File Type Posted
Dry Chem Sys in Radioactive Storage_Redacted.pdf PDF
36C24223Q0714.docx DOCX document
Ground Floor Kitchen_Redacted.pdf PDF
CO2 System Insp_Redacted.pdf PDF
WD 2015-4187 Rev. 24.pdf PDF
Pre Action Systems_Redacted.pdf PDF
First Floor Kitchen_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: June 15, 2021

Tech:

Safe-Tech Inc. Phone:

Address

Phone

Manufacturer

FM-200 HALON CO2 Inergen Dry Chem Water Load Test

24V 12V 110V Pneumatic Cable Battery

Start 1:30 PM Restore 2:00 PM Operator ID

VIA VIA

Size 4" Supply PSI 60 PSI Seat PSI 44 Air Solenoid NA Comments:

Zone Air PSI NA LoAir 20 PSI System Loc.

Size AC On PSI 25 AC Off PSI 44 Comments:

Zone Supervisory Type Lo Air Serial No NA Sensativity OK GA NA Comments:

Zone Supervisory Type Tamper Serial No NA Sensativity 2 Turns Comments:

Zone Alarm Type Pressure Serial No NA Sensativity OK GA NA Comments:

DateCustomer Signature 6/15/2021

Printed Name

Signing Below will constitute acceptance of the Inspection & Fire Services Noted:

Comments: The spread between cut-in and cut-out is 20 PSI, as adjusted last year - OK

James J. Peters VA Medical Center

SYSTEM TRIPS AT 20 PSI +/-

Boiler Room

Direct to Class "E" panel - OK

Direct to Class "E" panel - OK

Reliable Battery Backup

Fire Suppression Inspection Report

Dry Pipe Sprinkler Mechanical Information

Boiler Room

Comments:

Building FACP NA

130 W. Kingsbridge

Detection Information

Customer

Contact

System Type

Notifications Central Station

Shutdowns NA

City, State, Zip Bronx, NY 10468

Protected Area

Control Panel

Heater Blade Exchange Room

NA - Dry System

Direct to Class "E" panel - OK

Supply @ 44 PSI

LOCAL AIR COMPRESSOR

System Location

Agent

Date: June 15, 2021

Tech:

Safe-Tech Inc. Phone:

Address

Phone

Manufacturer

FM-200 HALON CO2 Inergen Dry Chem Water Load Test

24V 12V 110V Pneumatic Cable Battery

Start 11:30 AM Restore 12:00 PM Operator ID

VIA VIA

Size 4" Supply PSI 105 PSI Seat PSI 40 PSI Air Solenoid NA Comments:

Zone Air PSI 38 PSI NA LoAir NA System Loc.

Size AC On PSI 30 PSI AC Off PSI 40 PSI Comments:

Zone Supervisory Type Lo Air Serial No Sensativity GA NA Comments:

Zone Supervisory Tamper OK

Zone ALARM Type Pressure Serial No NA Sensativity OK GA NA Comments:

Comments:

Comments:

Comments:

Comments:

DateCustomer Signature 6/15/2021

Printed Name

Reliable

Fire Suppression Inspection Report

Dry Pipe Sprinkler Mechanical Information

Signing Below will constitute acceptance of the Inspection & Fire Services Noted:

Comments: The New low air pressure switch, needs to be monitored by Class "E" system directly. If the system pressure goes below 28 PSI, you need to know it. The new drum drip was opened to test the air compressor points of operation

- and significant amounts of rust water was drained out - to the point of air only. This should be done just before the cold weather.

James J. Peters VA Medical Center

Valve is in service Cage by pallet wrap

Battery Backup

INSTALLED BUT NOT TIED IN

Direct to Class "E" panel - OK

NA

Locked Cage by pallet wrap

Comments:

COMPRESSOR SET UP FOR 110 VAC OPERATION - OK

Building FACP NA

NA - Dry System

130 W. Kingsbridge

Detection Information

Customer

Contact

System Type

Notifications Central Station

Shutdowns

Gast Compressor

Direct to Class "E" panel - OK

Inspectors Test Valve @ Dock by tank storage cages in ceiling

System Location

Agent

City, State, Zip Bronx, NY 10468

Protected Area

Control Panel