About this file

This document contains a federal contract solicitation for HVAC air terminal control systems upgrade services. The United States Department of Agriculture Agricultural Research Service is seeking proposals to renovate and upgrade the HVAC air terminal control systems at its Dairy Forage Research Center location in Madison, Wisconsin. The solicitation is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. The period of performance is 180 days from receipt of the notice to proceed, and bonds are required. Site visits are scheduled for May 20th and 21st, with registration required by May 19th. Questions are due by May 29th and will be answered via amendment. The use of biobased products is required where reasonably available and priced.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Air Terminal Control Systems Upgrade, newest first.
File Type Posted
Site Visit Sign-In June 3.pdf PDF
RFIs.pdf PDF
Wage Determination - Revised 19 June 2020.pdf PDF
Site Visit Sign-In June 4.pdf PDF
SF-30 Amendment 03.pdf PDF
SF-30 Amendment 01.pdf PDF
SF-1442.pdf PDF
Drawing M-303 - Third Floor Air Balance Summary - Option 2.pdf PDF
Drawing E-107 - Third Floor Electrical New Work - Option 3.pdf PDF
Drawing M-203 - Third Floor HVAC Piping New Work - Option 2.pdf PDF
Drawing MD-104 - Penthouse Mechanical Demolition - Base Bid.pdf PDF
ARS-371.pdf PDF
Drawing E-110 - First Floor and Mezzanine Electrical New Work - Option 3.pdf PDF
Drawing E-104 - Second Floor Electrical New Work - Option 1.pdf PDF
Drawing M-701 - Mechanical Details - Base Bid Option 1 Option 2.pdf PDF
Drawing MD-106 - Penthouse Mechanical Demolition - Option 2.pdf PDF
Drawing MD-203 - Third Floor HVAC Piping Demolition - Option 2.pdf PDF
Drawing T-000 - Title Page.pdf PDF
Drawing ED-106 - Penthouse Electrical Demolition - Option 2.pdf PDF
Drawing E-109 - Penthouse Electrical New Work - Option 5.pdf PDF
Drawing M-602 - Mechanical Controls - Base Bid.pdf PDF
Drawing M-202 - Second Floor HVAC Piping New Work - Option 1.pdf PDF
Drawing M-002 - General Symbols and Demolition Notes.pdf PDF
Drawing M-102 - Second Floor Mechanical New Work - Option 1.pdf PDF
Drawing E-001 - Electrical Legend and Abbreviations.pdf PDF
Drawing T-001 - Index of Drawings.pdf PDF
Drawing M-103 - Third Floor Mechanical New Work - Option 2.pdf PDF
Drawing M-603 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-101 - First Floor Mechanical New Work - Base Bid.pdf PDF
Specifications.pdf PDF
Drawing E-103 - First Floor Electrical New Work - Option 4.pdf PDF
Drawing M-301 - First Floor Air Balance Summary - Base Bid.pdf PDF
Drawing M-601 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing ED-105 - Penthouse Electrical Demolition - Option 1.pdf PDF
Drawing MD-202 - Second Floor HVAC Piping Demolition - Option 1.pdf PDF
Drawing M-600 - Mechanical Controls - Base Bid Option 1 Option 2.pdf PDF
Drawing M-104 - Penthouse Mechanical New Work - Base Bid.pdf PDF
Drawing M-803 - Mechanical Schedules - Option 2.pdf PDF
Drawing E-105 - Second Floor Electrical New Work - Option 3.pdf PDF
Drawing MD-105 - Penthouse Mechanical Demolition - Option 1.pdf PDF
Drawing MD-103 - Third Floor Mechanical Demolition - Option 2.pdf PDF
Drawing E-106 - Third Floor Electrical New Work - Option 2.pdf PDF
Drawing ED-104 - Penthouse Electrical Demolition - Base Bid.pdf PDF
Drawing MD-201 - First Floor HVAC Piping Demolition - Base Bid.pdf PDF
Drawing M-201 - First Floor HVAC Piping New Work - Base Bid.pdf PDF
Drawing ED-101 - First Floor Electrical Demolition - Base Bid.pdf PDF
Drawing MD-102 - Second Floor Mechanical Demolition - Option 1.pdf PDF
Drawing E-101 - First Floor Electrical New Work - Base Bid.pdf PDF
Drawing M-302 - Second Floor Air Balance Summary - Option 1.pdf PDF
Drawing M-001 - Mechanical Abbreviations.pdf PDF
Show all 50

HVAC Air Terminal Control Systems Upgrade has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL

CONTRACT NO.

PROJECT

LOCATION

PARTIAL PAYMENT NO.

REQUISITION NO.

FOR PERIOD BEGINNING ENDING

FINAL PAYMENT

ITEM AMOUNT

1. Amount of original contract

2. Change orders and/or amendments

3. Total adjusted contract prices

4. Value of work completed to end of period

5. Value of material stored at the site (Itemize below)

6. Total value of work completed and stored material (Line 4 plus Line 5).

8. Total due contractor thru end of this period

9. Less previous requests

10. Net amount due contractor this payment

7. Less

MATERIAL STORED AT THE SITE (See Item 5 above) Description Value

CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION

SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE

RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate)

CONCUR (Signature of EPM or COR as appropriate)

DATE SIGNED

DATE SIGNED

DATE SIGNED

Form ARS-372 (06/2011) USDA-ARS This form was electronically produced by USDA/ARS/OCIO/EASB.

% retainage

The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;(1)

(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.(4)

I hereby certify, to the best of my knowledge and belief, that -

Previous edition is not usable.

c:\\docume~1\\admini~1.for\\mydocu~1\\accounts\\usda2\\origin~1\\set3~1\\ars372.wpf Administrator D:20050417122932- 04'00' D:20050426102902- 04'00'

CONTRACTOR'S REQUEST FOR PAYMENT TRANSMITTAL

CONTRACT NO.

PROJECT

LOCATION

PARTIAL PAYMENT NO.

REQUISITION NO.

FOR PERIOD BEGINNING

ENDING

FINAL PAYMENT

ITEM

AMOUNT

1. Amount of original contract

2. Change orders and/or amendments

3. Total adjusted contract prices

4. Value of work completed to end of period

5. Value of material stored at the site (Itemize below)

6. Total value of work completed and stored material (Line 4 plus Line 5).

8. Total due contractor thru end of this period

9. Less previous requests

10. Net amount due contractor this payment

7. Less MATERIAL STORED AT THE SITE (See Item 5 above) Description Value

CONTRACTOR'S PROGRESS PAYMENT CERTIFICATION

SIGNATURE OF CONTRACTOR'S AUTHORIZED REPRESENTATIVE

RECOMMENDED FOR PAYMENT (Signature of EPM, COR, CM or A-E as appropriate) CONCUR (Signature of EPM or COR as appropriate)

DATE SIGNED

DATE SIGNED

DATE SIGNED

Form ARS-372 (06/2011)

USDA-ARS

This form was electronically produced by USDA/ARS/OCIO/EASB.

% retainage The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(1) (2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and This certification is not to be construed as final acceptance of a subcontractor's performance.

(4) I hereby certify, to the best of my knowledge and belief, that - Previous edition is not usable.

Check if Final payment.: 0
Enter date for period beginning using format MM/DD/YYYY.:
Enter date for period ending using format MM/DD/YYYY.:
Item. 1. Amount of original contract.:
Item 2. Change orders and / or amendments.:
Item 3. Total adjusted contract prices.:
Item 4. Value of work completed to end of period.:
Item 5. Value of material stored at the site (Itemize below).:
Item 6. Total value of work completed and stored material (Line 4 plus Line 5). Value of material stored at the site (Itemize below).:
Item 7. Enter Percent retainage.:
Item 7. Less indicated percentage retainage.:
Item 8. Total due contractor thru end of this period.:
Item 9. Less previous requests.:
Item 10. Net amount due contractor this payment.:
Value. Line 1.:
Value. Line 2.:
Value. Line 3.:
Value. Line 4.:
Value. Line 5.:
Value. Line 6.:
Value. Line 7.:
Value. Line 8.:
Value. Line 9.:
Contractor's request for payment transmittal. Enter contract number.:
Partial payment number.:
Project.:
Requisition number.:
Location.:
Description. Line 1.:
Description. Line 2.:
Description. Line 3.:
Description. Line 4.:
Description. Line 5.:
Description. Line 6.:
Description. Line 7.:
Description. Line 8.:
Description. Line 9.:
Value. Line 10.:
Value. Line 11.:
Value. Line 12.:
Value. Line 13.:
Value. Line 14.:
Value. Line 15.:
Value. Line 16.:
Value. Line 17.:
Description. Line 10.:
Description. Line 11.:
Description. Line 12.:
Description. Line 13.:
Description. Line 14.:
Description. Line 15.:
Description. Line 16.:
Description. Line 17.:
Enter date in this format MM/DD/YYYY:
Enter date in this format MM/DD/YYYY:
Enter date in this format MM/DD/YYYY: