Drawing ED-103 - Third Floor Electrical Demolition - Option 2.pdf

PDF 310 KB Posted

Attached to
HVAC Air Terminal Control Systems Upgrade Federal contract opportunity
Solicitation number
12505B20R0002
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This federal contract opportunity solicits proposals for HVAC air terminal control systems upgrade work. The United States Department of Agriculture Agricultural Research Service seeks to renovate and upgrade HVAC air terminal control systems at its Dairy Forage Research Center located at 1925 Linden Drive in Madison, Wisconsin. The total small business set-aside contract value is estimated between $1,000,000 to $5,000,000, with a 180-day period of performance. Interested small businesses must meet the $39.5 million size standard for NAICS code 236220. The solicitation is issued as a request for proposals to be incorporated into a firm-fixed price order in accordance with FAR Parts 15 and 36. The deadline for questions is May 29, 2020, with responses provided via amendment. Proposals are due by June 12, 2020. Attendance at an optional May 20-21, 2020 site visit must be pre-registered by May 19.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Air Terminal Control Systems Upgrade, newest first.
File Type Posted
RFIs.pdf PDF
Wage Determination - Revised 19 June 2020.pdf PDF
Site Visit Sign-In June 4.pdf PDF
SF-30 Amendment 03.pdf PDF
SF-30 Amendment 02.pdf PDF
SF-30 Amendment 01.pdf PDF
Drawing E-109 - Penthouse Electrical New Work - Option 5.pdf PDF
Drawing M-602 - Mechanical Controls - Base Bid.pdf PDF
Drawing M-202 - Second Floor HVAC Piping New Work - Option 1.pdf PDF
Drawing M-002 - General Symbols and Demolition Notes.pdf PDF
Drawing M-102 - Second Floor Mechanical New Work - Option 1.pdf PDF
Drawing E-001 - Electrical Legend and Abbreviations.pdf PDF
Drawing T-001 - Index of Drawings.pdf PDF
Drawing M-103 - Third Floor Mechanical New Work - Option 2.pdf PDF
Drawing M-603 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-101 - First Floor Mechanical New Work - Base Bid.pdf PDF
Drawing M-302 - Second Floor Air Balance Summary - Option 1.pdf PDF
Drawing M-001 - Mechanical Abbreviations.pdf PDF
Drawing M-801 - Mechanical Schedules - Base Bid.pdf PDF
Drawing ED-102 - Second Floor Electrical Demolition - Option 1.pdf PDF
Drawing M-802 - Mechanical Schedules - Option 1.pdf PDF
Drawing MD-101 - First Floor Mechanical Demolition - Base Bid.pdf PDF
Drawing M-106 - Penthouse Mechanical New Work - Option 2.pdf PDF
ARS-372.pdf PDF
Drawing E-102 - First Floor Electrical New Work - Option 3.pdf PDF
Drawing E-108 - Penthouse Electrical New Work - Base Bid.pdf PDF
Wage Determination.pdf PDF
Drawing E-401 - Electrical Schedules and Details.pdf PDF
Drawing M-105 - Penthouse Mechanical New Work - Option 1.pdf PDF
Specifications.pdf PDF
Drawing E-103 - First Floor Electrical New Work - Option 4.pdf PDF
Drawing M-301 - First Floor Air Balance Summary - Base Bid.pdf PDF
Drawing M-601 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing ED-105 - Penthouse Electrical Demolition - Option 1.pdf PDF
Drawing MD-202 - Second Floor HVAC Piping Demolition - Option 1.pdf PDF
Drawing M-600 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-104 - Penthouse Mechanical New Work - Base Bid.pdf PDF
Drawing M-803 - Mechanical Schedules - Option 2.pdf PDF
Drawing E-105 - Second Floor Electrical New Work - Option 3.pdf PDF
Drawing MD-105 - Penthouse Mechanical Demolition - Option 1.pdf PDF
Drawing MD-103 - Third Floor Mechanical Demolition - Option 2.pdf PDF
Drawing E-106 - Third Floor Electrical New Work - Option 2.pdf PDF
Drawing ED-104 - Penthouse Electrical Demolition - Base Bid.pdf PDF
Drawing MD-201 - First Floor HVAC Piping Demolition - Base Bid.pdf PDF
Drawing M-201 - First Floor HVAC Piping New Work - Base Bid.pdf PDF
Drawing ED-101 - First Floor Electrical Demolition - Base Bid.pdf PDF
Drawing MD-102 - Second Floor Mechanical Demolition - Option 1.pdf PDF
Drawing E-101 - First Floor Electrical New Work - Base Bid.pdf PDF
SF-1442.pdf PDF
Drawing M-303 - Third Floor Air Balance Summary - Option 2.pdf PDF
Show all 50

HVAC Air Terminal Control Systems Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gaudreau,Inc.

ARCHITECTS I PLANNERS

810 Light Street I Baltimore I Maryland 21230

410 . 837 . 5040 I www.gaudreauinc.com

100% FINAL

S

A D

U

NO. DATE BY DESCRIPTION

DATE

PROJECT

NO.

RMF PROJECT

NO.

DESIGNER

DRAWN

BY

PROJECT

MANAGER

REAL

PROPERTY

SAFETY &

HEALTH

PPM

EPM

REVISIONS

RMF ENGINEERING, INC.

5520 RESEARCH PARK DR, 3RD FLR

BALTIMORE, MD 21228

P:410.576-0505 F:410.385-0327

117212.F0

RMF

RMF

KJB

M. LEACH

UNIVERSITY OF WISCONSIN

1925 LINDEN DRIVE

MADISON, WI 53706

ED-103THIRD FLOOR

ELECTRICAL DEMOLITION