ESCP_OR_PFH_46(13)_Erosion_and_Sediment_Control_Plan.pdf
PDF 6 MB Posted
- Attached to
- OR PFH 46(13), Fall Creek Bridge Replacement Federal contract opportunity
- Solicitation number
- DTFH70-16-B-00021
About this file
ESCP OR PFH 46(13) Erosion and Sediment Control Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidSum_Fall_Creek.pdf | ||
| Q&A_4-10-2017.pdf | ||
| Q&A_4-7-2017.pdf | ||
| Q&A_4-6-2017.pdf | ||
| A001_Fall_Creek.pdf | ||
| Q&A.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_As-builts.pdf | ||
| Fall_Creek_Bridge.FINAL.pdf | ||
| Plan-Set_100_.pdf | ||
| GR18-15_Fall_Creek_Bridge,_Final_Foundation_and_Geotech_Rpt.pdf | ||
| IFB_Fall_Creek.pdf | ||
| Plan_Request_form_Fall_Creek.pdf | ||
| of04613_100__xs_layout_mainline_labeled.pdf | ||
| OR_PFH_46(13)_Fall_Creek_Bridge_Inspection_Report.pdf | ||
| of04613xs01_EW.pdf | ||
| PROJECT_DESCRIPTION_Fall_Creek.pdf | ||
| FALL_CREEK_Preliminary-Letter.pdf | ||
| Plans_Fall_Creek.pdf | ||
| PROJECT_DESCRIPTION_Fall_Creek.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Erosion and Sediment Control Plan
ESCP
For:
OR PFH 46(13)
Fall Creek Bridge Replacement
Deschutes County Oregon
Federal Highway Administration, Western Federal Lands Highway Division Project Engineer: _____________________________
General Contractor: ____________________________
Table @f Contents
. SWP.PP/ESCP TABS
TAB 1: SWPPP/ESCP Narrative
TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)
TAB 3: NOi, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
TAB 4: Delegation of Authority
TAB 5: Maps
TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
TAB 7: Permanent Stabilization and Revegetation Plan .(plan sets and details)
TAB 8: SWPPP Amendment Log
TAB 9: Erosion/Sediment Control Inspection Reports and Requirements
TAB 10: Corrective Action Log
TAB il: Water Quality Monitoring, Reporting Requirements, and Reports
TAB 12: Training Log
TAB 13: Waste and/or Borrow Site Information
TAB 14: Grading and Stabilization .Log
TAB 15: Hazardous Spill Plan
TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)
TAB 17: NPDES Quality Assurance Checklist
TAB 18: NPDES Notice of Termination (NOT)
Tab 1
CONTRACTOR:
Complete SWPPP narrative in accordance with contract 107.0lA(b).
Revise SWPPP narrative as needed throughout construction in accordance with contract 107.0lA(f)
ALASKA, IDAHO AND WASHINGTON PROJECTS ONLY:
SWPPP narrative must be signed by General Contractor's responsible corporate officer as defined in CGP I.11.2.
File approved SWPPP narrative i~ Tab 1.
Stormwater Pollution Prevention Plan (SWPPP)
Oregon: Erosion and Sediment Control Plan (ESCP)
For Construction Activities at:
I Project Name: Fall Creek Bridge Replacement, OR PFH 46(13)
Project Site Location: Approx. 26.5 miles SE of Bend, OR on Cascade Lakes Scenic Byway
City, County, State, Zip Deschutes County, OR Code:
SWPPP Prepared for:
Organization Name: FHWA, Western Federal Lands Highway Division
Address: 610 East Fifth Street
Vancouver, WA 98661-3801
(j Telephone Number: 360-619-7700
SWPPP Prepared by:
Name, Title: Erin Chipps, Environmental Protection Specialist
Name, Title:
Company/Organization: FHWA
Address: 610 E 5th St.
Vancouver, WA 98661
Telephone Number: 360-619-7637
SWPPP Preparation Date: August 22, 2016
Estimated Project Dates:
Project Start Date: June 15, 2017 Project Completion Date: October 15, 2017
TAB 1:
TAB2:
TAB3:
TAB4:
TABS:
TAB6:
TAB7:
TAB8:
TAB9:
TABlO:
TAB 11:
TAB 12:
TAB 13:
TAB 14:
TAB 15:
TAB 16:
TAB 17:
TAB 18:
SWPPP TABs (SWPPP Inclusions)
SWPPP/ESCP Narrative
NPDES Permit (Construction General Permit or Corresponding State Permit)
NOi, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence
Delegation of Authority
Maps
Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)
Revegetation Plan (if applicable)
SWPPP Amendment Log
Inspection Reports
Corrective Action Log
Water Quality Monitoring, Reporting Requirements, and Reports (if applicable)
Training/Certification Log
Government-Selected Waste, Borrow, Staging Sites
Grading and Stabilization Log
Hazardous Spill Plan or SPCC
Threatened and Endangered Species and Historic Preservation (Section 106) Documentation
NPDES Quality Assurance Checklist
NPDES Notice of Termination (NOT)
TAB 1:
SWPPP/ESCP NARRATIVE
Table of Contents
SECTION 1: RESPONSIBLE PARTIES/CONT ACT INFORMATION
1.1 Operator(s): ...................•
1.2 Construction Site SWPPP Contact(s):
1.3 SWPPP Prepared by:
1.4 NPDES Stormwater Permit
1.5 SWPPP Administrator
1.6 Permitting Authority for FHW A/WFLHD Projects
SECTION 2: PROJECT INFORMATION
2.1 Project Name and Location
2.2 Project Site Characteristics .....................................................................•
SECTION 3: NATURE OF CONSTRUCTION ACTIVITY
3.1 General Description of Project and Scope of Work:
3.2 Sequence and Estimated Dates of Construction Activities
3.3 Potential Sources of Pollutants
SECTION 4: SITE MAPS
SECTION 5: DISCHARGES
5.1 Allowable Non-Stormwater Discharges
5.2 Receiving Waters:
5.3 Water Quality Monitoring Requirements
SECTION 6: COMPLIANCE WITH OTHER APPLICABLE REQUIREMENTS .........• 16
6.1 Endangered Species Protection
6.2 Historic Presel9V'ation
6.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 7: EROSION AND SEDIMENT CONTROLS
7.1 Natural Buffers or Equivalent Sediment Controls
7.2 Perimeter Controls
7.3 Sediment Track-Out
7.4 Stockpiled Soil or Other Erodible Materials .........................................................................•... 22
·--. 7.5 Minimize Dust
[i]
·1.6 Minimize Disturbance of Steep Slopes ................•.....................•
7.7 Topsoil Conservation
7.8 Minimize Soil Compaction
7.9 Storm Drain Inlets and Culvert Inlets
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
7.11 Sediment Basins
7 .12 Chemical Treatment
7.13 Dewatering Practices
7.14 Erosion Control and Stabilization
7.15 Removal of BMPs
7.16 Post Construction Measures
SECTION 8: OPERATIONAL CONTROLS/GOOD HOUSEKEEPING MEASURES ... 29
8.1 Hazardous SpiJI Plan
8.2 SpiJls/Releases in Excess of Reportable Quantities
8.3 EquipmentNehicle Fueling and Maintenance Practices
8.4 EquipmentNehicle Washing
8.5 Material Handling and Waste Management
8.6 Designate Concrete Washout Areas
SECTION 9: INSPECTIONS
9.1 Inspection Frequency
9.2 Corrective Actions
SECTION 10: DELEGATIONS OF AUTHORITY
SECTION 11: STAFF TRAINING
SECTION 12: CERTIFICATION AND NOTIFICATION
[ii]
Section 1: Responsible Parties/Contact Information
1.1 Operator(s):
i O!:gi!~ization Name: I FHWA, Western Federal Lands Highway Division (WFLHD
I Address: I 610 East Fifth Street
1 Vancouver, WA 98661-3801 ~phon_e_N_u_m_b_e_r_: ~~~i-3-60--619-7700
~ID, WA projects only) eral Contractor me:
I Address:
Telephone Number:
1.2 Construction Site SWPPP Contact(s):
FHWA Contact Name:
Title: Project Engineer
I Address:
Telephone Number:
General Contractor, I Company:
(complete for all States) I
Erosion Control
I Supervisor Name:
(complete for all States) I
Address: I Tele~hone Number: I
1.3 SWPPP Prepared by:
Organization/Company:
Erin Chipps, Environmental Protection Specialist
Environmental compliance/SWPPP pre aration I 360-619-7637 I Erin.chipps@dot.gov
' I Name, Position:
I Role/Res~onsibili!Y I Telephone Number:
I Email:
[l]
I i I l I
I
I
1.4 NPDES Stormwater Permit
The Applicable EPA/State NPDES Stormwater Permit is located in TAB 2. The Project NOi and EPA/State Acknowledgement with NPDES Tracking Number is located in TAB 3.
1.5 SWPPP Administrator
The General Contractor (section 1.2) is responsible for maintaining the project SWPPP of Record. The General Contractor will provide a qualified Erosion Control Supervisor, who is responsible for managing the installation, maintenance, inspection, and reporting for erosion and sediment control measures, shall maintain and update the project SWPPP of Record and prepare all documentation required by the project NPDES stormwater permit and SWPPP.
The Erosion Control Supervisor (ECS) is identified in section 1.2 and his/her qualifications are documented in TAB 12.
The FHW A/WFLHD Project Engineer (PE) is the duly authorized representative of the FHWA for the purpose of overseeing compliance with the NPDES stormwater permit and SWPPP at the construction site. See Delegation of Authority TAB 4.
All SWPPP documentation, revisions/updates, and reports will be approved/signed by both the General Contractor's ECS and the FHW A PE.
1.6 Permitting Authority for FHW A/WFLHD Projects
Delivery Confirmation documentation of the NOi is located in TAB 3.
The applicable EPA/State NPDES permit is located in TAB 2
Idaho and Washington, Environmental Protection Agency EPA Region 10
Alaska Department of Environmental Conservation (ADEC)
Montana Department of Environmental Quality (MDEO)
Oregon Department of Environmental Quality (ODEQ)
Wyoming Department of Environmental Quality (WDEQ)
State Permittin2 Authority Alaska • ADEC is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for the Denali National Park and Preserve and Metlakatla Indian Reservation.
Idaho • EPA is permitting authority for discharges within the state .
Montana • MDEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Oregon • ODEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state .
Washington • WDE is permitting authority for most discharges within the state EXCEPT for:
• EPA is permitting authority for Federal Operators and Indian Country lands within the state
Wyoming • WDEQ is permitting authority for most discharges within the state EXCEPT for:
• EPA is the permitting authority for Indian Country lands within the state
The NOi for Alaska projects (through the ADEC) can be filed electronically at Alaska Pollutant Discharge Elimination System Program website. The completed SWPPP will be submitted to either ADEC or the Municipality based on the project type and operator described in the ADEC CGP.
[2]
The NOi for projects in Idaho, Washington, Denali NP and Metlakatla Indian Reservation can be filed electronically at The EPA website.
The NOi for Montana can be filed through MDEQ following guidance at this website.
Oregon DEQ authorizes FHWA/WFLHD projects under the programmatic 1200-CA permit, (expired in 12/3112005, administratively extended)
The NOi for Wyoming can be filed electronically at this website.
[3]
Section 2: Project Information
2.1 Project Name and Location
This basic site information is used to file for National Pollutant Discharge Elimination System (NPDES) permit coverage. Permit coverage is obtained by filing the Notice of Intent (NOi) after the SWPPP is complete. . - Project Name:
I . . -·· - - - - -
Fall Creek Bridge Replacement, OR JiFH 46(13) I HCRHSt
Project Site Location:
I City, County, State, Zip I Code:
Approx. 26.5 miles SE of Bend, OR on Cascade Lakes Scenic Byway
[ Deschutes County, OR
I
Latitude/Longitude (Using Q!!!: of three possible formats)1
Latitude: Longitude:
I. _ _ 0 __ ' __ " N (degrees, minutes, seconds) I. __ 0
__ ' _ _ " W (degrees, minutes, seconds)
2. __ 0 __ • _ _ ' N (degrees, minutes, decimal) 2. __ 0
__ • __ ' W (degrees, minutes, decimal)
3. 44.0301° N (decimal) 3. -121.7384° W (decimal)
The method used for determining latitude/longitude was: Other Website
Township: 18S
Range: 8E
Section: 11
Is the project located in Indian country? No
If yes, the name of Reservation is:
Are you applying for permit coverage as a "federal operator?" Yes
The project Does Not discharge stormwater into a Municipal Separate Storm Sewer System ?
1 Detailed information on determining the site's latitude and longitude can be found at:
www.epa.gov/npdes/stormwater/latlong
[4]
I i South ~fl
_Hood Riv<
2.2 Project Site Characteristics
The undeveloped site and features of the land that are incorporated into the final soil Erosion and Sediment Control plan sheets (TAB 6) , as well as natural resources that should be protected are described below:
Vegetation, trees, and sensitive areas, such as stream buffers, wetlands, highly erodible soils, and steep slopes at the site include:
I Plant association groups (PAGs) that occur in the DNF and were identified within the study area include lodgepole pine dry forest, wet meadows, moist meadows, dry meadows, riparian, and open water. One stream, Fall Creek, and several overflow channels cross the project area. A wetland complex also encompasses a large portion of the project area.
Also, see TAB 6
Stormwater currently drains from the site in the following manner, Stormwater generally drains towards Fall Creek, and south towards Sparks Lake.
Also, see TAB 6
The location of discharge points or areas
I Fall Creek and its associated overflow channels are receiving waters from the project site. There is no point source discharge from this project.
Also see TAB 6
The location of all waters, including wetlands, are shown on the site map located in
TABs 5 and6.
Critical slopes and slope lengths include:
Locations: NI A. The project area is fairly level, with no critical erosion potential sites.
Soil type(s) of highly erodible soils and the soils' infiltration capacity are identified as,2
No highly erodible soils in the area. Soils found within the project area are
I primarily gravel-sized pumice that have a rapid permeability.
This indicates that infiltration rates needed for effective dispersion can be expected.
Any past soil contamination at the site is identified as, 2 Access the Natural Resources Conservation Service Web Soil Survey.
[5]
[6]
The following natural features, including trees, streams, wetlands, slopes and other features to be protected includes:
Also see TAB 6
Protected Natural Features:
Natural resource buffers will be protected to the extent possible. Impacts to streams, wetlands, and vegetation have been minimized to the extent possible, but
, are unavoidable.
Measures to protect these features:
Natural resource buffers will be protected to the extent possible. Impacts to streams, woodlands, and wetlands have been minimized. Indirect impacts to water
, quality in streams will be minimized through use of BMPs including preserved
· vegetation acting as a vegetative buffer, silt fence, straw wattles, stabilized construction entrances/exits, and establishing both temporary and permanent . vegetation for soil stabilization.
Mean Annual Precipitation at the Project Site: 20 Inches per year
The frequency, intensity, and duration of rainfall for the project site, which are the principal factors influencing erosion from a construction site, are described as, The 2-year, 24-hour storm event:3
3 .5 Inches per day I ~ ·------- -·-- - -- ·--- -------·-·· .. . _J
The 10-year, 24-hour storm event:
: __ 4~?-In~e~p_e:~a~----------- _ _____ -__ -_ --·1 The 25-year, 24-hour storm event:
;_ 2·?_ ~nch~~ per day
Alaska Projects Only, Approximate Growing Season at the Project Site: Click here to enter text.
3 Precipitation frequency for Western States
[7]
Section 3: Nature of Construction Activity
3.1 General Description of Project and Scope of Work:
(i.e. highway construction, roadway realignment, highway and bridge reconstruction, etc.) is described below:
· Bridge replacement project, with temporary detour route south of existing bridge
The type or function of the project is: Other transportation-related
Construction Support Activities: If applicable, describe any construction support activities such as dedicated concrete or asphalt batch plants, dedicated aggregate sites, equipment staging yards, material storage areas, borrow, or disposal sites (government-selected sites):
'. Equipment and material staging areas may be located in existing disturbed areas, including a portion of Green Lakes Trailhead parking lot and overflow parking area across highway from the trailhead. No batch plants, material source sites, or waste disposal sites have been identified.
NOTE: All Contractor-selected sources and support sites are the sole responsibility of the General Contractor. The SWPPP and NPDES permitting for Contractor-selected sites and sources are separate from this documentation (SCR 107.0lA(h)).
Support activities are located on the general vicinity map and/or site map in TAB 5 and TAB 6.
Size of the Construction Project:
(Including all Government-selected support sites such as staging, borrow, waste, access roads, etc.)
Estimated Are_a _ __________ _ _ ____ ,_U_n_it_s ___ ______ ____,-1
Total project area (within ROW or Construction limits): 3.2 Acres
1 Construction site area to be disturbed: 2.5 Acres .
Percent Impervious Area BEFORE Construction: 40 %
Runoff Coefficient BEFORE Construction: 0.45
Percent Impervious Are AFTER Construction: 40 %
Runoff Coefficient AFTER Construction: 0.45
[8]
3.
S eq ue nc e an d E st im at ed
D at es o f C on st ru ct io n A ct iv it ie s (T o be c om pl et ed b y C on tr ac to r)
T he in te nd ed c on st ru ct io n se qu en ci ng a nd ti m in g o f m aj or c on st ru ct io n ac ti vi ti es is d et ai le d he re in cl u di ng th e ph as ed g ra di ng a nd s ta bi li za ti on ac ti vi ti es u se d to m in im iz e ov er al l am ou nt o f d is tu rb ed s oi l.
P ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n o f s eg ue nc e:
B M
P s as so ci at ed w it h th is s eg ue
S ta bi li za ti on m ea su re s:
C li ck h er e to e nt er te xt
C li ck h er e to e nt er t ex t.
C li ck h er e to e nt er te xt
C li ck h er e ro e m er t ex t.
P ha se
C on st ru ct io n se gu en ce d es cr in ti on
D u ra ti o n o f s eg ue
P s as so ci at ed w it h th is s eg ue bi li za ti on m ea su ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
C li ck h er e to e nt er t ck h er e to e nt er te x t.
P ha se
C on st ru ct io n se gu en ce d es cr in ti on
D ur at io n o f s eg ue
P s as so ci at ed w it h th is s eg ue bi li za ti on m ea su ck h er e to e nt er t ex t.
C li ck h er e to e nt er te xt
C li ck h er e to e nt er t ex t.
C li ck h er e to e nl er t ex t.
[9
P ha se
C on st ru ct io n se gu en ce d es cr iI !t io n:
D u ra ti on o f s eg ue
P s as so ci at ed w it h t hi s se gu en ce
St ab il iz at io n m ea su ck h er e to e nt er te xt
C li ck h er e to e nt er t ck h er e to e nt er te xt
C li ck h er e to e nt er te xt
[IO
g a
" <.I o;
rn
D
IZI
D
3.3 Potential Sources of Pollutants
The fo1low table identifies all potential sources (checked activities in column 1) of sediment and other sources of pollution, which may reasonably be expected to affect the quality of stonnwater discharges from the construction site.
Potential Construction Site Pollutants
.. "' Construction Activity "' ~ 0: - .. "' c: Zl 0:
c; ::; .. c: ·;::: ""
E .. .c -~ :B ..... ·;::: ~ ~ "' ... > :a :; '"' 0: .0 "' "' .. 0: = 0 rn ;z. = Cl. ~ IQ Q., =
Clearing, excavating, and grading x x Fill of roadway embankment, backfill at structures x x Vehicle/equipment fueling and maintenance x x Vehicle/equipment use and storage x Sanitary/septic waste x x Dewatering operations x x Drilling and blasting operations x x x Concrete washout and waste x x Structure construction/painting/cleaning x x x Demolition and debris disposal x x x x Solid waste (trash and debris) x Hazardous waste or contaminated spills x x Paving operations x x Landscaping operations x x x Mining, rock extraction, crushing x x x
Construction and waste material expected to be stored on-site includes: (To be completed by Contractor)
Material 1
Storage Location
I
- -· ------~- -· ·-- ____ t _ . -~--- -- - ----- - ·- ----- - -
!!l c:
... ~ .. ;: -== - 0 0 g., x x x x x x
-- -- --- -- - --- ---- --1 ---- ---- --- --- - -- ----. ---- ·- - --·· ·---
!__ _________ ________ __ -·· ---------- ----· i __________ ____ ··--- ----·- ·· ------. ---- ···-· -- -. ·"
[I I]
Section 4: Site Maps
Vicinity maps are located in TAB 5. Site maps and erosion and sediment control plan maps are located in TAB 6.
[12]
Section 5: Discharges
(Section 5 to be completed by Contractor)
Industrial stormwater discharges associated with industrial activity other than construction at the site (including dedicated asphalt plants and dedicated concrete plants that are covered by this permit) include:
NOTE: An Industrial Activity Multi-Sector General Permit may be required for some activities. 1- Industrial Activity Stormwater Discharge -i
Multi-Sector General I Location Permit Number (if i
I I applicable)
1.
--j
2.
~ I I
5.1 Allowable Non-Stormwater Discharges
Non-stormwater discharges used at the construction sited are identified below, along with control measures used to eliminate or reduce the discharges and BMPs used to prevent stormwater contamination.
Applicable to this Project
Potential Non-Stormwater Discharges Control Measures (check all that apply)
D Waters used to wash vehicles where detergents are not used
• D • Water used to control dust
• D • Potable water including uncontaminated water line flushings
• D • Construction dewatering (uncontaminated)
• D • Ground water or spring water (uncontaminated)
• D • Routine external building wash down that does not use detergents
• D • Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents are not used
• D • Foundation or footing drains where flows are not contaminated with process materials such as solvents
• D • Landscape irrigation
• D • Discharges from emergency fire-fighting activities
• D • Fire hydrant flushings
[13]
I I I
I
I
. D • Uncontaminated air conditioning or compressor condensate ·
NOTE: The likely locations of these discharges are identified on the site map TAB 5 and/or
TAB6
5.2 Receiving Waters:
Are there any surface waters located within 50 feet of the construction disturbance? Choose an item.
i Name(s) of the first surface water that receives stormwater directly from your site and/or i from the MS4 ! ___ - -- - ---·--·- ---·------- ~ ----· --- -· - ·- -·------·-----------· ·-- - --- ----------------- ·-- --..... --1 ! 1. Fall Creek I i 2 : .
! 3.
4.
Impaired Waters/TDMLs:
Answer the following for each surface water listed in Table 1:
Is this surface What pollutant(s) is Has a TMDL Pollutant(s) for which water listed as causing the been there is a TDML "impaired?" impairment? completed?
1. [ Yes D No [8] I YesD NoD
2. I YesD NoD I YesD NoD
3. YesD NoD YesD NoD
I YesO NoO I
Source used to determine whether or not your project discharges into an impaired water:
EPA Website (https://ofmpub.epa.gov/waters10/attains_index.search_wb?p_cycle=2006&p_area= OR&p_huc=l 7070301)
Tier 2, 2.5 or 3 Waters
Answer the following for each surface water listed in Table 1:
Is this surface If yes, specify which Tier.
water designated as Tier 1,2 or 3?
1. Yes D No [8] Choose an item.
2. Yes D No [8] Choose an item.
[14)
!3~-l-Y;;fT_N_o_~---,.-C-h_o_o_s;-an-i~~m~----------------
1 4. I Yes D No~ Choose an item.
If applicable, documentation of consultation with State or Federal TMDL authorities on consistency of SWPPP conditions with the approved TMDL is found in TAB 11. The control measures required to ensure that discharge of pollutants from the site are consistent with the assumptions and requirements of the EPA-established or approved TMDL, including any specific waste-load allocations are included in that documentation.
5.3 Water Quality Monitoring Requirements
Provisions in Permit Conditions of the applicable NP DES storm water permit, as well as the associated §401 certification or other special conditions, define additional monitoring and reporting requirements. Details about water quality monitoring and reporting requirements applicable to this project are included in TAB 11.
Samples and measurements taken for the purpose of monitoring will be representative of the monitored activity. Records of all monitoring information will be retained in TAB 11, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation.
Records of monitoring information will include:
1. The date, exact place, and time of sampling or measurements;
2. The individual(s) who performed the sampling or measurements;
3. The date(s) analyses were performed
4. The individual(s) who performed the analyses;
5. The analytical techniques or methods used; and
6. The results of such analyses.
[15]
Section 6: Compliance with Other Applicable Requirements
6.1 Endangered Species Protection
Under which criterion is project eligible for Endangered Species coverage under the NPDES permit (EPA)?
DA DB De ~n DE
Criterion A.
Criterion B.
Criterion C
Criterion D.
No federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in your site's "action area" as defined in Appendix A of EPA permit.
The construction site's discharges and discharge-related activities were already addressed in another operator's valid certification of eligibility for your action area under eligibility Criterion A, C, D, E, or F and there is no reason to believe that federally-listed species or federally-designated critical habitat not considered in the prior certification may be present or located in the "action area". To certify your eligibility under this Criterion, there must be no lapse ofNPDES permit coverage in the other operator's certification.
By certifying eligibility under this Criterion, you agree to comply with any effluent limitations or conditions upon which the other operator's certification was based. You must include in your NOI the tracking number from the other operator's notification of authorization under this permit. If your certification is based on another operator's certification under Criterion C, you must provide EPA with the relevant supporting information required of existing dischargers in Criterion C in the EPA NOI form.
Federally-listed threatened or endangered species or their designated critical habitat(s) are likely to occur in or near your site's "action area," and your site's discharges and discharge-related activities are not likely to adversely affect listed threatened or endangered species or critical habitat. This determination may include consideration of any stormwater controls and/or management practices you will adopt to ensure that your discharges and discharge-related activities are not likely to adversely affect listed species and critical habitat. To make this certification, you must include the following in your NOi: 1) any federally listed species and/or designated habitat located in your "action area"; and 2) the distance between your site and the listed species or designated critical habitat (in miles). You must also include a copy of your site map with the
NOL
Coordination between you and the Services has been concluded. The coordination must have addressed the effects of your site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally-designated critical habitat, and must have resulted in a written concurrence from the relevant Service(s) that your site's discharges and discharge-related activities are not likely to adversely affect listed species or critical habitat. You must include copies of the
[16]
Criterion E.
Criterion F.
c01Tespondence between yourself and the Services in your SWPPP and
NOL
Consultation between a Federal Agency and the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service under section 7 of the ESA has been concluded. The consultation must have addressed the effects of the construction site's discharges and discharge-related activities on federally-listed threatened or endangered species and federally designated critical habitat. The result of this consultation must be either:
L a biological opinion that concludes that the action in question (taking into account the effects of your site's discharges and discharge-related activities) is not likely to jeopardize the continued existence of listed species, nor the destruction or adverse modification of critical habitat; or
11. written concurrence from the applicable Service(s) with a finding that the site's discharges and discharge-related activities are not likely to adversely affect federally-listed species or federally-designated habitat.
You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Your construction activities are authorized through the issuance of a permit under section 10 of the ESA, and this authorization addresses the effects of the site's discharges and discharge-related activities on federally listed species and federally-designated critical habitat. You must include copies of the correspondence between yourself and the Services in your SWPPP and NOL
Support Documentation for Endangered Species criterion eligibility is filed in TAB 16.
6.2 Historic Preservation
1. Will the project involve installation of any of the following storm water controls that entail subsurface earth disturbance? Yes
D Dike
D Berm
D Catch Basin
D Pond
D Ditch, trench, swale, perimeter drain, etc.
[8'.I Culvert
[8'.I Other ground-disturbing stormwater control Silt Fence, Straw Wattles
If the project involves no installation of earth-disturbing stormwater controls, then no further historic preservation screening is necessary (for NPDES permitting purposes).
2. If answer to step 1 is Yes, have professional surveys or evaluations determined that historic properties do not exist (or have prior disturbances at the site precluded the existence of historic properties)? No
Provide documentation for the basis of this determination. Click here to enter text.
[17)
3. If answer to step 2 is No, have professional surveys or evaluations determined that installation of storm water controls will have no effect on historic properties? Yes
Provide documentation for the basis of this determination. See Tab 16
4. Has the State Historic Preservation Officer (SHPO), Tribal Historic Preservation Office (THPO) or other tribal representative concurred with the determinations of effects on historic properties? Yes
Provide the nature of their response. Concurrence. See Tab 16.
6.3 Safe Drinking Water Act Underground Injection Control Requirements
Will the project plan install any of the following controls? No
Check all that apply:
D Infiltration trenches (if storm water is directed to any bored, drilled, driven shaft or dug hole that is deeper than is widest surface dimension, or has a subsurface fluid distribution system)
D Commercially manufactured pre-cast or pre-built proprietary subsurface detention vaults, chambers, or other devices designed to capture and infiltrate stormwater flow.
D Drywells, seepage pits, or improved sinkholes (if stormwater is directed to any bored, drilled, driven shaft or dug hole that is deeper than its widest surface dimension, or has a subsurface fluid distribution system)
If yes, provide documentation of communications with the EPA or applicable State agency.
Click here to enter text.
(18]
Section 7: Erosion and Sediment Controls
Control measures at the construction site are selected, installed, implemented, and maintained to minimize pollutants in the discharge as necessary to meet applicable water quality standards.
The objectives of this SWPPP include:
• Stabilize the site as soon as possible (targeting the preparation and implementation of erosion and sediment controls to get the site to final grade, and either permanently or temporarily stabilize all bare soil areas as soon as possible).
• Perimeter controls will be installed before ground disturbing activities are initiated.
• Perimeter protection will remain in place until final stabilization has been achieved.
• Slopes and channels will be protected by conveying concentrated stormwater runoff around the top of slopes and stabilize slopes as soon as possible. A void disturbing natural channels and the vegetation along natural channels as much as possible.
• Divert stormwater coming on to the site by conveying it safely around, through, or under the work area. (Divert the clean water, trap the dirty water.)
• Protect receiving waters and other environmentally sensitive waters or areas adjacent to the site.
• Follow pollution prevention measures by providing proper containers for waste and garbage at the site. Store hazardous materials and chemicals so that they are not exposed to stormwater.
• Minimize the area and duration of exposed soils. Clear only land that will be under construction in the near future.
7.1 Natural Buffers or Equivalent Sediment Controls (Required for EPA CGP states only - ID, WA)
This section only applies if a surface water is located within 50 feet of the project's earth disturbing activities.
Are there any surface waters within 50 feet of the project's earth disturbances? Yes
If No, then no further documentation is required for the SWPPP.
NOTE: Reference EPA CGP appendix G for buffer guidance.
If Yes, check which natural buffer compliance alternative is used at the project site:
D The project will provide and maintain a 50-foot wide undisturbed natural buffer.
The location and width of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
[19]
D The project will provide and maintain an undisturbed natural buffer that is less than 50 feet in width and is supplemented by additional erosion and sediment controls, which in combination achieves the sediment load reduction equivalent to a 50-foot undisturbed natural buff er.
The location of natural buffers are shown on the Erosion and Sediment Control Plan sheets in TAB 6.
Insert the width of the natural buffer to be retained Click here to enter text.
Insert description of additional erosion and sediment controls to be used in combination with the natural buffer: Click here to enter text.
Document the method used to determine that the above combination of natural buffer and sediment and erosion controls equal the estimated sediment removal capacity of a 50-foot undisturbed natural buffer: Click here to enter text.
IZl It is infeasible to provide and maintain an undisturbed natural buffer of any size, therefore, the project will implement erosion and sediment controls that achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer.
Insert rationale for concluding that providing and maintaining a natural buffer of any size is infeasible: The project includes bridge replacement and the existing bridge is directly adjacent to Fall Creek with no existing natural buffer. The project also includes a temporary bypass road around the bridge, and includes temporary culverts. A natural buffer will be maintained where possible.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Silt fence at perimeters of work areas; fiber rolls placed along contours of slopes; tackifier placed on temporarily disturbed slopes; mulch placed on final slopes
D The project qualifies for one of the exceptions in EPA COP Part 2.1.2.1.e
D For a "linear project", site constraints (e.g. limited right of way) make it infeasible for the project to meet any of the COP part 2.1.2.1.a compliance alternatives.
D Other exception (state type): Click here to enter text.
Document why it is infeasible to meet one of the buffer compliance alternatives: Click here to enter text.
Insert description of erosion and sediment controls to be used to achieve the sediment load reduction equivalent to a 50-foot undisturbed natural buffer: Click here to enter text.
[20]
7.2 Perimeter Controls (This section to be completed by Contractor)
All Perimeter Sediment Controls will be installed prior to ground disturbing activities taking place. There will be no clearing or grubbing outside the physical clearance limits.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
The following perimeter controls will be implemented:
Control measure: Silt fence
Implementation: Prior to ground disturbing activities
Maintenance requirements: Click here to enter text.
Control measure: Fiber rolls
Implementation: Prior to ground disturbing activities
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7 .3 Sediment Track-Out
The following methods will be implemented to minimize off-site vehicle tracking of sediment onto paved surfaces. If sediment escapes the construction site, off-site accumulations of sediment will be removed at a frequency sufficient to minimize off-site impacts.
Locations and design specificat.ions of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Stabilized construction entrance
Implementation: During active construction
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
[21)
7.4 Stockpiled Soil or Other Erodible Materials (This section to be completed by Contractor) '
Stockpile management includes measures to minimize surface erosion and sediment transport from soil stockpiles or other erodible materials.
Locate erodible stockpiles away from drainages including storm sewer inlets and culvert inlets.
Locations of stockpiles are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.5 Minimize Dust (This section to be completed by Contractor)
Dust control includes practices used to reduce or prevent the surface and air transport of dust during construction
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
(22]
7.6 Minimize Disturbance of Steep Slopes (This section to be completed by Contractor)
Describe how disturbance of steep slopes will be minimized. Describe controls (e.g. erosion control blankets, tackifiers) that will be implemented to minimize sediment discharges from slope disturbances.
If applicable, describe how stormwater run-on and run-off will be managed. Flows may be diverted from exposed soils by retaining/detaining flows or otherwise minimizing runoff and the discharge of pollutants from exposed areas of the site. Placement of structural practices in floodplains will be avoided to the degree technologically and economically practicable and achievable.
D Not applicable to this project. Reason:
If applicable:
Control measure: Tackifier
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Fiber rolls along contours
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[23]
7.7 Topsoil Conservation (This section to be completed by Contractor)
Describe how topsoil will be preserved, if feasible. If conservation of topsoil is infeasible, explain why, and describe alternate methods to be used to insure optimum vegetation survival and growth.
Erosion and sediment control measures for topsoil stockpiles (and other erodible materials) are shown in section 4.4.
D Conservation of topsoil is Infeasible:
Reason: Click here to enter text.
Alternate method: Click here to enter text.
IZI Conservation of topsoil is Feasible:
Conservation measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Conservation measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.8 Minimize Soil Compaction (This section to be completed by Contractor)
Minimize soil compaction in areas where final vegetative stabilization will occur and where infiltration practices will be installed.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
[24]
7.9 Storm Drain Inlets and Culvert Inlets (This section to be completed by Contractor)
Applicable for stormwater drain inlets which are connected to separate storm sewer systems (usually in urban locations) AND for culvert inlets that discharge stormwater from the project into surface waters.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project. Reason: Click here to enter text.
If applicable:
The following BMPs are applicable to:
D Storm Drain Inlets
IZI Culvert Inlets
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.10 Constructed Stormwater Conveyance Channels and Culvert Outlets
(This section to be completed by Contractor)
Describe velocity dissipation and/or erosion control devices to be installed at stormwater conveyance channels (such as roadside ditches) and culvert outlets. Includes permanent and temporary devices (specify).
Velocity dissipation devices will be placed at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g., no significant changes in the hydrological regime of the receiving water).
Locations and design specifications ofBMPs are shown on the erosion and sediment control plan sheets in TAB 6.
D Not applicable to this project.
If applicable:
[25]
Control measure: Permanent rip rap culvert outlet
Implementation: Following completion of fill slope grade.
Maintenance requirements: Periodic maintenance by County
Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance requirements: Click here to enter text.
Add other measures as needed.
7.11 Sediment Basins
If applicable, provide site design specifications and other details for design of sediment basins and ponds. This may also include sediment infiltration swales.
Locations and design specifications of BMPs are shown on the erosion and sediment control plan sheets in TAB 6.
At a minimum, sediment ponds must provide storage for either the calculated volume of runoff from the 2-year, 24-hour storm event or 3,600 cubic feet per acre drained. Sediment ponds must also use outlet structures that withdraw water from the surface, unless infeasible.
~ Not applicable to this project.
If applicable, type of sediment retention/infiltration used: Click here to enter text.
Design description: Click here to enter text.
7.12 Chemical Treatment
If chemical sediment control (such as polymers) will be used, provide design specifications and other details considered when choosing treatment type and locations.
~ Not applicable to this project.
If applicable:
NOTE: If use of cationic treatment chemicals is planned, separate prior approval is required from EPA.
Locations of chemical treatment sites are shown on the erosion and sediment control plan sheets in TAB 6.
Describe/name treatment chemicals that will be used and why these chemicals are suited to site soil characteristics and other construction site conditions: Click here to enter text.
Describe treatment system specifications and dosage of chemicals to be used: Click here to enter text.
Describe storage of chemicals and other material safety data: Click here to enter text.
[26]
Special controls to be used for Cationic treatment chemicals: Click here to enter text.
Describe training that personnel handling/applying treatment chemicals have/will receive: Click here to enter text.
7.13 Dewatering Practices (This section to be completed by Contractor)
Discharge of ground water or accumulated storm water that is removed from excavations, trenches, foundations, etc. into surface waters is prohibited unless such waters are first effectively managed by appropriate sediment controls. Uncontaminated non-turbid dewatering water can be discharge without being routed to a control.
D Not applicable to this project
If applicable:
Specific dewatering practice: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
Add other measures as needed.
7.14 Erosion Control and Stabilization (This section to be completed by Contractor)
Commence temporary soil stabilization measures immediately if no further disturbance of an area of the site or stockpile is expected within the next 14 days. Complete temporary soil stabilization measures to disturbed sites or stockpiles within 14 days of last disturbance. Provide for temporary stabilization of all exposed soil prior to winter construction shut down~
Specify whether stabilization measure is temporary or permanent.
IZl Temporary Measures:
Practice/Control measure: Temporary seeding
Implementation: Within 14 days of final grading
Maintenance: Click here to enter text.
Practice/Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
[27) fZI Permanent Measures:
Practice/Control measure: Permanent revegetation and mulching
Implementation: Following completion of construction activities
Maintenance: USFS will monitor project revegetation for three years following implementation
Practice/Control measure: Click here to enter text.
Implementation: Click here to enter text.
Maintenance: Click here to enter text.
Add other measures as needed.
7.15 Removal ofBMPs
Remove erosion and sediment control BMPs that are no longer needed and leave in good working order those BMPs that will remain at the construction site after close-out.
BMPs are no longer needed when the site that the BMP is protecting has reached final stabilization as defined in the applicable NPDES Stormwater Permit.
Final stabilization means:
• All ground disturbing activities at the site have been completed, AND
• Vegetation has been established that provides a uniform perennial vegetative cover with a density of 70% of the natural vegetative cover prior to construction.
• In arid (0-1 O" annual precipitation) or semiarid (10-20" annual precipitation) areas, final stabilization is considered to be achieved when the area is seeded or planted and vegetation is expected to provide 70% cover within 3 years; AND, erosion controls are in place that provide soil protection for at least 3 years without active maintenance.
Document arid/semi-arid conditions in SWPPP
• Effective non-vegetative stabilization is in-place such as rip rap, gabions, geotextiles, rock, aggregate etc.
7.16 Post Construction Measures
Responsibility for NPDES permit compliance after construction close-out will be the responsibility of:
181 FHWA/WFLHD
0 Land Management/Owner Agency
0 County/State DOT
Specify Agency: Choose an item.
Applicable permit termination/transfer information is located in TAB 18.
[28]
Section 8: Operational Controls/Good Housekeeping Measures
8.1 Hazardous Spill Plan
Spills and potential stormwater contamination will be controlled to reduce the chance of spills, stop the source of spills, contain and clean up spills, and dispose of materials contaminated by spills.
Spill prevention and response actions are outlined in the Hazardous Spill Plan or Spill Prevention, Control, and Countermeasure Plan (SPCC) whichever is applicable, TAB 15.
Construction sites may be subject to 40 CFR Part 112 regulations that require the preparation and implementation of a Spill Prevention, Control and Countermeasure Plan if the facility is a non transportation-related facility that: has a total storage capacity greater than 1,320 gallons or a completely buried storage capacity greater than 42,000 gallons and could reasonably be expected to discharge oil in quantities that may be harmful to navigable waters of the United States and adjoining shorelines. See EPA website: http://www.epa.gov/OEM/content/spcc/index.htm
Implementation: Prior to construction activities and throughout construction.
8.2 Spills/Releases in Excess of Reportable Quantities
This permit does not provide authorization to discharge hazardous substances or oil resulting from an on-site spill. This permit does not provide relief from the federal reporting requirements of 40 CFR Part 110, 40 CFR Part 117 and 40 CFR Part 302 relating to spills or other releases of oils or hazardous substances.
For a release containing a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117 or 40 CFR Part 302, occurs during a 24-hour period:
• Notice will be provided to the National Response Center (800-424-8802) in accordance with the requirements of 40 CFR Part 110, 40 CFR Part 117 and 40 CFR Part 3 02 as soon as site staff have knowledge of the discharge; and written notice will be provided within 7 calendar days of knowledge of the release, provide a description of the release, the circumstances leading to the release, and the date of a release.
• Measures to prevent the reoccurrence of such releases will be implemented.
8.3 EquipmentN ehicle Fueling and Maintenance Practices
On-site fueling areas will have a spill kit present, visible, and maintained. Employees and subcontractors will receive training regarding equipment/vehicle fueling and maintenance practices, including proper fueling procedures, proper use of pumps, emergency shutoff valves (training efforts documented in TAB 11).
On-site vehicles and equipment will be inspected daily for leaks, equipment damage, and other service problems.
Designate vehicle/equipment service will be marked and the areas will be located away from drainage facilities and watercourses to prevent stormwater run-on and runoff. Designated washout areas will be shown on the SWPPP plan sheets (TAB 6).
[29]
Drip pans, drip cloths, or absorbent pads will be used when replacing spent fluids. All spent fluids will be collected and store in appropriate labeled containers in the proper storage areas.
Implementation: Prior to construction activities and throughout construction.
8.4 EquipmentNehicle Washing
Equipment/vehicle washing and allowable non-stormwater will be controlled using procedures and practices including using off-site facilities;…