CTR065803-Amendment_3-Price_Revision.pdf

PDF 3 MB Posted

Attached to
Master Agreement AZ|CTR065803
Contract number
CTR065803
Issued by
Arizona

About this file

This document is a Contract Amendment (Amendment No. 3) for Contract No. CTR065803 between the Arizona Department of Environmental Quality (ADEQ) and Western Technologies, Inc. The contract is for Statewide Asbestos, Lead and Mold Consultant and Abatement Services, with ADEQ located in Phoenix, Arizona serving as the primary contracting agency.

The amendment primarily focuses on revising and replacing the current pricing with a new pricing sheet that includes a 3% rate increase across various professional service categories. The pricing schedule includes labor rates for different experience levels and positions, ranging from Support Level I to Field Level IV, with both standard and premium rates. The rates cover a wide range of services including project management, supervision, consulting, drafting, technical support, and other environmental consulting activities. The amendment maintains all other existing terms and conditions of the original contract, with the sole modification being the updated pricing structure. The contract appears to be an indefinite delivery vehicle for environmental consulting services across the state of Arizona.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Main Office 1110 West Washington Street • Phoenix, AZ 85007

(602) 771-2300

Southern Regional Office 400 West Congress Street • Suite 433 • Tucson, AZ 85701

(520) 628-6733

August 13, 2025

Western Technologies, Inc.

Attn: Stephen J. Smelser, R.G.

Phoenix, AZ. 85040 ssmelser@rma-western.com

Re: Contract No. CTR065803

Dear Mr. Smelser, The above referenced Amendment is attached for your review. Please sign and return via email.

Once executed, a copy can be obtained through Arizona Procurement Portal (APP) eProcurement System for your records.

If you have any questions regarding this Amendment, please contact May Forbin at forbin.merrilyn@azdeq.gov or 602-771-4779.

Sincerely, Merrilyn Forbin Procurement Officer mailto:ssmelser@rma-western.com

Form approved by CPO, Rev. 08-01-2025

CONTRACT AMENDMENT

CONTRACT NO.:

AMENDMENT NO.:

TITLE:

CONTRACTOR:

CTR065803

NO.3

Statewide Asbestos, Lead and Mold Consultant and Abatement Services Western Technologies, Inc.

ADEQ PROCUREMENT

1110 W. Washington Street Phoenix, AZ 85007 602-771-4779

THE PURPOSE OF THIS AMENDMENT IS TO:

1. Revise and replace the current pricing with the new pricing as seen in the attached Pricing Sheet.

2. All other Terms and Conditions remain unchanged.

WESTERN TECHNOLOGIES, INC.

ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY

The Contractor hereby acknowledges receipt and understanding of the above Amendment.

The above referenced contract Amendment is hereby executed this day at Phoenix, Arizona.

Day of

Signature of Authorized Individual Date

Typed or Printed Name and Title Merrilyn Forbin Sr. Procurement Specialist

Available online at Arizona Procurement Portal (APP) eProcurement System https://app.az.gov

Steve Smelser Principal

8/15/2025 22 August https://app.az.gov/

2025-08-25T13:39:05-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .