This draft request for proposal (RFP) seeks a small caliber second source supplier to produce 5.56mm, 7.62mm, and .50 caliber ammunition. The supplier must be geographically separated from the Lake City Army Ammunition Plant. The competition is restricted to offerors located in the United States, its outlying areas, or Canada.

The acquisition will result in a five-year firm fixed price contract with one successful offeror. The base quantity award will include 10 million rounds of 5.56mm and 12 million rounds of 7.62mm ammunition. The contract will include a base year and four option years for pricing periods. The RFP lists 18 national stock numbers (NSNs) for ammunition items that may be awarded over the life of the contract. Offerors must propose pricing using the price matrix attachment and meet all packaging and technical data requirements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB) Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until

(hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item 10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W52P1J-20-R-0046 X

DOA6

SEE SCHEDULE

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

MARK D. STEVENS

(309)782-2082

CCRI-AB

MARK.D.STEVENS.CIV@MAIL.MIL

X 3 25

1 118

X 1

X 6 X 8

X 12 X 30 X 51

X 59

X 61

X 62

X 93

X 94

X 104

X 112

DRAFT

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARK D. STEVENS

Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-2082

Type of Contract 1: Fixed Price with EPA - Established Prices

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

NOTICE______

(a) This is a Draft Request for Proposal (RFP). The purpose of this document is to obtain industry comment and feedback on its contents prior to release of the Final RFP. The Government is not utilizing this document to negotiate or solicit proposals, and issuance of this Draft RFP does not serve to bind the Government in any way. Portions of this Draft RFP are subject to change.

(b) Comments regarding the Draft RFP are due to the below individuals, via email, no later than 29 May 2020.

Jennifer Paul, Contracting Officer, jennifer.n.paul.civ@mail.mil

Mark Stevens, Contract Specialist, mark.d.stevens.civ@mail.mil

1. EXECUTIVE SUMMARY _________________

(a) RFP W52P1J-20-R-0046 is for a Small Caliber Second Source supplier to produce 5.56mm, 7.62mm, and Caliber .50 ammunition. The

Second Source supplier is required to be geographically separated from the Lake City Army Ammunition Plant (LCAAP).

(b) This acquisition is a restricted competition to the United States, its outlying areas, or Canada.

(c) Award will result in one five-year firm fixed price (FFP) contract to a single successful Offeror and consist of a Base Quantity

Award and five evaluated Option Year Pricing Periods.

The Base Quantity Award will consist of firm quantities of the following Department of Defense Identification Codes (DODICs) .

10,000,000 each of DODIC AB57 (5.56mm)

12,000,000 each of DODIC AB86 (7.62mm)

Base Year Option Pricing Period: Date of Award - 365 Days After Award (DAA)

Option Year 1 Pricing Period: 366 DAA - 730 DAA

Option Year 2 Pricing Period: 731 DAA - 1,095 DAA

Option Year 3 Pricing Period: 1,096 DAA - 1,460 DAA

Option Year 4 Pricing Period: 1,461 DAA - 1,825 DAA

Although all 18 DODICs listed below will not be included the Base Quantity Award, the Government may exercise the evaluated Option Year

Pricing Periods in such a way as to award all 18 DODICs during the life of the resulting contract.

(d) An Economic Price Adjustment (EPA) for copper (see Section I Narrative I0001) will be included and will apply to Option Year Pricing

Periods 1 through 4 only.

(e) Manufacture of the following 18 small caliber items will be required for this acquisition.

5.56mm______

CONTRACT LINE ITEM NUMBER (CLIN): X001

DODIC: A059

NATIONAL STOCK NUMBER (NSN): 1305-01-155-5459

CLIN: X002

DODIC: A062

NSN: 1305-01-258-8692

CLIN: X003

DODIC: A080

NSN: 1305-00-182-3217

2 118

W52P1J-20-R-0046

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CLIN: X004

DODIC: AB56

NSN: 1305-01-559-3332

CLIN: X005

DODIC: AB57

NSN: 1305-01-559-3333

CLIN: X006

DODIC: AB58

NSN: 1305-01-559-3335

CLIN: X007

DODIC: AB77

NSN: 1305-01-598-0155

7.62mm______

CLIN: X008

DODIC: A131

NSN: 1305-01-569-2912

CLIN: X009

DODIC: A143

NSN: 1305-01-569-2917

CLIN: X010

DODIC: AB79

NSN: 1305-01-598-5913

CLIN:X011

DODIC: AB86

NSN: 1305-01-606-7003

CLIN: X012

DODIC: AB82

NSN: 1305-01-598-8201

Caliber .50___________

CLIN: X013

DODIC: A555

NSN: 1305-01-658-2714

CLIN: X014

DODIC: A555 (Lead Free)

NSN: 1305-01-591-4838

CLIN: X015

DODIC: A557

NSN: 1305-01-658-2580

CLIN: X016

DODIC: A557 (Lead Free)

NSN: 1305-01-591-4857

CLIN: X017

DODIC: A576

NSN: 1305-01-659-2421

CLIN: X018

DODIC: A598

NSN: 1305-01-078-4879

(f) Offerors cannot use LCAAP as a place of performance and/or obtain components or cartridges from LCAAP. However, any proposed use of

3 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

an Armament Retooling Manufacturing Support (ARMS) tenant at LCAAP requires the appropriate ARMS approvals to have been granted by the

Government, consistent with the purposes of ARMS and this RFP.

(g) As outlined in Sections L and M of this RFP, a best value subjective tradeoff approach will be used to evaluate proposals submitted in response to this RFP. The Government reserves the right to make award to other than the lowest priced Offeror for non-price factors.

The Government anticipates receiving adequate price competition under this RFP; therefore, certified cost or pricing data is not required to be submitted with proposals. However, in the event the Procuring Contracting Officer (PCO) determines that adequate competition does not exist, the Government reserves the right to require that certified cost or pricing data be submitted.

(h) The Government intends to award without discussions; therefore, each proposal should contain the Offeror's best terms for award of a contract under this RFP. The PCO may contact Offerors for clarifications, as described in FAR 15.306(a) and Section L, FAR 52.215-1, Instructions to Offerors - Competitive, without opening discussions. However, the Government reserves the right to conduct discussions and to permit Offerors to revise their proposals if determined necessary by the PCO.

(i) Offerors shall propose pricing using the Price Matrix (Section J, RFP Attachment 0005) as outlined in Section L of this RFP. Prices entered anywhere other than this price matrix will not be considered.

(j) The unit prices in the Price Matrix (Section J, RFP Attachment 0005) will be the prices used for the Base Quantity Award and any exercise of option for increased quantity. The unit prices for the Base Quantity Award will be taken from the specially designated boxes for DODICs AB57 (quantity of 10,000,000 each) and AB86 (quantity of 12,000,000 each). The unit prices for subsequent awards will be taken from the corresponding Option Year Pricing Period in which the option for increased quantity is exercised. Reference Section

I, Clause 52.217-6, Option for Increased Quantity, for information regarding multiple options exercised within the same Option Year

Pricing Period. The Government is not required to exercise any of the evaluated options for increased quantity.

(k) Offerors are to submit prices on a Free On Board (FOB) Origin basis. The Government is only responsible for the costs associated with the shipment of the deliverable end item. The contractor is responsible for all other shipping.

(l) Deliveries will be in accordance with the schedules set forth in Section F Narrative F0002, Required Delivery Schedule.

(m) To obtain the Technical Data Packages (TDPs) for this RFP, Offerors must request explicit access through the "Attachments/Links" tab in the beta.sam.gov website under W52P1J-20-R-0046. Request access to the document titled "TDP Request W52P1J-20-R-0046". When prompted for "Reason for Request", Offerors shall enter the following: "I am requesting access to the .zip file for the TDPs under RFP

W52P1J-20-R-0046. My CAGE Code is XXXXX". Successful completion of this will prompt a Government point of contact to send the TDP to the requesting data custodian via the DoD SAFE website.

Offerors must have an approved DD Form 2345, Military Critical Technical Data Agreement, on file with the Joint Certification Program

(JCP) in order to be granted access to the TDP. Restricted technical data will not be available to an Offeror who has not been certified. NOTE: The TDP requestor must be the data custodian in the JCP database or the TDP request will be denied. To verify who your data custodian is, please log into https://www.dla.mil/HQ/LogisticsOperations/Services/JCP/www.dlis.dla.mil/jcp/ and use the CAGE Code search function.

Detailed instructions of the TDP process and use of the beta.sam.gov website can be found in Section J, RFP Attachment 0014, "Contractor

Vendor Guide-Contract Opportunities-beta.sam.gov".

(n) Program Reviews and teleconferences are a requirement of this contract. See Section C Narrative C0003, Program Reviews and

Teleconferences, for details.

(o) All contractual provisions specified are obligatory for the prime contractor. The prime contractor is responsible for enforcing contractual provisions upon any subcontractors/suppliers/vendors.

(p) These items are considered to be sensitive ammunition/explosives that require a Pre-Award Survey, which at a minimum shall address safety and security considerations, to be completed at the applicable place(s) of performance.

(q) Note for Other Than Small Businesses ONLY. Separate from Small Business Participation, Other Than Small Business Offerors shall also submit a Small Business Subcontracting Plan as required by FAR 19.7 (FAR Clause 52.219-9, Small Business Subcontracting Plan). The

Small Business Subcontracting Plan will be reviewed when the apparent awardee is determined. In accordance with Army Federal

Acquisition Regulation Supplement Appendix DD, the Small Business Subcontracting Plan must correlate with the percentages of small business utilization identified in the Offeror's Small Business Participation Plan in order to be eligible for award. For Offerors utilizing a Commercial Subcontracting Plan, the Offeror shall also provide an explanation showing how the percentages of small business utilization identified in the Offeror's Small Business Participation Plan correlate to the goals in its Commercial Subcontracting Plan in order to be eligible for award.

The Government has established the following goals for this procurement based on total contract value (including options):

Small Business (SB) - 13%

4 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Small Disadvantaged Business (SDB) - 1%

Women-Owned Small Business (WOSB) - 1%

HUBZone Certified Small Business (HUBZone) - 1%

Veteran-Owned Small Business (VOSB) - 1%

Service Disabled Veteran-Owned Small Business (SDVOSB) - 1%

(r) Offerors must ensure their proposals are fully complete, including all fill-ins within the RFP. Proposals shall be submitted no later than the date specified in Block 9 of the Standard Form (SF)33 and shall remain valid for 210 days from the closing date of this

RFP. Please ensure page 1, block 12 is completed with 210 days.

(s) Offerors must have an active registration in the System for Award Management (SAM) in order to be considered for award. Offerors are required to be registered in SAM at the time of proposal submission. The website for SAM registration is www.sam.gov .

(t) Pursuant to FAR 9.103, a contract will only be awarded to a contractor that the PCO determines to be responsible. Offerors must be able to demonstrate that they meet the standards of responsibility set forth in FAR 9.104.

(u) The successful Offeror's proposal in response to this RFP may be incorporated in whole or part as a material term of the resultant contract and failure to fully implement it may result in termination. No revisions or changes to the Offeror's proposal may be made after award without prior approval from the PCO. The contract requirements take precedence over the incorporated proposal should a conflict exist.

(v) In the event a configuration change should materialize in the future, it will be negotiated in accordance with the Changes clause

(FAR 52.243-1, Changes-Fixed Price).

(w) Receipt of an Offeror's proposal in response to this RFP is an affirmation that the Offeror has had access to and received adequate information to prepare a proposal.

(x) The cognizant ACC-RI PCO is the only individual authorized to issue awards, modifications, and changes under the resultant contract.

(y) This RFP should not be discussed with any Government employee except the PCO, Ms. Jennifer Paul, or her representative, Mr. Mark

Stevens. Ms. Jennifer Paul can be contacted at (309)782-6737 or by email at jennifer.n.paul.civ@mail.mil. Mr. Mark Stevens can be contacted at (309)782-2082 or by email at mark.d.stevens.civ@mail.mil. Failure to adhere to this restriction may be grounds to declare your firm ineligible for consideration of award resulting from this RFP.

*** END OF NARRATIVE A0001 ***

5 118

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CONTRACT DATA REQUIREMENTS LISTS (CDRLS) ________________________________________

CDRLS SHALL NOT BE SEPARATELY PRICED

INFORMATION REQUIRED BY THE CDRLS SHALL BE DELIVERED

AS SPECIFIED IN RFP EXHIBIT A.

(End of narrative B001)

0002 FIRST ARTICLE _____________

ALL PROPOSED PRICES FOR FIRST ARTICLE TESTS SHALL BE

ENTERED INTO RFP ATTACHMENT 0005, PRICE MATRIX.

SEE SECTION E NARRATIVE E0008, FIRST ARTICLE TEST

(CONTRACTOR TESTING), FOR FIRST ARTICLE TEST

REQUIREMENTS.

(End of narrative B001)

0003 PRODUCTION QUANTITY ___________________

ALL PROPOSED UNIT PRICES FOR PRODUCTION QUANTITY

SHALL BE ENTERED INTO RFP ATTACHMENT 0005, PRICE

MATRIX.

(End of narrative B001)

6 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERY SCHEDULES__________________

Reference Section F Narrative F0002, Required Delivery Schedule, for details.

ORDERING________

Reference Section I Clause 52.217-6, Option for Increased Quantity, for details.

*** END OF NARRATIVE B0001 ***

7 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CONTRACTUAL BASELINE REPORT___________________________

The Technical Data Packages (TDPs) issued through the beta.sam.gov website in conjunction with this RFP will serve as the TDP baseline at the time of contract award. After contract award, Engineering Change Proposals (ECPs) and/or Requests for Variations (RFVs) may be incorporated via contract modification. Reference Section J, Exhibit A, CDRL A018 regarding a requirement for a Contractual Baseline

Report which would annotate the baseline TDP for each DODIC supplemented with any ECPs/RFVs subsequently incorporated. The TDP Baseline shall be for informational purposes only. The contract and any subsequent modifications shall take precedence.

*** END OF NARRATIVE C0001 ***

SALE/DE-MILITARIZATION OF ENHANCED PERFORMANCE ROUNDS (EPR)___________________________________________________________

(a) The contractor is not authorized to sell or otherwise distribute conforming or non-conforming EPR, nor specific components

(including, but not limited to, M855A1 and M80A1) without the express approval of the PCO.

(b) The contractor must de-militarize the EPR projectiles for any and all rounds found to be non-conforming material. The contractor can choose any de-militarization process, so long as the bullets are not usable as bullets after the process in completed.

(c) The Government may permit direct sales of specific cartridges and components to other Government agencies and DoD approved contractors. The contractor must request and obtain PCO approval as outlined herein, and include the following information for each qualified request.

(1) Statement of Purpose for the sale identifying a Government sponsor, proposed test plan/matrix, and quantity required.

(2) Alcohol, Tobacco, Firearms, and Explosives (ATF) license.

(3) U.S. Government Agency/DoD Approved Contractor DD Form 2345.

(4) Completed and signed Non-Disclosure Agreements (See Section J, RFP Attachment 00XX).

(d) Additional conditions/requirements.

(1) Sales to foreign companies are restricted. Exportation of ammunition is not allowed.

(2) All components/cartridges delivered to other Government agencies and DoD approved contractors must be in compliance with all

Government TDPs and requirements.

(3) For all approved EPR sales, the contractor must include the following verbiage in the purchase agreement: "The Purchaser is not authorized to sell or otherwise distribute conforming or non-conforming Enhanced Performance Rounds (EPR), nor specific components

(including, but not limited to, M855A1 and M80A1) without the express approval of the Procuring Contracting Officer. The Purchaser must de-militarize any and all EPR projectiles left over or found to be non-confirming material. The Purchaser can choose any de-militarization process, so long as the bullets are not usable as bullets after the process is completed. Penetrators may remain intact".

(4) The contractor shall not proceed with any EPR direct sale until PCO approval is obtained.

*** END OF NARRATIVE C0002 ***

PROGRAM REVIEWS AND TELECONFERENCES___________________________________

(a) Program Reviews: Upon request by the PCO, the prime contractor shall hold Program Reviews, generally on a quarterly basis, at a location and time to be established by the Government. Responsible and cognizant contractor personnel shall attend these reviews to provide cognizant Government personnel with a status update, accomplishments during the previous period, and a review of any technical and administrative issues associate with the program. Program Review briefing charts shall be submitted to the PCO, PM MAS Program

Lead, and Joint Munitions Command (JMC) Production Leads at least five working days in advance of the scheduled Program Review.

(b) Teleconferences: Teleconferences shall be conducted by the Small Caliber Second Source Integrated Product Team (IPT), consisting of

Government and prime contractor personnel. These teleconferences will be held at mutually agreed to times or at the discretion of the

PCO. Their purpose is to ensure that pertinent program issues are addressed in a timely manner. The contractor shall provide an action

8 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

item list for the teleconference at least one working day in advance of the teleconference. The Government reserves the right to require

IPT teleconferences for each individual caliber family and an overarching contract IPT.

*** END OF NARRATIVE C0003 ***

ENGINEERING SUPPORT___________________

Throughout the life of this contract, the contractor may be required to provide additional engineering support, above and beyond what is already required by the terms and conditions in this contract, necessary for small caliber ammunition. As engineering support is needed, the Government will provide the contractor with a SOW and will request a proposal. Efforts will be negotiated and incorporated by contract modification.

*** END OF NARRATIVE C0004 ***

OPERATIONS SECURITY (OPSEC) REQUIREMENTS________________________________________

(a) As defined in Army Regulation (AR) 5300-1, Operations Security (OPSEC), sensitive information is information requiring special protection from disclosure that could cause compromise or threat to our national security, an Army organization, activity, family member, Department of the Army civilian, or Department of Defense contractor. Critical Information is defined as information important to the successful achievement of United States (U.S.) objectives and missions, or which may be of use to an adversary of the U.S. It consists of specific facts about friendly capabilities, activities, limitations (includes vulnerabilities), and intentions needed by adversaries for them to plan and act effectively so as to degrade friendly mission accomplishment. All critical information is sensitive, but not all sensitive information is critical.

(b) The contractor shall not release sensitive information to the general public without prior written approval from the Procuring

Contracting Officer (PCO). All contractor requests to release sensitive information shall be in writing and clearly explain the necessity for release of the information and consequences if approval is not granted. Contractor employees who are U.S. citizens shall be provided access to sensitive information on a "need to know" basis required to fulfill the terms and conditions of the contract.

Foreign National (FN) employees' access to information will be limited to non-sensitive information. FN access to sensitive information will be approved in writing by the PCO on a case-by-case basis, and will be strictly limited to the information that the employee must know in order to fulfill the terms and conditions of the contract.

(c) The PCO will provide the contractor with a list of known Critical Information (CI) pertinent to contract requirements as soon as possible after contract award. CI shall be used by the Contractor's appointed OPSEC Manager to prepare an OPSEC Plan.

(d) The contractor shall be responsible for establishing and maintaining an OPSEC program to adequately manage, protect and control sensitive information that has been provided or generated under the contract. The contractor shall prepare and submit a written OPSEC

Plan to the PCO for approval IAW DD 1423/DI-MGMT-80934C within 30 calendar days after receipt of the CI addressed in Paragraph 3 above.

The PCO will coordinate with the Government OPSEC Officer and advise the contractor in writing of the approval, conditional approval or disapproval of the plan within 20 days of receipt.

(e) The contractor shall conduct annual self-assessments of their OPSEC program and submit annual written assessments to the PCO in the anniversary month of contract award. OPSEC Assessment checklists and sample assessment responses will be provided in advance by the

Government as tools to aid the contractor in assessing their OPSEC program.

(f) The contractor shall provide OPSEC training to all employees regarding the safeguarding of sensitive information prior to employees being allowed access to such information, and annually thereafter.

(g) The contractor shall destroy all sensitive program material at the completion of the contract so as to ensure the information cannot be accessed or utilized for any purpose and notify the PCO in writing of its destruction.

(h) These same requirements will flow down to all subcontractors working on or provided any sensitive information related to the contract.

*** END OF NARRATIVE C0005 ***

CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION_____________________________________________

9 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change.

Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form

1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the

ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation or RFD) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver or RFW). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this contract by the contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Procuring Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the contractor shall not preclude the Government from exercising its rights under any clause of the contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices are not required).

*** END OF NARRATIVE C0006 ***

NATO PRODUCTION TESTING_______________________

The contractor shall be responsible for the delivery of a representative sample(s) of ammunition to the North Atlantic Treaty

Organization (NATO) North American Regional Test Center (NARTC) located at LCAAP in Independence, Missouri, for NATO Production Testing.

This is required in order to determine if the United States (U.S.) ammunition designs, that are currently qualified to be used by NATO

Member Forces, continue to meet the NATO standards for battlefield interchangeability, and merit the application of the NATO Symbol of

Interchangeability.

Reference Section J, RFP Attachment 0003, NATO Production Test SOW.

*** END OF NARRATIVE C0007 ***

RESTRICTION OF CRITICAL ITEMS AND COMPONENTS____________________________________________

(a) The components listed in paragraphs (b) are critical to the support of national defense items. As such, it is necessary to create and/or maintain a domestic capability for the production of these components by limiting production and procurement to the United States

(U.S.), its outlying areas, or Canadian industrial base.

(b) Components listed in this paragraph must be manufactured, assembled, and tested in the U.S., its outlying areas, or Canada.

(1) Propellant

(2) Nitrocellulose

10 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) M2A2, PA108, and M19A1 Ammunition Containers

(c) Load, Assemble, and Pack of all cartridges shall occur at a facility other than the Lake City Army Ammunition Plan that is within the U.S., its outlying areas, or Canada.

(d) The failure of the contractor or subcontractor(s) to comply with this requirement shall be a material breach of the contract.

(e) The contractor will insert the substance of this narrative, including this paragraph (e), in every subcontract for items or components identified above to ensure flow-down to, but not including, raw materials.

*** END OF NARRATIVE C0008 ***

CONTRACT PRODUCTION/DELIVERY REPORTING______________________________________

The contractor will be required to submit recurring reports of varying frequency pertaining to production progress/status. The contractor is responsible for executing the Section J, RFP Attachment 0007, Contract Production/Delivery Reporting SOW. The associated report templates are included in Section J, RFP Attachments 0008 through 0012. Reports will be submitted for all items procured under this contract unless specifically excluded by the Procuring Contracting Officer.

*** END OF NARRATIVE C0009 ***

11 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

PACKAGING REQUIREMENTS______________________

CLIN: X001

DODIC: A059

NSN: 1305-01-155-5459

NOMENCLATURE: Cartridge, 5.56mm, Ball, M855; Packed 10-Ctgs/10 Round

Clip; 3-Clips/Carton; 4-Cartons/Bandoleer, M8 with Magazine Filler; 7-

Bandoleers/Box, Ammunition M2A2; 2-Box, M2A2/Box, Wirebound (Total 1680

Ctgs/Box, Wirebound)

(a) Packaging shall be in accordance with 12551963, revision BD, dated 28 MARCH 2019.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 12551963, revision BD, dated 28 MARCH 2019. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 JAN 2018.

(d) The following shall apply to drawing 12551963, revision BD, dated 28 MARCH 2019:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All

WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see

URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/5, revision 20, dated 01 MARCH 2019. 19-48-4116, Revision 13, dated 01 JAN

2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D

12 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

barcodes are required.

CLIN: X002

DODIC: A062

NSN: 1305-01-258-8692

NOMENCLATURE: Cartridge, 5.56mm, Ball, M855, Linked; Packed 200-

Ctgs/Belt, Link, Cartridge, M27; 1-Belt/Magazine, Ammo, M249 SAW; 1-

Magazine, Ammo, M249 SAW/Bandoleer 200 Rd Mag, (M249 M.G.); 4-

Bandoleers/Container, Ammo, PA108; 2-Container, PA108/Box, Wirebound

(Total 1600 Ctgs/Box, Wirebound)

(a) Packaging shall be in accordance with 12590217 revision AR, dated 28 MAR 2019.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 12590217 revision AR, dated 28 MAR 2019. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 JAN 2018.

(d) The following shall apply to drawing 12590217 revision AR, dated 28 MAR 2019:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All

WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see

URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/5C, revision 9, dated 01 AUG 2017. 19-48-4116, Revision 13, dated JAN 2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with ACV00561, 13 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.

CLIN: X003

DODIC: A080

NSN: 1305-00-182-3217

NOMENCLATURE: Cartridge, 5.56mm, Blank, M200; Packed 20-Ctgs/Carton;

57-Cartons/Box, Ammunition, M2A2; 2-Box, M2A2/Box, Wirebound (Total 2280

Ctgs/Box, Wirebound)

(a) Packaging shall be in accordance with 12551963 revision BD, dated 28 MAR 2019.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 12551963, revision BD, dated 28 MAR 2019. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 JAN 2018.

(d) The following shall apply to drawing 12551963, revision BD, dated 28 MAR 2019:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All

WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see

URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/5A, revision 7, dated 01 APRIL 2019. 19-48-4116, Revision 13, dated 01 JAN

2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D

14 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

barcodes are required.

CLIN: X004

DODIC: AB56

NSN: 1305-01-559-3332

NOMENCLATURE: Cartridge, 5.56mm, Ball, M855A1, Linked; Packed 200-

Ctgs/Belt, Link, Cartridge, M27; 1-Belt/Magazine, Ammo, M249 SAW; 1-

Magazine, Ammo, M249 SAW/Bandoleer 200 Rd Mag, (M249 M.G.); 4-

Bandoleers/Container, Ammo, PA108; 2-Container, PA108/Box, Wirebound

(Total 1600 Ctgs/Box, Wirebound)

(a) Packaging shall be in accordance with 12590217 revision AR, dated 28 MARCH 2019.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 12590217 revision AR, dated 28 MARCH 2019. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 JAN 2018.

(d) The following shall apply to drawing 12590217 revision AR, dated 28 MARCH 2019:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation. Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the government. For multiyear contracts, the contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract, or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

(f) EXCEPTION TO POP MARKINGS

(1) If the container is manufactured outside the USA, the contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

(g) POP VERIFICATION

(1) In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

(h) HEAT TREAT WOOD QUALITY MARKING

(1) In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood

Packaging Material (WPM). Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All

WPM shall be constructed from heat treated (treated to 56 degrees Celsius -core temperature- for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see

URL: http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(i) MARKING

(1) Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM-15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non-manufactured wood products verified in accordance with the ISPM-15 compliance program.

(j) Palletization shall be in accordance with 19-48-4116/5C, revision 9, dated 01 AUGUST 2017. 19-48-4116, Revision 13, dated 01 JAN

2017, applies. This drawing is the basic palletization drawing called out in this contract. Marking shall be in accordance with

15 118

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

ACV00561, Revision G, dated 26 JAN 2018. Wood Packaging Material (WPM) shall be in accordance with ACV00831, Dated: 01 MAR 2010. 2-D barcodes are required.

CLIN: X005

DODIC: AB57

NSN: 1305-01-559-3333

NOMENCLATURE: Cartridge, 5.56mm, Ball, M855A1; Packed 10-Ctgs/10

Round Clip; 3-Clips/Carton; 4-Cartons/Bandoleer, M8 with Magazine Filler; 7-

Bandoleers/Box, Ammunition M2A2; 2-Box, M2A2/Box, Wirebound (Total 1680

Ctgs/Box, Wirebound)

(a) Packaging shall be in accordance with 12551963 revision BD, dated 28 MAR 2019.

(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

(c) Marking shall be in accordance with 12551963 revision BD, dated 28 MAR 2019. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 JAN 2018.

(d) The following shall apply to drawing 12551963 revision BD, dated 28 MAR 2019:

(e) PERFORMANCE ORIENTED PACKAGING (POP)

(1) Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance Oriented

Packaging (POP) Test laboratory for compliance with POP requirements in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .