AMENDMENT 6 Q As 57-76

View the file

Other files for this federal contract opportunity

Other files attached to TSC Facility O&M Support, newest first.
File Type Posted
SF_30_(2).pdf PDF
SOW_Attachment_B_Fire_Alarm_ _Sprinkler_Riser.pdf PDF
SF_30_(2).pdf PDF
Round_2 _Part_2_Q As.docx DOCX document
Site_Visit_agenda_with__Q_ A_5.5.2015.docx DOCX document
SF_30_(2).pdf PDF
Site_Visit_Sign_in_Sheet_5_5_2015.pdf PDF
ROUND_2_All_QUESTIONS_ _Responses_.docx DOCX document
SF_30_(2).pdf PDF
AMENDMENT__3_QAs_5_1_2015.docx DOCX document
Attachment_L_-_ARQ_(Section_K).pdf PDF
Attachment_A_of_SOW_Equipment_inventory.pdf PDF
SF_30.pdf PDF
Liberty_Park_CBA_2015_-_2016.pdf PDF
SF_30.pdf PDF
O M_Attachments_D8-D13.pdf PDF
O M_Attachment_H _VAR.pdf PDF
O M_Attachment_E_SOW_April_22_2015_Final.docx DOCX document
O M_Attachments_D1-D7.pdf PDF
O M_Attachment_G _Labor_Wage.pdf PDF
O M_Attachment_J_SF33_(2).pdf PDF
O M_Attachment_K _Past_Performance.docx DOCX document
O M_RFP_4-22-2015.docx DOCX document
O M_Attachment_F.1_DD254.pdf PDF
O M_Attachment_I _QA_Template.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT I - QUESTIONS AND ANSWER TEMPLATE

TSC FACILITY O&M RFP # DJF-15-4400-PR-0023541

AMENDMENT #6, MAY 19, 2015

QUESTION NUMBER
DOC NAME (RFP or Attachment
PAGE # OR SECTION #
RESPONDENTS QUESTION
GOVERNMENT’S RESPONSE
57
RFP
SOW 2.0 C Electrical Systems
When was the last time the electrical equipment was IR Scanned?
Completed March 2015
58
RFP
SOW 2.0 C

Electrical Systems

When was the last time the major electrical preventive maintenance (tighten-up) was performed?
Completed November 2014
59
RFP
SOW 2.0 D

Fire Life Safety

Could you please provide an equipment list of all fire life safety devices in the building? (i.e. Smokes, strobes, pull stations, valves, etc.)
A new attachment to the SOW has been added to address the equipment list of all fire safety devices in the building. Refer to SOW Attachment B, herein, for info.
60
RFP
SOW 2.0 F

Plumbing

Please provide the size, type and maintenance frequency of all oil water separators?
Oil Separator = Zurn 700- 3” Quantity 2. Maintenance frequency according to SOW.
61
RFP
SOW Section D
If EO “first right of refusal” applies could you please provide the current staff information and seniority so the follow on contractor could price union benefits correctly?
See Q&A # 56, Amendment 5. The Government does not have seniority information on the incumbent’s staff.
62
Equipment List
N/A
Please provide the make and model of the Building Control system?
Siemens Apogee
63
Equipment List
N/A
Only two security delta barriers are located on the equipment list. If there are more that need to be maintained please provide details?
See Q&A 12, Amendment #3.
64
Amendment 1
N/A
Are all current contract incumbent technical employees or technical employees provided by a subcontractor covered by the Collective Bargaining Agreement issued in Amendment 1?
No.
65
RFP
Page 3
Please confirm that in the requirement for “10-senior technicians (5-HVAC And 5-POWER), the “power technicians” refer to electricians.
Power Technicians must be qualified/skilled/trained at the appropriate level to properly operate and maintain the systems within the RFP/SOW.
66
RFP
Page 3
Current incumbent staffing lists a “subcontract manager”, please provide the duties and responsibilities of this position as it pertaining to this contract requirement.
Refer to SOW. It is the offorer’s responsibility to determine their staffing plan and strategy.
67
RFP
Page 3/63
As the Government is requiring a minimum of 2 project coordinators and the current staffing identifies 3, please provide historical workload data specific to position category.
Refer to SOW. It is the offorer’s responsibility to determine their staffing plan and strategy.
68
RFP
N/A
Please provide any labor categories that will be provided under this contract that the Government will require the contractor to backfill for sick or vacation coverage.
The offeror needs to determine how, and when or if, it covers for absent staff.
69
RFP
N/A
Is the contractor required to provide backfill for sick or vacation coverage for management positions on this contract (ie. Project Manager, Mission Critical PM, etc.)?
The offeror needs to determine how, and when or if, it covers for absent staff.
RFP
SOW Section A1-4
If a SOW Section A question has been addressed in the proposal (e.g., quality control program required by SOW A.3.t and A.4.h and also by M.3.1.2) can the offeror simply refer to that proposal response in the SOW questionnaire?
Yes
71
RFP
SOW A.3.t and A.4.h
What should the offeror do if a SOW Section A repeats itself (e.g., SOW A.3.t and A.4.h)?
Offeror’s are required to submit a proposal that clearly reflects a complete understanding of the RFP/SOW requirements. The 2 references sections have to do with different items (e.g., O&M Management Plan; and Systems, Reports and Quality Control.
72
RFP
SOW A3
Are SOW A.3 u, v, w, x, y, and z questions? Do they refer to sample documents from similar projects that should be submitted by the offeror? If so, where should these documents be placed in the proposal?
A.3 v,w,x,y and z are here by deleted from the SOW.
73
RFP
SOW 5
Where should the required discussions cited in SOW 5 Assumed Risk under Performance Based Measurement, Maintenance Philosophies, and Staffing be included in the proposal?
It shall be included in the Technical Proposal, Volume II.
74
RFP
L.26
(a) What is the technical summary “road map and highlights for the subfactor explanations” required per RFP L.26?

(b) Is the “road map” a variant of the cross reference matrix required per RFP L.23?

(c) What level of “highlights” is desired? (e.g., a bullet list of subfactor paratgraph, content, a synopsis of each subfactor paragraph discussion?)

a) It is the offeror’s responsibility to determine the best way to structure their technical proposal to reflect this requirement.

b) No

c) It is the offeror’s responsibility to determine the best way to structure their technical proposal to reflect this requirement.

75
General
N/A
Was the site visit mandatory?
It was not mandatory, so vendors that did not attend can still submit a proposal.
76
RFP
L & M
For past performance what security level is acceptable to the government (secret, Top Secret)?
As stated in RFP Section M.2 under “Proposal Submission for Relevant/Recent Experience”, which was revised (in part) with response to question 13 (Amend. #3), “The offeror will demonstrate experience level and shall submit a minimum of 3 projects being performed in a secure environment requiring a security clearance”. Also see responses to questions 39, 41 (Amend. #4). To further clarify, a security clearance in a secure environment at some level (e.g., LBI, Secret, TS, TS/SCI), is required for past performance.