Amendment_2_Revised_Bidding_Schedule.pdf
PDF 34 KB Posted
- Attached to
- Tucson Substation Stage 02 Federal contract opportunity
- Solicitation number
- DE-SOL-0009771
About this file
Amendment 2 Revised Bidding Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Amendment_001.pdf | ||
| Amendment_001_Attch_A_Specifications_7_8_16.pdf | ||
| Ammendment_001_Pre-bid_Sign-in.pdf | ||
| Attch_A_Specifications_6_16_16.pdf | ||
| DE-SOL-0009771.pdf | ||
| Attch_E__Foreign_National_Data_Card.pdf | ||
| Attch_F_o442_21.pdf | ||
| Attch_D_Submittal_Log.pdf | ||
| Attch_B_Drawings.pdf | ||
| Attch_C_Wage_Determination.pdf | ||
| Attch_G_Tucson_Sub_Geotechnical_Report.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation DE-SOL-0009771 Amendment 0002
SECTION B
SUPPLIES OR SERVICES AND PRICES
BIDDING SCHEDULE
TUCSON SUBSTATION, STAGE 02
CLIN Work or Material Estimated Quantity Unit Unit Price Amount
0001 Mobilization and Preparatory Work
(Not to exceed 5% of Total. See Section M
LS $ _____________
0002 Miscellaneous Sitework LS $ _____________
0003 Remove Environmental Contaminants
LS $ _____________
0004 Demolition LS $ _____________
0005 Remove Existing Transmission Line LS $ _____________
0006 Borrow Excavation LS $ _____________
0007 Embankments LS $ _____________
0008 Security Chain-link Fence LS $ _____________
0009 Gravel Surfacing LS $ _____________
0010 Concrete Foundations for Substation Steel Structures
743.1 CY $ ________ $ _____________
0011 Concrete Foundations for Transmission Line Steel Pole Structures
275 CY $ ________ $ _____________
Type "C" Cable Trench
LS
0013 Furnish and Install Fiber Optic Pullbox
1 EA $ ________ $ _____________
0014 Steel Structures, Welded (Galvanized)
217,238 LB $ ________ $ _____________
Install Government-furnished Transmission Line Steel Pole Structure as follows:
0015 146D-55 (BP) 1 EA $ ________ $ _____________
0016 154N-45 (BP) 1 EA $ ________ $ _____________
0017 281D-45 (BP) 1 EA $ ________ $ _____________
0018 281D-50 (BP) 1 EA $ ________ $ _____________
0019 Modify Transmission Line Steel Pole Structure
LS $ _____________
0020 Power Circuit Breaker, 230-kV, 3,000-amps (Government-furnished)
3 EA $ ________ $ _____________
0021 Disconnect Switch, 230-kV, 3,000-amps, (Government-furnished)
6 EA $ ________ $ _____________
0022 Disconnect Switch, 230-kV, 3,000-amps, with Grounding Blades (Government-furnished)
3 EA $ ________ $ _____________
0023 Load Break Disconnect Switch, 115-kV, 600-amps
1 EA $ ________ $ _____________
0024 Single-pole Fuse Disconnect Switch, 115-kV
3 EA $ ________ $ _____________
0025 Station Service Voltage Transformer, 115-kV, Single-phase
3 EA $ ________ $ _____________
0026 Coupling Capacitor Voltage Transformer, 115-kV, Single-phase (Government-furnished)
9 EA $ ________ $ _____________
0027 Surge Arrester, 115-kV, Single-phase
3 EA $ ________ $ _____________
0028 Station Service Transformer, 480V- 208/120V, Three-phase, 150-kVA
1 EA $ ________ $ _____________
0029 Automatic Transfer Switch 600-amps, 240-V
1 EA $ ________ $ _____________
0030 Fusible Safety Switch, 400-amps, 240-V
2 EA $ ________ $ _____________
0031 Fusible Safety Switch, 200-amps, 480-V
1 EA $ ________ $ _____________
0032 Back-up Station Service Meter Socket and Conduit
1 EA $ ________ $ _____________
0033 Grounding System LS $ _____________
0034 Outdoor Bus Systems LS $ _____________
0035 Associated Electrical Equipment and Material
LS $ _____________
0036 Furnish 5/c No. 10 AWG Control Cable
6,850 LF $ ________ $ _____________
0037 Install 5/c No. 10 AWG Control Cable
6,850 LF $ ________ $ _____________
0038 Furnish 12/c No. 10 AWG Control Cable
6,000 LF $ ________ $ _____________
0039 Install 12/c No. 10 AWG Control Cable
6,000 LF $ ________ $ _____________
0040 Vertical Switchboard Sections (Government-furnished)
4 EA $ ________ $ _____________
0041 AC and DC Distribution Boards LS $ _____________
0042 Station Battery System (Government-furnished)
LS $ _____________
0043 Station Battery Chargers (Government-furnished)
2 EA $ ________ $ _____________
0044 Furnish and Install Fiber Optics LS $ _____________
0045 Electrical Testing LS $ _____________
0046 Communication Racks LS $ _____________
0047 Approach Spans LS $ _____________
0048 Service Building LS $ _____________
TOTAL $ _____________