DE-SOL-0009771.pdf
PDF 438 KB Posted
- Attached to
- Tucson Substation Stage 02 Federal contract opportunity
- Solicitation number
- DE-SOL-0009771
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Amendment_2_Revised_Bidding_Schedule.pdf | ||
| Amendment_001.pdf | ||
| Amendment_001_Attch_A_Specifications_7_8_16.pdf | ||
| Ammendment_001_Pre-bid_Sign-in.pdf | ||
| Attch_A_Specifications_6_16_16.pdf | ||
| Attch_F_o442_21.pdf | ||
| Attch_D_Submittal_Log.pdf | ||
| Attch_B_Drawings.pdf | ||
| Attch_E__Foreign_National_Data_Card.pdf | ||
| Attch_C_Wage_Determination.pdf | ||
| Attch_G_Tucson_Sub_Geotechnical_Report.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
16WA117324
WAPA (DSW)
US DOE/WESTERN AREA POWER
DESERT SOUTHWEST REGIONAL OFFICE
PO BOX 6457
DSW
PHOENIX AZ 85005-6457
US DOE/Western Area Power Administration
Attn: Greg Cagle DE-SOL-0009771 615 S 43rd Ave Phoenix, AZ 85009-5313
Gregory Cagle 602-605-2921 x
06/17/2016
DE-SOL-0009771
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Tucson Substation Stage 2 Construction Project.
This project consists of furnishing all labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary to construct three bays of 115-kV energized bus constructed with 230-kV spacing, structures, associated electrical equipment, site grading and development, a new service building, three approach spans, and removing underground utilities, as required in the area of new construction. All work shall be in strict compliance with the specifications and drawings.
This is a 100% Small Business Set-aside. The NAICS Code is 237130.
The project magnitude is estimated between $1,000,000.00 and $5,000,000.00.
Site Visit: To be held on 28 June, 2016, 10 AM, at the site. See Provision
DOE-L-2019, although not mandatory a site visit by interested parties is encouraged.
Note: The Government intends to issue "Notice to Proceed" on or about 10 days following contract award.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
See Clause 52.211-10
07/19/2016
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
WAPA (DSW)
US DOE/WESTERN AREA POWER
DESERT SOUTHWEST REGIONAL OFFICE
PO BOX 6457
DSW
PHOENIX AZ 85005-6457
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
06/17/2016
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 127
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
DE-SOL-0009771
FOB: Destination
00001 This Line item is for funding purposes only, see pricing schedule.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation DE-SOL-0009771
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
TUCSON SUBSTATION, STAGE 02
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and Preparatory Work (Not to exceed 5% of Total. See Section M
LS $ _____________
0002 Miscellaneous Sitework LS $ _____________
0003 Remove Environmental Contaminants
LS $ _____________
0004 Demolition LS $ _____________
0005 Remove Existing Transmission Line LS $ _____________
0006 Borrow Excavation LS $ _____________
0007 Embankments LS $ _____________
0008 Security Chain-link Fence LS $ _____________
0009 Gravel Surfacing LS $ _____________
0010 Concrete Foundations for Substation Steel Structures
743.1 CY $ ________ $ _____________
0011 Concrete Foundations for Transmission Line Steel Pole Structures
275 CY $ ________ $ _____________
0012 Type "C" Cable Trench LS $ _____________
0013 Furnish and Install Fiber Optic Pullbox
1 EA $ ________ $ _____________
0014 Steel Structures, Welded (Galvanized)
217,238 LB $ ________ $ _____________
0015 146D-55 (BP) 1 EA $ ________ $ _____________
0016 154N-45 (BP) 1 EA $ ________ $ _____________
0017 281D-45 (BP) 1 EA $ ________ $ _____________
0018 281D-50 (BP) 1 EA $ ________ $ _____________
0019 Modify Transmission Line Steel Pole Structure
LS $ _____________
0020 Power Circuit Breaker, 230-kV, 3,000-amps (Government-furnished)
3 EA $ ________ $ _____________
0021 Disconnect Switch, 230-kV, 3,000-amps, (Government-furnished)
6 EA $ ________ $ _____________
0022 Disconnect Switch, 230-kV, 3,000-amps, with Grounding Blades (Government-furnished)
3 EA $ ________ $ _____________
0023 Load Break Disconnect Switch, 115-kV, 600-amps
1 EA $ ________ $ _____________
0024 Single-pole Fuse Disconnect Switch, 115-kV
3 EA $ ________ $ _____________
0025 Station Service Voltage Transformer, 115-kV, Single-phase
3 EA $ ________ $ _____________
0026 Coupling Capacitor Voltage Transformer, 115-kV, Single-phase (Government-furnished)
9 EA $ ________ $ _____________
0027 Surge Arrester, 115-kV, Single-phase
3 EA $ ________ $ _____________
0028 Station Service Transformer, 480V- 208/120V, Three-phase, 150-kVA
1 EA $ ________ $ _____________
0029 Automatic Transfer Switch 600-amps, 240-V
1 EA $ ________ $ _____________
0030 Fusible Safety Switch, 400-amps, 240-V
2 EA $ ________ $ _____________
0031 Fusible Safety Switch, 200-amps, 480-V
1 EA $ ________ $ _____________
0032 Back-up Station Service Meter Socket and Conduit
1 EA $ ________ $ _____________
0033 Grounding System LS $ _____________
0034 Outdoor Bus Systems LS $ _____________
0035 Associated Electrical Equipment and Material
LS $ _____________
0036 Furnish 5/c No. 10 AWG Control Cable
6,850 LF $ ________ $ _____________
0037 Install 5/c No. 10 AWG Control Cable
6,850 LF $ ________ $ _____________
0038 Furnish 12/c No. 10 AWG Control Cable
6,000 LF $ ________ $ _____________
0039 Install 12/c No. 10 AWG Control Cable
6,000 LF $ ________ $ _____________
0040 Vertical Switchboard Sections (Government-furnished)
4 EA $ ________ $ _____________
0041 AC and DC Distribution Boards LS $ _____________
0042 Station Battery System (Government-furnished)
LS $ _____________
0043 Station Battery Chargers (Government-furnished)
2 EA $ ________ $ _____________
0044 Furnish and Install Fiber Optics LS $ _____________
0045 Electrical Testing LS $ _____________
0046 Type "C" Cable Trench LS $ _____________
0047 Approach Spans LS $ _____________
0048 Service Building LS $ _____________
TOTAL $ _____________
ABBREVIATIONS
CLIN = contract line item number CY = cubic yards EA = each LF = linear feet LS = for the lump sum of LB = pounds
SECTION C – DESCRIPTION/SPECIFICATIONS
The Specifications and Drawings are listed as Attachment A & B in Section J.
SECTION D – PACKINGAGING AND MARKING
Reserved
SECTION E – INSPECTION AND ACCEPTANCE
52.246-12 INSPECTION OF CONSTRUCTION (APR 1996)
DOE-E-2001 INSPECTION AND ACCEPTANCE
Inspection and acceptance of all items under this contract shall be accomplished by the Contracting Officer in accordance with the clause entitled FAR 52.246-12, Inspection of Construction. If the Contracting Officer assigns this responsibility to the Contracting Officer’s Representative or another representative of the Government, the Contracting Officer shall notify the Contractor in writing.
(End of clause)
SECTION F – DELIVERIES OR PERFORMANCE
52.211-10 COMMENCEMENT, PROCECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than December 15, 2017. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION (SEPT 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,138.00, for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of Clause)
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.
(End of Clause)
SECTION G – CONTRACT ADMINISTRATION DATA
DOE-G-2001 Contracting Officer Authority (OCT 2014)
The Contracting Officer is responsible for administration of the contract. The Contracting Officer may appoint a Contracting Officer’s Representative (COR), in accordance with the clause entitled Contracting Officer’s Representative, to perform specifically delegated functions. The Contracting Officer is the only individual who has the authority on behalf of the Government, among other things, to take the following actions under the contract:
(a) Assign additional work within the general scope of the contract.
(b) Issue a change in accordance with the clause entitled Changes.
(c) Change the cost or price of the contract.
(d) Change any of the terms, conditions, specifications, or services required by the contract.
(e) Accept non-conforming work.
(f) Waive any requirement of the contract.
(End of clause)
DOE-G-2007 Contractor Performance Assessment Reporting (OCT 2014)
(a) The Contracting Officer will document the Contractor’s performance under this contract (including any task orders placed against it, if applicable) by using the Contractor Performance Assessment Reporting System (CPARS). CPARS information is handled as “Source Selection Information.” Performance assessments entered into CPARS by the Contracting Officer are transmitted to the Past Performance Information Retrieval System (PPIRS) which is maintained by the Department of Defense (DoD). Information in PPIRS is available to authorized Government personnel seeking past performance information when evaluating proposals for award.
(b) Contractor performance will be evaluated at least annually at the contract or task order level, as determined by the Contracting Officer. Evaluation categories may include any or all of the following at the Government’s discretion: (1) quality, (2) schedule, (3) business relations, (4) business management/key personnel, and (5) cost/price. PPIRS information is available at http://www.ppirs.gov, and CPARS information is available at http://www.cpars.gov. It is recommended that the Contractor take the overview training that can be found on the CPARS website. The Contractor shall acknowledge receipt of the Government’s request for comments on CPARS assessments at the time it is received and shall respond to such requests within thirty (30) calendar days of the request.
(c) Joint Ventures. Performance assessments shall be prepared on contracts with joint ventures.
When the joint venture has a unique Commercial and Government Entity (CAGE) code and Data Universal Numbering System (DUNS) number, a single assessment will be prepared for the joint venture using its CAGE code and DUNS number. If the joint venture does not have a unique CAGE code and DUNS number, separate assessments, containing identical narrative, will be prepared for each participating contractor and will state that the evaluation is based on performance under a joint venture and will identify the contractors that were part of the joint venture.
(d) In addition to the performance assessments addressed above, the Government will perform other performance assessments necessary for administration of the contract in accordance with other applicable clauses in this contract
(End of clause)
WES-G-1001 CORRESPONDENCE PROCEDURES (WAPA, JAN 2008)
a. The designated DOE contract specialist is the focal point for all non-technical matters related to this contract. The DOE contract specialist for this contract will be assigned upon contract award.
b. All correspondence submitted under this contract shall reference the contract number.
c. One copy of all correspondence related to this contract shall be sent to each of the following:
1. The DOE Contract Specialist.
2. The DOE Contracting Officer.
3. The DOE Contracting Officer's Representative (COR).
4. The DOE Patent Counsel (only if patent or technical data issues are involved).
d. If a Government Contract Administration Office (CAO) other than DOE has been designated for this contract, a copy of all correspondence shall also be sent to the Government CAO. The assigned CAO, if any, is designated on the form used to award this contract.
(End of clause)
WES-G-1002 ADMINISTRATIVE TIME FOR COMPLETION OF DRAWINGS (WAPA,
JAN 2008)
a.The contractor is authorized up to 60 calendar days after the contract completion date to complete and submit final drawings, operation and maintenance manuals, and any other data required by the contract.
b.This period noted above is strictly for administrative purposes and is not an extension of the actual performance period of the contract. Liquidated damages are not applicable to this period.
(End of clause)
WES-G-1004 CONTRACTOR'S CONTRACT ADMINISTRATION (WAPA, FEB 2008)
The name, title, phone number, office name, and complete mailing address of the Contractor's point of contact for contract administration, including defective or improper invoices, is as follows:
Name: _________________________________________________
Title: __________________________________________________
Phone Number: _________________________________________
E-mail address: _________________________________________
Fax Number: ___________________________________________
Company Name: ________________________________________
Address: ______________________________________________
City/State/Zip: __________________________________________
(End of clause)
SECTION H – SPECIAL CONTRACT REQUIREMENTS
DOE-H-2012 Sustainable Acquisitions under DOE Construction Contracts (OCT 2014)
Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Department of Energy is committed to managing its facilities in an environmentally preferable manner that will promote the natural environment and protect the health and well being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and well being of Federal and contract employees at the facility. Sustainable acquisition or environmentally preferable contracting has several interacting initiatives. Among the initiatives are the following:
• Recycled Content Products are described at http://epa.gov/cpg
• Biobased Products are described at http://www.biopreferred.gov/
• Energy efficient products are at http://energystar.gov/products for Energy Star products
• Energy efficient products are at http://www.eere.energy.gov/femp/procurement for FEMP designated products
• Environmentally Preferable Computers are at http://www.epeat.net
• Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html
• Water efficient plumbing products are at http://epa.gov/watersense To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the sustainable, environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet reasonable performance standards. The clauses at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-
Designated Items in Service and Construction Contracts, in Section I of this contract require the use of products that have biobased content, are energy efficient, or have recycled content.
In case of an apparent inconsistency between this provision and any specification elsewhere in the contract, consult the contracting officer for resolution.
(End of clause)
DOE-H-2013 Consecutive Numbering (Oct 2014)
Due to automated procedures employed in formulating this document, clauses and provisions contained within may not always be consecutively numbered.
(End of clause)
DOE-H-2033 Alternative Dispute Resolution (OCT 2014)
(a) The DOE and the Contractor both recognize that methods for fair and efficient resolution of contractual issues in controversy by mutual agreement are essential to the successful and timely completion of contract requirements. Accordingly, DOE and the Contractor shall use their best efforts to informally resolve any contractual issue in controversy by mutual agreement. Issues of controversy may include a dispute, claim, question, or other disagreement. The parties agree to negotiate with each other in good faith, recognizing their mutual interests, and attempt to reach a just and equitable solution satisfactory to both parties.
(b) If a mutual agreement cannot be reached through negotiations within a reasonable period of time, the parties may use a process of alternate dispute resolution (ADR) in accordance with the clause at FAR 52.233-1, Disputes. The ADR process may involve mediation, facilitation, fact-finding, group conflict management, and conflict coaching by a neutral party. The neutral party may be an individual, a board comprised of independent experts, or a company with specific expertise in conflict resolution or expertise in the specific area of controversy. The neutral party will not render a binding decision, but will assist the parties in reaching a mutually satisfactory agreement. Any opinions of the neutral party shall not be admissible in evidence in any subsequent litigation proceedings.
(c) Either party may request that the ADR process be used. The Contractor shall make a written request to the Contracting Officer, and the Contracting Officer shall make a written request to the appropriate official of the Contractor. A voluntary election by both parties is required to participate in the ADR process. The parties must agree on the procedures and terms of the process, and officials of both parties who have the authority to resolve the issue must participate in the agreed upon process.
(d) ADR procedures may be used at any time that the Contracting Officer has the authority to resolve the issue in controversy. If a claim has been submitted by the Contractor, ADR procedures may be applied to all or a portion of the claim. If ADR procedures are used subsequent to issuance of a Contracting Officer’s final decision under the clause at FAR 52.233-1, Disputes, their use does not alter any of the time limitations or procedural requirements for filing an appeal of the Contracting Officer’s final decision and does not constitute reconsideration of the final decision.
(e) If the Contracting Officer rejects the Contractor’s request for ADR proceedings, the Contracting Officer shall provide the Contractor with a written explanation of the specific reasons the ADR process is not appropriate for the resolution of the dispute. If the Contractor rejects the Contracting Officer’s request to use ADR procedures, the Contractor shall provide the Contracting
Officer with the reasons for rejecting the request.
DOE-H-2034 Contractor Interface With Other Contractors And/Or Government Employees
(OCT 2014)
The Government may award contracts to other contractors for work to be performed at a DOE-owned or –controlled site or facility. The Contractor shall cooperate fully with all other on-site DOE contractors and Government employees. The Contractor shall coordinate its own work with such other work as may be directed by the Contracting Officer or a duly authorized representative.
The Contractor shall not commit or permit any act which will interfere with the performance of work by any other contractor or by a Government employee.
(End of clause)
DOE-H-2044 Material Safety Data Sheet Availability (OCT 2014)
In implementation of the clause at FAR 52.223-3, Hazardous Material Identification and Material Safety Data, the Contractor shall obtain, review and maintain a Material Safety Data Sheet (MSDS) in a readily accessible manner for each hazardous material (or mixture containing a hazardous material) ordered, delivered, stored or used; and maintain an accurate inventory and history of use of hazardous materials at each use and storage location. The MSDS shall conform to the requirements of 29 CFR 1910.1200(g).
(End of clause)
DOE-H-2051 Annual Representations And Certifications And Other Statements Of The Offeror (OCT 2014)
(a) Pursuant to the clause at FAR 52.204-8, Annual Representations and Certifications, the Contractor’s Online Representations and Certifications Application (ORCA) dated:
______________ is hereby incorporated into the contract by reference.
(b) The Contractor, by signing this contract, certifies that it has verified that its ORCA submission incorporated by reference into this contract pursuant to paragraph (a) above is current, accurate, complete, and applicable to this contract.
(End of clause)
DOE-H-2055 Government Furnished Property (OCT 2014)
In accordance with the clause 52.245-1, Government Property, the Government will provide the property as specified in the specifications.
(End of clause)
DOE-H-2057 Department Of Labor Wage Determinations (OCT 2014)
The Contractor’s performance under this contract shall comply with the requirements of the U.S.
Department of Labor Wage Determination(s) located in Section J, Attachment C, and the clause at FAR 52.222-42, Statement of Equivalent Rates for Federal Hires.
(End of clause)
DOE-H-2059 Preservation Of Antiquities, Wildlife And Land Areas (OCT 2014)
(a) Federal Law provides for the protection of antiquities located on land owned or controlled by the Government. Antiquities include Indian graves or campsites, relics and artifacts. The Contractor shall control the movements of its personnel and its subcontractor's personnel at the job site to ensure that any existing antiquities discovered thereon will not be disturbed or destroyed by such personnel. It shall be the duty of the Contractor to report to the Contracting Officer the existence of any antiquities so discovered.
(b) The Contractor shall also preserve all vegetation (including wetlands) except where such vegetation must be removed for survey or construction purposes. Any removal of vegetation shall be in accordance with the terms of applicable habitat mitigation plans and permits. Furthermore, all wildlife must be protected consistent with programs approved by the Contacting Officer.
(c) Except as required by or specifically provided for in other provisions of this contract, the Contractor shall not perform any excavations, earth borrow, preparation of borrow areas, or otherwise disturb the surface soils within the job site without the prior approval of DOE or its designee.
(End of clause)
DOE-H-2065 Reporting Of Fraud, Waste, Abuse, Corruption, Or Mismanagement (OCT 2014)
The Contractor shall comply with the following:
(a) Notify employees annually of their duty to report allegations of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement relating to DOE programs, operations, facilities, contracts, or information technology systems to an appropriate authority (e.g., OIG, other law enforcement, supervisor, employee concerns office, security officials). Examples of violations to be reported include, but are not limited to, allegations of false statements; false claims; bribery;
kickbacks; fraud; DOE environment, safety, and health violations; theft; computer crimes;
contractor mischarging; conflicts of interest; and conspiracy to commit any of these acts.
Contractors must also ensure that their employees are aware that they may always report incidents or information directly to the Office of Inspector General (OIG).
(b) Display the OIG hotline telephone number in buildings and common areas such as cafeterias, public telephone areas, official bulletin boards, reception rooms, and building lobbies.
(c) Publish the OIG hotline telephone number in telephone books and newsletters under the Contractor’s cognizance.
(d) Ensure that its employees report to the OIG within a reasonable period of time, but not later than 24 hours after discovery, all alleged violations of law, regulations, or policy, including incidents of fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement, that have been referred to Federal, State, or local law enforcement entities.
(e) Ensure that its employees report to the OIG any allegations of reprisals taken against employees who have reported to the OIG fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(f) Ensure that its managers do not retaliate against DOE contractor employees who report fraud, waste, abuse, misuse, corruption, criminal acts, or mismanagement.
(g) Ensure that all their employees understand that they must –
(1) Comply with requests for interviews and briefings and must provide affidavits or sworn statements, if so requested by an employee of the OIG so designated to take affidavits or sworn statements;
(2) Not impede or hinder another employee's cooperation with the OIG; and
(3) Not take reprisals against DOE contractor employees who cooperate with or disclose information to the OIG or other lawful appropriate authority.
(h) Seek more specific guidance concerning reporting of fraud, waste, abuse, corruption, or mismanagement, and cooperation with the Inspector General, in DOE directives.
(End of clause)
WES-H-1002 RETAINAGE/HOLDBACK FOR UNDELIVERED DATA (WAPA, APR
2009)
The Government may retain/holdback up to 10 percent of total amount and final payment will not be made until all final drawings, as-builts, operation and maintenance manuals, and any other data required under the contract have been delivered to and accepted by the Government.
(End of clause)
WES-H-1006 BREAKDOWN OF CONTRACT PRICES (WAPA, FEB 2008)
In addition to the requirements of the contract clause entitled "Payments under Fixed Price Construction Contracts", the contractor shall submit a detailed breakdown of the total contract price within 30 calendar days after the date of the notice to proceed. The price breakdown shall be submitted in triplicate to the Contracting Officer's Representative (COR) designated in this contract. The breakdown of contract costs shall be arranged by bid item with a further, more detailed division into the various kinds of work which make up the bid item. Contract costs shall be furnished for each bid item detailing the various kinds of work covered in the technical paragraphs of the specifications. The cost breakdown shall show the quantities of each type of work, the unit prices for materials, labor, and equipment, as well as the total price. The contractor shall obtain cost information from its subcontractor(s) as required, to provide the Government with a complete breakdown of the actual bid price.
(End of clause)
WES-H-1008 RIGHT TO USE AND OPERATE UNSATISFACTORY EQUIPMENT
(WAPA, FEB 2008)
After installation of the equipment being purchased under this contract, if the operating parameters, materials, or equipment furnished by the contractor fail to comply with the specifications contained in this contract, the Government shall have the right to use the materials and/or operate the equipment until the defects, errors, or omissions can be corrected.
(End of clause)
WES-H-1022 INDEMNITY (WAPA, FEB 2008)
The contractor shall hold harmless and indemnify the United States and its officers, representatives, and employees, from all claims, losses, damages, actions, causes of action, expenses, and/or liability resulting from, brought for, or on account of, any loss, personal injury, death, or property damage, including but not limited to incidents related to the transportation, removal, disposal, and/or accidental discharge of toxic and/or hazardous waste or material, received or sustained by any person or persons, including but not limited to the contractor, the United States, or third parties, and any of their employees, agents, officers, or representatives, to the extent caused by, growing out of, resulting from, incident to, or connected with, the contractor's negligent performance under this contract.
(End of clause)
WES-H-1023 REQUIRED INSURANCE (WAPA, FEB 2008)
a. The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
(1) Workman's Compensation Insurance in accordance with the laws of the state where contract performance occurs; Occupational Disease Coverage; and Employees Liability Coverage.
(2) Comprehensive General and Automobile Liability Insurance with the following minimum coverages:
(i) GENERAL LIABILITY
(A) Bodily Injury $500,000.00 per occurrence.
(B) Property Damage $500,000.00 each accident;
$1,000,000.00 in the aggregate.
(ii) AUTOMOBILE INSURANCE
(A) Bodily Injury, $200,000.00 per person;
$500,000.00 per occurrence.
(B) Property Damage, per occurrence: $20,000.00.
b. These policies shall have appropriate language waiving all subrogation rights against the Government, unless otherwise approved by the Contracting Officer.
c. Prior to the commencement of work under this contract, the contractor shall furnish a copy of the insurance certificate (binder) or other objective evidence of the above-required insurance to the Contracting Officer. The policies shall contain an endorsement to the effect that cancellation or any material change in the insurance policies that adversely affect the interests of the Government in such insurance shall not be effective for such period as may be prescribed by the laws of the State in which this contract is to be performed, and in no event less than thirty (30) days after written notification is provided to the Contracting Officer.
d. The contractor agrees to insert the substance of this clause, including this paragraph (d), into any subcontracts issued under this contract.
WES-H-1024 CONTRACT PRICES (WAPA, FEB 2008)
Payment for the various line items listed in Section B shall constitute full compensation for furnishing all plant, labor, equipment, appliances and materials; for performing all operations required to complete the work in conformity with the drawings and specifications, including installation and erection of the total system; necessary engineering services; and all drawings, data and/or reports.
(End of clause)
WES-H-1026 PROTECTION AND RESTORATION OF REAL ESTATE CROSSED BY
RIGHT-OF-WAY (WAPA, FEB 2008)
a. General. The contractor shall limit the movement of its crews and equipment to the right-of-way, including access routes. The contractor shall further limit movement on the right-of-way so as to minimize damage to grazing land, crops, orchards, or other real and personal property, and shall avoid marring the land. The contractor shall be responsible for all damages off the right-of-way and shall settle all such damage claims directly with the property owner. Pursuant to FAR 52.236-7 "Permits and Responsibilities," the contractor shall be responsible for all damages that are a result of its fault or negligence.
b. Restoration of Land to Original Conditions. When weather and ground conditions permit, the contractor shall obliterate all contractor caused ruts that are hazardous to farming operations and to movement of equipment. Such ruts shall be leveled, filled, and graded or otherwise eliminated in an approved manner. Ruts, scars, and compacted soils in hay meadows, alfalfa fields, pastures, and cultivated productive lands shall have the soil loosened and leveled by scarifying, harrowing, disking, or other approved methods.
c. Hillside Erosion Prevention. Water turnoff bars or small terraces shall be constructed across all right-of-way trails on hillsides to prevent water erosion and to facilitate natural re-vegetation on the trails.
d. Irrigation Ditches, Drainage Ditches, Terraces, and Title Drains. The contractor shall take measures, especially during the irrigation season, to ensure that its operations do not affect the operation of irrigation and drainage ditches, terraces, and title drains, and ensure that any other irrigation features are adequately protected during contract performance.
e. Resolution of Damage Claims. The contractor shall promptly notify the property owner(s) of any damage caused by the contractor. The contractor, within 60 days of its knowledge of, or notice from, a landowner of damage off the right-of-way caused by the contractor's operations shall notify the Contracting Officer's Representative in writing of the disposition of each claim. In order to adequately protect the Government against landowner claims, demands, or liabilities arising out of the contractor's construction operations under this contract, the Contracting Officer may withhold progress payments, in whole or in part, due the contractor until landowner claims are settled.
(End of clause)
WES-H-1027 MOBILIZATION AND PREPARATORY WORK (WAPA, FEB 2008)
a. General. The contractor will be compensated for mobilization and preparatory work in accordance with the terms of this contract. Mobilization and preparatory work may include movement of personnel, equipment, supplies, and incidentals to the project site; establishment of offices, buildings, plants and other facilities at the project site; payment of premiums for bonds and insurance for the project; necessary costs for acquisition of equipment; and for any other work which must be performed incident to the start of construction at the site.
b. Facilities, plants, and equipment required for this project that are established at, or brought to, the worksite are subject to the provisions of this clause unless the Contracting Officer specifically excludes, in writing, a particular item or items. The contractor is solely responsible for the adequacy, efficiency, use, protection, maintenance, repair, and preservation of all its facilities, plants, and equipment. The facilities, plants, and equipment covered by this paragraph shall not be dismantled or removed from the worksite prior to completion of the work specified in the contract without the written permission of the Contracting Officer.
