About this file

This document contains a federal contract solicitation and related opportunity details. The United States Department of Agriculture Agricultural Research Service Midwest Area is seeking proposals to renovate and upgrade the HVAC air terminal control systems at its Dairy Forage Research Center in Madison, Wisconsin. The solicitation requests firm-fixed price proposals and has a total small business set-aside designation with a NAICS code of 236220 and size standard of $39.5 million. The period of performance is 180 days from notice to proceed with bid, payment, and performance bonds required. Organized site visits are scheduled for May 20-21, 2020 and questions are due by May 29, 2020 with responses posted as an amendment. Biobased products are required where reasonably available and priced.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Air Terminal Control Systems Upgrade, newest first.
File Type Posted
Site Visit Sign-In June 3.pdf PDF
Site Visit Sign-In June 4.pdf PDF
SF-30 Amendment 03.pdf PDF
RFIs.pdf PDF
Wage Determination - Revised 19 June 2020.pdf PDF
SF-30 Amendment 01.pdf PDF
SF-1442.pdf PDF
Drawing M-303 - Third Floor Air Balance Summary - Option 2.pdf PDF
Drawing E-107 - Third Floor Electrical New Work - Option 3.pdf PDF
Drawing M-203 - Third Floor HVAC Piping New Work - Option 2.pdf PDF
Drawing MD-104 - Penthouse Mechanical Demolition - Base Bid.pdf PDF
ARS-371.pdf PDF
Drawing E-110 - First Floor and Mezzanine Electrical New Work - Option 3.pdf PDF
Drawing E-104 - Second Floor Electrical New Work - Option 1.pdf PDF
Drawing M-701 - Mechanical Details - Base Bid Option 1 Option 2.pdf PDF
Drawing MD-106 - Penthouse Mechanical Demolition - Option 2.pdf PDF
Drawing MD-203 - Third Floor HVAC Piping Demolition - Option 2.pdf PDF
Drawing T-000 - Title Page.pdf PDF
Drawing ED-106 - Penthouse Electrical Demolition - Option 2.pdf PDF
Specifications.pdf PDF
Drawing E-103 - First Floor Electrical New Work - Option 4.pdf PDF
Drawing M-301 - First Floor Air Balance Summary - Base Bid.pdf PDF
Drawing M-601 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing ED-105 - Penthouse Electrical Demolition - Option 1.pdf PDF
Drawing MD-202 - Second Floor HVAC Piping Demolition - Option 1.pdf PDF
Drawing M-600 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-104 - Penthouse Mechanical New Work - Base Bid.pdf PDF
Drawing M-803 - Mechanical Schedules - Option 2.pdf PDF
Drawing E-105 - Second Floor Electrical New Work - Option 3.pdf PDF
Drawing MD-105 - Penthouse Mechanical Demolition - Option 1.pdf PDF
Drawing MD-103 - Third Floor Mechanical Demolition - Option 2.pdf PDF
Drawing E-106 - Third Floor Electrical New Work - Option 2.pdf PDF
Drawing ED-104 - Penthouse Electrical Demolition - Base Bid.pdf PDF
Drawing MD-201 - First Floor HVAC Piping Demolition - Base Bid.pdf PDF
Drawing M-201 - First Floor HVAC Piping New Work - Base Bid.pdf PDF
Drawing ED-101 - First Floor Electrical Demolition - Base Bid.pdf PDF
Drawing MD-102 - Second Floor Mechanical Demolition - Option 1.pdf PDF
Drawing E-101 - First Floor Electrical New Work - Base Bid.pdf PDF
Drawing E-109 - Penthouse Electrical New Work - Option 5.pdf PDF
Drawing M-602 - Mechanical Controls - Base Bid.pdf PDF
Drawing M-202 - Second Floor HVAC Piping New Work - Option 1.pdf PDF
Drawing M-002 - General Symbols and Demolition Notes.pdf PDF
Drawing M-102 - Second Floor Mechanical New Work - Option 1.pdf PDF
Drawing E-001 - Electrical Legend and Abbreviations.pdf PDF
Drawing T-001 - Index of Drawings.pdf PDF
Drawing M-103 - Third Floor Mechanical New Work - Option 2.pdf PDF
Drawing M-603 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-101 - First Floor Mechanical New Work - Base Bid.pdf PDF
Drawing M-302 - Second Floor Air Balance Summary - Option 1.pdf PDF
Drawing M-001 - Mechanical Abbreviations.pdf PDF
Show all 50

HVAC Air Terminal Control Systems Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12505B20R0002 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12505B

PEORIA IL 61604

1815 N UNIVERSITY STREET

USDA ARS MWA AAO ACQ/PER PROP

05/08/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/10/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to clarify that any reference to "Siemens Controls" in the

Specifications is as a basis of design only, not specifying that Siemens controls must be used for this requirement. The following additional information is provided:

The existing system is a Tridium (Honeywell) Niagara Framework Building Automation

System (BAS). This system was installed in 2012. In 2017, the system was updated from a

Tridium N3.5 to the most current Tridium IoT (Internet of Things) software platform, the

Tridium N4. The components for this project shall be compatible with Tridium N4.

All other terms and conditions remain unchanged.

Period of Performance: 08/01/2020 to 01/28/2021

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOSHUA J. DOBEREINER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .