WCMBP_Section_F_-_Deliveries_and_Performance_AMD_6.doc
DOC document 476 KB Posted
- Attached to
- Solicitation Notice for Workers' Compensation Medical Bill Processing (WCMBP) Federal contract opportunity
- Solicitation number
- DOL141RP21903
About this file
Amendment 6 - Section F
View the file
Other files for this federal contract opportunity
Show all 50
Solicitation Notice for Workers' Compensation Medical Bill Processing (WCMBP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Labor
(DOL)
Workers’ Compensation Medical Bill Process (WCMBP)
Section F Deliveries or Performance Revised July 24, 2014 Office of Workers’ Compensation Programs (OWCP)
Table of Contents
Section
Page
5F.1 Clause Incorporation
5F.2 Periods of Performance
5F.3 Place of Performance
6F.4 FAR 52.242-15, Stop-Work Order (AUG. 1989)
7F.5 Delivery Schedule
13F.6 Waiver of Delivery Schedule: Express Intent to Forbear
13F.7 Notice to the Government of Delays
14F.8 Performance Incentives
16F.9 Performance Standards
16F.9.1 Contract Transition
16F.9.1.1 Implementation Milestones
16F.9.1.1.1 Significant Milestones
21F.9.1.1.2 Deliverables
21F.9.1.2 Ongoing Documentation Delivery
22F.9.1.3 Performance Deficiency Correction – Corrective Action Plan
22F.9.1.4 Ongoing Operational Certification
23F.9.1.5 Certification Deficiency Correction – Corrective Action Plan
23F.9.2 Information Security Standards
23F.9.2.1 Security Notification
24F.9.2.2 Security – Data Protection
24F.9.3 Staffing
24F.9.3.1 Staffing – Key Position
24F.9.4 Central Mailroom
24F.9.5 Document Imaging
25F.9.5.1 Document Imaging – Incoming
25F.9.5.2 Document Imaging – Processing
26F.9.6 Claimant Bill Development
26F.9.6.1 Document Processing
26F.9.7 Bill Scan / Data Entry
26F.9.7.1 Bill Scan / Data Entry Process
27F.9.7.2 Bill Scan / Data Entry Accuracy
27F.9.8 Bill Processing
27F.9.8.1 Bill Processing – Processing Time
28F.9.8.2 Bill Processing – Contractor Error
28F.9.8.3 Best Scan Possible
28F.9.9 Third Party Liability
29F.9.10 Prompt Payment Bill Processing
29F.9.10.1 Bill Processing – PPA Processing
29F.9.11 Return to Provider
29F.9.12 Edits and Audits
29F.9.13 Claimant Eligibility
29F.9.14 Provider Enrollment and Management
29F.9.14.1 Provider Enrollment Package Request
30F.9.14.2 Provider Enrollment
30F.9.14.3 Provider Enrollment Notification
30F.9.14.4 Provider Management
31F.9.14.5 Provider Expiring License Notification and Deactivation
31F.9.14.6 Provider Enrollment Package Images
32F.9.14.7 Call Center – Provider Inquiries
32F.9.15 Authorizations
32F.9.15.1 Authorization Disposition
32F.9.15.2 Authorization Image Transmission
33F.9.15.3 Authorization Level 2 Processing
33F.9.15.4 Authorization Level 3 Processing
33F.9.15.5 Authorization Completion
34F.9.15.6 Triage Nurse – Notification
34F.9.15.7 Triage Nurse – Provider Notification
35F.9.16 Treatment Suites
35F.9.17 Bill Pricing
35F.9.18 Pharmacy
35F.9.19 Bill Resolution
35F.9.20 Payment Files Process: RV/EFT and 1099
36F.9.20.1 Bill Payment – Remittance Voucher Imaging
36F.9.20.2 Bill Payment – 1099 Processing
37F.9.20.3 Bill Payment – 1099 -Timeliness
37F.9.20.4 Bill Payment – Payment File Transmission
37F.9.21 Fee Schedule Appeals
37F.9.22 Adjustment Processing
38F.9.22.1 Adjustments
38F.9.22.2 Adjustments Entry
38F.9.23 Fraud and Abuse Detection
38F.9.24 Reporting
39F.9.24.1 Management Reporting - Availability
39F.9.24.2 Performance Reporting
39F.9.24.3 Report-based Corrective Action Plans
40F.9.24.4 Invoice Reporting
40F.9.25 Change Management
40F.9.25.1 Change Management – Accuracy
41F.9.25.2 Change Management - Timeliness
41F.9.26 Communications
41F.9.26.1 Call Center – Speed of Answer
42F.9.26.2 Call Center – Response Accuracy
42F.9.26.3 Call Center –Average Response Time
42F.9.26.4 Call Center – Same Day Response
FAR References
Reference
Page
5FAR 52.252-2, Clauses Incorporated By Reference (FEB 1998)
5FAR 52.242-15, Stop-Work Order (AUG. 1989)
List of Tables Table
Page 7Table 1 WCMBP Plan Deliverables
9Table 2 WCMBP Recurring Deliverables
15Table 3 Positive Performance Incentives
15Table 4 Negative Performance Incentives
17Table 5 Significant Milestones and Acceptance Criteria
F.1 Clause Incorporation FAR 52.252-2, Clauses Incorporated By Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer (CO) will make their full text available. Also, the full text of a clause may be accessed electronically at https://acquisition.gov/far/current/pdf/FAR.pdf.
All FAR references are formatted as illustrated in the incorporated clause below:
FAR 52.242-15, Stop-Work Order (AUG. 1989)
F.2 Periods of Performance The WCMBP contract, including the base contract and options, may encompass up to seven years of services. The period of performance will begin from the date of contract award:
· Base Year
· Option 1
· Option 2
· Option 3
· Option 4
· Award Term 1
· Award Term 2 The Government anticipates this contract to be effective for a 12-month period from the date of contract award, with the Government’s unilateral right to exercise up to six (6) option periods. Award Terms 1 and 2 are based on contract performance during Option Periods 1 through 4.
F.3 Place of Performance The Contractor shall perform all primary activities at the Contractor’s facilities, in locations specified in the fully-executed contract, using Contractor-supplied systems. The Contractor shall provide on-site resources for OWCP staff and representatives as stated in the Performance Work Statement (PWS), titled as Section C. The Contractor shall ensure that the contractor’s facilities, involved in bill processing and all other functions described in the PWS, meet two geographical requirements:
1. All facilities will be located in the continental U.S. and will be in compliance with the location requirements in Section 1.3.3 of the PWS.
2. All facilities will be within 180 minutes travel time by automobile from a commercial airport (as calculated by http://www.mapquest.com/directions/ [1]).
F.4 FAR 52.242-15, Stop-Work Order (AUG. 1989)
(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either—
(1) Cancel the stop-work order; or
(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.
(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—
(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and
(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.
(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.
(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.
F.5 Delivery Schedule The Government expects the Contractor to provide deliverables throughout the period of performance of the WCMBP Contract. A majority of these deliverables are identified in the PWS but some of the deliverables are identified in other sections of this solicitation. The Contractor shall deliver the deliverables listed in Table 1, Table 2, Section C (PWS), and Section L (Instructions). Section J includes templates for selected reports and letters. A vendor library, that includes detailed descriptions of key deliverables, will be made available to the successful offeror.
Table 1 WCMBP Plan Deliverables
| Title |
| Discuss in Proposal |
Deliver in Proposal
Deliver in Contract
| Project Management) |
| - |
| - |
| - |
| Project Management Plan (PMP) |
| Yes |
| No |
| Yes |
| Project Schedule |
| Yes |
| Yes |
| Yes |
| Transition-In Plan |
| As necessary(overview) |
| Yes(draft) |
| Yes |
| Staffing Plans |
| Yes |
| No |
| Yes |
| Key Position Resumes |
| Yes |
| Yes |
| Yes |
| Categorized Position Resumes |
| Yes |
| No |
| Yes |
| Other Staff Resumes |
| No |
| No |
| Yes |
| Key Personnel List |
| Yes |
| Yes |
| Yes |
| Letter(s) of Intent for Key Positions |
| Yes |
| Yes |
| No |
| Facilities Plan |
| Yes |
| No |
| Yes |
| Subcontract Management Plan |
| Yes |
| Yes |
| Yes |
| Configuration Management Plan |
| Yes |
| No |
| Yes |
| Quality Control Plan |
| Yes |
| No |
| Yes |
| Implementation |
| - |
| - |
| - |
| Technical Implementation Plan |
| Yes |
| No |
| Yes |
| Systems Architecture Description |
| Yes |
| No |
| Yes |
| Requirements Specification Documents |
| Yes |
| No |
| Yes |
| Functional Specification Documents |
| Yes |
| No |
| Yes |
| Requirements Traceability Matrix |
| Yes |
| No |
| Yes |
| Bi-Monthly Functional Demo(s) |
| Yes |
| No |
| Yes |
| Data Management Plan |
| Yes |
| No |
| Yes |
| Training Plan |
| Yes |
| No |
| Yes |
| Training Materials |
| Yes |
| No |
| Yes |
| User Manuals |
| Yes |
| No |
| Yes |
| Reports Aids |
| Yes |
| No |
| Yes |
| Test Planning |
| - |
| - |
| - |
| WCMBP Test Management Plan |
| Yes |
| No |
| Yes |
| Performance Test Plan |
| As necessary (overview) |
| No |
| Yes |
| Volume Test Plan |
| As necessary (overview) |
| No |
| Yes |
| System Integration Test Plan |
| As necessary (overview) |
| No |
| Yes |
| Parallel Test Plan |
| As necessary (overview) |
| No |
| Yes |
| Test Artifacts for Systems Integration Test |
| As necessary (overview) |
| No |
| Yes |
| Test Artifacts for Parallel Test |
| As necessary (overview) |
| No |
| Yes |
| Test Artifacts for Volume Test |
| As necessary (overview) |
| No |
| Yes |
| Test Artifacts for Performance Test |
| As necessary (overview) |
| No |
| Yes |
| Test Readiness Review for Systems Integration Test |
| As necessary (overview) |
| No |
| Yes |
| Test Readiness Review for Parallel Test |
| As necessary (overview) |
| No |
| Yes |
| Test Readiness Review for Volume Test |
| As necessary (overview) |
| No |
| Yes |
| Test Readiness Review for Performance Test |
| As necessary (overview) |
| No |
| Yes |
| Test Report and Results for Systems Integration Test |
| As necessary (overview) |
| No |
| Yes |
| Test Report and Results for Parallel Test |
| As necessary (overview) |
| No |
| Yes |
| Test Report and Results for Volume Test |
| As necessary (overview) |
| No |
| Yes |
| Test Report and Results for Performance Test |
| As necessary (overview) |
| No |
| Yes |
Test Report and Results from Performance Testing
| Operations |
| - |
| - |
| - |
| Operations Plan |
| Yes |
| No |
| Yes |
| Assumption of Operations Plan |
| Yes |
| No |
| Yes |
| Provider Outreach Plan |
| Yes |
| No |
| Yes |
| Claimant Outreach Plan |
| Yes |
| No |
| Yes |
| Medical Bill Operations Manual For DFEC |
| As necessary (overview) |
| No |
| Yes |
| Medical Bill Operations Manual For DEEOIC |
| As necessary (overview) |
| No |
| Yes |
| Medical Bill Operations Manual For DCMWC |
| As necessary (overview) |
| No |
| Yes |
| Medical Bill Operations Manual For DLHWC (Upon government’s request) |
| As necessary (overview) |
| No |
| Yes |
| Call Flows and Call Scripts (IVR and Call Center) |
| As necessary (overview) |
| No |
| Yes |
| Transition-Out Plan |
| As necessary (overview) |
| Yes(draft) |
| Yes |
| Corrective Action Plans |
| As necessary (overview) |
| No |
| Yes |
| Fraud and Abuse Management Plan |
| As necessary (overview) |
| No |
| Yes |
| System Certification & Accreditation Documents |
| - |
| - |
| - |
| System Security Plan (CSAM Input) |
| Yes |
| No |
| Yes |
| Security Risk Assessment |
| Yes |
| No |
| Yes |
| Rules of Behavior |
| As necessary (overview) |
| No |
| Yes |
| Contingency Plan |
| As necessary (overview) |
| No |
| Yes |
| Incident Response Plan |
| No |
| No |
| Yes |
| POA&M |
| As necessary (overview) |
| No |
| Yes |
| MOUs / ISAs |
| As necessary (overview) |
| No |
| Yes |
| Security Control Assessment (CSAM Input) |
| No |
| No |
| Yes |
| NIST Security Self Assessment |
| As necessary (overview) |
| No |
| Yes |
| C&A (CSAM Input) |
| As necessary (overview) |
| No |
| Yes |
The Contractor shall submit the deliverables listed in Table 1 to the Government. These deliverables are organized and presented in Table 1 based on the WCMBP area for which the deliverable will be developed. The exact dates for the delivery of each deliverable will be defined when the Project Schedule is finalized. Table 2 lists the currently identified WCMBP Recurring Deliverables with the delivery intervals. This list is subject to change.
Table 2 WCMBP Recurring Deliverables Implementation Phase:
| Document |
| Interval |
| Program |
| Project Status Report |
| Weekly |
| All |
| Project Schedule Update |
| Weekly |
| All |
| Program Management Report |
| Monthly |
| All |
| Executive Program Management Report |
| Quarterly |
| All |
Operations Phase:
| Document |
| Interval |
| Program |
| Services Denied by Bills Examiner |
| On Demand |
| DCMWC |
| Services Force Paid by Bills Examiner |
| On Demand |
| DCMWC |
| Determination Test and DCMWC Consultant Bills on Suspense File |
| On Demand |
| DCMWC |
| Aged Detail Suspense Report |
| Daily |
| DCMWC |
| Top 10 Bills Approved for Payment |
| Weekly |
| DCMWC |
| Voucher and Schedule of Payments |
| Weekly |
| DCMWC |
| Denied Determination Test and DCMWC Consultant Bills |
| Weekly |
| DCMWC |
| Paid Determination Test and DCMWC Consultant Bills |
| Weekly |
| DCMWC |
| Bill/Document Total Count Control Report Original Paid and Denied Bills – Summary or Detail Option |
| Weekly |
| DCMWC |
| Bill/Document Total Count Control Report Paid and Denied Adjusted Bills |
| Weekly |
| DCMWC |
| Remittance Activity Control Totals |
| On Demand |
| DCMWC |
| Claimant EFT Register |
| Weekly |
| DCMWC |
| Claimant Check Register |
| Weekly |
| DCMWC |
| Provider Check Register |
| Weekly |
| DCMWC |
| Final Payment Summary |
| Weekly |
| DCMWC |
| Provider EFT Register |
| Weekly |
| DCMWC |
| Medical Bill Audit Sample |
| On Demand |
| DCMWC |
| Black Lung Audit Check List |
| On Demand |
| DCMWC |
| Audit Summary Form |
| On Demand |
| DCMWC |
| Services Denied by Bills Examiners |
| On Demand |
| DEEOIC |
| Services Force Paid by Bills Examiners |
| On Demand |
| DEEOIC |
| Aged Detail Suspense Report |
| Daily |
| DEEOIC |
| Prompt Pay Bills Summary – Paid and Denied |
| Quarterly |
| DEEOIC |
| Bills Processing Paid, Denied and Adjustments Summary by Bill Type |
| Weekly |
| DEEOIC |
| Claimant Check Register |
| Weekly |
| DEEOIC |
| Voucher and Schedule of Payments (Check) |
| Weekly |
| DEEOIC |
| Remittance Activity Control Totals |
| On Demand |
| DEEOIC |
| Bill Timeliness/Prompt Pay Report |
| Quarterly |
| DEEOIC |
| Provider Check Register |
| Weekly |
| DEEOIC |
| Provider EFT Register |
| Weekly |
| DEEOIC |
| Prompt Payment Act (PPA) Report |
| Quarterly |
| DEEOIC |
| Voucher and Schedule of Payments |
| Weekly |
| DEEOIC |
| Medical Bill Audit Sample |
| On Demand |
| DEEOIC |
| Energy Audit Check List |
| On Demand |
| DEEOIC |
| Audit Summary Form |
| On Demand |
| DEEOIC |
| EEOICP Authorization Pended more than 3 Days Report |
| Monthly As Requested |
| DEEOIC |
| Weekly/Year-to-Date Financial Summary |
| Weekly |
| DFEC |
| FECA Pended Authorizations Report |
| Monthly As Requested |
| DFEC |
| Medical Policy/Criteria Listing by Procedure Code/Modifiers |
| Yearly and As Required |
| DFEC |
| Medical Policy/Criteria Listing by Diagnosis |
| Yearly and As Required |
| DFEC |
| List of Reports generated by the WCMBP |
| Quarterly |
| DFEC |
| Edit/Audit Analysis by Edit/Audit Bill Type Report |
| Weekly |
| DFEC |
| PDCS Interface Summary Report |
| Weekly/Monthly As Requested |
| DFEC |
| OCR HCFA TCN/Batch Control Report |
| Weekly As Requested |
| DFEC |
| Medical Policy/Criteria Listing by Diagnosis |
| Yearly and As Required |
| DFEC |
List of Reports generated by the WCMBP
DFEC
| OCR UB TCN/Batch Control Report |
| Weekly As Requested |
| DFEC |
| Resolved Billed/Paid Amount Report |
| Weekly |
| DFEC |
| Weekly Approved Pay Summary by Bill Type |
| Weekly |
| DFEC |
| Prompt Payment Act (PPA) Report of Prompt Pay Testing and OWCP Consultant Bills in Suspense File |
| Weekly |
| DFEC |
| Inpatient Bill Monitoring Report |
| Quarterly |
| DFEC |
| Claim Credit Exception Report |
| Weekly |
| DFEC |
| Claim Adjustment Exception Report |
| Weekly |
| DFEC |
| Gross Adjustment Exception Report |
| Weekly |
| DFEC |
| Weekly Inventory of Adjusted Bills |
| Weekly |
| DFEC |
| Suspended Aging Report By Edit Group |
| Weekly |
| DFEC |
| Services Denied By Bills Examiners |
| On Demand |
| DFEC |
| Services Force Paid by Bills Examiners |
| On Demand |
| DFEC |
| Bill Type Suspense Action Summary Report |
| Weekly |
| DFEC |
| Forced/Denied Exception Monitoring Report |
| Weekly |
| DFEC |
| Age of Bills Upon Arrival in Edit Group Report |
| Weekly |
| DFEC |
| Check Register Report |
| Weekly |
| DFEC |
| Provider EFT Register Report |
| Weekly |
| DFEC |
| Suspended Aging Report By Edit Group and TCN |
| Weekly |
| DFEC |
| Remittance Vouchers to Providers |
| Weekly |
| DFEC |
| Remittance Vouchers to Claimants |
| Weekly |
| DFEC |
| Medical Payment Summary |
| Quarterly/ Yearly |
| DFEC |
| Text Edit/Audit Control Report |
| Weekly |
| DFEC |
| Weekly/Year-to-date Final Payment Summary |
| Weekly |
| DFEC |
| Over/Under Payment Detail Report |
| Weekly or As Requested |
| DFEC |
| Top 10 Bills Approved For Payment |
| Weekly or As Requested |
| DFEC |
| Voucher and Schedule of EFT Payments |
| Weekly |
| DFEC |
| Prompt Payment Act (PPA) Report of Denied Prompt Pay Testing and OWCP Consultant Bills |
| Weekly |
| DFEC |
| Prompt Payment Act (PPA) Financial Summary Report of Paid Prompt Pay and OWCP Consultant Bills |
| Monthly |
| DFEC |
| Check Register Statistical Data |
| Weekly |
| DFEC |
| Provider Form 1099 Summary Earning Report and Provider Earning Report Form |
| Yearly |
| DFEC |
| Provider Adjustment Overpayment Report |
| Weekly |
| DFEC |
| Mass Credit/Adjustment Analysis Report |
| On Demand |
| DFEC |
| Bills Returned and Voided Summary Report |
| Weekly |
| DFEC |
| Edit Action Summary Report |
| Daily |
| DFEC |
| Edit/Audit Group Action Summary Report |
| Daily |
| DFEC |
| Eligibility Suspended Bill Aging Report |
| Weekly |
| DFEC |
| Age of Bills Processed to Resolution Report |
| Weekly |
| DFEC |
| Suspended Bill Aging Report by Age |
| Weekly |
| DFEC |
| Suspended Bill Edit Worksheet |
| Daily |
| DFEC |
| Alphabetic Listing of Payable Drugs and Medical Policy/Criteria |
| Yearly and As Required |
| DFEC |
| Provider File report by ZIP Code |
| Yearly and As Required |
| DFEC |
| Provider File Report by Tax ID |
| Yearly and As Required |
| DFEC |
| Provider File Report by Alphabetic Name |
| Yearly and As Required |
| DFEC |
| Provider File Report By Provider Number |
| Quarterly and As Required |
| DFEC |
| Provider File Update Report |
| Weekly |
| DFEC |
| Text Edit/Audit Control and Associated Explanation of Benefit Report |
| Monthly and As Requested |
| DFEC |
| FECA Authorization Pended more than 3 Days Report |
| Monthly As Requested |
| DFEC |
| DRG Summary Report |
| Weekly As Requested |
| DFEC |
| FECA Prior Authorization Letter Generation Report |
| Daily |
| DFEC |
| Prompt Pay Cost Summary Report |
| Quarterly |
| DFEC |
| Treatment Cost Summary Report |
| Quarterly |
| DFEC |
| Durable Medical Equipment Cost Summary Report |
| Quarterly |
| DFEC |
| Vocational Rehabilitation/ Home Health/Contract Nursing Cost Summary Report |
| Quarterly |
| DFEC |
| Treatment Travel Cost Summary Report |
| Quarterly |
| DFEC |
| Drug Cost Summary Report |
| Quarterly |
| DFEC |
| Outpatient Bill Monitoring Report |
| Quarterly |
| DFEC |
| Authorization Related Bill Processing Monitoring Report |
| Quarterly |
| DFEC |
| Drug Bill Monitoring Report |
| Quarterly |
| DFEC |
| Provider Large Payment Monitoring Report |
| Weekly |
| DFEC |
| Claimant Large Payment Monitoring Report |
| Weekly |
| DFEC |
| Weekly Over $50,000 Bill Report |
| Weekly |
| DFEC |
| Quality Assurance - Identified Error Report |
| Monthly |
| DFEC |
| Field Level Accuracy Report |
| On Demand |
| DFEC |
| Transmit Report |
| As Required |
| DFEC |
| Daily Summary - Documents Processed |
| Daily |
| DFEC |
| FECA Case Statistical Summary Report |
| On Demand |
| DFEC |
| FECA Case Statistical Detail Report |
| On Demand |
| DFEC |
| DFEC Imaging - Transmit Report |
| As Required |
| DFEC |
| DFEC Imaging - Transmit Report Summary |
| As Required |
| DFEC |
| DFEC Imaging - Control Report |
| As Required |
| DFEC |
| DFEC Imaging - Accuracy Report |
| As Required |
| DFEC |
| Status Report – one for each OWCP Program |
| Daily and As requested |
| COR |
| WCMBP Performance Report Card – one for each Program |
| Monthly |
| COR |
| Invoice Report Detail – Includes all three Programs |
| Monthly |
| COR |
| Invoice Report Detail – Comprehensive Error Adjustment Report |
| Monthly |
| COR |
| Invoice Report Detail – Pass-through Report |
| Monthly |
| COR |
| License Termination Warning |
| As Required |
| DCMWC, DEEOIC,DFEC |
| Program Totals Report |
| Daily |
| DCMWC, DEEOIC,DFEC |
| FAD Algorithms |
| As Required |
| OWCP |
| FAD Studies |
| As Required |
| OWCP |
| Fraud and Abuse Analysis Reports |
| As Required |
| OWCP |
F.6 Waiver of Delivery Schedule: Express Intent to Forbear None of the following shall be regarded as an extension, waiver, and/or abandonment of the delivery schedule and/or a waiver of the Government’s right to terminate for default;
(i) Delay by the Government in terminating for default;
(ii) Acceptance of delinquent deliveries; and/or
(iii) Acceptance or approval of samples submitted either after default in delivery and/or in insufficient time for the Contractor to meet the delivery schedule.
