16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf

PDF 17 KB Posted

Attached to
Replace Obsolete Wall Panels at the Hampton ARTCC, Hampton, Georgia.
Solicitation number
DTFAEN-16-R-00175
Issued by

About this file

16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16 (pdf)

View the file

Other files

File Type Posted
21 SF30 Amend 0001 signed Wall Panel - 7Sep16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
21 SF30 Amend 0002 signed Wall Panel - 20Sep16.pdf PDF
16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
21 SF30 Amend 0001 signed Wall Panel - 7Sep16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Cost Breakdown Replace Obsolete Wall Panels, Hampton ARTCC

NO. ITEM/DESCRIPTION QTY UNIT

UNIT

PRICE

MATERI

AL COST

LABOR

ER

HOURL

Y RATE HOURS

LABOR

COST

SUBTOTAL

LABOR/MATER

IALS

1 ELECTRICAL DEMOLITION:

Remove Panel boards EA Remove feeder conductors < #1 AWG LF Remove feeder conductors > #1 AWG LF Panel loads temp. relocation JOB

2 ELECTRICAL NEW WORK:

Panel B-B119-C (SSP) 225A 208/120V (30Brks) EA Feeder # 1/0 from BSB2-2 to Paenl B-B119-C LF Panel B-B103-G-A (X) 225A 208/120V (30 Brks) EA Feeder #4/0 conductors from MDP-2 to Panel B-B103-G-A LF Feeder #2 from MDP-2 to Panel B-B103-G-A LF Panel E-B101-A (E-B102-A) 225A 208/120V (42 Brks) EA Feeder #4 conductors from MCC-B Panel E-B101-A LF Feeder #6 from MCC-B to Panel E-B101-A LF

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD $

SUBTOTAL $

PROFIT $

TOTAL PRICE $

0.00

% 0.00

0.00

0.00

0.00

0.00

0.00

% 0.00

Sheet1