AMENDMENT 5 Q As 35-56

View the file

Other files for this federal contract opportunity

Other files attached to TSC Facility O&M Support, newest first.
File Type Posted
SF_30_(2).pdf PDF
OM_Attachment_I_QA_dever.docx DOCX document
SOW_Attachment_B_Fire_Alarm_ _Sprinkler_Riser.pdf PDF
SF_30_(2).pdf PDF
Site_Visit_agenda_with__Q_ A_5.5.2015.docx DOCX document
SF_30_(2).pdf PDF
Site_Visit_Sign_in_Sheet_5_5_2015.pdf PDF
ROUND_2_All_QUESTIONS_ _Responses_.docx DOCX document
SF_30_(2).pdf PDF
AMENDMENT__3_QAs_5_1_2015.docx DOCX document
Attachment_L_-_ARQ_(Section_K).pdf PDF
Attachment_A_of_SOW_Equipment_inventory.pdf PDF
SF_30.pdf PDF
Liberty_Park_CBA_2015_-_2016.pdf PDF
SF_30.pdf PDF
O M_Attachments_D1-D7.pdf PDF
O M_Attachment_G _Labor_Wage.pdf PDF
O M_Attachments_D8-D13.pdf PDF
O M_Attachment_H _VAR.pdf PDF
O M_Attachment_E_SOW_April_22_2015_Final.docx DOCX document
O M_Attachment_J_SF33_(2).pdf PDF
O M_Attachment_K _Past_Performance.docx DOCX document
O M_RFP_4-22-2015.docx DOCX document
O M_Attachment_F.1_DD254.pdf PDF
O M_Attachment_I _QA_Template.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT I - QUESTIONS AND ANSWER TEMPLATE

TSC FACILITY O&M RFP # DJF-15-4400-PR-0023541

AMENDMENT #5, MAY 12, 2015

QUESTION NUMBER
DOC NAME (RFP or Attachment
PAGE # OR SECTION #
RESPONDENTS QUESTION
GOVERNMENT’S RESPONSE
35
RFP
L.21
Paragraph L.21 of the RFP states QUOTE "Each Offeror shall submit a Quality Assurance and Surveillance Plan (QASP), to be included as an attachment to the proposed PWS, which identifies the minimum performance indicators, indices, and metrics to be used. The measures identified in an Offeror’s QASP shall relate to the FBI’s stated objectives and measures of success, as stated in the Statement of Work (SOW)." ENQUOTE This statement implies that the Government desires offerors to submit Performance Work Statement Statements (PWS) as part of its proposal which are based upon the Scope of Work. HOWEVER, we have not identified any requirement within the RFP or the Scope of Work which requires offerors to prepare such PWS statements.

Does the Government intend for offerors to prepare Performance Work Statements based upon the Scope of Work?

A Performance Work Statement (PWS) is not required, and Section L.21 is revised, in part, to read as follows: “Each Offeror shall submit a QASP, which identifies the minimum performance indicators, indices, and metrics used…”

RFP

L.21

Paragraph L.21 of the RFP states QUOTE "Each Offeror shall submit a Quality Assurance and Surveillance Plan (QASP), to be included as an attachment to the proposed PWS, which identifies the minimum performance indicators, indices, and metrics to be used. The measures identified in an Offeror’s QASP shall relate to the FBI’s stated objectives and measures of success, A PWS is not required, as reflected in above Q&A 36. Therefore, the QASP shall be placed in Volume II, Technical, after Factor 3. Also see Q&A 19 in Amendment #4.

as stated in the Statement of Work (SOW)." ENQUOTE "If the Government does not require PWS statements, does the Government want the QASP attached to Volume II, Technical Evaluation?

A PWS is not required, as reflected in above Q&A 35. Therefore, the QASP shall be placed in Volume II, Technical, after Factor 3. Also, see Q&A 19 in Amendment #4.

37
RFP
L.21
"If the Government does not require PWS statements, does the Government want the QASP embedded within Volume II, Technical Evaluation as part of the Project Management Plan?"
See Answer to #36, above, and Answer #19 in Amendment #4.
38
SOW
24 SEC J
Can the five (5) Facility Monitors be served by a subcontractor?
Yes. The offeror is required to meet all of requirements regarding the (5) Facility Monitors. The offeror must decide on its approach and articulate said approach for evaluation.
39
SOW
Section A, 1.i
This question asks if we have managed facilities with Top Secret clearance or TS/SCI clearance over the past five years. Since the answer to Question Number 13 in the Questions and Answers indicates offerors are not required to submit past performance for contracts that required Top Secret Clearance and TS/SCI clearances, can we respond “None” without penalty or disqualification?
SOW Section A – Project Management Requirements, 1.i is hereby revised to read: “How many facilities requiring TS Clearance and/or TS/SCI clearances does the company have, or has, managed over the past 5-years?” The offeror must meet all of the required security requirements contained in the RFP, including responding to all SOW Section A questions, including this one. All responses will be evaluated in accordance with the RFP.
40
RFQ
L.28.2
We respectfully ask if the three year relevant experience be based on years, not months. We have a relevant project but are restricted if based on months and years. (FBI Field Office, DC, 10/02—03/12.) Another potential option would be to increase time to 5 years, which would correspond with Section A.1.i. “How many facilities…over the past five years.”
RFP Section L.28.2 stated, in part, that “The Offeror shall submit information on 3 of their most relevant, recent contracts completed by the Offeror over the past 3 years”. For clarification purposes, the projects would have had to be completed no earlier than 4/22/12 (date RFP issued) or later, or can still be ongoing (e.g., not completed yet).

AMENDMENT__3_QAs_5_1_2015.doc/SOW

Page 3. Q.13/M.2

The answer to Question Number 13 in the Questions and Answers indicates offerors are not required to submit past performance for contracts that required Top Secret Clearance and TS/SCI clearances. Is this correct?
Offerors must meet all security requirements contained in the RFP. As the answer to Q13 in Amendment #3 stated, in part the projects must have been performed in a secure environment requiring a security clearance. It does not specifically state that it needs to be a TS or TS/SCI clearance.
42
SOW
G.a.
The Scope of Work, Section G, Item a, (page 38) states the contractor “shall maintain a Facility Clearance Level of Top Secret and demonstrate contractor suitability. The FBI will issue a DD-254 upon issuance of the contract.”

Since the answer to Question Number 13 in the Questions and Answers indicates offerors are not required to submit past performance for contracts that required Top Secret Clearance and TS/SCI clearances, can an offeror who currently possesses a Secret Facility Clearance submit a proposal and then apply for the Top Secret upgrade after award?

Offerors must meet all security requirements contained in the RFP. As stated in RFP Section M.1.1, the Offeror must have a Department of Defense (DoD) facility clearance at time of proposal submission and, if it doesn’t, then they will be ineligible for award.

43
Inventory
--
Who maintains the rotary UPS units? Should it be an OEM representative?
The incumbent, DTZ, maintains these units. This equipment is within scope of this RFP and shall be priced in your FF priced proposal. Also, see Q24 response in Amendment #4.
44
Inventory
--
Who maintains the MGE static UPS units?
The incumbent, DTZ, maintains these units. This equipment is within scope of this RFP and shall be priced in their FF priced proposal. Also, if subcontracting the effort, the offeror shall provide details in their technical proposal. This also goes for all subcontracted items.
This 45
Inventory
--
Are the seven (7) Cummins generators maintained in-house or by subcontractor?
The incumbent, FTZ, maintains these units. This equipment is within scope of this RFP and shall be priced in your FF priced proposal. If subcontracting the effort, you shall provide details in your technical proposal.
46
Inventory
--
Who (subcontractor) takes care of the ten (10) security (Delta) barriers?
The incumbent, DTZ, maintains these units. This equipment is within scope of this RFP and shall be priced in your FF priced proposal. If subcontracting the effort, you shall provide details in your technical proposal.
47
Site Visit observation
--
Is the chain link fence in the back parking lot identified as part of the contract?
Yes.
48
Site Visit observation
--
Is the K-rated fencing identified as part of the contract?
Yes.
49
AMENDMENT__3_QAs_5_1_2015.doc
--
Are you considering this document an amendment (3) and if so, will there be a corresponding SF30 to support it?
This is part of Amendment #5, and has a supporting SF-30 attached to it.
50
SOW
Page 10
Building Repairs—Is there a dollar amount repair threshold limit for the contractor?
The limit of contractor risk is reflect on Section B CLIN 3
51
SOW
Page 5
Description of services—Will the government provide contractor with a CMMS system?
The Offeror is required to provide their own CMMS for their internal use. However the successful offeror will be provided access to the Government provided system for performance related matters.
52
SOW
Page 12
AA. Certification Frequencies—does the Va. DEQ require an annual report be turned in for the generator fuel usage?
Yes.
53
Site Visit Observation
--
ARK Flash survey and labeling hasn’t been completed on any of the electrical equipment as of yet. Does the Government consider this part of the Base contract or reimbursable?
ARC flash study was completed during the commissioning process. It is not expected that another study would be required during the performance period of this procurement.
54
Site Visit Observation
--
The cafeteria was not open for tour. Is there a commercial kitchen and if so, is the equipment covered under base?
There is not a cafeteria in the facility, so it is not a part of the RFP.
55
Site Visit Observation
--
Document shredding was discussed on the site visit. Is this included in base contract and if so, how many estimated annual or monthly hours are dedicated to shredding.
Typically it’s 32.0 hours per month. Since it is a part of this RFP, all offeror’s shall include it in their FF priced proposal.
56
RFP
L.24
Our policy is to consider, based on Government recommendations, the hiring of key personnel in order to ensure a seamless transition. Given this, can we please obtain key personnel resumes?
No. The Government does not have the authority to provide other contractor personnel resumes to other companies.