BAFO-Exhibit_A_Pricing_Sheet_Western_Technologies.xlsx
XLSX spreadsheet 36 KB Posted
- Attached to
- Master Agreement AZ|CTR065803
- Contract number
- CTR065803
- Issued by
- Arizona
About this file
The document is an Exhibit A Pricing Sheet for a statewide contract (Solicitation No. BPM004287) for Asbestos, Lead, and Mold Consultant and Abatement Services, submitted by Western Technologies Inc. The contract appears to be a state-level indefinite delivery vehicle covering consultant and analytical services across multiple environmental hazard domains.
The pricing document details labor rates for various professional, field, and support staff levels, ranging from $35 to $265 per hour, with specific experience and certification requirements for each tier. Additionally, the contract includes comprehensive pricing for laboratory analytical services from multiple providers, covering services such as Polarized Light Microscopy (PLM), Transmission Electron Microscopy (TEM), Phase Contrast Microscopy (PCM), and various lead and mold testing methodologies. Equipment rental rates are also specified, including air sampling pumps, protective equipment, and specialized measurement devices. The contract provides both standard and rush pricing options, with turnaround times varying from 1 to 7 days depending on the specific service and laboratory.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A1-Asbestos Consultant Labor
| Exhibit A - Pricing Sheet | ||
| Request for Proposal No. BPM004287 | ||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | ||
| Offeror Company Name: | Western Technologies Inc. | |
| Note: Offeror may add additional line items or Rate Categories |
| PRICE SCHEDULE (SOW 2A:1) | ||
| ASBESTOS CONSULTIANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, copying, general administration No direct experience required
| Minimum 1 employee required | Standard Rate | $ 35.00 | ||||
| Level I | Premium Rate | $ 35.00 | ||||
| Support | Support Level II - Drafting, project manager's assistant, graphics |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 45.00 | ||||
| Level II | Premium Rate | $ 45.00 | ||||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor, business manager |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 55.00 | ||||
| Level III | Premium Rate | $ 55.00 | ||||
| Support | Support Level IV - Office manager, senior drafting personnel, copy-writer/Publisher |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 65.00 | ||||
| Level IV | Premium Rate | $ 65.00 | ||||
| Field | Field Level I - Air monitoring, project assistant, site technician: closely supervised |
6+ months of direct experience required
| Minimum 1 employee required | Standard Rate | $ 55.00 | ||||
| Level I | Premium Rate | $ 55.00 | ||||
| Field | Field Level II - AHERA Building Inspector/Management Planner: independent collection and analysis of data, report writing; 1+ years of direct experience; | |||||
| Minimum 1 employee required | Standard Rate | $ 65.00 | ||||
| Level II | Premium Rate | $ 65.00 | ||||
| Field | Field Level III - AHERA Contractor/Supervisor: independent site management, air bulk sample data analysis, report preparation; 2+ years of direct experience; | |||||
| Minimum 2 employees required | Standard Rate | $ 75.00 | ||||
| Level III | Premium Rate | $ 75.00 | ||||
| Field | Field Level IV - Project Designer: planning and design of asbestos abatement projects and field activities;2+ years direct experience. AHERA Project Designer training required; Minimum 1 employee required | Standard Rate | $ 85.00 | |||
| Level IV | Premium Rate | $ 85.00 | ||||
| Professional | Professional Level I - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | $ 105.00 | |||
| Level I | Premium Rate | $ 105.00 | ||||
| Professional | Professional Level II - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | $ 125.00 | |||
| Level II | Premium Rate | $ 125.00 | ||||
| Professional | Professional Level III -Program Manager/IH: supervision of abatement projects, oversees field services; 5+ years of direct experience; AHERA Insp/MP/Cont/Super/Proj Design required; No employee requirements | Standard Rate | $ 135.00 | |||
| Level III | Premium Rate | $ 135.00 | ||||
| Professional | Professional Level IV - Principal/PE/CIH: 10+ years of direct experience; AHERA Contractor Supervisor Training Required; | |||||
| Minimum 1 employee required | Standard Rate | $ 165.00 | ||||
| Level IV | Premium Rate | $ 165.00 |
A2-Lead Consultant Labor
| Exhibit A - Pricing Sheet | ||
| Request for Proposal No. BPM004287 | ||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | ||
| Offeror Company Name: | Western Technologies Inc. | |
| Note: Offeror may add additional line items or Rate Categories |
| PRICE SCHEDULE (SOW 2A:1) | ||
| LEAD CONSULTANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
| Support | Support Level I - Clerical, word processing, filing, copying, general administration | |||||
| No direct experience required Minimum 1 employee required | Standard Rate | $ 35.00 | ||||
| Level I | Premium Rate | $ 35.00 | ||||
| Support | Support Level II - Drafting, project manager's assistant, graphics | |||||
| No direct experience required, Minimum 1 employee required | Standard Rate | $ 45.00 | ||||
| Level II | Premium Rate | $ 45.00 | ||||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor, business manager | |||||
| No direct experience required, Minimum 1 employee required | Standard Rate | $ 55.00 | ||||
| Level III | Premium Rate | $ 55.00 | ||||
| Support | Support Level IV - Office manager, senior drafting personnel, copy-writer/Publisher | |||||
| No direct experience required, Minimum 1 employee required | Standard Rate | $ 65.00 | ||||
| Level IV | Premium Rate | $ 65.00 | ||||
| Field | Project assistant, site technician: closely supervised. | |||||
| 3+ months of direct experience, Minimum 1 employee required | Standard Rate | $ 55.00 | ||||
| Level I | Premium Rate | $ 55.00 | ||||
| Field | Inspector: Inspections, post-abatement clearance activities; |
6+ months direct experience, EPA Lead Inspector training required
| Minimum 1 employee required | Standard Rate | $ 65.00 | ||||
| Level II | Premium Rate | $ 65.00 | ||||
| Field | Risk Assessor: Inspections, post abatement clearance, lead hazard screening, risk assessments; 6+ months direct experience; EPA Lead Risk Assessor training required. Minimum 1 employee required | Standard Rate | $ 75.00 | |||
| Level III | Premium Rate | $ 75.00 | ||||
| Field | Supervisor Abatement project oversight, occupant protection plans, abatement reports; 6+ months direct experience, EPA Lead Supervisor training required | |||||
| Minimum 1 employee required | Standard Rate | $ 85.00 | ||||
| Level IV | Premium Rate | $ 85.00 | ||||
| Professional | Project Manager: Supervision of abatement projects, oversees field services; |
2+ years direct experience; EPA Inspector/Risk Assessor required;
| Minimum 1 employee required | Standard Rate | $ 105.00 | ||||
| Level I | Premium Rate | $ 105.00 | ||||
| Professional | Project Manager/IH: Supervision of abatement projects, oversees field services; |
2+ years direct experience; EPA Inspector/Risk Assessor or Supervisor required;
| No staffing requirement for this position | Standard Rate | $ 125.00 | ||||
| Level II | Premium Rate | $ 125.00 | ||||
| Professional | Professional Level III -Program Manager/IH: supervision of abatement projects, oversees field services; 5+ years of direct experience; Inspector/Risk Assessor, Contractor, or Designer Required;; No employee requirements | Standard Rate | $ 135.00 | |||
| Level III | Premium Rate | $ 135.00 | ||||
| Professional | Professional Level IV - Principal/PE/CIH: 10+ years of direct experience; Inspector/Risk Assessor, Contractor, or Designer Required; | |||||
| Minimum 1 employee required | Standard Rate | $ 165.00 | ||||
| Level IV | Premium Rate | $ 165.00 |
A3-Mold Consultant Labor
| Exhibit A - Pricing Sheet | ||
| Request for Proposal No. BPM004287 | ||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | ||
| Offeror Company Name: | Western Technologies Inc. | |
| Note: Offeror may add additional line items or Rate Categories |
| PRICE SCHEDULE (SOW 2A) | ||
| Mold CONSULTANT LABOR RATES | ||
| SOLICITATION BPM004287 | ||
| *Direct Experience shall mean experience specific to the Scope of Work of this solicitation. | ||
| POSITION | DESCRIPTION | PRICE PER HOUR |
Support Support Level I - Clerical, word processing, filing, copying, general administration No direct experience required
| Minimum 1 employee required | Standard Rate | $ 35.00 | ||||
| Level I | Premium Rate | $ 35.00 | ||||
| Support | Support Level II - Drafting, project manager's assistant, graphics |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 45.00 | ||||
| Level II | Premium Rate | $ 45.00 | ||||
| Support | Support Level III - Drafting supervisor, senior word processor, supervisor, business manager |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 55.00 | ||||
| Level III | Premium Rate | $ 55.00 | ||||
| Support | Support Level IV - Office manager, senior drafting personnel, copy-writer/Publisher |
No direct experience required
| Minimum 1 employee required | Standard Rate | $ 65.00 | ||||
| Level IV | Premium Rate | $ 65.00 | ||||
| Field | Field Level I - Air monitoring, project assistant, site technician: closely supervised |
6+ months of direct experience required
| Minimum 1 employee required | Standard Rate | $ 55.00 | |||||
| Level I | Premium Rate | $ 55.00 | |||||
| Field | Field Level II - independent collection and analysis of data, report writing; 1+ years of direct experience; | ||||||
| Minimum 1 employee required | Standard Rate | $ 65.00 | |||||
| Level II | Premium Rate | $ 65.00 | |||||
| Field | Field Level III - independent site management, air & bulk sample data analysis, report preparation; 2+ years of direct experience; | ||||||
| Minimum 2 employees required | Standard Rate | $ 75.00 | |||||
| Level III | Premium Rate | $ 75.00 | |||||
| Field | Field Level IV - Project Designer: planning and design of asbestos abatement projects and field activities;2+ years direct experience. AHERA Project Designer training required; Minimum 1 employee required (mold abatement still requires asbestos clearance) | Standard Rate | $ 85.00 | ||||
| Level IV | Premium Rate | $ 85.00 | |||||
| Professional | Professional Level I - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super Minimum 1 employee required | Standard Rate | $ 105.00 | ||||
| Level I | Premium Rate | $ 105.00 | |||||
| Professional | Professional Level II - Project Manager: supervision of abatement projects, oversees field services; 2+ years of direct experience; AHERA Insp/MP/Cont/Super required; Minimum 1 employee required | Standard Rate | $ 125.00 | ||||
| Level II | Premium Rate | $ 125.00 | |||||
| Professional | Professional Level III -Program Manager/IH: supervision of abatement projects, oversees field services; 5+ years of direct experience; AHERA Insp/MP/Cont/Super/Proj Design required; No employee requirements | Standard Rate | $ 135.00 | ||||
| Level III | Premium Rate | $ 135.00 | |||||
| Professional | Professional Level IV - Principal/PE/CIH: 10+ years of direct experience; AHERA Contractor Supervisor Training Required; | ||||||
| Minimum 1 employee required | Standard Rate | $ 165.00 | |||||
| Level IV | Premium Rate | $ 165.00 | |||||
| Professional | Professional Level V - Sr. Principal/PE/CIH: 20+ years of direct experience; Qualified as Expert Witness | ||||||
| No employee requirements | Standard Rate | $ 225.00 | |||||
| Level V | Premium Rate | $ 265.00 | This takes into account what CSC will charge for litiigation consultants |
A4-Asbestos Consultant Services
| Exhibit A - Pricing Sheet | |||||
| Request for Proposal No. BPM004287 | |||||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | |||||
| Offeror Company Name: | Western Technologies Inc. | ||||
| Prices Exclude Sales Tax. | |||||
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2A:1) | |||||
| ASBESTOS CONSULTANT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| DESCRIPTION | PRICE | ||||
| UOM | Non Rush | Rush | |||
| Western Technologies | |||||
| PCM Analysis, in-house | EA | $ 20.00 | $ 24.00 | ||
| FIBERQUANT ANALYTICAL SERVICES | |||||
| Polarized Light Microscopy (PLM) Bulk Sample Non-Rush, 1-3 Days; Rush = 6 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 16.80 | $ 25.20 | ||
| Polarized Light Microscopy (PLM) Point Count Bulk Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | No Charge | |||
| Transmission Electron Microscopy (TEM) Bulk Sample, per layer | |||||
| Non-Rush Only, 1-3 Days (Includes all cost such as postage, delivery, and courier) | EA | $105.00 | NC | ||
| Phase Contrast Microscopy (PCM) Air Sample, Non-Rush, 24 hours; Rush 4 hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 10.50 | $ 15.75 | ||
| Transmission Electron Microscopy (TEM) Air Sample, Non-Rush, 24-Hours; Rush, 6 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 105.00 | $ 157.50 | ||
| AEROBIOLOGY LABORATORY ASSOCIATES | |||||
| Polarized Light Microscopy (PLM) Bulk Sample; Non-Rush 5-7 Days; Rush, 24 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 8.00 | $ 14.00 | ||
| Polarized Light Microscopy (PLM) 400-Point Count Bulk Sample; Non-Rush, 5 Days; Rush, 24 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $12.00 | $ 36.00 | ||
| Polarized Light Microscopy (PLM), Complex Bulk (roof core, vermiculite, dust, soil); Bulk Sample; Non-Rush, 5 Days; Rush, 24 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $21.00 | $ 36.75 | ||
| Transmission Electron Microscopy (TEM) Bulk Sample, per layer, Non-Rush, 3 Days; Rush, 24 hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 36.75 | $ 47.25 | ||
| Phase Contrast Microscopy (PCM) Air Sample, Non-Rush, 5 Days; Rush 1 Day; | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 11.55 | $ 17.85 | ||
| Transmission Electron Microscopy (TEM) Air Sample | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | Not Available | |||
| MOODY LABS | |||||
| Polarized Light Microscopy (PLM) Bulk Sample; 'Non-Rush 5 Days; Rush, 1 Day; | |||||
| (Includes all cost such as postage, delivery, and courier) | Layer | $ 6.50 | $ 12.50 | ||
| Polarized Light Microscopy (PLM) 400-Point Count, Bulk Sample; Non-Rush 5 Days, Rush 1 Day; | |||||
| (Includes all cost such as postage, delivery, and courier) | Layer | $21.50 | $ 47.50 | ||
| Gravimetric Prep with PLM, Non-Rush, 5 Days: Rush not available | Layer | $ 31.50 | |||
| Phase Contrast Microscopy (PCM) Air Sample; Non-Rush, 5 Days; Rush 1 Day | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 6.83 | $ 12.60 | ||
| Transmission Electron Microscopy (TEM) Air Sample; Non-Rush, 24 Hours; Rush 6 Hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 63.00 | $ 78.75 | ||
| EMSL ANALYTICAL | |||||
| CARB 435 Level A, Polarized Light Microscopy (PLM), Bulk Sample, Non-Rush 72 Hours, Rush, 24 Hours, (Includes all cost such as postage, delivery, and courier) | EA | $ 126.00 | $ 190.05 | ||
| CARB 435 Level B, Trasnmission Electron Microscopy (TEM), Bulk Sample, Non-Rush 72 Hours, Rush, 24 Hours, (Includes all cost such as postage, delivery, and courier) | EA | $270.90 | $ 347.55 | ||
| EUROFINS EM LAB P&K | |||||
| Polarized Light Microscopy (PLM) Bulk Sample 1 or 2 layers, Non-Rush, 3 Days, Rush 1 Day | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 9.45 | $ 14.18 | ||
| Polarized Light Microscopy (PLM) Bulk Sample, Additional layers, per layer, Non-Rush, 3 Days, Rush 1 Day, (Includes all cost such as postage, delivery, and courier) | Layer | $ 4.20 | $ 6.40 | ||
| Polarized Light Microscopy (PLM) 400-Point Count, Per Layer, Non-Rush, 3 Days; Rush 1 Day | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 26.25 | $ 39.38 | ||
| CARB 435, Polarized Light Microscopy (PLM), Bulk Sample, Per Layer, Non-Rush 7 Days, Rush Not Available (Includes all cost such as postage, delivery, and courier) | Layer | $157.50 | NC | ||
| EQUIPMENT COSTS | |||||
| High Volume Air Sampling Pump | day | $ 25.00 | $ 25.00 | ||
| Low Volume Air Sampling Pump | day | $ 25.00 | $ 25.00 | ||
| Primary Source Calibration Device | day | $ 15.00 | $ 15.00 | ||
| Personal Protective Equipment, Per Person, Per Day | day | $ 25.00 | $ 25.00 | ||
| Air Sample Cassetttes (PCM or TEM) | ea | $ 10.00 | $ 10.00 |
A5-Lead Consultant Services
| Exhibit A - Pricing Sheet | ||
| Request for Proposal No. BPM004287 | ||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | ||
| Offeror Company Name: | Western Technologies Inc. |
| Prices exclude sales tax. Turn around times are from the piont samples are received by the lab. | |||||
| Note: Offeror may add additional line items or Rate Categories | |||||
| PRICE SCHEDULE (SOW 2A:1) | |||||
| LEAD CONSULTANT SERVICES | |||||
| SOLICITATION BPM004287 | |||||
| DESCRIPTION | PRICE | ||||
| Unit | Non Rush | Rush | |||
| FIBERQUANT ANALYTICAL | |||||
| Atomic Absorption Spectroscope (AAS) Paint Chip, Soil, Wipes, or Air(filter) Analysis, Non-rush: 1-3 Days; Rush, 6 hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 16.80 | $ 25.20 | ||
| SCIENTIFIC ANALYTICAL INSTITUTE | |||||
| Atomic Absorption Spectroscope (AAS) Paint Chip, Soil, Wipes, or Air (filter) Analysis. Non-rush: 3 Days; Rush 24 hours | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 8.40 | $ 9.19 | ||
| EUROFINS ENVIRONMENT TESTING SOUTHWEST | |||||
| Atomic Absorption Spectroscope (AAS), Paint Chip, Soil, Wipe, Air, Non-rush: 7- days, rush, 1 day | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 21.00 | $ 42.00 | ||
| Toxicity Characteristic Leaching Procedure (TCLP) Test, Extraction and Analysis. Non-Rush 7 Days; Rush 3 Days | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 99.75 | $ 199.50 | ||
| PACE ANALYTICAL | |||||
| Atomic Absorption Spectroscope (AAS) Air Analysis, Paint Chip, Soil, Wipes, or Air (filter).Non-rush, 7 days; Rush 3 Days | |||||
| (Includes all cost such as postage, delivery, and courier) | EA | $ 26.25 | $ 39.38 | ||
| Toxicity Characteristic Leaching Procedure (TCLP) Test, Extraction and Analysis | |||||
| (Includes all cost such as postage, delivery, and courier), Non-Rush 7 Days; Rush 3 Days | EA | $ 73.50 | $ 110.25 | ||
| EQUIPMENT COSTS | |||||
| High Volume Air Sampling Pump, ea | day | $ 25.00 | $ 25.00 | ||
| Low Volume Air Sampling Pump, ea | day | $ 25.00 | $ 25.00 | ||
| Primary Source Calibration Device | day | $ 15.00 | $ 15.00 | ||
| Personal Protective Equipment, Per Person, Per Day | day | $ 25.00 | $ 25.00 | ||
| Air Sample Cassettes | ea | $ 10.00 | $ 10.00 | ||
| Ghost wipes | ea | $ 5.00 | $ 5.00 | ||
| Niton Xlp XRF | day | $ 150.00 | $ 150.00 |
A6-Mold Consultant Services
| Exhibit A - Pricing Sheet | ||
| Request for Proposal No. BPM004287 | ||
| Statewide Asbestos Lead and Mold Consultant and Abatement Services | ||
| Offeror Company Name: | Western Technologies Inc. | |
| Prices exclude sales tax | ||
| Note: Offeror may add additional line items or Rate Categories |
| PRICE SCHEDULE (SOW 2A:1) | |||
| MOLD CONSULTANT SERVICES | |||
| SOLICITATION BPM004287 | |||
| DESCRIPTION | PRICE | ||
| Unit | Day | Week | |
| Visual Inspection (quoted using labor rates) | By Quote | Quoted using Labor Rates | |
| Particle Count and Analysis (equipment only, consisting of a TSI 7585 Q Track or similar) | Day/Week | $ 150.00 | $ 360.00 |
| Mold Air Sampling | By Quote | Quote using Labor and Lab Rates | |
| Mold Swab/Swipe Sampling | By Quote | Quoted using Labor and Lab Rates | |
| Atmospheric Monitoring TSI 7545 IAQ Calc or similar) | Day/Week | $ 126.00 | $ 267.00 |
| Report Writing (Recommendations and Conclusions) | By Quote | Quoted Using Labor Rates | |
| Laboratory Analysis - Varies by Test and laboratory, see below | |||
| Description | Unit | Non-Rush | Rush |
| EM LAB P&K | |||
| Culturable Air Fungi, Non-rush, 7 Days | ea | $ 36.75 | not available |
| Spore Trap, Fungi, Non-Rush, 2 Days; Rush 24 hours | ea | $ 29.40 | $ 44.10 |
| Surface, Fungal, Direct Examination, 2 Days; Rush 24 hours | ea | $ 30.45 | $ 45.68 |
| Bacteria, Culturable, Air or Surface, 3 Genus ID, Non-rush, 14 days | ea | $ 99.75 | NA |
| Bacteria, Culturable, Air or Surface, 3 Species ID, Non-rush, 14 days | ea | $ 168.00 | NA |
| Bacteria, Culturable, Air or Surface, 5 Genus ID, Non-rush, 14 days | ea | $ 194.25 | NA |
| Bacteria, Culturable, Air or surface, 5 Species ID, Non-rush, 14 days | ea | $ 257.25 | NA |
| Bacteria, Culturable, Air, gram stain/counts, Non-rush, 7 days | ea | $ 36.75 | NA |
| AEROBIOLOGY LABORATORY ASSOCIATES | |||
| Spore Trap, Fungi, Non-Rush, 2-3 Days; Rush 24 hours | ea | $ 33.60 | $ 49.35 |
| Surface/Wipe, Fungal, Quantitative, Direct Examination, Non-Rush, 3-5 days Days; Rush 24 hours | ea | $ 33.60 | $ 49.35 |
| Surface/Wipe, Fungal, Qualitative, Direct Examination, Non-Rush, 3-5 days Days; Rush 24 hours | ea | $ 27.30 | $ 40.95 |
| Fungi, Culturable, Air, Genus ID, Non-rush 5-7 days | ea | $ 39.90 | NA |
| Fungi, Culturable, Surface, Genus ID, Non-Rush, 5-7 days | ea | $ 47.25 | NA |
| FUBERQUANT ANALYTICAL | |||
| Spore Trap, Fungi, Non-Rush, 1-2 Days; Rush 6 hours | ea | $ 28.35 | $ 42.53 |
| Fungi, non-viable, Bulk, Surface, Wipe Swab), Quantitative, Direct Examination, Non-Rush, 1-2 days Days; Rush 4 hours | ea | $ 17.33 | $ 25.73 |
| SCIENTIFIC ANALYTICAL INSTITUTE | |||
| Fungi, Spore Trap, Non-Rush 3 days, Rush 12 hours | ea | $ 21.00 | $ 42.00 |
| Fungi, Direct Examination, Non-Rush 3 days, Rush 12 hours | ea | $ 21.00 | $ 42.00 |
| Fungi, Culturable Air, Non-Rush 7 Days | ea | $ 52.50 | NA |
| Fungi, Culturable Swab or Bulk, Non-Rush 7 Days | ea | $ 68.25 | NA |
| Bacteria, Culturable, Air, 5 Genus ID, Non-rush, 7 days | ea | $ 52.00 | NA |
| EQUIPMENT COSTS | |||
| High Volume Air Sampling Pump | day | $ 25.00 | $ 25.00 |
| Low Volume Air Sampling Pump | day | $ 25.00 | $ 25.00 |
| Primary Source Calibration Device | day | $ 15.00 | $ 15.00 |
| Personal Protective Equipment | per person, per dat | $ 25.00 | $ 25.00 |
| Spore Trap Sample Cassettes | ea | $ 7.00 | $ 7.00 |
| Moisture meter | Day/Week | $ 10.00 | $ 40.00 |
| Infrared Camera | Day/Week | $ 125.00 | $ 425.00 |
| Agar, Swabs | ea | $ 7.00 | $ 7.00 |
| 4-Gas Meter | Day/week | $ 50.00 | $ 200.00 |
| Methane/LEL \Meter | Day/Week | $ 50.00 | $ 200.00 |
| TSI Aerotrack 9306 particle counter or similar | Day/Weel | $ 120.00 | $ 450.00 |
File details come from the government source that posted it. Updated .