Any assistance rendered to the Contractor on this contract and/or acceptance by the Government of delinquent goods or services hereunder, will be solely for the purpose of mitigating damages, and is not to be construed as an intention on the part of the Government to condone any delinquency, or as a waiver of any rights the Government may have under subject contract.
Notwithstanding the foregoing, this provision is not intended to permit the Government to extend its forbearance period in perpetuity. Accordingly, the Government’s right to terminate for default based on a particular failure(s) by the contractor must be exercised within a reasonable period of time, which is defined for purposes of this procurement contract as a period extending 6 years following the contractor’s receipt of a formal Cure Notice from the Contracting Officer specifying the failure (or failures) forming the basis for the termination decision.
F.7 Notice to the Government of Delays The Contractor shall immediately notify the CO and the COR in writing, giving pertinent details, in the event the Contractor:
· Encounters difficulty in meeting performance requirements
· Anticipates difficulty in complying with the contract delivery schedule or completion date
· Becomes aware that an actual or potential situation is delaying or threatens to delay the timely performance of this contract This notification is considered informational in character only, and this provision is not to be construed as a waiver by the Government of any delivery schedule or date, or any rights or remedies provided by law or under this contract.
F.8 Performance Incentives In addition to the Award Term(s) discussed in Section H, the contractor may qualify for Positive Performance Incentives for exceeding (i.e., satisfactorily completing prior to the scheduled date) certain performance metric standards, or may be assessed Negative Performance Incentives for failure to meet certain performance metrics. Negative Performance Incentives are necessary to protect the Government from the adverse effects of a contractor’s failure to adhere satisfactorily to the contract schedule. The failure to meet one performance metric may lead to failures to meet other such metrics, in a cascading effect. Any of these failures may cause the Government to incur additional costs that cannot be determined with certainty at the outset of the contract, but which may reasonably be approximated by the schedule of Negative Performance Incentives provided for here.
Amounts due the Government as Negative Performance Incentives may be assessed by deduction from any money payable to the Contractor pursuant to this contract, or by offset against any other money due the contractor from the United States. The Government will notify the Contractor in writing of any such assessment at least thirty (30) calendar days prior to the date the Government makes the deduction or offset. If no monies are due, or if the amounts due are insufficient to satisfy any assessed Negative Performance Incentives, the Government may enforce such Negative Performance Incentives by asserting Government claims for the amount of the assessments. Performance Incentives (both Positive and Negative) will be calculated on the basis of business days. A Negative Performance Incentive, arising from any failure to meet a performance metric, may be assessed separately or in combination with other assessments for other failures. Multiple assessments may relate to overlapping periods of time, so long as each assessment is calculated for just one failure.
Negative Performance Incentives will neither accrue nor be assessed when the contractor’s failure to meet a specified metric is due to Government-ordered suspension or Stop-Work, or to diminution or delay of service arising from causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include (1) acts of God or of the public enemy, (2) acts of the Government in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, (9) unusually severe weather, and (10) Government-declared disasters. Although evaluation of the contractor’s performance against performance metrics will occur throughout the term of the contract, in order to allow for a ramp-up period, Negative Performance Incentives related to metrics assigned to the Operations Phase will accrue, but will not be enforced (i.e., assessed) until six (6) months after the Contractor is scheduled to assume responsibility for operations of the WCMBP. The Government may, in its sole discretion, reduce the amount of, or waive entirely, any assessment of Negative Performance Incentives. The exercise of such discretion in any instance(s) shall not be construed as a waiver of the Government’s right to enforce any Negative Performance Incentive in any other instance(s).
All Performance Metrics are listed in Section F.10. The Performance Metrics with Positive Performance Incentives are itemized in Table 3, along with the associated incentive payment.
Table 3 Positive Performance Incentives
| Section |
| Metric |
| Positive Incentive |
| F.9.1.1.1 |
| Significant Milestone – Operational Go-Live |
| $5,000 for each business day, up to a maximum of 30 business days (in addition, the Contractor may invoice the entire amount of the awarded transition-in CLIN in the event that Go-Live is achieved 30 days early) |
The Performance Metrics with Negative Performance Incentives are itemized in Table 4 , along with the associated payment due to the Government.
Table 4 Negative Performance Incentives
| Section |
| Metric |
| Negative Incentive |
| F.9.1.1.1 |
| Significant Milestone – Operational Go-Live |
| The Contractor shall be liable for a daily charge of $149,000 for each business day after the go live date. For purposes of this section only, Business Days are defined as: weekdays Mon-Fri (Federal Holidays excluded). If there is a contract change to the Go-Live date, then this negative incentive will apply to the changed milestone date. |
| F.9.2.2 |
| Security – Data Protection |
| The Contractor shall take corrective actions, as determined by the Government on a case by case basis, in redress of unauthorized PII disclosures that are determined to be the fault of the Contractor |
| F.9.8.2 |
| Bill Processing – Contractor Error |
| The Contractor shall reprocess and/or adjust incorrectly adjudicated/paid bills at no charge to the Government, as many times as required until the bill is correctly adjudicated and paid |
| F.9.14.5 |
| Provider Expiring License Notification and Deactivation |
| The Contractor shall be liable for any medical bills paid to a provider with expired license due to the Contractor’s failure to deactivate medical providers once license deactivation deadline has been passed |
| F.9.20.3 |
| Bill Payment – 1099-MISC Timeliness |
| The Contractor shall be responsible for any fines, fees or other expenses charged by the IRS as noted in IRS Publication 1220 for the tax year in which the late 1099s were postmarked after the mandatory mail by date |
F.9 Performance Standards The following sections define the performance metrics for the WCMBP program. The Contractor shall calculate and report on its performance against these metrics to the Government during WCMBP Operations. As discussed above, the Government may award positive incentive cash payment(s) or assess negative incentive deductions based on the Contractor’s performance against the performance metrics.
The performance metrics are arranged by functional area, similarly to the PWS. The PWS functional areas include references to appropriate metrics in this section.
Section H discusses the award of contract extension(s) - called Award Term(s) – based on the Contractor’s performance against the Award Term Plan (ATP).
F.9.1 Contract Transition F.9.1.1 Implementation Milestones F.9.1.1.1 Significant Milestones The Contractor shall meet all significant implementation milestones as set forth in the Contractor’s project schedule, and as approved and accepted by the Government according to the published criteria in Section E of this contract. Significant milestones include those that impact the overall implementation schedule critical path including:
Table 5 Significant Milestones and Acceptance Criteria
| Key Milestone |
| Deliverable |
| Acceptance Criteria |
| 1. Preliminary Design Review (PDR) -- Requirements Phase Complete |
| 1. Requirement Specification Document (RSD) |
2. Functional Specification Document (FSD)
3. Requirements Traceability Matrix (RTM) for Requirements Phase (shows mapping for all requirements thru the RSD and FSD level)
4. Updated IMS if appropriate
5. Meeting minutes/action items
1. All requirements are included in the RSDs and all functional requirements are included in the FSDs, and the RSDs and FSDs have been reviewed and approved by the Government.
2. Mapping for all requirements through the RSD and FSD level has been documented in the RTM for Requirements Phase, and the RTM for Requirements Phase has been reviewed and approved by the Government.
3. Contractor has conducted a successful Preliminary Design Review for the Government:
· Preliminary designs and flows are presented by contractor
· Detailed timelines for completing detailed designs are reviewed and confirmed with each stakeholder to be accurate
· All follow-ups and risks that are generated from the PDR have been documented with plans for resolution/closure approved by the government.
4. Resolution / closure plans for all known action items that are not closed as of the milestone have been reviewed and approved by the Government. Each resolution / closure plan should state when and how the action item will be resolved / closed.
5. PDR meeting minutes have been approved by the government.
| 2. Critical Design Review (CDR) - Design Phase Complete |
| 1. System Architecture Description - describes how the system should function and be constructed to provide the capabilities defined in the FSDs. This document includes: |
· Logical architecture
· Physical architecture
· Data model
· Security model
· Interfaces – External and Internal
· User roles
2. RTM for Design Phase (expands mapping for all requirements to the configuration item/allocated baseline level)
3. Updated IMS if appropriate
4. Meeting minutes/action items
1. System Architecture Description has been reviewed and approved by the Government.
2. Detailed technical designs have been completed and briefed to the Government.
3. Mapping for all requirements through the RSD, FSD, and configuration item/allocated baseline levels has been documented in the RTM for Design Phase, and the RTM for Design Phase has been reviewed and approved by the Government.
4. Contractor has conducted a successful Critical Design Review for the Government:
· All contractor organizations involved in Development and Testing are present and accounted for
· Detailed designs that each contractor organization is responsible for are discussed / reviewed, including
· Screen flows
· Screen designs
· Form and letter designs
· Report designs
· Detailed system interface designs
· Data mapping
· Detailed timelines for completing development and testing are reviewed and confirmed with each stakeholder to be accurate.
· All follow-ups and risks that are generated from the CDR have been documented with plans for resolution/closure approved by the government.
5. Resolution / closure plans for all known action items that are not closed as of the milestone have been reviewed and approved by the Government. Each resolution / closure plan should state when and how the action item will be resolved / closed.
6. CDR meeting minutes have been approved by the government.
| 3. Development Phase Complete |
| 1. SIT Plan |
2. SIT Test Artifacts, to include:
· Test Scenarios
· Test Cases
· Use Cases
· Test Scripts and Procedures
3. RTM for Development Phase (expands mapping for all requirements to the test scenario and test case level)
4. SIT TRR documentation
5. Bi-Monthly Functional Demo(s)
1. Bi-Monthly Functional Demo(s) showing increasing functionality achieved by the development teams have been conducted at agreed upon dates for Government.
2. The completed software was delivered into the test environment with functionality as specified in the FSDs.
3. All code in the development baseline is completed, unit tested, and signed off by the Contractor development team
4. Unit test documentation as defined in the Contractor’s Unit Test process completed for each component tested provided in the TRR documentation
5. All software components are under CM control and stored in the version controlled repository
6. SIT TRR successfully conducted and the meeting minutes have been approved by the government.
7. Unit testing is complete and results are available for Government review
8. SIT Plan is complete and has been approved by DOL
9. Resolution / closure plans for all known action items that are not closed as of the milestone have been reviewed and approved by the Government. Each resolution / closure plan should state when and how the action item will be resolved / closed.
10. SIT Test artifacts have been approved by the Government
| 4. System Integration Test, Parallel and P&V Test Phase Complete |
| 1. SIT Test Report |
2. Parallel Test Artifacts
3. Parallel TRR Documentation
4. Parallel Test Report
5. Performance and Volume Test Artifacts
6. Performance and Volume TRR Documentation
7. Performance and Volume Test Report
8. RTM for Testing Phase (expands mapping for all requirements to the test scenario and test case level with test result documented)
Systems Integration Test (SIT)
1. All SIT test cases executed with disposition as “passed” or “failed” by the Contractor.
2. All SIT defects have been documented and available for government review.
3. Any other SIT exit criteria, as described in the DOL approved SIT test plan, have been met
4. SIT Test results generated and reviewed with DOL, and any test results that DOL does not concur with are documented with mitigation plan agreed upon by DOL and the Contractor
5. No severity level 1 or 2 defects open. Severity level 3 and 4 defects are prioritized and have a corrective action plan stating what the Contractor will do and when the defect will be fixed or when a work around will be identified.
Performance & Volume Test (P&V)
6. All P&V test cases executed with disposition as “passed” or “failed” by the Contractor.
7. All P&V defects have been documented and available for government review.
8. Any other P&V exit criteria, as described in the DOL approved P&V test plan, have been met
9. P&V Test results generated and reviewed with DOL, and any test results that DOL does not concur with are documented with mitigation plan agreed upon by DOL and the Contractor
10. No severity level 1 or 2 defects open. Severity level 3 and 4 defects are prioritized and have a corrective action plan stating what the Contractor will do and when the defect will be fixed or when a work around will be identified.
