 2
Bearing
"16
"16
" = 1'-0"2 1Scale: 1
TYPICAL SECTION
" = 1'-0"2 1Scale: 1
VOIDED SLAB END ELEVATION
" = 1'-0"2 1Scale:
VOIDED SLAB PLAN
S e e N o te
S e e N o te
"8 57 "8
57 7" 7" "8 57 7"7""8
A
A B
B #5SE3
tensioning duct
3" Ø post-
(3) #4SE2
#4SE1, #4SE2
(3) #4SE2
31'-4"
4" 4" 20 Spa. @ 2" = 3'-4"
19 (0.5" Ø) straight strands, bottom row
3 (0.5" Ø) straight strands, top row
14 (0.5" Ø) straight strands, middle row
4" 4"
6" 6"
Dowel holes
" Ø2
1 2CL
3'-3" Void
B
C C
B C
MARK
DIMENSION
"2 11'-4
"2 11'-4
#4SE1
#4SE2 3'-8"
#5SE3 66'-8"
"2 12'-6
ESTIMATED QUANTITIES
Concrete reinforcing steel
Expoxy coated
0.5" Ø Strands
11.6 Cu. Yd.
1450 Lbs.
2301 Ln. Ft.
REINFORCING STEEL SCHEDULE
SECTION A-A
" = 1'-0"2 1Scale: 1
SECTION B-B
" = 1'-0"2 1Scale: 1
SLAB DETAILS
INTERIOR VOIDED
4"4"
10 RG3009-J
F.10
A C
T U
A L F I L E F
P
F H
G
I R
D I
N T .D
G N
As Shown
(Typ.)
and rebars
Extended P/S strands
1'-8" details.
See "FRAMING PLAN" sheet for lifting eye4.
".16 3prestressed units to an amplitude of
Transversely roughen top and end surfaces of 3.
strands to vertical.
Extend half of bottom row strands 2'-3". Bend2.
90° hook with a 1'-0" leg.
Extend all top reinforcement 2'-0". Provide1.
0.5" Ø P/S Strands
One slab only
J u n e
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
e fa m y fi le s p w p r o d u c ti o n d F P F
H
G I R
D E
X T .D
G N
4'-0"
(Typ.)
both ends of each void
" Non-ferrous drain at 4 notch
" Drip4
Ø
Ø
Ø
1'-2"10" 1'-2" 10"
Slab unitCL
20 Spa. @ 2" = 3'-4"
19 (0.5" Ø) straight strands, bottom row
3 (0.5" Ø) straight strands, top row
14 (0.5" Ø) straight strands, middle row
4" 4"
7" 7" 7"7"
SECTION A-A
" = 1'-0"2 1Scale: 1
SECTION B-B
" = 1'-0"2 1Scale: 1
C lr
Slab unitCL
Slab unitCL
SLAB DETAILS
EXTERIOR VOIDED
5"2" 4"8" 6"3 Spa.1'-0"5"5"
"2 15 "2
1'-6"
@ 6" =
25 Spa. @ 1'-0" = 25'-0" CL Slab unit (Symm.)
slab unit
ExteriorCL
10"
1'-0"10"
CL
CL
tensioning duct
3" Ø post-CL
(See Note 3)
Lifting eyes
18'-8" 10'-0"
CL
tensioning duct
3" Ø post-
(Typ.)
#5SE3
A C
T U
A L F I L E F
P
F H
G
I R
D E
X T .D
G N
(1) #4SE2
(4) #4SE1
C lr
#4SE1
#4SE2
#4SE2
#4SE2
(Typ.)
#5SE3
1'-0"
1'-8"
S
E
T o p
(Typ.)
Dowel holes
" Ø2 1 2
Bearing
"16
"16
" = 1'-0"2 1Scale: 1
TYPICAL SECTION
" = 1'-0"2 1Scale: 1
VOIDED SLAB END ELEVATION
" = 1'-0"2 1Scale:
VOIDED SLAB PLAN
S e e N o te
S e e N o te
"8 57 "8
57 7" 7" "8 57 7"7""8
A
A B
B #5SE3
tensioning duct
3" Ø post-recess
Post-tensioning
(3) #4SE2
#4SE1, #4SE2
B
C C
(3) #4SE2
B C
MARK
DIMENSION
"2 11'-4
"2 11'-4
#4SE1
#4SE2 3'-8"
#5SE3 66'-8"
"2 12'-6
ESTIMATED QUANTITIES
Concrete reinforcing steel
Expoxy coated
0.5" Ø Strands
11.8 Cu. Yd.
1450 Lbs.
2301 Ln. Ft.
REINFORCING STEEL SCHEDULE
31'-4"
4" 4" 20 Spa. @ 2" = 3'-4"
19 (0.5" Ø) straight strands, bottom row
3 (0.5" Ø) straight strands, top row
14 (0.5" Ø) straight strands, middle row
4" 4"
6" 6"
Dowel holes
" Ø2
1 2CL
3'-3" Void
3"
" 4"4"
F.11
11 RG3009-KAs Shown
(Typ.)
and rebars
Extended P/S strands details.
See "FRAMING PLAN" sheet for lifting eye4.
".16 3prestressed units to an amplitude of
Transversely roughen top and end surfaces of 3.
strands to vertical.
Extend half of bottom row strands 2'-3". Bend2.
90° hook with a 1'-0" leg.
Extend all top reinforcement 2'-0". Provide1.
M a r c h
One slab only
0.5" Ø P/S Strands
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
1'-0"
"2 14 "2
14"2
6" Ø Hole with 4 - 1" Ø holes
" x 12" x 13"8 3P L
1'-0"
"2 14 "2
6"
Post
" Ø anchor bolts8
" Ø Holes for8 14 - 1
ANCHOR PLATE DETAILS
Scale: 2" = 1'-0" Scale: 2" = 1'-0"
BASE PLATE DETAILS
Scale: 2" = 1'-0"
RAIL SPLICE DETAILS
"8
" Ø Hole8
L
Scale: 8" = 1'-0
PLATE WASHER "C"
Scale: 2" = 1'-0
PLATE "D"
"2 11'-5
"2 11 "4
35"4
(Typ.)
6" "2
"8 3P L
3" drain hole
4" Ø zinc bolts (Typ.)
" Ø8 7holes for
" Slotted2 11" x 1 "16
"16
8"
"16
"8 3P L
Scale: 4" = 1'-0"
ALTERNATE POST
Scale: 4" = 1'-0"
RAIL CAP DETAILS
2" 2"
T y p .) "8
(Typ.)
Rail tube member
" to provide zinc drains4 3corners
", cope4 3" x 34
3" x 616 3P L jam nuts.
self locking nuts or nuts and
Install angle with washers and guardrail connections.
studs on each rail cap at
" Ø Reduced base welded4 32 -
Leg of connection angle
F.12
12 RG3009-L
"2 15 4"
1"* has a deck expansion joint.
plans. Provide a rail splice in panel that
1" gap unless noted otherwise on detail
*Note:
"8
"4 1from P
Make splice tube
L
"16
(Typ.)
1'-0"6"
#4DE4, #4APE4
Not to Scale
4" 9"
"2
Clr.
G r o u t_+
(Typ.)
#4CE2
#4CE1 or alternate post
W8x24 Post or
"2 11'-7
1 nut
1-lockwasher, and
1-plate washer "C", stud x 2" long with reduced weld base
" Ø4 3Threaded
" 4
(Typ.)
Roadway width
CURB AND POST DETAILS
" = 1'-0"2 1Scale: 1
#4APE4
#4DE4 or constr. jt.
Roughen
1HSS7x4x
5Spacer blocks
"2 1 x 64
1HSS7x3x
(Typ.)
1HSS7x4x
"4
(Typ.)
#4APE4
#4DE4 or
(Typ.)
bolt head two places
Tack weld anchor plate to
@ 18"
#4DE4 or #4APE4
Rail splice
R
"4 11'-111'-0" 1'-1"
See Plate "D"
"16
Each side
Seal weld
" = 1'-0"4 3Scale:
" = 1'-0"4 3Scale:
PLAN
ELEVATION
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
R A I L
D G
N
10'-0" Max post spacings
Approach slab
As Shown
A C
T U
A L F I L E F
P
F H
R
A I L .D
G N wearing surface
2" Asphalt
1" nuts (galv.)
4 - Leveling
O n b r id g e
O n a p p r s la b
Pay limit for rail
RAILING DETAILS - 1
"16 1" = 82'-216
99 Spa. @ 9'-1
"16 11'-11
"4 11'-11 "4
11'-11
#4DE1 or #4DE2 #4CE1 or #4CE2 not shown for clarity)
(Asphalt wearing surface
Top of concrete overlay
" Post spacings 16 99'-1
1'-3"10'-6"
" Jt.2 11 Sleeper slab and flat washers (galv.)
bolts threaded 5" min with 2 nuts
" Ø High strength anchor8 7(4)
"16
"4 1P
"4
4"
(Typ.)
of curb)
(To end
"16 11'-11 of curb)
(To end
CL
(Typ.)
Railpost
CL
(Typ.)
Railpost
Slotted holes in post
"2 16 - 1" x 1
2'-3" ± 6"
(Typ.)
Rail splice details.
See "RAILING DETAILS - 2" for end railing connection3.
of the structure. Install posts normal to grade.
Fabricate railing to the horizontal and vertical alignment 2.
conforming to ASTM F436, Type 3.
conforming to ASTM A563, Grade C3. Provide washers conforming to ASTM A325, Type 3. Provide nuts sleeves conforming to ASTM A588. Provide bolts to ASTM A847. Provide steel posts, plates, and splice
Provide structural tubing for rail elements conforming 1.
J u n e
1'-3"
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
OR PFH 46(13)
17 June 2016AR reinforcement
Deck
13 RG3009-M
F.13
RAILING DETAILS - 2
A C
T U
A L F I L E F
P
F H
R
A I L .D
G N
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
R A I L .D
G N
End rail postCL
"16 11'-11
"4 11'-11
(See Note 1)
Plate D
END RAILING ELEVATION
" = 1'-0"2 1Scale: 1 " = 1'-0"2
1Scale: 1
" = 1'-0"2 1Scale: 1
" = 1'-0"2 1Scale: 1
END RAILING PLAN
SECTION B-B GUARDRAIL CONNECTION PLATE DETAILS
SECTION E-E
CONNECTION ANGLE "A"
" = 1'-0"2 1Scale: 1
SECTION D-D DETAIL "A"
End of rail element
(See detail this sheet)
Connection angle "A"
(See details this sheet)
Guardrail connection plate nut and jam nut self locking nut or
" Ø Bolt with8
(Typ.)
"2 1 x 94
1HSS7x3x
(See Note 1)
Plate D
L
"2
4" x 1'-7"8 3L4x4x
"16
1'-0"
"2 11 4"4"
"2 1P L
D
E
D
E " x 4" x 1'-7"8
3P
1'-7"
3" "2 11'-2 "2
"2 11 8" x 1'-7"8 3L4x4x
"2 1Connection P L leg of angle
1" Ø Holes in vertical
1'-7"
3" "2 11'-2 "2
"2 1Connection P L
" x 4" x 1'-7"8 3P L
"2
4"
3"
"4 x 1'-10"8 3L4x3x
Slotted holes
"2 1" x 14 back of plate
Bolt to be flush with
Connection plate
"2
0.135"
Not to scale
See Note 2
Top of curb
B
B
2'-1"
(See details this sheet)
Connection angle "A"
(See details this sheet)
Guardrail connection plate
(See Note 2) rail elements
Thrie beam terminal
"2 11'-2
(Typ.)
Slotted holes
"4 1" x 18
(Typ.)
1" Ø holes
(Typ.)
1" Ø holes
As shown
3'-9"
"4 31'-0
1'-3" sleeper slab
End of " Jt.2
(See detail this sheet)
(1) 0.135" thick element
Thrie beam terminal connector, " = 1'-0"2 1Scale: 1
CONNECTOR
THRIE BEAM TERMINAL
2'-6"
Snug tighten (See Detail "A" this sheet).
" Ø bolts (ASTM A325).8 7Drill and tap 2 holes for
Snug tighten bolts (ASTM A325).
" 8 7(6) 1" Ø Holes for
Snug tighten bolts (ASTM A325).
" 8 7(5) 1" Ø Holes for
"A" this sheet).
Snug tighten (See Detail
" Ø bolts (ASTM A325).8
Drill and tap 2 holes for connector terminal
Thrie beam
" Ø Bolts (ASTM A307)8
Scale: 1" = 1'-0"
Scale: 1" = 1'-0"
7"
See Sheet H.3 for structure transition rail details.2.
See "RAIL DETAILS - 1" sheet for Plate "D" detail.1.
(Typ.)
" Ø Bolts (ASTM A307)8
M a r c h slab and curb
End of approach
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
e fa m y fi le s p w p r o d u c ti o n d F P F
H
B E
A R .D
G N
BearingsLC
Voided slabCL
(Typ.)
Bearing pad
Scale: 2" = 1'-0"
SECTION AT ABUTMENT
BearingsLC
Dowel hole
" Ø2
See Note 3
5" Concrete deck
10"
BEARING PAD
9"
BEARING PAD LAYOUT
As Shown
Not to Scale
Not to Scale
" Clr. all sides4
(Typ.)
" Top & bottom layers4
" Interior layers2 1(3) molded securely to pad
" Steel shim 8 1(4)
(36 Required)
F.14
#8 dowel
A C
T U
A L F I L E F
P
F H
B
E A
R .D
G N
RG3009-N
joint filler
2" Flexible cellular drain pipe
3" Ø Perforated
"2 14 "2
1 and 2)
(See Notes
#8 Dowel grout.
dowels and then fill with high-strength, non-shrink
" above top of2 1with joint sealer material to 2 non-shrink grout. At expansion end, fill dowel holes
At fixed end, fill dowel holes in slabs with high-strength,3.
non-shrink epoxy grout.
Place dowels and fill holes in abutments with approved2.
lateral ties are tensioned.
the beam and shear keys have been grouted and the
Drill 2"Ø holes in the abutments for #8 dowels after1.
3" Ø Weep hole sheet drain
Geocomposite
BEARING DETAILS
M a r c h
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
AF
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
F.15
No Scale BK 17
REINFORCING STEEL BAR LIST
RG3009-O
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
R E
B A
R E
X T .D
G N
A C
T U
A L F I L E F
P
F H
R
E B
A R E
X T .D
G N
M a r c h
PROJECT TEAM LEADER BRIDGE DRAWING
NO.
U.S. DEPARTMENT OF TRANSPORTATION
OR
DESCHUTES NATIONAL FOREST
FALL CREEK BRIDGE
OR PFH 46(13)
June 2016AR
REINFORCING STEEL SCHEDULE DIMENSION TABLE
BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R V
Abutment
STR#8A1 8 Horiz.
17 0'-3ƒ"#5A2 5 Vert.
2 0'-6„"#8A3 8 Horiz.
STR#7A4 7 Horiz. e.f.
STR#5A5 5 Vert. e.f.
STR#5A6 5 Vert. e.f.
STR#5A7 5 Vert.
67 0'-3ƒ"#5A8 5 Horiz.
17 0'-3ƒ"#5A9 5 Vert.
2 0'-3ƒ"#5A10 5 Vert.
STR#7A11 7 Horiz.
LBSSUBTOTAL
Backwall
STR#5AD1 5 Horiz.
17 0'-3ƒ"#5AD2 5 Stirrups
Wingwall
STR#7W1 7 Horiz. e.f.
STR#5W2 5 Vert. e.f.
STR#5W3 5 Vert. e.f.
STR#5W4 5 Vert. e.f.
STR#5W5 5 Vert. e.f.
LBSSUBTOTAL
TYPE 2
A G
B
B
C
D
OPTIONAL LEG
TYPE 17
A
B C
D
TYPE 67
F.16
No Scale BK
REINFORCING STEEL BAR LIST
EPOXY COATED
RG3009-P17
D e fa m y fi le s p w p r o d u c ti o n d F P F
H
R E
B A
R E
P O
X Y E
X T .D
G N
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .