This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) Procurement division, located in Phoenix, Arizona. The amendment involves Empire Southwest as the contractor and pertains to a contract for Tunnel High Voltage Switch and Controls.

The amendment adds two line items to the existing contract: CTR064455-5 for parts used in repair or preventative maintenance (referenced in section 5.8 of the scope of work), and CTR064455-6 for shop supplies not to exceed 5% of labor costs (per section 4.1.3). All other terms, conditions, and provisions of the original contract remain unchanged. The document is dated April 2020 and represents Amendment Number Two to the original contract.

View the file

Other files

File Type Posted
2-Participation In Boycott of Israel.pdf PDF
CTR064455_Certificate_of_Insurance.pdf PDF
CTR064455_Certificate_of_Insurance_ANY_ALL_GL_AL_WC_04.01.24-04.01.25__2___1_.pdf PDF
CTR064455_Contract_Amendment_Summary_Four__4_.pdf PDF
Empire Southwest LLC. Additional Document.pdf PDF
2-BPM004877_Price_Increase_Percentages.pdf PDF
ACCEPTED_ANY_ALL_GL_AL_WC_04.01.25-04.01.26.pdf PDF
BPM004878_Affidavit_of_Publication.pdf PDF
CTR064455_Contract_Amendment_Summary_Six__6_.pdf PDF
CTR064455_Contract_Documents.pdf PDF
2-Forced Labor of Ethnic Uyghurs Ban.pdf PDF
2-PowerSystemsTotalSolutionsInfographic.jpg JPG image
CTR064455_Contract_Amendment_Summary_Five__5_.pdf PDF
CTR064455_Contract_Amendment_Summary_One__1_.pdf PDF
04.01.24 CoI GL,AL,WC.pdf PDF
2-20221208SA50LZ14132604.pdf PDF
2-BPM004877_Pricing_Form CF.pdf PDF
2-Confidentiality and Trade Secrets.pdf PDF
2-Engine Pumps and Control Maintenance BPM004877 Key Personnel.pdf PDF
2-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
2-Offer and Acceptance.pdf PDF
2-Proposal # 1-prop_items.xls XLS spreadsheet
2-Switch Gear capabilities .pdf PDF
CTR064455_Contract_Amendment_Summary_Three__3_.pdf PDF
CTR064455_Post_Award_Meeting_Sign-In_Sheet.pdf PDF
CTR064455_Pricing.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARIZONA DEPARTMENT OF TRANSPORTATION

1655 W. Jackson Street, MD 100P

Phoenix, AZ 85007

Contract Amendment Summary CONTRACTOR: Empire Southwest AMENDMENT NO.: Two (2)

DESCRIPTION: Tunnel High Voltage Switch and Controls

Rev. 04/2020

Procurement

Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:

1. The Following line items have been hereby added to the contract.

CTR064455-5 Parts Used in a Repair or Preventative maintenance -Per section 5.8 of the scope of work.

CTR064455-6 Shop supplies NTE 5% of labor cost- Per section 4.1.3.

2. All other terms, conditions and provisions of this contract remain unchanged.

javascript:void('0') javascript:void('0')

File details come from the government source that posted it. Updated .