Parallel Test
11. All parallel test cases executed with disposition as “passed” or “failed” by the Contractor.
12. All parallel test defects have been documented and available for government review.
13. Any other parallel test exit criteria, as described in the DOL approved parallel test plan, have been met
14. Parallel Test results generated and reviewed with DOL, and any test results that DOL does not concur with are documented with mitigation plan agreed upon by DOL and the Contractor
15. No severity level 1 or 2 defects open. Severity level 3 and 4 defects are prioritized and have a corrective action plan stating what the Contractor will do and when the defect will be fixed or when a work around will be identified.
16. GAT TRR successfully conducted
| 5. Government Acceptance Testing Complete |
| 1. Assumption of Operations Plan |
1. All GAT test cases executed with a disposition as “passed” or “failed” by the Contractor. With written Government approval, test cases can have a disposition as “waived” or “deferred” within GAT.
2. Defects corrected during GAT are regression tested, documented, and available for government review.
3. Any other GAT exit criteria, as described in the DOL approved GAT test plan, have been met
4. GAT Test results generated and reviewed with DOL, and any test results that DOL does not concur with are documented with mitigation plan agreed upon by DOL and the Contractor
5. No severity level 1 or 2 defects open. Severity level 3 and 4 defects are prioritized and have a corrective action plan stating what the Contractor will do and when the defect will be fixed or when a work around will be identified.
| 6. Operational Readiness Review and Certification Complete |
| 1. Operational Certification Checklist |
2. Operational Certification Statement
3. Operations Readiness Review documentation
1. Operational Certification Checklist completed and approved by DOL
2. Operations Readiness Review conducted successfully
3. Operational Certification Statement completed and submitted to DOL
| 7. Transition to Go Live Phase Complete |
| 1. WCMBP Solution |
| 1. Successful completion of all tasks / activities outlined in Assumption of Operations Plan |
2. DOL has granted approval in writing for system Go Live
Applicable Phase(s): Implementation Phase
Applicable Requirement(s): Applicable to numerous milestone-related requirements throughout Attachment 3 – Performance Work Statement, and E.2.1.
Method of Measurement: As Scheduled – The Government will track and monitor the Contractor’s compliance with agreed upon dates.
Performance Metric: All deliverables listed for the milestone are 100% timely and accepted by the Government and all acceptance criteria listed for the milestone have been satisfied as confirmed by the Government Positive Performance Incentive: For each business day, before the agreed date for the Operational Go-Live event that the Contractor’s full operational WCMBP capability is certified by the Government as ready to perform the Operational Requirements, the Government will pay a positive incentive of $5,000 for each business day, up to a maximum of 30 (business) days.
Negative Performance Incentive: The negative performance incentive will be $149,000 for each business day after the go live date. , For purposes of this section only, Business Days are defined as: weekdays Mon-Fri (Federal Holidays excluded). If there is a contract change to the Go-Live date, then this negative incentive will apply to the changed milestone date.
F.9.1.1.2 Deliverables The Contractor shall submit acceptable deliverables on time, as set forth in the Contractor’s project schedule and as approved by the Government. Acceptance is according to the published criteria in Section E of this contract.
Applicable Phase(s): Implementation Phase
Applicable Requirement(s): Applicable to numerous deliverable-related requirements throughout Attachment 3 – Performance Work Statement, and E.2.1.
Method of Measurement: Timely delivery and quality deliverable– The Government will review deliverables for acceptance (quality deliverable), and track and monitor the Contractor’s compliance with agreed upon dates.
Performance Metric: Deliverables are 100% timely and accepted by the Government
Positive Performance Incentive: None
Negative Performance Incentive: None F.9.1.2 Ongoing Documentation Delivery The Contractor shall deliver acceptable updates to the following documentation within 5 business days of the start of each Federal fiscal quarter:
· Requirements Specification
· Central Bill Process Medical Bill Operations Manual
Applicable Phase(s): Implementation and Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0021 – C.R0024, E.2.1.
Method of Measurement: Quarterly – The Government will review deliverables for acceptance, and monitor the Contractor’s compliance with all dates.
Performance Metric: Deliverables are 100% timely and accepted by the Government Positive Performance Incentive: None
Negative Performance Incentive: None
F.9.1.3 Performance Deficiency Correction – Corrective Action Plan Upon identification by the Government of a deficiency in performance, the Contractor shall develop a corrective action plan for delivery within three (3) business days, unless otherwise provided under separate contract provisions, for the metric(s) in question. The Contractor shall modify and finalize the corrective action plan within one (1) workday after receiving Government feedback.
Applicable Phase(s): Implementation and Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0038 Method of Measurement: Periodic – The Government will monitor the Contractor’s performance.
Performance Metric: Deliverables are 100% timely Positive Performance Incentive: None
Negative Performance Incentive: None
F.9.1.4 Ongoing Operational Certification The Contractor shall maintain its operational certification, including compliance with all FISMA requirements, according to the Government’s specifications, with regard to the Contractor’s operations, including supporting systems, processes, call center, reporting, Federal security requirements, disaster recovery site, documentation, staffing, etc.
Applicable Phase(s): Operations
Applicable Requirement(s): Addresses requirements including, but not limited to C.R0124, C.R0142 Method of Measurement: Ongoing – The Government will monitor the Contractor’s compliance.
Performance Metric: Government certification of operational capability is maintained at 100% Positive Performance Incentive: None
Negative Performance Incentive: None F.9.1.5 Certification Deficiency Correction – Corrective Action Plan The Contractor shall immediately notify the Government when any deficiency is identified that may negatively impact certification or recertification requirements. The Contractor shall develop and submit corrective action plan(s) for the deficiency(s) within three (3) business days and modify and finalize the corrective action plan within one (1) workday after receiving Government feedback. Upon approval of the corrective action plan by the Government, the Contractor shall correct the deficiency(s) without negative performance incentives being assessed. If the Government determines that deficiency(s) is so substantial as to significantly degrade operations, the Government’s Certification will be removed.
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to R0038 Method of Measurement: Ongoing – The Contractor monitors WCMBP performance Performance Metric: Notice provided upon identification of deficiency in 100% of instances Positive Performance Incentive: None
Negative Performance Incentive: None
F.9.2 Information Security Standards The following performance metrics are associated with security requirements.
F.9.2.1 Security Notification As documented in Section 3.2.2 of the PWS, the Contractor shall use a Government-approved report form to notify the Government of all security incidents involving Personally Identifiable Information (PII) within one (1) hour of becoming aware of the incident Applicable Phase(s): Implementation and Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0175, C.R0176 Method of Measurement: Periodic – The Government will monitor the timeliness of the Contractor’s reports of known incidents against time of occurrence. Additional documentation related to time of incident confirmation may be considered if provided by the Contractor.
Performance Metric: Notice is 100% timely Positive Performance Incentive: None
Negative Performance Incentive: None
F.9.2.2 Security – Data Protection The Contractor shall protect the Personally Identifiable Information (PII) of all claimants, providers, and Government employees from unauthorized disclosure.
Applicable Phase(s): Implementation and Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0153-C.R0159 Method of Measurement: Monthly – the Government will monitor reports for any occurrence of unauthorized disclosure.
Performance Metric: Zero (0) unauthorized disclosures of PII Positive Performance Incentive: None
Negative Performance Incentive: The Contractor shall take corrective actions, as determined by the Government on a case by case basis, in redress of unauthorized PII disclosures that are determined to be the fault of the Contractor.
F.9.3 Staffing The following Performance Metrics are associated with staffing requirements.
F.9.3.1 Staffing – Key Position The Contractor shall ensure that no Key Positions remain unfilled due to attrition or scheduled leave for more than 30 consecutive calendar days
Applicable Phase(s): Implementation and Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0208 Method of Measurement: Periodic – The Government will monitor backfill times for Key Positions as vacancies occur.
Performance Metric: Zero (0) Key Positions unfilled due to attrition or scheduled leave for more than 30 consecutive calendar days Positive Performance Incentive: None
Negative Performance Incentive: None F.9.4 Central Mailroom There are no Performance Metrics associated with mailroom requirements.
F.9.5 Document Imaging The following Performance Metrics are associated with imaging requirements.
F.9.5.1 Document Imaging – Incoming The Contractor shall ensure that all OWCP mail received is opened, scanned, indexed, and made available to the Government within a monthly average of 2 business days.
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0238 – C.R0295, C.R0422, C.R1011--C.R1012, C.R1039 --C.R1041, C.R1092 -- C.R1094, C.R1104—CR1118 Method of Measurement: Monthly – The Government will monitor performance reports for timeliness and completion rate of OWCP mail handling, imaging/indexing, and transmittal.
Performance Metric: 100% of the documents received have been processed through the processing procedures, required to make the document available to the Government, within a monthly average of 2 business days.
· OWCP documents are considered ‘available when placed on the landing zone for pick up by DOL and uploaded onto the Government network.
· Bill-related documents are considered available when loaded into the Contractor’s document repository and corresponding data transmitted to the bill processing system.
· Return to Provider (RTP) / Return to Claimant (RTC) letters are considered available when loaded into the Contractor’s document repository and accessible for viewing to authorized users.
Positive Performance Incentive: None
Negative Performance Incentive: None.
F.9.5.2 Document Imaging – Processing The Contractor shall maintain, during each reporting period, the accuracy levels specified in the PWS of 99.5% for document key fields and 98% accuracy for all other fields
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0286 Method of Measurement: Monthly – The Government assessment of performance reports based on the Contractor’s daily quality control monitoring of all documents imaged using a minimum 2% random sample.
Performance Metric: Reporting period accuracy levels of 99.5% for document key fields, and 98% accuracy for all other fields Positive Performance Incentive: None
Negative Performance Incentive: None F.9.6 Claimant Bill Development The following Performance Metrics are associated with claimant bill development requirements.
F.9.6.1 Document Processing The Contractor shall ensure that all OWCP document mail is processed and data is transmitted to the Government within a monthly average of 2 business days from receiving the mail into the contractor’s facility.
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0278 Method of Measurement: Monthly – The Government will monitor performance reports for timeliness and completion rate of OWCP document handling, imaging/indexing, and transmittal.
Performance Metric: 100% of OWCP documents received have been processed through the processing procedures, required to make the document available to the Government, within a monthly average of 2 business days.
Positive Performance Incentive: None
Negative Performance Incentive: None F.9.7 Bill Scan / Data Entry The following Performance Metrics are associated with bill scan / data entry requirements.
F.9.7.1 Bill Scan / Data Entry Process The Contractor shall ensure that all bills received are opened, scanned, and made available to the Government within a monthly average of 2 business days Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0238 – C.R0247, C.R0316 – C.R0346, C.R1039, C.R1040, C.R1104 Method of Measurement: Monthly – The Government’s assessment of performance reports.
Performance Metric: 100% bills received are processed through appropriate data entry procedures within a monthly average of 2 business days of receipt.
Positive Performance Incentive: None
Negative Performance Incentive: None F.9.7.2 Bill Scan / Data Entry Accuracy The Contractor shall maintain reporting period accuracy levels of 99.5% for bill data entry in key fields, and 98% accuracy for all other fields. Key fields include but are not limited to:
· Pay to Provider
· Date of Service
· Procedure Codes
· Claimant ID
· Units
· Charges
· Diagnosis for all bill types
· Medicare Number
· For UB bills also Blocks 50B (Payer), 67, 80 and Revenue Codes
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0342 Method of Measurement: Monthly – The Government’s assessment of performance reports based on the Contractor’s daily quality control monitoring of each receipt date using a minimum 2% random sample by bill type.
Performance Metric: Reporting period accuracy levels of 99.5% for bill data entry in key fields, and 98% accuracy for all other fields.
Positive Performance Incentive: None
Negative Performance Incentive: None F.9.8 Bill Processing The following Performance Metrics are associated with bill processing requirements.
F.9.8.1 Bill Processing – Processing Time The Contractor shall pay or deny bills (excluding Prompt Pay & Determination bills) within 28 calendar days of receipt. Contractor’s processing time does not include time spent by the Government to review bills.
Applicable Phase(s): Operations Applicable Requirement(s): Addresses requirements including, but not limited to C.R0377 Method of Measurement: Monthly – The Government’s assessment of performance reports Performance Metric:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .