About this file
This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) Procurement division, located in Phoenix, Arizona. The amendment involves Empire Southwest as the contractor and pertains to a contract for Tunnel High Voltage Switch and Controls.
The amendment adds two line items to the existing contract: CTR064455-5 for parts used in repair or preventative maintenance (referenced in section 5.8 of the scope of work), and CTR064455-6 for shop supplies not to exceed 5% of labor costs (per section 4.1.3). All other terms, conditions, and provisions of the original contract remain unchanged. The document is dated April 2020 and represents Amendment Number Two to the original contract.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: Empire Southwest AMENDMENT NO.: Two (2)
DESCRIPTION: Tunnel High Voltage Switch and Controls
Rev. 04/2020
Procurement
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. The Following line items have been hereby added to the contract.
CTR064455-5 Parts Used in a Repair or Preventative maintenance -Per section 5.8 of the scope of work.
CTR064455-6 Shop supplies NTE 5% of labor cost- Per section 4.1.3.
2. All other terms, conditions and provisions of this contract remain unchanged.