16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf

PDF 17 KB Posted

Attached to
Replace Obsolete Wall Panels at the Hampton ARTCC, Hampton, Georgia. Federal contract opportunity
Solicitation number
DTFAEN-16-R-00175
Issued by
Department of Transportation Federal Aviation Administration Southern Region

About this file

16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16 (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to Replace Obsolete Wall Panels at the Hampton ARTCC, Hampton, Georgia., newest first.
File Type Posted
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
21 SF30 Amend 0001 signed Wall Panel - 7Sep16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
21 SF30 Amend 0002 signed Wall Panel - 20Sep16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf PDF
21 SF30 Amend 0001 signed Wall Panel - 7Sep16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00175_Atch4_WD GA20150133_Wall Panel - 29Aug16.pdf PDF
16 SIR16R00175_Atch6_Construction Breakdown_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch3_SOW NAP 2012 Panelboard - 29Aug16.pdf PDF
16 SIR16R00175_Atch5_Bus Dec - 29Aug16.pdf PDF
16 SIR16R00176_Atch7_PPQ_Wall Panels - 29Aug16.pdf PDF
16 SIR16R00175_Atch2_Drawings 100 Signed - 29Aug16.pdf PDF
16 SIR16R00175_Atch1_Spec 100 combined - 29Aug16.pdf PDF
16 SIR_Wall Panels Final - 29Aug16.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Cost Breakdown Replace Obsolete Wall Panels, Hampton ARTCC

NO. ITEM/DESCRIPTION QTY UNIT

UNIT

PRICE

MATERI

AL COST

LABOR

ER

HOURL

Y RATE HOURS

LABOR

COST

SUBTOTAL

LABOR/MATER

IALS

1 ELECTRICAL DEMOLITION:

Remove Panel boards EA Remove feeder conductors < #1 AWG LF Remove feeder conductors > #1 AWG LF Panel loads temp. relocation JOB

2 ELECTRICAL NEW WORK:

Panel B-B119-C (SSP) 225A 208/120V (30Brks) EA Feeder # 1/0 from BSB2-2 to Paenl B-B119-C LF Panel B-B103-G-A (X) 225A 208/120V (30 Brks) EA Feeder #4/0 conductors from MDP-2 to Panel B-B103-G-A LF Feeder #2 from MDP-2 to Panel B-B103-G-A LF Panel E-B101-A (E-B102-A) 225A 208/120V (42 Brks) EA Feeder #4 conductors from MCC-B Panel E-B101-A LF Feeder #6 from MCC-B to Panel E-B101-A LF

TOTAL MATERIAL COSTS $

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $

OVERHEAD $

SUBTOTAL $

PROFIT $

TOTAL PRICE $

0.00

% 0.00

0.00

0.00

0.00

0.00

0.00

% 0.00