Drawing MD-202 - Second Floor HVAC Piping Demolition - Option 1.pdf

PDF 429 KB Posted

Attached to
HVAC Air Terminal Control Systems Upgrade Federal contract opportunity
Solicitation number
12505B20R0002
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

About this file

This federal solicitation requests proposals for an HVAC air terminal control systems upgrade project. The United States Department of Agriculture Agricultural Research Service seeks to renovate and upgrade the HVAC air terminal control systems at its Dairy Forage Research Center located in Madison, Wisconsin. Interested small businesses must submit proposals by May 29, 2020 in response to solicitation number 12505B20R0002. The requirement is set aside for small businesses with a size standard of $39.5 million or less. The construction magnitude is estimated between $1 million to $5 million and the period of performance is 180 days from notice to proceed. Site visits are scheduled for May 20-21, 2020 and registration is required by May 19. All questions must be submitted by May 29 and answers will be posted in an amendment. The successful offeror must utilize biobased products to the extent available and reasonably priced.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Air Terminal Control Systems Upgrade, newest first.
File Type Posted
Site Visit Sign-In June 3.pdf PDF
RFIs.pdf PDF
Wage Determination - Revised 19 June 2020.pdf PDF
Site Visit Sign-In June 4.pdf PDF
SF-30 Amendment 03.pdf PDF
SF-30 Amendment 01.pdf PDF
SF-1442.pdf PDF
Drawing M-303 - Third Floor Air Balance Summary - Option 2.pdf PDF
Drawing E-107 - Third Floor Electrical New Work - Option 3.pdf PDF
Drawing M-203 - Third Floor HVAC Piping New Work - Option 2.pdf PDF
Drawing MD-104 - Penthouse Mechanical Demolition - Base Bid.pdf PDF
ARS-371.pdf PDF
Drawing E-110 - First Floor and Mezzanine Electrical New Work - Option 3.pdf PDF
Drawing E-104 - Second Floor Electrical New Work - Option 1.pdf PDF
Drawing M-701 - Mechanical Details - Base Bid Option 1 Option 2.pdf PDF
Drawing MD-106 - Penthouse Mechanical Demolition - Option 2.pdf PDF
Drawing MD-203 - Third Floor HVAC Piping Demolition - Option 2.pdf PDF
Drawing T-000 - Title Page.pdf PDF
Drawing ED-106 - Penthouse Electrical Demolition - Option 2.pdf PDF
Drawing E-109 - Penthouse Electrical New Work - Option 5.pdf PDF
Drawing M-602 - Mechanical Controls - Base Bid.pdf PDF
Drawing M-202 - Second Floor HVAC Piping New Work - Option 1.pdf PDF
Drawing M-002 - General Symbols and Demolition Notes.pdf PDF
Drawing M-102 - Second Floor Mechanical New Work - Option 1.pdf PDF
Drawing E-001 - Electrical Legend and Abbreviations.pdf PDF
Drawing T-001 - Index of Drawings.pdf PDF
Drawing M-103 - Third Floor Mechanical New Work - Option 2.pdf PDF
Drawing M-603 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-101 - First Floor Mechanical New Work - Base Bid.pdf PDF
Specifications.pdf PDF
Drawing E-103 - First Floor Electrical New Work - Option 4.pdf PDF
Drawing M-301 - First Floor Air Balance Summary - Base Bid.pdf PDF
Drawing M-601 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing ED-105 - Penthouse Electrical Demolition - Option 1.pdf PDF
Drawing M-600 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-104 - Penthouse Mechanical New Work - Base Bid.pdf PDF
Drawing M-803 - Mechanical Schedules - Option 2.pdf PDF
Drawing E-105 - Second Floor Electrical New Work - Option 3.pdf PDF
Drawing MD-105 - Penthouse Mechanical Demolition - Option 1.pdf PDF
Drawing MD-103 - Third Floor Mechanical Demolition - Option 2.pdf PDF
Drawing E-106 - Third Floor Electrical New Work - Option 2.pdf PDF
Drawing ED-104 - Penthouse Electrical Demolition - Base Bid.pdf PDF
Drawing MD-201 - First Floor HVAC Piping Demolition - Base Bid.pdf PDF
Drawing M-201 - First Floor HVAC Piping New Work - Base Bid.pdf PDF
Drawing ED-101 - First Floor Electrical Demolition - Base Bid.pdf PDF
Drawing MD-102 - Second Floor Mechanical Demolition - Option 1.pdf PDF
Drawing E-101 - First Floor Electrical New Work - Base Bid.pdf PDF
Drawing M-302 - Second Floor Air Balance Summary - Option 1.pdf PDF
Drawing M-001 - Mechanical Abbreviations.pdf PDF
Drawing M-801 - Mechanical Schedules - Base Bid.pdf PDF
Show all 50

HVAC Air Terminal Control Systems Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gaudreau,Inc.

ARCHITECTS I PLANNERS

810 Light Street I Baltimore I Maryland 21230

410 . 837 . 5040 I www.gaudreauinc.com

100% FINAL

S

A D

U

NO. DATE BY DESCRIPTION

DATE

PROJECT

NO.

RMF PROJECT

NO.

DESIGNER

DRAWN

BY

PROJECT

MANAGER

REAL

PROPERTY

SAFETY &

HEALTH

PPM

EPM

REVISIONS

RMF ENGINEERING, INC.

5520 RESEARCH PARK DR, 3RD FLR

BALTIMORE, MD 21228

P:410.576-0505 F:410.385-0327

117212.F0

RMF

RMF

KJB

M. LEACH

UNIVERSITY OF WISCONSIN

1925 LINDEN DRIVE

MADISON, WI 53706

MD-202SECOND FLOOR

HVAC PIPING DEMOLITION

File details come from the government source that posted it. Updated .