Drawings 15-122 AHU Final Mechanical.pdf
PDF 26 MB Posted
- Solicitation number
- 36C25725B0013
About this file
This file contains mechanical drawings and diagrams for an Air Handling Unit (AHU) project, labeled as "15-122 AHU Final." The drawings appear to be technical mechanical engineering schematics related to HVAC system replacement work in a hemodialysis facility at a Veterans Affairs medical center. Without access to view the actual drawings, no further specific details about the mechanical systems, specifications, or design elements can be provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs Project 671-25-006 Replace HVAC in Hemodialysis.pdf | ||
| 36C25725B0013 0003.pdf | ||
| 36C25725B0013 0003_Posting.docx | DOCX document | |
| 36C25725B0013 0002.pdf | ||
| Wage Rates.pdf | ||
| 36C25725B0013 0002_1.docx | DOCX document | |
| revised Final Electrical Drawings.pdf | ||
| 36C25725B0013 0001_1.docx | DOCX document | |
| 36C25725B0013 0001.pdf | ||
| 36C25725B0013_Solicitation corrected.pdf | ||
| PCRA C406 HEMODIALYSIS UNIT REPLACE HVAC 120524.pdf | ||
| ICRA C406 HEMODIALYSIS UNIT REPLACE HVAC 120524.pdf | ||
| 36C25725B0013_1 Solicitation Posting.docx | DOCX document | |
| S02 671-15-122 Final Construction Specs 03-28-18_Redacted.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1000 E. Walnut Street, Suite 227, Pasadena, CA 91106 t: 888.900.3823 f: 626.463.2739 www.schwabeng.com
Project No.: 02164823.00
R
E V
I S
I O
N
N
O T
F
C
N
S T
R U
C T
I O
N
MECHANICAL GENERAL NOTES AND
DRAWING LIST
SHEET INDEX
SHEET NO. SHEET TITLE
SPECIAL NOTES
GENERAL NOTES
EQUIPMENT IDENTIFICATION
SCHEDULE
SAFETY SWITCHES/ MOTOR
STARTERS:
DESIGN CONDITIONS
GENERAL SEISMIC NOTES
ALTERNATE BID
FIRE PROTECTION NOTES
A
B
C
D
E
F
0 •
- <D C
II
u
.E g -u
.E
°'o 0
II
u
.E m
~o ,5
~ ..;t-L..L~
~o
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 2015
INTERNAllONAL CODES THE VA CONSTIRUCllON STANDARDS (http: //www.cfm.va.gov/tll/lndex.asp) AND THE REQUIREMENTS STATED IN THE APPLICABLE SECllON OF THE NAllONAL FIRE CODES (NFPA
STANDARDS) CURRENT AT THE TIME OF ISSUANCE OF THE CONSTIRUCTION
DOCUMENTS. AMENDMENTS TO THESE CODES AS SET FORTH BY THE
AUTHORITY HAVING JURISDICllON SHALL SUPERSEDE THE INTERNATIONAL
CODES AND NFPA STANDARDS AS ISSUED.
2. CONSTIRUCTION OPERA llONS SHALL BE SUPERVISED BY A LICENSE MASTER
MECHANICAL INSTALLER TO ENSURE THAT ALL WORK IS INSTALLED IN
ACCORDANCE W1TH VA REQUIREMENTS, THE APPLICABLE CODES, AND THE
CONSTIRUCllON DOCUMENTS.
3. PRIOR TO BIDDING, THE DIVISION 23 INSTALLER SHALL VISIT THE JOB SITE
TO FAMILIARIZE HIMSELF W1TH EXISllNG CONDlllONS AND TO VERIFY LOCAllONS, SIZE AND QUANllllES OF EXISTING EQUIPMENT, DUCTWORK
ETC. SUBMITTAL OF A BID SHALL SIGNIFY WILLINGNESS TO COMPLY W1TH
CONSTRUCTION DOCUMENTS AND ACCEPTANCE OF ON-SITE CONDITIONS
AS THEY EXIST.
4. THE EXISTENCE AND LOCATION OF UllLITIES, MECHANICAL SYSTEMS, ELECTIRICAL SYSTEMS AND OTHER CONSTIRUCTION INDICATED AS EXISllNG
ARE NOT GUARANTEED. BEFORE BEGINNING WORK, INVESTIGATE AND
VERIFY THE EXISTENCE AND LOCA llON OF MECHANICAL AND ELECTIRICAL SYSTEMS AND OTHER CONSTIRUCllON AFFECllNG THE WORK AND ADJUST THE NEW WORK ACCORDINGLY. FURNISH AND INSTALL ADDlllONAL
DUCTWORK, PIPING, OFFSETS AND FITTINGS AS REQUIRED TO
ACCOMMODATE EXISllNG CONDlllONS AS PART OF WORK.
5. COOPERATE FULLY WITH SEPARATE CONTIRACTORS SO THAT WORK ON
THOSE CONTIRACTS MAY BE CARRIED OUT SMOOTHLY WITHOUT
INTERFERING WITH OR DELAYING WORK UNDER THIS CONTIRACT.
COORDINATE THE PURCHASE, FABRICATION, DELIVERY AND PERFORMANCE
OF THE WORK OF THIS CONTIRACT WITH WORK PERFORMED UNDER
SEPARATE CONTIRACTS TO AVOID DELAYING THE CONSTIRUCllON WORK.
6. THE INSTALLER IS RESPONSIBLE FOR COORDINAllNG W1TH OTHER TIRADES.
THE INSTALLER SHALL NOT INSTALL OR FABRICATE ANY WORK SHOWIN
UNTIL ALL SUCH WORK IS FULLY COORDINATED. FURNISH AND INSTALL
ADDITIONAL DUCTWORK, PIPING, OFFSET, AND FITTINGS AS REQUIRED TO
COORDINATE THE INSTALLATIONS AS PART OF THE WORK.
7. MAINTAIN EXISllNG BUILDING IN A WEATHERllGHT CONDlllON THROUGHOUT
THE CONSTIRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTIRUCTION
OPERATIONS. PROTECT BUILDING AND ITS OCCUPANTS DURING
CONSTIRUCllON PERIOD.
8. DO NOT INTERRUPT UTILlllES SERVING FACILlllES OCCUPIED BY TENANTS
OR OTHER UNLESS PERMITTED BY THE VA HOSPITAL FACILITY MANAGER.
COORDINATE UllLITY OUTAGES W1TH THE VA HOSPITAL FACILITY MANAGER
14 DAYS IN ADVANCE.
9. THE DRAW1NGS ARE DIAGRAMMAllC ONLY AND SHALL BE SCALED, NOT
ALL ITEMS CAN BE SHOWIN. THE CONTIRACTORS SHALL FURNISH AND
INSTALL COMPONENTS, EQUIPMENT, DUCTWORK, PIPING, HANGERS ETC. AS
REQUIRED FOR A COMPLETE, FUNCllONAL AND CODE COMPLIANT SYSTEM.
10. TAKE FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY.
RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE
PORllONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTIRUCTION, VERIFY DIMENSIONS OF OTHER CONSTIRUCTIONS BY FIELD MEASUREMENTS
BEFORE FABRICAllON, FURNISHING AND INSTALLING ADDlllONAL DUCTWORK, PIPING, FITTINGS, OFFSETS, TIRANSlllONS, REDUCERS, ETC. TO CONNECT TO EXISTING CONSTIRUCllON OR ACCOMMODATE FIELD CONDlllONS IS CONSIDERED PART OF WORK.
11. CLEAN AND PROTECT CONSTRUCllON IN PROGRESS AND ADJOINING
MATERIALS ALREADY IN PLACE. APPLY PROTECTIVE COVERING WHERE
REQUIRED TO ENSURE PROTECllON FROM DAMAGE OR DETERIORATION.
DAMAGED EQUIPMENT OR MATERIALS SHALL BE REMOVED FROM THE
PROJECT SITE AND REPLACED AT NO COST TO THE OWINER.
12. PERFORM MAINTENANCE ON EQUIPMENT OPERATED DURING CONSTRUCTION
AS FREQUENTLY AS NECESSARY TO ENSURE PEAK PERFORMANCE AT
SUBSTANTIAL COMPLEllON. FURNISH AND INSTALL FILTERS AND OTHER COMPONENTS AFFECTED BY THE CONSTIRUCllON WORK AS REQUIRED FOR PROPER OPERAllONS AND AS RECOMMENDED BY THE MANUFACTURER.
13. START AND TEST EQUIPMENT AND OPERAllNG COMPONENTS TO CONFIRM PROPER OPERA llON. ADJUST AND LUBRICATE COMPONENTS TO ENSURE
OPERABILITY WITHOUT DAMAGING EFFECTS. INSTALL NEW FILTERS AT THE
TIME OF TESllNG. REMOVE MALIFUNCllONING UNITS, REPLACE WITH NEW
UNITS, AND RETEST.
14. ACCESS PANELS ARE REQUIRED IN GYP BOARD CEILINGS AND WALLS FOR
ALL VALVES, TIRAPS, DAMPERS, CLEANOUTS, CONTIROLS, ETC. UNLESS
OTHERWISE SPECIFIED, THE ACCESS PANELS SHALL BE 16 GAUGE
PAINTABLE STEEL CONSTIRUCTION WITH A PIANO HINGED DOOR, FLANGE
FRAME, WALL SLEEVE AND KEYED LOCK. THE PANELS IN EXPOSED,
FINISHED AREAS SHALL BE STAINLESS STEEL THE ACCESS PANELS IN FIRE
RATED ASSEMBLIES SHALL HAYE THE SAME RAllNG AS THE ASSEMBLY.
15. INTERRELAllON BETWEEN THE DRAWINGS AND THE SPECIFICAllONS: IN GENERAL, THE DRAW1NGS INDICATE LOCA llONS, QUANllTIES AND CAPACITIES AND THE SPECIFICATIONS INDICATE QUALITY, OPllONS, WARRANTIES AND COMPLIANCE STANDARDS. IN THE EVENT THERE IS A
CONFLICT BETWEEN THE SPECIFICATIONS AND THE DRAWINGS, THE
GREATER QUALITY OR QUANTITY SHALL BE REQUIRED. IN ALL CASES, THE
ENGINEER OF RECORD SHALL BE THE INTERPRETER OF THE DOCUMENTS.
16. INTERRELAllON BETWEEN THE DRAWINGS: IN THE EVENT OF A CONFIUCT
BETWEEN A DETAIL AND A FLOOR PLAN, THE LARGER SIZE, QUANTITY,
LENGTH OR OPllONS SHALL BE REQUIRED. IN THE EVENT OF A CONFLICT
BETWEEN WHAT IS SHOWIN ON THE FLOOR PLAN AND A KEYED NOTE, THE
KEYED NOTE SHAL GOVERN. IN ALL CASES. THE ENGINEER OF RECORD
SHALL BE THE INTERPRETER OF THE DOCUMENTS
17. COORDINATE EXACT LOCATION OF CORE DRILLING, CUTTING OF FLOOR SLAB,
OR WALLS OF THE BUILDING WITH THE PROJECT ENGINEER.
18. PROVIDE ISOLATING VALVES AND UNIONS ON PIPING ADJACENT TO ALL
CONTIROL VALVES, STEAM TIRAPS, AND OTHER APPURTENANCES OR
EQUIPMENTS. LOCATE VALVES SO THAT EQUIPMENT CAN BE REMOVED
WITHOUT DISMANTLING ANY BRANCH LINES.
19. PITCH PIPELINES AS REQUIRED FOR PROPER DRAINAGE AND ELIMINAllON OF
AIR.
20. INSTALL DRAIN VALVES AT LOW POINTS OF EACH SYSTEM TO ENABLE
COMPLETE DRAINAGE, AND AIR VENTS AT ALL HIGH POINTS IN PIPING
SYSTEM TO ENABLE COMPLETE AIR VENllNG.
21. PIPE STIRAINERS TO NEAREST FLOOR SINK/DRAIN. PROVIDE VALVE WITH
UNION ON END OF STRAINER W1TH INDIRECT WASTE LINE.
22. PROVIDE CONDENSATE DRAIN PIPING WITH DRAINAGE FITTINGS FOR ALL
COOLING COILS AND ROUTE TO A NEAREST APPROVED RECEPTOR.
23. MANUFACTURERS NAMES FOR PRODUCTS LISTED ON DRAWINGS ARE BASIS
OF DESIGN. SEE SPECIFICAllONS FOR EQUIVALENT MANUFACTURERS.
24. COORDINATE WITH DIV.26 CONTIRACTOR FOR LOCAllON OF POWER AND LOCAL DISCONNECTS FOR COM BINA llON FIRE/SMOKE DAMPERS.
25. DIELECTRIC FITTINGS AND UNIONS SHALL NOT BE USED ON ANY PIPING.
PROVIDE A 6" BRASS NIPPLE AT EACH LOCATION WHERE THE PIPING
TIRANSlllON FROM COPPER TO STEEL.
26. CONTIRACTOR SHALL COMPLY WITH ALL CONTIRACT DOCUMENTS IN LAYING
OUT HIS WORK AND EQUIPMENT OR SPECIALTIES REQUIRING READING,
ADJUSTMENT, INSPECllON, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE
CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE
FINISHED BLDG.
27. ALL BRACING OF DUCTS AND PIPING SHALL BE INSTALLED IN ACCORDANCE
WITH SPECIFICATION SECTIONS 230511, 230541 AND 233100 AS WELL AS
THE "SMACNA" GUIDELINES FOR SEISMIC RESTIRAINTS OF MECHANICAL AND
PLUMBING SYSTEMS. WHERE BRACING DETAILS ARE NOT SHOWIN ON
DRAWINGS OR IN THE GUIDELINES, THE FIELD INSTALLAllON SHALL BE TO
THE APPROVAL OF THE ENGINEER.
28. ALL FRESH AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10' FROM ANY
SANITARY VENT, EXHAUST FAN DISCHARGE AND FLUE OF OTHER FURNACES.
WHEN NECESSARY EXTEND VENTS OR PROVIDE ADDlllONAL FRESH AIR INTAKE
DUCTWORK AS DIRECTED BY THE ENGINEER.
29. FIRE DAMPERS AND SMOKE DAMPERS SHALL BE PROVIDED AS REQUIRED. FIRE
DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS SHALL BE UL LISTED AND
INSTALLED STRICTIL Y IN ACCORDANCE W1TH THE MANUFACTURER'S
INSTRUCllONS & IN COMPLIANCE WITH AUTHORlllES HAVING JURISDICTION.
MANUFACTURER'S INSTIRUCllONS SHALL BE MADE AVAILABLE TO THE INSPECllNG AUTHORITY. DETAILS SHOWIN AS REFERENCE ONLY.
30. THE INSTALLAllON OF VALVES, THERMOMETERS, GAUGES, CLEANOUTS, DAMPERS, DUCT ACCESS DOORS OR OTHER INDICA llNG EQUIPMENT OR SPECIAL llES REQUIRING READING, ADJUSTMENT, INSPECllON, REPAIRS, REMOVAL OR
REPLACEMENT SHALL BE CONYENIENTL Y AND ACCESSIBLY LOCATED.
31. WHERE ANCHORAGE DETAILS ARE NOT SHOWIN ON THE DRAW1NGS, THE FIELD
INSTALLAllON SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER.
32. THE SIZES, WEIGHTS AND CAPAClllES DF ALL EQUIPMENT SCHEDULES ON THE
DRAWING HAYE BEEN CAREFULLY COMPUTED. SHOULD EQUAL ITEMS BY
DIFFERENT MANUFACTURERS BE SUBMITTIED FOR APPROVAL, ALL SUCH
SUBMITTALS SHALL INCLUDE 1 /4 INCH SCALE SHOP DRAW1NGS SHO\'t1NG
METHOD OF INSTALLATION.
33. IN SOME INSTANCES, IT MAY BE NECESSARY TO DEFER WORK IN CERTAIN
AREAS AND LOCAllONS UNllL SUCH TIME AS EXISTING FACILlllES CAN BE
RELOCATED OR REARRANGED BY THE OWNER. THEREFORE, WHENEVER IT
BECOMES NECESSARY FOR THE CONTIRACTOR TO PERFORM WORK UNDER THIS
CONTIRACT IN EXISTING AREAS IN WHICH THE OWINERS WORK UNDER IS BEING
PERFORMED, THIS CONTIRACTOR SHALL ADVICE THE OWNERS RELA llVE TO
THIS AS TIME AND PROCEDURE ARE CONCERNED. ALLOW OWINER 72 HOURS
PRIOR NOllCE. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL PREMIUM
TIME TO WHICH HE MAY BE SUBJECTED TO FOR PERFORMING WORK IN SUCH
PROCEDURE AND AT SUCH TIME AS MAY BE NECESSARY TO CAUSE THE
LEAST INTERFERENCE W1TH THE OPERATION OF THE OWINER.
34. REQUIRED ROUTINE MAINTENANCE ACllON SHALL BE CLEARLY STATED AND
IN CORPORA TED ON A READILY ACCESSIBLE LABEL, WHICH MAY BE LIMITED TO
IDENllFYING BY TITLE AND/OR PUBLICATION NUMBER THE OPERAllON AND
MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL AND TYPE OF
PRODUCT. COPIES OF THIS INFORMAllON SHALL BE FURNISHED BY THE
CONTIRACTOR TO THE CITY PER THE SPECIFICATION REQUIREMENTS.
35. AFTER ALL REQUIREMENTS OF THE SPECIFICAllONS AND/OR THE DRAWINGS HAYE BEEN FULLY COMPLETED, REPRESENTAllYES OF THE OWINER WILL
INSPECT THE WORK. THE CONTIRACTOR SHALL PROVIDE COMPETENT
PERSONNEL TO DEMONSTIRATE THE OPERATION OF ANY ITEM OR SYSTEM,
TO THE FULL SATISFACTION OF EACH REPRESENTAllYE. FINAL ACCEPTANCE
OF THE WORK W1LL BE MADE BY THE OWINER AFTER RECEIPT OF APPROVAL
AND RECOMMENDAllON OF ACCEPTANCE FROM EACH REPRESENTAllYE.
36. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DO ALL CORING, SAW
CUTTING, PATCHING AND REFINISHING OF WALLS AND SURFACES WHEREVER
IT IS NECESSARY FOR HIM TO MEET THE FIRE RATING OF THE PARllCULAR
WALL, FLOOR OR CEILING PENETIRATED.
37. CUTTING, BORING, SAW CUTTING OR DRILIUNG THROUGH THE NEW
STIRUCTURAL ELEMENTS IS NOT TO BE STARTED UNTIL THE DETAILS HAYE
BEEN REVIEW AND APPROVED BY THE PROJECT ENGINEER IF THE DETAILS
DO NOT SHOW OR CONFORM TO THE APPROVED DRAWINGS.
38. PENETIRA llONS OF PIPES, CONDUITS, ETC., THROUGH MECHANICAL ROOMS
REQUIRING PROTECTED OPENING SHALL BE FIRE STOPPED. FIRE STOP
MA TERI AL SHALL BE A U.L. TESTED AND APPROVED ASSEMBLY APPROVED
BY THE LOCAL AUTHORlllES.
39. ALL ROOFTOP AND FLOOR MOUNTED MECHANICAL EQUIPMENT PADS,
FLOOR/ROOF OPENINGS SHALL BE FULLY COORDINATED WITH ALL TIRADES AT
THE VERY BEGINNING OF THE PROJECT. MECHANICAL TRADE TO PROVIDE THE
SIZE OF PADS, OPENINGS ETC. TO ALL OTHER BLDG. TIRADES AT THE VERY
BEGINNING OF THE PROJECT(WITHIN 60 DAYS OF NTP).
40. MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL HAYE A
FLAME-SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED
RA TING OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE Vt1TH IMC &
LOCAL CODE.
41. CONTRACTOR TO PROVIDE A COMPLETE AND OPERABLE MECHANICAL SYSTEMS.
42. PRIME AND OIL PAINT ALL EXPOSED MECHANICAL & PLUMBING SYSTEM
COMPONENTS. COLOR AND FINISH AS DIRECTED BY THE ENGINEER.
43. CONTRACTOR SHALL COORDINATE ALL WALL, FLOOR, ROOF ETC. OPENINGS
THROUGH MASONARY AND CONCRETE WALLS, METAL DECK ROOF, FLOOR ETC.
FOR ALL DUCTS, PIPES ETC. OPENINGS W1TH ALL OTHER BUILDING TRADES AT
THE VERY BEGINNING STAGE OF THE PROJECT(WITHIN 60 DAYS OF NTP).
44. COORDINATE PLUMBING VENTS THAT ARE NOT 10' AWAY FROM ALL THE
INTAKES OF THE BUILDING & AIR HANDLERS.
45. THE CONTIRACTOR IS RESPONSIBLE FOR DESIGNING AND BUILDING
EQUIPMENT MOUNllNG THAT MEET LOCAL JURISDICllON CODES AND
MANUFACTURER'S REQUIREMENTS.
46. COORDINATE WITH DIV.26 TO PROVIDE FUSED DISCONNECTS, STARTER & ALL
NECESSARY INTERFACE DEVICES FOR ALL MECHANICAL EQUIPMENTS &
SYSTEMS. THE CONTRACTOR TO THOROUGHLY COORDINATE ALL VOLTAGE,
HORSEPOWER, KW, ETC. REQUIREMENTS Vt1TH DIV.26 PRIOR TO ORDERING
ALL THE MECHANICAL SYSTEM & EQUIPMENTS.
1. PRIOR TO START OF ANY WORK, THE CONTRACTOR SHALL PERFORM AN AIR SURVEY
OF THE EXISllNG FACILITY ON ALL THE SUPPLY, RETURN AND EXHAUST MAIN DUCTS
INCLUDING THE EXISTING AIR HANDLING UNIT AND EXHAUST FAN SERVING THE SPACE.
SUBMIT A REPORT AND PLAN FOR REVIEW. ANY DEVIANCIES FROM THE ACTUAL
READING AND THE AS-BUILT MAY RESULT IN CHANGES IN THE DESIGN WHICH THE
CONTIRACTOR Vt1LL PERFORM WITHOUT ADDlllONAL COST TO THE VA.
2. ASBESTOS OR HAZARDOUS WASTE: AIR HANDLER, MECHANICAL ROOM WALLS, FLOOR
TAR, DUCT AND PIPE INSULATION TO BE DEMOLISHED AS ASBESTOS ABATEMENT.
DRAW LINES FROM METAL DECKS HAS ASBESTOS ROPE.
3. THE CONTIRACTOR SHALL IMMEDIATELY NOllFY THE BUILDING ADMINISTIRATOR AND
STOP WORK WHEN ASBESTOS ARE FOUND IN THE AREA INCLUDED IN THE SCOPE OF
WORK. THE CONTIRACTOR SHALL NOT DISTURB, HANDLE OR REMOVE THE ASBESTOS.
RESUMPTION OF WORK SHALL COMMENCE ONLY AFTER ALL THE ASBESTOS HAS BEEN
PROPERLY DISPOSED OF.
4. ALL WORK SHALL BE DONE SUCH THAT INFECllON CONTROL AND PREYENllON IN A
HOSPITAL ENVIRONMENT ARE FULLY IMPLEMENTED.
5. CONTIRACTOR SHALL HAYE MINIMUM 5 YEARS OF EXPERIENCE WORKING IN PATIENT
AREAS AND SHALL BE COGNIZANT OF INFECllON CONTIROL REQUIREMENT. PRIOR TO BIDDING, CONTRACTOR SHALL REVIEW INFECTION PREYENllON MEASURES AS DESCRIBED IN SPECIFICATION SECllON 010000 - 1.8 INFECllON PREVENTION
MEASURES.
6. THE CONTIRACTOR SHALL PREPARE PHASING PLANS TO ACHIEVE REPLACEMENT OF AIR
HANDLING UNITS.
7. AIR HANDLING UNIT HOUSING PENETIRAllONS FOR CONTROL CONDUITS SHALL BE
PROPERLY SEALED AND CAULKED TO PREVENT AIR LEAKAGE.
8. PIPE AND DUCT SUPPORT SHALL BE ATTACHED TO THE METAL DECK.
9. ABATEMENT IS NEEDED FOR ANY DUCT INSULATION AND FAN SUPPORT PLATFORM
CONTAINING ASBESTOS.
10. WORK SHALL BE CONDUCTED AT NIGHTS FOR AIR-HANDLER AC-2-7A, AC-2-8A,
AC-2-1E, AC-2-4E, AC-2-5E, AC-2-6E, AND AC-4-2B. SPECIFICALLY OYER
WEEKENDS TO LIMIT DISRUPllONS TO VA PERSONNEL AND HOSPITAL OPERATIONS.
11. THE CONTIRACTOR SHALL MODIFY THE EXISTING FIRE SPRINKLER SYSTEM TO
ACCOMMODATE THE RENOVAllONS. MODIFICAllONS SHALL BE IN ACCORDANCE WITH
THE CURRENT NFPA 13 AND VA GUIDELINES. THE PIPING MATERIALS AND SPRINKLER
HEADS SHALL MATCH EXISTING.
12. PLASllC BARRIER SHALL BE PROVIDED IN MECHANICAL ROOMS TO PROTECT ADJACENT EQUIPMENT DURING DEMOLlllON AND CONSTRUCllON.
13. PLASllC BARRIER SHALL BE PROVIDED BELOW THE MECHANICAL ROOMS TO PROTECT
CEILING OF ROOM BELOW FROM DUST OR DEBRIS.
14. PLASllC COVERS FOR SMOKE DETECTORS IN MECHANICAL ROOMS ARE TO BE USED WHILE WORKING DURING CONSTIRUCllON, AFTER-HOURS REMOVE PLASTIC COVERS.
15. NEW AIR HANDLING UNITS SHALL BE COVERED TO PROTECT FROM MOISTURE OR
DEBRIS WITH A POLYETHYLENE FILM DURING CONSTRUCTION.
16. PIPE FREEZE SHALL BE APPLIED WHERE EXISTING ISOLA llON VALVES LEAK AT CHILLED
WATER BRANCH FROM MAIN RISER.
17. PATCH ANY REMAINING PENETIRAllONS IN EXISTING MECHANICAL ROOM WALL AND
FIRESTOP.
18. GENERAL CONTIRACTOR SHALL BE ON CALL AT ALL llME IF THERE IS ANY ISSUE W1TH
TEMPORARY UNITS.
19. WORK SHALL BE CONDUCTED AT DAYS FOR AIR HANDLER AC-5-2B, AC-B-2E AND
AC-B-3E ••
20. AFTER REMOVING ASBESTOS ROPE FROM DRAIN LINES ON METAL CEILING, RESEAL
AREAS.
21. SMOKE DETECTORS TO BE TESTED BY FIRE ALARM TECH FOR AFTER COMPLETION TO
VERIFY OPERAllONAL.
22. INSTALL DUCT DETECTORS AND ALL COMPONENTS TO THE FIRE ALARM SYSTEM THEN
ENFACE TO THE ANDOVER SYSTEM, FOR A COMPLETE AND OPERAllONAL SYSTEM.
DUCT DETECTOR TO BE INSTALLED BY A FIRE ALARM TECH. UPDATE GRAPHICS W1TH
COMPLETE AND OPERAllONAL CONTIROL SYSTEM.
23. FURNISH AND INSTALL NEW DUCT MOUNTED SMOKE DETECTOR IN ACCORDANCE W1TH
VAMC STANDARD INTERLOCK THE NEW SMOKE DETECTORS WITH THE NEW VIFD's FOR SHUT-OFF UPON DETECllON OF SMOKE AND INTERLOCK THE DETECTORS TO THE FIRE ALARM THROUGH THE EXISTING BUILDING-Vt1DE FIRE ALARM SYSTEM. PROVIDE ALL Vt1RE/CONDUIT AND ACCESSORIES AS NECESSARY FOR A COMPLETE AND
OPERATIONAL SMOKE DETECTOR SYSTEM.
24. INSTALL NEW FIRE ALARM, SUPPORT SECURED TO NEW CEILING WHEN INSTALLED.
1. CONTIRACTOR SHALL FOLLOW SPECIFICAllON SECllONS 230511, 230541 AND 233100 TO
PROVIDE COMPLETE SEISMIC ANCHORAGE AND BRACING FOR ALL MECHANICAL EQUIPMENT
WEIGHING 400 POUNDS OR MORE THAT IS DIRECTLY MOUNTED ON THE FLOOR OR ROOF AND
ALL MECHANICAL EQUIPMENT WEIGHING OVER 20 POUNDS THAT IS SUSPENDED FROM THE
FLOOR, WALL OR SUPPORTED BY VIBRAllON ISOLATORS TO RESIST A HORIZONTAL FORCE ACllNG IN ANY DIRECTION USING THE CRITERIA OUTLINED IN SPECIFICATION SECTION 130541.
2. CONTRACTOR TO PROVIDE COMPLETE SEISMIC BRACING AND ANCHORAGE OF ALL PIPING.
BRACING AND ANCHORAGE SHALL CONFORM TO SPECIFICAllON SECTIONS 130541, 230511, 230541 AND 233100.
3. REFER TO STRUCTURAL DRAWINGS FOR CONCRETE ANCHOR TYPE AND INSTALLATION
REQUIREMENTS.
4. SHOP DRAWINGS SHOW1NG ALL BRACING LOCAllONS AND DETAILS OF CONNECTIONS ARE
REQUIRED FOR ALL SYSTEMS INCLUDING PRE-APPROVED SYSTEM.
5. CONTIRACTOR SHALL SUBMIT SEISMIC ANCHORAGE DRAW1NGS FOR DUCllNG, PIPING ETC. FOR
REVIEW PRIOR TO INSTALLATION.
1. BASE BID
INCLUDE SCOPE OF WORK ASSOCIATED Vt1TH AIR HANDLING UNITS REPLACEMENT OF AC-2-7A, AC-2-8A, AC-2-5E, AC-2-6E, AC-4-2B AND AC-5-2B.
2. ALTERNATE #1
INCLUDE SCOPE OF WORK ASSOCIATED WITH AIR HANDLING UNIT REPLACEMENT OF AC-2-1E,
AND AC-2-4E.
3. ALTERNATE /12
INCLUDE SCOPE OF WORK ASSOCIATED Vt1TH AIR HANDLING UNIT REPLACEMENT OF AC-B-2E, AND AC-B-3E.
1. ALL FIRE PROTECTION SYSTEMS WORK SHALL BE BY UNDER A DESIGN BUILD
CONTIRACT BY A LICENSED Cl 6 CONTIRACTOR.
2. ALL WORK PERFORMED AND MATERIALS INSTALLED SHALL BE IN STIRICT ACCORDANCE
WITH ALL APPLICABLE CODES, REGULAllONS, AND ORDINANCES. CONTIRACTOR SHALL
GIVE ALL NOTICES AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS,
AND LAWFUL ORDERS OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY COMPANY
SPECIFICAllONS, AND LOCAL AND STATE JURISDICllONAL CODES BEARING ON THE
PERFORMANCE OF THE WORK.
3. THE FIRE PROTECTION SYSTEMS SHALL BE DESIGNED TO MEET OWINER'S INSURANCE
COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWINER'S
INSURANCE UNDER\'t1RITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE
USED.
4. THE CONTRACTOR SHALL PROVIDE INTERMEDIATE TEMPERATURE SPRINKLERS IN ALL
AREAS WHERE REQUIRED BY NFPA 13.
5. THE INSTALLAllON OF THE SEISMIC BRACING FOR THE FIRE SPRINKLER SYSTEM SHALL
BE SUBJECT TO THE APPROVAL OF THE FIRE MARSHALL FIELD INSPECTOR.
6. ALL PIPING SHALL BE SCHEDULE 40 PIPE WITH FITTINGS, SUPPORTS, BRACING,
SEISMIC RESTIRAINTS, ETC. PER NFPA 13.
7. CONTIRACTOR SHALL COORDINATE WORK WITH ALL OTHER TIRADES AND COORDINATE
SPRINKLERS LOCATION AND PIPING WITH LIGHTING FIXTURES, SPEAKERS, AND
MECHANICAL DUCTWORK.
8. THE CONTRACTOR SHALL COORDINATE ALL STIRUCTURAL PENETIRATIONS WHERE
REQUIRED WITH THE STIRUCTURAL ENGINEER.
9. THE CONTRACTOR SHALL COORDINATE THE FIRE ALARM BELL LOCATION AND
CONNECllON W1TH ELECTRICAL CONTRACTOR.
10. ALL PIPES SHALL BE LOCATED AS HIGH AS POSSIBLE AND SHALL HAYE THEIR
ROUllNG FULLY COORDINATED WITH THE MECHANICAL CONTIRACTOR AND ALL OTHER
TIRADES.
11. SPRINKLERS SHALL BE QUICK-RESPONSE, UL LISTED, AND FM APPROVED.
12. THE CONTRACTOR SHALL LOCATE SPRINKLERS SUCH THAT THEY ARE ALIGNED WITH
THEMSELVES, LIGHTING, DIFFUSERS, ANY OTHER FEATURE IN THE CEILING, AND IF
APPLICABLE ANY EXISTING SPRINKLER HEADS.
13. IF REQUIRED, THE CONTRACTOR SHALL REVISE ANY EXISllNG SPRINKLERS AS NECESSARY SUCH THAT THEY W1LL BE ARE ALIGNED WITH THEMSELVES, LIGHllNG, DIFFUSERS, ANY OTHER FEATURE IN THE CEILING.
14. IN ACOUSllCAL TILE CEILING AREAS THE SPRINKLERS SHALL BE RECESSED AND/OR
CONCEALED WITH A FACTORY FINISH AS DEFINED BY THE ARCHITECT.
15. IN EXPOSED AREAS THE SPRINKLERS SHALL BE HEADS, UPRIGHT AND/OR PENDANT
HEADS W1TH A FACTORY FINISH AS DEFINED BY THE ARCHITECT.
16. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY
THE ARCHITECT.
17. SPRINKLER DRAINS SHALL BE DISCHARGED INTO APPROVED RECEPTORS.
18. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE
ARCHITECT.
19. THE BUILDING ENGINEER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR
RECHARGING OF THE SPRINKLER SYSTEM.
20. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND
SHALL OBTAIN APPROVAL FROM THE AUTHORlllES HAVING JURISDICTION AND THE LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLAllON.
SUMMER W1NTER
OUTSIDE INSIDE OUTSIDE INSIDE
99'FDB, 78'FW18 75'F,50:>IRH 27'F 75'F
THE EQUIPMENT LABELS SHALL BE INSTALLED ON NEW
ELECTIRICAL EQUIPMENT AND EXISTING EQUIPMENT
AFFECTED BY THE NEW CONSTIRUCTION. IDENTIFICAllON
LABELS SHALL BE LAMINATED BLACK PHENOLIC RESIN
WITH A WHITE CORE AND ENGRAVED LETTIERING. A
MINIMUM OF 1/2" HIGH FOR THE PANEL NAME AND
1/4" FOR THE DESCRIPTION.
DEVICE SERVED: DEVICE NAME
AMPS/VOLTAGE/,/ NO.OF WIRES/ AF OR NF
FED FROM: DEVICE NAME
EXAMPLE
DEVICE SERVED: AHU-1
30A/600V/30/3W/25AF
FED FROM: MCC-B1
THE CONTIRACTOR SHALL PHASE THE WORK FOR
THIS PROJECT AS TO NOT DISRUPT THE DAILY
OPERATIONS OF THE HOSPITAL. ALL WORKS SHALL
BE PERFORMED AFTER HOURS AND COORDINATED
W1TH VA PERSONNEL.
~--------------~---.~---------------------------------,•r-----------,r--------------------~------------, Dra11q1Tdle
ARCHITECT /ENGINEERS/CONSULTANTS:
ca□ 5J S c h w a b [g E3 5J Engineering & Management [9 g ~ A Certified SB/DVBE Firm
RMlona: Dale
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7
7 8 9
M-001 MECHANICAL GENERAL NOlES AND DRAl\lNG UST
M-002 MECHANICAL SYMBOLS AND A88REVIA TIONS
M-003 MECHANICAL SCHEDULES
M-100 MECHANICAL BASEMENT OVERALL PLAN (AC-B-2E & AC-B-3E)
1------+-------------------------t A MK101 MECHANICAL PARTIAL BASEMENT INlERSTITIAL lEMPORARY PLAN (AC-B-2E)
MD101 MECHANICAL PARTIAL BASEMENT INlERSTITIAL DEMOLITION PLAN (AC-B-2E)
MH101 MECHANICAL PARTIAL BASEMENT INlERSTITIAL REMODEL PLAN (AC-B-2E)
MK102 MECHANICAL PARTIAL BASEMENT INlERSTITIAL lEMPORARY PLAN (AC-B-3E)
MD102 MECHANICAL PARTIAL BASEMENT INlERSTITIAL DEMOLITION PLAN (AC-B-3E)
MH102 MECHANICAL PARTIAL BASEMENT INlERSTITIAL REMODEL PLAN (AC-B-3E)
MH102A MECHANICAL PARTIAL BASEMENT INlERSTITIAL REMODEL PLAN (AC-B-2E & AC-B-3E)
M-110 MECHANICAL SECOND FLOOR OVERALL PLAN (AC-2-7A, AC-2-8A,AC-2-1E, AC-2-4E. AC-2-5E & AC-2-6E)
1------+-------------------------t B MK111A MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-4E)
MD111A MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-4E)
MH111A MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-4E)
MK111B MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-1E)
MD111B MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-1E)
MH111B MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-1E)
MK112 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-5E)
MD112 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-5E) l--------11----------------------------ic MH112 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-5E)
MK113 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-6E)
MD113 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-6E)
MH113 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-6E)
MH113A MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-6E)
MK114 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-7A)
MD114 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-7A)
MH114 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-7A)
1--------i----------------------------lD MH114A MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-7A)
MK115 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL lEMPORARY PLAN (AC-2-8A)
MD115 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL DEMOLITION PLAN (AC-2-8A)
MH115 MECHANICAL PARTIAL SECOND FLOOR INlERSTITIAL REMODEL PLAN (AC-2-8A)
M-120 MECHANICAL FOURTH FLOOR OVERALL PLAN (AC-4-2B)
MK121 MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL TEMPORARY PLAN (AC-4-28)
MD121 MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL DEMOLITION PLAN (AC-4-2B)
MH121 MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL REMODEL PLAN (AC-4-28)
MH121A MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL REMODEL PLAN (AC-4-28)
M-130 MECHANICAL FIFTH FLOOR OVERALL PLAN (AC-5-2B)
MK131 MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL TEMPORARY PLAN (AC-5-2B)
MD131 MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL DEMOLITION PLAN (AC-5-2B)
MH131 MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL REMODEL PLAN (AC-5-2B)
MH131A MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL REMODEL PLAN (AC-5-2B)
M-201 AIR HANDLING UNIT DETAILS - 1 (AC-2-5E, AC-2-6E, AC-2-7A, AND AC-2-8A)
M-202 AIR HANDLING UNIT DETAILS - 2 (AC-2-1E, AC-2-4E, AC-4-2B AND AC-5-2B)
M-203 AIR HANDLING UNIT DETAILS - 3 (AC-B-2E AND AC-B-3E)
M-204 MECHANICAL DETAILS
M-205 MECHANICAL DETAILS
M-301 MECHANICAL CONTROLS ACC HVAC
Project Tille
AIR HANDLERS REPLACEMENT
DESIGN
1~~
1~400~~~~:AL I ~~01
Office of Facilities
Management
IDme ~~ 11:;Jr:;J ~ m -
8 9
Department of Veterans Affairs
E
F
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, OCT 1978
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL
AutoCAD SHX Text 67441
AutoCAD SHX Text
ALI HAMI
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text X
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text
ARCHITECT/ENGINEERS/CONSULTANTS:
AutoCAD SHX Text Office of
AutoCAD SHX Text Facilities
AutoCAD SHX Text Management
AutoCAD SHX Text
AIR HANDLERS REPLACEMENT
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
7400 MERTON MINTER, SAN ANTONIO, TX 78229
AutoCAD SHX Text 03-14-2018
AutoCAD SHX Text 671-15-122
AutoCAD SHX Text M-001
AutoCAD SHX Text
PD
AutoCAD SHX Text
SL
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text
MECHANICAL GENERAL NOTES AND DRAWING LIST
AutoCAD SHX Text M-003
AutoCAD SHX Text M-001
AutoCAD SHX Text
MK111A
AutoCAD SHX Text
MD111A
AutoCAD SHX Text
MECHANICAL FOURTH FLOOR OVERALL PLAN (AC-4-2B)
AutoCAD SHX Text M-120
AutoCAD SHX Text
MK101
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL TEMPORARY PLAN (AC-B-2E)
AutoCAD SHX Text
MD101
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL DEMOLITION PLAN (AC-B-2E)
AutoCAD SHX Text
MD112
AutoCAD SHX Text
MH112
AutoCAD SHX Text
MD121
AutoCAD SHX Text
MH121
AutoCAD SHX Text M-130
AutoCAD SHX Text
MECHANICAL FIFTH FLOOR OVERALL PLAN (AC-5-2B)
AutoCAD SHX Text
MK112
AutoCAD SHX Text
MK121
AutoCAD SHX Text
MH101
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL REMODEL PLAN (AC-B-2E)
AutoCAD SHX Text
MH111B
AutoCAD SHX Text
MECHANICAL BASEMENT OVERALL PLAN (AC-B-2E & AC-B-3E)
AutoCAD SHX Text M-100
AutoCAD SHX Text M-110
AutoCAD SHX Text MECHANICAL SECOND FLOOR OVERALL PLAN (AC-2-7A, AC-2-8A,AC-2-1E, AC-2-4E, AC-2-5E & AC-2-6E)
AutoCAD SHX Text
MD131
AutoCAD SHX Text
MH131
AutoCAD SHX Text
MK131
AutoCAD SHX Text
MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL TEMPORARY PLAN (AC-5-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL DEMOLITION PLAN (AC-5-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL FIFTH FLOOR INTERSTITIAL REMODEL PLAN (AC-5-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL TEMPORARY PLAN (AC-4-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL DEMOLITION PLAN (AC-4-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL FOURTH FLOOR INTERSTITIAL REMODEL PLAN (AC-4-2B)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL TEMPORARY PLAN (AC-2-4E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-4E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-1E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL TEMPORARY PLAN (AC-2-5E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-5E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-5E)
AutoCAD SHX Text
MK114
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL TEMPORARY PLAN (AC-2-6E)
AutoCAD SHX Text
MD113
AutoCAD SHX Text
MD114
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-6E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-7A)
AutoCAD SHX Text
MH114
AutoCAD SHX Text
MH113
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-6E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-7A)
AutoCAD SHX Text M-301
AutoCAD SHX Text
MECHANICAL CONTROLS ACC HVAC
AutoCAD SHX Text
MK113
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL TEMPORARY PLAN (AC-2-7A)
AutoCAD SHX Text
MK102
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL TEMPORARY PLAN (AC-B-3E)
AutoCAD SHX Text
MD102
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL DEMOLITION PLAN (AC-B-3E)
AutoCAD SHX Text
MH102
AutoCAD SHX Text
MECHANICAL PARTIAL BASEMENT INTERSTITIAL REMODEL PLAN (AC-B-3E)
AutoCAD SHX Text
MD115
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-8A)
AutoCAD SHX Text
MK111B
AutoCAD SHX Text
MD111B
AutoCAD SHX Text
MH111A
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL TEMPORARY PLAN (AC-2-1E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL DEMOLITION PLAN (AC-2-1E)
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-4E)
AutoCAD SHX Text
MH115
AutoCAD SHX Text
MECHANICAL PARTIAL SECOND FLOOR INTERSTITIAL REMODEL PLAN (AC-2-8A)
AutoCAD SHX Text 32.
AutoCAD SHX Text 30.
AutoCAD SHX Text 31.
AutoCAD SHX Text 28.
AutoCAD SHX Text 29.
AutoCAD SHX Text 26.
AutoCAD SHX Text 25.
AutoCAD SHX Text 24.
AutoCAD SHX Text 21.
AutoCAD SHX Text 23.
AutoCAD SHX Text 22.
AutoCAD SHX Text 19.
AutoCAD SHX Text 20.
AutoCAD SHX Text 17.
AutoCAD SHX Text 18.
AutoCAD SHX Text 33.
AutoCAD SHX Text DIELECTRIC FITTINGS AND UNIONS SHALL NOT BE USED ON ANY PIPING. PROVIDE A 6" BRASS NIPPLE AT EACH LOCATION WHERE THE PIPING TRANSITION FROM COPPER TO STEEL.
AutoCAD SHX Text 39.
AutoCAD SHX Text 38.
AutoCAD SHX Text 35.
AutoCAD SHX Text 37.
AutoCAD SHX Text 36.
AutoCAD SHX Text 34.
AutoCAD SHX Text 46.
AutoCAD SHX Text 44.
AutoCAD SHX Text 45.
AutoCAD SHX Text CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING OUT HIS WORK AND EQUIPMENT OR SPECIALTIES REQUIRING READING, ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED WITH REFERENCE TO THE FINISHED BLDG.
AutoCAD SHX Text ALL FRESH AIR INTAKES SHALL BE LOCATED A MINIMUM OF 10' FROM ANY SANITARY VENT, EXHAUST FAN DISCHARGE AND FLUE OF OTHER FURNACES. WHEN NECESSARY EXTEND VENTS OR PROVIDE ADDITIONAL FRESH AIR INTAKE DUCTWORK AS DIRECTED BY THE ENGINEER.
AutoCAD SHX Text FIRE DAMPERS AND SMOKE DAMPERS SHALL BE PROVIDED AS REQUIRED. FIRE DAMPERS AND COMBINATION FIRE/SMOKE DAMPERS SHALL BE UL LISTED AND INSTALLED STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS & IN COMPLIANCE WITH AUTHORITIES HAVING JURISDICTION. MANUFACTURER'S INSTRUCTIONS SHALL BE MADE AVAILABLE TO THE INSPECTING AUTHORITY. DETAILS SHOWN AS REFERENCE ONLY.
AutoCAD SHX Text THE INSTALLATION OF VALVES, THERMOMETERS, GAUGES, CLEANOUTS, DAMPERS, DUCT ACCESS DOORS OR OTHER INDICATING EQUIPMENT OR SPECIALTIES REQUIRING READING, ADJUSTMENT, INSPECTION, REPAIRS, REMOVAL OR REPLACEMENT SHALL BE CONVENIENTLY AND ACCESSIBLY LOCATED.
AutoCAD SHX Text WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS, THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER.
AutoCAD SHX Text THE SIZES, WEIGHTS AND CAPACITIES OF ALL EQUIPMENT SCHEDULES ON THE DRAWING HAVE BEEN CAREFULLY COMPUTED. SHOULD EQUAL ITEMS BY DIFFERENT MANUFACTURERS BE SUBMITTED FOR APPROVAL, ALL SUCH SUBMITTALS SHALL INCLUDE 1/4 INCH SCALE SHOP DRAWINGS SHOWING METHOD OF INSTALLATION.
AutoCAD SHX Text COORDINATE PLUMBING VENTS THAT ARE NOT 10' AWAY FROM ALL THE INTAKES OF THE BUILDING & AIR HANDLERS.
AutoCAD SHX Text THE CONTRACTOR IS RESPONSIBLE FOR DESIGNING AND BUILDING EQUIPMENT MOUNTING THAT MEET LOCAL JURISDICTION CODES AND MANUFACTURER'S REQUIREMENTS.
AutoCAD SHX Text COORDINATE WITH DIV.26 TO PROVIDE FUSED DISCONNECTS, STARTER & ALL NECESSARY INTERFACE DEVICES FOR ALL MECHANICAL EQUIPMENTS & SYSTEMS. THE CONTRACTOR TO THOROUGHLY COORDINATE ALL VOLTAGE, HORSEPOWER, KW, ETC. REQUIREMENTS WITH DIV.26 PRIOR TO ORDERING ALL THE MECHANICAL SYSTEM & EQUIPMENTS.
AutoCAD SHX Text
1. PRIOR TO START OF ANY WORK, THE CONTRACTOR SHALL PERFORM AN AIR SURVEY PRIOR TO START OF ANY WORK, THE CONTRACTOR SHALL PERFORM AN AIR SURVEY OF THE EXISTING FACILITY ON ALL THE SUPPLY, RETURN AND EXHAUST MAIN DUCTS INCLUDING THE EXISTING AIR HANDLING UNIT AND EXHAUST FAN SERVING THE SPACE. SUBMIT A REPORT AND PLAN FOR REVIEW. ANY DEVIANCIES FROM THE ACTUAL READING AND THE AS-BUILT MAY RESULT IN CHANGES IN THE DESIGN WHICH THE CONTRACTOR WILL PERFORM WITHOUT ADDITIONAL COST TO THE VA. 2. ASBESTOS OR HAZARDOUS WASTE: AIR HANDLER, MECHANICAL ROOM WALLS, FLOOR ASBESTOS OR HAZARDOUS WASTE: AIR HANDLER, MECHANICAL ROOM WALLS, FLOOR TAR, DUCT AND PIPE INSULATION TO BE DEMOLISHED AS ASBESTOS ABATEMENT. DRAW LINES FROM METAL DECKS HAS ASBESTOS ROPE. 3. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE BUILDING ADMINISTRATOR AND THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE BUILDING ADMINISTRATOR AND STOP WORK WHEN ASBESTOS ARE FOUND IN THE AREA INCLUDED IN THE SCOPE OF WORK. THE CONTRACTOR SHALL NOT DISTURB, HANDLE OR REMOVE THE ASBESTOS. RESUMPTION OF WORK SHALL COMMENCE ONLY AFTER ALL THE ASBESTOS HAS BEEN PROPERLY DISPOSED OF. 4. ALL WORK SHALL BE DONE SUCH THAT INFECTION CONTROL AND PREVENTION IN A ALL WORK SHALL BE DONE SUCH THAT INFECTION CONTROL AND PREVENTION IN A HOSPITAL ENVIRONMENT ARE FULLY IMPLEMENTED. 5. CONTRACTOR SHALL HAVE MINIMUM 5 YEARS OF EXPERIENCE WORKING IN PATIENT CONTRACTOR SHALL HAVE MINIMUM 5 YEARS OF EXPERIENCE WORKING IN PATIENT AREAS AND SHALL BE COGNIZANT OF INFECTION CONTROL REQUIREMENT. PRIOR TO BIDDING, CONTRACTOR SHALL REVIEW INFECTION PREVENTION MEASURES AS DESCRIBED IN SPECIFICATION SECTION 010000 - 1.8 INFECTION PREVENTION MEASURES. 6. THE CONTRACTOR SHALL PREPARE PHASING PLANS TO ACHIEVE REPLACEMENT OF AIR THE CONTRACTOR SHALL PREPARE PHASING PLANS TO ACHIEVE REPLACEMENT OF AIR HANDLING UNITS. 7. AIR HANDLING UNIT HOUSING PENETRATIONS FOR CONTROL CONDUITS SHALL BE AIR HANDLING UNIT HOUSING PENETRATIONS FOR CONTROL CONDUITS SHALL BE PROPERLY SEALED AND CAULKED TO PREVENT AIR LEAKAGE. 8. PIPE AND DUCT SUPPORT SHALL BE ATTACHED TO THE METAL DECK. PIPE AND DUCT SUPPORT SHALL BE ATTACHED TO THE METAL DECK. 9. ABATEMENT IS NEEDED FOR ANY DUCT INSULATION AND FAN SUPPORT PLATFORM ABATEMENT IS NEEDED FOR ANY DUCT INSULATION AND FAN SUPPORT PLATFORM CONTAINING ASBESTOS. 10. WORK SHALL BE CONDUCTED AT NIGHTS FOR AIR-HANDLER AC-2-7A, AC-2-8A, WORK SHALL BE CONDUCTED AT NIGHTS FOR AIR-HANDLER AC-2-7A, AC-2-8A, AC-2-1E, AC-2-4E, AC-2-5E, AC-2-6E, AND AC-4-2B. SPECIFICALLY OVER WEEKENDS TO LIMIT DISRUPTIONS TO VA PERSONNEL AND HOSPITAL OPERATIONS. 11. THE CONTRACTOR SHALL MODIFY THE EXISTING FIRE SPRINKLER SYSTEM TO THE CONTRACTOR SHALL MODIFY THE EXISTING FIRE SPRINKLER SYSTEM TO ACCOMMODATE THE RENOVATIONS. MODIFICATIONS SHALL BE IN ACCORDANCE WITH THE CURRENT NFPA 13 AND VA GUIDELINES. THE PIPING MATERIALS AND SPRINKLER HEADS SHALL MATCH EXISTING. 12. PLASTIC BARRIER SHALL BE PROVIDED IN MECHANICAL ROOMS TO PROTECT ADJACENT PLASTIC BARRIER SHALL BE PROVIDED IN MECHANICAL ROOMS TO PROTECT ADJACENT EQUIPMENT DURING DEMOLITION AND CONSTRUCTION. 13. PLASTIC BARRIER SHALL BE PROVIDED BELOW THE MECHANICAL ROOMS TO PROTECT PLASTIC BARRIER SHALL BE PROVIDED BELOW THE MECHANICAL ROOMS TO PROTECT CEILING OF ROOM BELOW FROM DUST OR DEBRIS. 14. PLASTIC COVERS FOR SMOKE DETECTORS IN MECHANICAL ROOMS ARE TO BE USED PLASTIC COVERS FOR SMOKE DETECTORS IN MECHANICAL ROOMS ARE TO BE USED WHILE WORKING DURING CONSTRUCTION, AFTER-HOURS REMOVE PLASTIC COVERS. 15. NEW AIR HANDLING UNITS SHALL BE COVERED TO PROTECT FROM MOISTURE OR NEW AIR HANDLING UNITS SHALL BE COVERED TO PROTECT FROM MOISTURE OR DEBRIS WITH A POLYETHYLENE FILM DURING CONSTRUCTION. 16. PIPE FREEZE SHALL BE APPLIED WHERE EXISTING ISOLATION VALVES LEAK AT CHILLED PIPE FREEZE SHALL BE APPLIED WHERE EXISTING ISOLATION VALVES LEAK AT CHILLED WATER BRANCH FROM MAIN RISER. 17. PATCH ANY REMAINING PENETRATIONS IN EXISTING MECHANICAL ROOM WALL AND PATCH ANY REMAINING PENETRATIONS IN EXISTING MECHANICAL ROOM WALL AND FIRESTOP. 18. GENERAL CONTRACTOR SHALL BE ON CALL AT ALL TIME IF THERE IS ANY ISSUE WITH GENERAL CONTRACTOR SHALL BE ON CALL AT ALL TIME IF THERE IS ANY ISSUE WITH TEMPORARY UNITS. 19. WORK SHALL BE CONDUCTED AT DAYS FOR AIR HANDLER AC-5-2B, AC-B-2E AND WORK SHALL BE CONDUCTED AT DAYS FOR AIR HANDLER AC-5-2B, AC-B-2E AND AC-B-3E. . 20. AFTER REMOVING ASBESTOS ROPE FROM DRAIN LINES ON METAL CEILING, RESEAL AFTER REMOVING ASBESTOS ROPE FROM DRAIN LINES ON METAL CEILING, RESEAL AREAS. 21. SMOKE DETECTORS TO BE TESTED BY FIRE ALARM TECH FOR AFTER COMPLETION TO SMOKE DETECTORS TO BE TESTED BY FIRE ALARM TECH FOR AFTER COMPLETION TO VERIFY OPERATIONAL. 22. INSTALL DUCT DETECTORS AND ALL COMPONENTS TO THE FIRE ALARM SYSTEM THEN INSTALL DUCT DETECTORS AND ALL COMPONENTS TO THE FIRE ALARM SYSTEM THEN ENFACE TO THE ANDOVER SYSTEM, FOR A COMPLETE AND OPERATIONAL SYSTEM. DUCT DETECTOR TO BE INSTALLED BY A FIRE ALARM TECH. UPDATE GRAPHICS WITH COMPLETE AND OPERATIONAL CONTROL SYSTEM. 23. FURNISH AND INSTALL NEW DUCT MOUNTED SMOKE DETECTOR IN ACCORDANCE WITH FURNISH AND INSTALL NEW DUCT MOUNTED SMOKE DETECTOR IN ACCORDANCE WITH VAMC STANDARD INTERLOCK THE NEW SMOKE DETECTORS WITH THE NEW VFD's FOR SHUT-OFF UPON DETECTION OF SMOKE AND INTERLOCK THE DETECTORS TO THE FIRE ALARM THROUGH THE EXISTING BUILDING-WIDE FIRE ALARM SYSTEM. PROVIDE ALL WIRE/CONDUIT AND ACCESSORIES AS NECESSARY FOR A COMPLETE AND OPERATIONAL SMOKE DETECTOR SYSTEM. 24. INSTALL NEW FIRE ALARM, SUPPORT SECURED TO NEW CEILING WHEN INSTALLED. INSTALL NEW FIRE ALARM, SUPPORT SECURED TO NEW CEILING WHEN INSTALLED.
AutoCAD SHX Text 40.
AutoCAD SHX Text IN SOME INSTANCES, IT MAY BE NECESSARY TO DEFER WORK IN CERTAIN AREAS AND LOCATIONS UNTIL SUCH TIME AS EXISTING FACILITIES CAN BE RELOCATED OR REARRANGED BY THE OWNER. THEREFORE, WHENEVER IT BECOMES NECESSARY FOR THE CONTRACTOR TO PERFORM WORK UNDER THIS CONTRACT IN EXISTING AREAS IN WHICH THE OWNERS WORK UNDER IS BEING PERFORMED, THIS CONTRACTOR SHALL ADVICE THE OWNERS RELATIVE TO THIS AS TIME AND PROCEDURE ARE CONCERNED. ALLOW OWNER 72 HOURS PRIOR NOTICE. THE CONTRACTOR SHALL INCLUDE IN HIS BID ALL PREMIUM TIME TO WHICH HE MAY BE SUBJECTED TO FOR PERFORMING WORK IN SUCH PROCEDURE AND AT SUCH TIME AS MAY BE NECESSARY TO CAUSE THE LEAST INTERFERENCE WITH THE OPERATION OF THE OWNER.
AutoCAD SHX Text REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY STATED AND INCORPORATED ON A READILY ACCESSIBLE LABEL, WHICH MAY BE LIMITED TO IDENTIFYING BY TITLE AND/OR PUBLICATION NUMBER THE OPERATION AND MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL AND TYPE OF PRODUCT. COPIES OF THIS INFORMATION SHALL BE FURNISHED BY THE CONTRACTOR TO THE CITY PER THE SPECIFICATION REQUIREMENTS.
AutoCAD SHX Text COORDINATE EXACT LOCATION OF CORE DRILLING, CUTTING OF FLOOR SLAB, OR WALLS OF THE BUILDING WITH THE PROJECT ENGINEER.
AutoCAD SHX Text PROVIDE ISOLATING VALVES AND UNIONS ON PIPING ADJACENT TO ALL CONTROL VALVES, STEAM TRAPS, AND OTHER APPURTENANCES OR EQUIPMENTS. LOCATE VALVES SO THAT EQUIPMENT CAN BE REMOVED WITHOUT DISMANTLING ANY BRANCH LINES.
AutoCAD SHX Text
PITCH PIPELINES AS REQUIRED FOR PROPER DRAINAGE AND ELIMINATION OF AIR.
AutoCAD SHX Text INSTALL DRAIN VALVES AT LOW POINTS OF EACH SYSTEM TO ENABLE COMPLETE DRAINAGE, AND AIR VENTS AT ALL HIGH POINTS IN PIPING SYSTEM TO ENABLE COMPLETE AIR VENTING.
AutoCAD SHX Text PIPE STRAINERS TO NEAREST FLOOR SINK/DRAIN. PROVIDE VALVE WITH UNION ON END OF STRAINER WITH INDIRECT WASTE LINE.
AutoCAD SHX Text PROVIDE CONDENSATE DRAIN PIPING WITH DRAINAGE FITTINGS FOR ALL COOLING COILS AND ROUTE TO A NEAREST APPROVED RECEPTOR.
AutoCAD SHX Text MANUFACTURERS NAMES FOR PRODUCTS LISTED ON DRAWINGS ARE BASIS OF DESIGN. SEE SPECIFICATIONS FOR EQUIVALENT MANUFACTURERS.
AutoCAD SHX Text COORDINATE WITH DIV.26 CONTRACTOR FOR LOCATION OF POWER AND LOCAL DISCONNECTS FOR COMBINATION FIRE/SMOKE DAMPERS.
AutoCAD SHX Text ALL ROOFTOP AND FLOOR MOUNTED MECHANICAL EQUIPMENT PADS, FLOOR/ROOF OPENINGS SHALL BE FULLY COORDINATED WITH ALL TRADES AT THE VERY BEGINNING OF THE PROJECT. MECHANICAL TRADE TO PROVIDE THE SIZE OF PADS, OPENINGS ETC. TO ALL OTHER BLDG. TRADES AT THE VERY BEGINNING OF THE PROJECT(WITHIN 60 DAYS OF NTP).
AutoCAD SHX Text MATERIALS EXPOSED WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME-SPREAD INDEX OF NOT MORE THAN 25 AND A SMOKE-DEVELOPED RATING OF NOT MORE THAN 50 WHEN TESTED IN ACCORDANCE WITH IMC & LOCAL CODE.
AutoCAD SHX Text AFTER ALL REQUIREMENTS OF THE SPECIFICATIONS AND/OR THE DRAWINGS HAVE BEEN FULLY COMPLETED, REPRESENTATIVES OF THE OWNER WILL INSPECT THE WORK. THE CONTRACTOR SHALL PROVIDE COMPETENT PERSONNEL TO DEMONSTRATE THE OPERATION OF ANY ITEM OR SYSTEM, TO THE FULL SATISFACTION OF EACH REPRESENTATIVE. FINAL ACCEPTANCE OF THE WORK WILL BE MADE BY THE OWNER AFTER RECEIPT OF APPROVAL AND RECOMMENDATION OF ACCEPTANCE FROM EACH REPRESENTATIVE.
AutoCAD SHX Text IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DO ALL CORING, SAW CUTTING, PATCHING AND REFINISHING OF WALLS AND SURFACES WHEREVER IT IS NECESSARY FOR HIM TO MEET THE FIRE RATING OF THE PARTICULAR WALL, FLOOR OR CEILING PENETRATED.
AutoCAD SHX Text CUTTING, BORING, SAW CUTTING OR DRILLING THROUGH THE NEW STRUCTURAL ELEMENTS IS NOT TO BE STARTED UNTIL THE DETAILS HAVE BEEN REVIEW AND APPROVED BY THE PROJECT ENGINEER IF THE DETAILS DO NOT SHOW OR CONFORM TO THE APPROVED DRAWINGS.
AutoCAD SHX Text PENETRATIONS OF PIPES, CONDUITS, ETC., THROUGH MECHANICAL ROOMS REQUIRING PROTECTED OPENING SHALL BE FIRE STOPPED. FIRE STOP MATERIAL SHALL BE A U.L. TESTED AND APPROVED ASSEMBLY APPROVED BY THE LOCAL AUTHORITIES.
AutoCAD SHX Text PRIME AND OIL PAINT ALL EXPOSED MECHANICAL & PLUMBING SYSTEM COMPONENTS. COLOR AND FINISH AS DIRECTED BY THE ENGINEER.
AutoCAD SHX Text
CONTRACTOR TO PROVIDE A COMPLETE AND OPERABLE MECHANICAL SYSTEMS.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE ALL WALL, FLOOR, ROOF ETC. OPENINGS THROUGH MASONARY AND CONCRETE WALLS, METAL DECK ROOF, FLOOR ETC. FOR ALL DUCTS, PIPES ETC. OPENINGS WITH ALL OTHER BUILDING TRADES AT THE VERY BEGINNING STAGE OF THE PROJECT(WITHIN 60 DAYS OF NTP).
AutoCAD SHX Text 41.
AutoCAD SHX Text 42.
AutoCAD SHX Text 43.
AutoCAD SHX Text 1.
AutoCAD SHX Text ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE 2015 INTERNATIONAL CODES THE VA CONSTRUCTION STANDARDS (http://www.cfm.va.gov/til/index.asp) AND THE REQUIREMENTS STATED IN THE APPLICABLE SECTION OF THE NATIONAL FIRE CODES (NFPA STANDARDS) CURRENT AT THE TIME OF ISSUANCE OF THE CONSTRUCTION DOCUMENTS. AMENDMENTS TO THESE CODES AS SET FORTH BY THE AUTHORITY HAVING JURISDICTION SHALL SUPERSEDE THE INTERNATIONAL CODES AND NFPA STANDARDS AS ISSUED.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONSTRUCTION OPERATIONS SHALL BE SUPERVISED BY A LICENSE MASTER MECHANICAL INSTALLER TO ENSURE THAT ALL WORK IS INSTALLED IN ACCORDANCE WITH VA REQUIREMENTS, THE APPLICABLE CODES, AND THE CONSTRUCTION DOCUMENTS.
AutoCAD SHX Text 3.
AutoCAD SHX Text PRIOR TO BIDDING, THE DIVISION 23 INSTALLER SHALL VISIT THE JOB SITE TO FAMILIARIZE HIMSELF WITH EXISTING CONDITIONS AND TO VERIFY LOCATIONS, SIZE AND QUANTITIES OF EXISTING EQUIPMENT, DUCTWORK ETC. SUBMITTAL OF A BID SHALL SIGNIFY WILLINGNESS TO COMPLY WITH CONSTRUCTION DOCUMENTS AND ACCEPTANCE OF ON-SITE CONDITIONS AS THEY EXIST.
AutoCAD SHX Text 4.
AutoCAD SHX Text THE EXISTENCE AND LOCATION OF UTILITIES, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS AND OTHER CONSTRUCTION INDICATED AS EXISTING ARE NOT GUARANTEED. BEFORE BEGINNING WORK, INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF MECHANICAL AND ELECTRICAL SYSTEMS AND OTHER CONSTRUCTION AFFECTING THE WORK AND ADJUST THE NEW WORK ACCORDINGLY. FURNISH AND INSTALL ADDITIONAL DUCTWORK, PIPING, OFFSETS AND FITTINGS AS REQUIRED TO ACCOMMODATE EXISTING CONDITIONS AS PART OF WORK.
AutoCAD SHX Text 5.
AutoCAD SHX Text COOPERATE FULLY WITH SEPARATE CONTRACTORS SO THAT WORK ON THOSE CONTRACTS MAY BE CARRIED OUT SMOOTHLY WITHOUT INTERFERING WITH OR DELAYING WORK UNDER THIS CONTRACT. COORDINATE THE PURCHASE, FABRICATION, DELIVERY AND PERFORMANCE OF THE WORK OF THIS CONTRACT WITH WORK PERFORMED UNDER SEPARATE CONTRACTS TO AVOID DELAYING THE CONSTRUCTION WORK.
AutoCAD SHX Text 6.
AutoCAD SHX Text THE INSTALLER IS RESPONSIBLE FOR COORDINATING WITH OTHER TRADES. THE INSTALLER SHALL NOT INSTALL OR FABRICATE ANY WORK SHOWN UNTIL ALL SUCH WORK IS FULLY COORDINATED. FURNISH AND INSTALL ADDITIONAL DUCTWORK, PIPING, OFFSET, AND FITTINGS AS REQUIRED TO COORDINATE THE INSTALLATIONS AS PART OF THE WORK.
AutoCAD SHX Text 7.
AutoCAD SHX Text MAINTAIN EXISTING BUILDING IN A WEATHERTIGHT CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. REPAIR DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. PROTECT BUILDING AND ITS OCCUPANTS DURING CONSTRUCTION PERIOD.
AutoCAD SHX Text 8.
AutoCAD SHX Text DO NOT INTERRUPT UTILITIES SERVING FACILITIES OCCUPIED BY TENANTS OR OTHER UNLESS PERMITTED BY THE VA HOSPITAL FACILITY MANAGER. COORDINATE UTILITY OUTAGES WITH THE VA HOSPITAL FACILITY MANAGER 14 DAYS IN ADVANCE.
AutoCAD SHX Text 9.
AutoCAD SHX Text THE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE SCALED, NOT ALL ITEMS CAN BE SHOWN.THE CONTRACTORS SHALL FURNISH AND INSTALL COMPONENTS, EQUIPMENT, DUCTWORK, PIPING, HANGERS ETC. AS REQUIRED FOR A COMPLETE, FUNCTIONAL AND CODE COMPLIANT SYSTEM.
AutoCAD SHX Text 10.
AutoCAD SHX Text TAKE FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTIONS BY FIELD MEASUREMENTS BEFORE FABRICATION, FURNISHING AND INSTALLING ADDITIONAL DUCTWORK, PIPING, FITTINGS, OFFSETS, TRANSITIONS, REDUCERS, ETC. TO CONNECT TO EXISTING CONSTRUCTION OR ACCOMMODATE FIELD CONDITIONS IS CONSIDERED PART OF WORK.
AutoCAD SHX Text 11.
AutoCAD SHX Text CLEAN AND PROTECT CONSTRUCTION IN PROGRESS AND ADJOINING MATERIALS ALREADY IN PLACE. APPLY PROTECTIVE COVERING WHERE REQUIRED TO ENSURE PROTECTION FROM DAMAGE OR DETERIORATION. DAMAGED EQUIPMENT OR MATERIALS SHALL BE REMOVED FROM THE PROJECT SITE AND REPLACED AT NO COST TO THE OWNER.
AutoCAD SHX Text 12.
AutoCAD SHX Text PERFORM MAINTENANCE ON EQUIPMENT OPERATED DURING CONSTRUCTION AS FREQUENTLY AS NECESSARY TO ENSURE PEAK PERFORMANCE AT SUBSTANTIAL COMPLETION. FURNISH AND INSTALL FILTERS AND OTHER COMPONENTS AFFECTED BY THE CONSTRUCTION WORK AS REQUIRED FOR PROPER OPERATIONS AND AS RECOMMENDED BY THE MANUFACTURER.
AutoCAD SHX Text 13.
AutoCAD SHX Text START AND TEST EQUIPMENT AND OPERATING COMPONENTS TO CONFIRM PROPER OPERATION. ADJUST AND LUBRICATE COMPONENTS TO ENSURE OPERABILITY WITHOUT DAMAGING EFFECTS. INSTALL NEW FILTERS AT THE TIME OF TESTING. REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, AND RETEST.
AutoCAD SHX Text 14.
AutoCAD SHX Text ACCESS PANELS ARE REQUIRED IN GYP BOARD CEILINGS AND WALLS FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. UNLESS OTHERWISE SPECIFIED, THE ACCESS PANELS SHALL BE 16 GAUGE PAINTABLE STEEL CONSTRUCTION WITH A PIANO HINGED DOOR, FLANGE FRAME, WALL SLEEVE AND KEYED LOCK. THE PANELS IN EXPOSED, FINISHED AREAS SHALL BE STAINLESS STEEL THE ACCESS PANELS IN FIRE RATED ASSEMBLIES SHALL HAVE THE SAME RATING AS THE ASSEMBLY.
AutoCAD SHX Text 15.
AutoCAD SHX Text INTERRELATION BETWEEN THE DRAWINGS AND THE SPECIFICATIONS: IN GENERAL, THE DRAWINGS INDICATE LOCATIONS, QUANTITIES AND CAPACITIES AND THE SPECIFICATIONS INDICATE QUALITY, OPTIONS, WARRANTIES AND COMPLIANCE STANDARDS.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .