ATTACHMENT I - QUESTIONS AND ANSWER TEMPLATE
TSC FACILITY O&M RFP # DJF-15-4400-PR-0023541
AMENDMENT #6, MAY 19, 2015
| QUESTION NUMBER |
| DOC NAME (RFP or Attachment |
| PAGE # OR SECTION # |
| RESPONDENTS QUESTION |
| GOVERNMENT’S RESPONSE |
| 57 |
| RFP |
| SOW 2.0 C Electrical Systems |
| When was the last time the electrical equipment was IR Scanned? |
| Completed March 2015 |
Electrical Systems
| When was the last time the major electrical preventive maintenance (tighten-up) was performed? |
| Completed November 2014 |
Fire Life Safety
| Could you please provide an equipment list of all fire life safety devices in the building? (i.e. Smokes, strobes, pull stations, valves, etc.) |
| A new attachment to the SOW has been added to address the equipment list of all fire safety devices in the building. Refer to SOW Attachment B, herein, for info. |
Plumbing
| Please provide the size, type and maintenance frequency of all oil water separators? |
| Oil Separator = Zurn 700- 3” Quantity 2. Maintenance frequency according to SOW. |
| 61 |
| RFP |
| SOW Section D |
| If EO “first right of refusal” applies could you please provide the current staff information and seniority so the follow on contractor could price union benefits correctly? |
| See Q&A # 56, Amendment 5. The Government does not have seniority information on the incumbent’s staff. |
| 62 |
| Equipment List |
| N/A |
| Please provide the make and model of the Building Control system? |
| Siemens Apogee |
| 63 |
| Equipment List |
| N/A |
| Only two security delta barriers are located on the equipment list. If there are more that need to be maintained please provide details? |
| See Q&A 12, Amendment #3. |
| 64 |
| Amendment 1 |
| N/A |
| Are all current contract incumbent technical employees or technical employees provided by a subcontractor covered by the Collective Bargaining Agreement issued in Amendment 1? |
| No. |
| 65 |
| RFP |
| Page 3 |
| Please confirm that in the requirement for “10-senior technicians (5-HVAC And 5-POWER), the “power technicians” refer to electricians. |
| Power Technicians must be qualified/skilled/trained at the appropriate level to properly operate and maintain the systems within the RFP/SOW. |
| 66 |
| RFP |
| Page 3 |
| Current incumbent staffing lists a “subcontract manager”, please provide the duties and responsibilities of this position as it pertaining to this contract requirement. |
| Refer to SOW. It is the offorer’s responsibility to determine their staffing plan and strategy. |
| 67 |
| RFP |
| Page 3/63 |
| As the Government is requiring a minimum of 2 project coordinators and the current staffing identifies 3, please provide historical workload data specific to position category. |
| Refer to SOW. It is the offorer’s responsibility to determine their staffing plan and strategy. |
| 68 |
| RFP |
| N/A |
| Please provide any labor categories that will be provided under this contract that the Government will require the contractor to backfill for sick or vacation coverage. |
| The offeror needs to determine how, and when or if, it covers for absent staff. |
| 69 |
| RFP |
| N/A |
| Is the contractor required to provide backfill for sick or vacation coverage for management positions on this contract (ie. Project Manager, Mission Critical PM, etc.)? |
| The offeror needs to determine how, and when or if, it covers for absent staff. |
| RFP |
| SOW Section A1-4 |
| If a SOW Section A question has been addressed in the proposal (e.g., quality control program required by SOW A.3.t and A.4.h and also by M.3.1.2) can the offeror simply refer to that proposal response in the SOW questionnaire? |
| Yes |
| 71 |
| RFP |
| SOW A.3.t and A.4.h |
| What should the offeror do if a SOW Section A repeats itself (e.g., SOW A.3.t and A.4.h)? |
| Offeror’s are required to submit a proposal that clearly reflects a complete understanding of the RFP/SOW requirements. The 2 references sections have to do with different items (e.g., O&M Management Plan; and Systems, Reports and Quality Control. |
| 72 |
| RFP |
| SOW A3 |
| Are SOW A.3 u, v, w, x, y, and z questions? Do they refer to sample documents from similar projects that should be submitted by the offeror? If so, where should these documents be placed in the proposal? |
| A.3 v,w,x,y and z are here by deleted from the SOW. |
| 73 |
| RFP |
| SOW 5 |
| Where should the required discussions cited in SOW 5 Assumed Risk under Performance Based Measurement, Maintenance Philosophies, and Staffing be included in the proposal? |
| It shall be included in the Technical Proposal, Volume II. |
| 74 |
| RFP |
| L.26 |
| (a) What is the technical summary “road map and highlights for the subfactor explanations” required per RFP L.26? |
(b) Is the “road map” a variant of the cross reference matrix required per RFP L.23?
(c) What level of “highlights” is desired? (e.g., a bullet list of subfactor paratgraph, content, a synopsis of each subfactor paragraph discussion?)
a) It is the offeror’s responsibility to determine the best way to structure their technical proposal to reflect this requirement.
b) No
c) It is the offeror’s responsibility to determine the best way to structure their technical proposal to reflect this requirement.
| 75 |
| General |
| N/A |
| Was the site visit mandatory? |
| It was not mandatory, so vendors that did not attend can still submit a proposal. |
| 76 |
| RFP |
| L & M |
| For past performance what security level is acceptable to the government (secret, Top Secret)? |
| As stated in RFP Section M.2 under “Proposal Submission for Relevant/Recent Experience”, which was revised (in part) with response to question 13 (Amend. #3), “The offeror will demonstrate experience level and shall submit a minimum of 3 projects being performed in a secure environment requiring a security clearance”. Also see responses to questions 39, 41 (Amend. #4). To further clarify, a security clearance in a secure environment at some level (e.g., LBI, Secret, TS, TS/SCI), is required for past performance. |