c. Termination for Default. In the event the contractor's right to proceed is terminated as provided by the contract clause entitled Default, all facilities, plants, and equipment on the worksite are subject to Western's right to take possession of and utilize the same for completion of the work. In addition, any encumbrance, lien, or other security interest on any such facilities, plants, or equipment shall be subordinate to Western's right to utilize these facilities, plants and equipment to complete the work under the contract.
d. Payment. Payment for mobilization and preparatory work will be made at the lump sum price specified in Section B of the contract. Progress payments for mobilization and preparatory work will be made as follows:
(1) When 5 percent of the total amount of the original contract is earned from other schedule items, 50 percent of the amount agreed upon for mobilization and preparatory work will be paid.
(2) When 10 percent of the total amount of the original contract is earned from other schedule items, the balance of the amount agreed upon for mobilization and preparatory work will be paid.
e. Progress payments for mobilization and preparatory work shall be subject to retainage as provided by FAR 52.232-5, "Payments Under Fixed-Price Construction Contracts." In addition, the line item for mobilization and preparatory work will not be considered to be a separate division of the work, completion of which would permit the payment of the complete item price without retention.
(End of clause)
WES-H-1031 FOREIGN VISITORS AND CONTRACT EMPLOYEES (WAPA, MAY 2005)
The Contractor must receive prior, written approval from the appropriate Western Security Manager (WSM) before any non-U.S. Citizens (Foreign Nationals) visit or work at any Western Area Power Administration (Western) facility. The Contractor must certify in writing that:
1) each of their employees working under this contract that may visit or be assigned to work at any Western facility is a U.S. Citizen, or;
2) the Contractor shall provide an accurately completed Foreign National Data Card, WAPA Form 3000-72, Attachment E for each of their Foreign National employees that may visit or work at any Western facility. The Contractor shall forward the completed Form to the COR at least 45 days in advance of each Foreign National employee's visit or their beginning of work. Foreign National employees shall not be allowed on-site at any Western facility without prior approval of the cognizant WSM. Circumstances which do not allow a 45 day notification require prior, written approval of the cognizant WSM. The Contractor shall include this requirement in any subcontract it issues under this contract. Western reserves the right to remove any contract employee from Western's property pending the conclusion of the Foreign National background check.
WES-H-1033 ACCESS TO DOE OWNED OR LEASED FACILITIES (WAPA, SEP 2011)
(a) The performance of this contract requires that employees of the Contractor have physical access to DOE owned or leased facilities. The Contractor understands and agrees that DOE has a prescribed process with which the Contractor and its employees must comply in order to receive a security badge that allows such physical access. This process includes, but is not limited to an FBI fingerprint check and other background checks and investigations as required by DOE. The Contractor further understands that it must propose employees whose background offers the best prospect of obtaining a security badge approval for access, considering the following criteria, which are not all inclusive and may vary depending on access requirements:
(1) is, or is suspected of being, a terrorist;
(2) is the subject of an outstanding warrant;
(3) has deliberately omitted, concealed, or falsified relevant and material facts from any Questionnaire for National Security Positions (SF-86), Questionnaire for Non-Sensitive Positions (SF-85), or similar form;
(4) has presented false or forged identity source documents;
(5) has been barred from Federal employment;
(6) is currently awaiting a hearing or trial or has been convicted of a crime punishable by imprisonment of six (6) months or longer; or
(7) is awaiting or serving a form of pre-prosecution probation, suspended or deferred sentencing, probation or parole in conjunction with an arrest or criminal charges against the individual for a crime that is punishable by imprisonment of six (6) months or longer.
(b) The Contractor shall assure:
(1) In initiating the process for gaining physical access, (i) compliance with procedures established by DOE in providing its employee(s) with any forms directed by DOE, (ii) that the employee properly completes any forms, and (iii) that the employee(s) submits the forms to the person designated by the Contracting Officer.
(2) In completing the process for gaining physical access, that its employee (i) cooperates with DOE officials responsible for granting access to DOE owned or leased facilities and (ii) provides additional information, requested by those DOE officials.
(c) The Contractor understands and agrees that DOE may unilaterally deny a security badge to an employee and that the denial remains effective for that employee unless DOE subsequently determines that access may be granted. Upon notice from DOE that an employees application for a security badge is or will be denied, the Contractor shall promptly identify and submit the forms referred to in subparagraph (b)(1) of this clause for the substitute employee. The denial of a security badge to individual employees by DOE shall not be cause for extension of the period of performance of this Contract or any contractor claim against DOE.
(d) The Contractor shall return to the Contracting Officer or designee the badge(s) or other credential(s) provided by DOE pursuant to this clause, granting physical access to DOE owned or leased facilities by the Contractors employee(s), upon:
(1) the termination of this Contract;
(2) the expiration of this Contract;
(3) the termination of employment on this Contract by an individual employee; or
(4) demand by DOE for return of the badge.
(e) The Contractor shall include this clause, including this paragraph (e), in any subcontract, awarded in the performance of this Contract, in which an employee(s) of the subcontractor will require physical access to DOE owned or leased facilities.
(End of clause)
WES-H-1033 ACCESS TO DOE OWNED OR LEASED FACILITIES (WAPA, SEP 2011)
(a) The performance of this contract requires that employees of the Contractor have physical access to DOE owned or leased facilities. The Contractor understands and agrees that DOE has a prescribed process with which the Contractor and its employees must comply in order to receive a security badge that allows such physical access. This process includes, but is not limited to an FBI fingerprint check and other background checks and investigations as required by DOE. The Contractor further understands that it must propose employees whose background offers the best prospect of obtaining a security badge approval for access, considering the following criteria, which are not all inclusive and may vary depending on access requirements:
(1) is, or is suspected of being, a terrorist;
(2) is the subject of an outstanding warrant;
(3) has deliberately omitted, concealed, or falsified relevant and material facts from any Questionnaire for National Security Positions (SF-86), Questionnaire for Non-Sensitive Positions (SF-85), or similar form;
(4) has presented false or forged identity source documents;
(5) has been barred from Federal employment;
(6) is currently awaiting a hearing or trial or has been convicted of a crime punishable by imprisonment of six (6) months or longer; or
(7) is awaiting or serving a form of pre-prosecution probation, suspended or deferred sentencing, probation or parole in conjunction with an arrest or criminal charges against the individual for a crime that is punishable by imprisonment of six (6) months or longer.
(b) The Contractor shall assure:
(1) In initiating the process for gaining physical access, (i) compliance with procedures established by DOE in providing its employee(s) with any forms directed by DOE, (ii) that the employee properly completes any forms, and (iii) that the employee(s) submits the forms to the person designated by the Contracting Officer.
(2) In completing the process for gaining physical access, that its employee (i) cooperates with
DOE
officials responsible for granting access to DOE owned or leased facilities and (ii) provides additional information, requested by those DOE officials.
(c) The Contractor understands and agrees that DOE may unilaterally deny a security badge to an employee and that the denial remains effective for that employee unless DOE subsequently determines that access may be granted. Upon notice from DOE that an employees application for a security badge is or will be denied, the Contractor shall promptly identify and submit the forms referred to in subparagraph (b)(1) of this clause for the substitute employee. The denial of a security badge to individual employees by DOE shall not be cause for extension of the period of performance of this Contract or any contractor claim.
(End of clause)
WES-H-1037 SAFETY AND HEALTH - HIGH RISK (WAPA, MAY 2005)
In performing the work required by this contract, the Contractor shall comply with all applicable Federal, State, or local safety, health, or industrial safety codes including the latest effective standards promulgated by the Department of Labor, Occupational Safety and Health Administration; Safety and Health Standards 29 CFR 1910, 29 CFR 1925; and the Construction Safety and Health regulations promulgated under Section 107 of the Contract Work Hours and Safety Standards Act, 29 CFR 1926. If there is a conflict between the requirements of the applicable Federal, State, or local safety, health, or industrial safety codes, the more stringent requirements shall prevail. For any cranes used in the performance of this contract, a copy of the crane inspection records shall be furnished to Western's on-site representative prior to the performance of work. The United States is liable only for negligence on the part of its employeees in accordance with the Federal Tort Claims Act, as amended. Prior to starting work, an on-site safety meeting shall be held with Western's representative to address and discuss safety procedures related to the work required.
In addition, the contractor agrees to the following requirements:
1. A hazard evaluation will be developed for each major work component.
2. The Contractor agrees that Western has the right to remove any supervisor that does not adhere to said requirements.
(End of clause)
WES-H-1048 LIMITATION OF COSTS RESULTING FROM SUBCONTRACTING
PRICE ADJUSTMENTS (WAPA, FEB 2008)
a. When contract price adjustments are allowed for performance wholly or substantially by subcontractors or suppliers, the Government will reimburse the prime contractor for actual associated indirect costs and profit up to a maximum adjustment of 10% of the total adjustment allowed for the subcontractor or supplier.
b. Where more than one tier of subcontractors or suppliers are involved in contract performance, the total allowance for the prime contractor's indirect cost and profit shall not exceed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .