2-BPM004877_Price_Increase_Percentages.pdf

PDF 114 KB Posted

Attached to
Master Agreement AZ|CTR064455
Contract number
CTR064455
Issued by
Arizona

About this file

This document is a Price Increase Percentages form from the Arizona Department of Transportation (ADOT) Procurement division, associated with Solicitation No. BPM004877. The document is available online at https://appstate.az.gov/ and appears to be part of a procurement process for a state contract.

The form outlines the maximum price increase percentages that an offeror may request during contract renewal periods. Specifically, the offeror can request up to 3% in the first renewal period, 6% in the second, 9% in the third, and 12% in the fourth renewal period. Each percentage increase is calculated against the original contract price, and the State of Arizona does not automatically grant increases. If an increase is requested, the offeror must provide documentation of need at the time of renewal. The document includes an example table demonstrating how these percentage increases would be applied to an original contract price.

View the file

Other files

File Type Posted
2-Participation In Boycott of Israel.pdf PDF
CTR064455_Certificate_of_Insurance.pdf PDF
CTR064455_Certificate_of_Insurance_ANY_ALL_GL_AL_WC_04.01.24-04.01.25__2___1_.pdf PDF
CTR064455_Contract_Amendment_Summary_Four__4_.pdf PDF
Empire Southwest LLC. Additional Document.pdf PDF
ACCEPTED_ANY_ALL_GL_AL_WC_04.01.25-04.01.26.pdf PDF
BPM004878_Affidavit_of_Publication.pdf PDF
CTR064455_Contract_Amendment_Summary_Six__6_.pdf PDF
CTR064455_Contract_Documents.pdf PDF
2-Forced Labor of Ethnic Uyghurs Ban.pdf PDF
2-PowerSystemsTotalSolutionsInfographic.jpg JPG image
CTR064455_Contract_Amendment_Summary_Five__5_.pdf PDF
CTR064455_Contract_Amendment_Summary_One__1_.pdf PDF
04.01.24 CoI GL,AL,WC.pdf PDF
2-20221208SA50LZ14132604.pdf PDF
2-BPM004877_Pricing_Form CF.pdf PDF
2-Confidentiality and Trade Secrets.pdf PDF
2-Engine Pumps and Control Maintenance BPM004877 Key Personnel.pdf PDF
2-Financial Envelope-Proposal # 1-prop_answer.xls XLS spreadsheet
2-Offer and Acceptance.pdf PDF
2-Proposal # 1-prop_items.xls XLS spreadsheet
2-Switch Gear capabilities .pdf PDF
CTR064455_Contract_Amendment_Summary_Three__3_.pdf PDF
CTR064455_Contract_Amendment_Summary_Two__2_.pdf PDF
CTR064455_Post_Award_Meeting_Sign-In_Sheet.pdf PDF
CTR064455_Pricing.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement

PRICE INCREASE PERCENTAGES

Solicitation No: BPM004877

Available online at https://appstate.az.gov/

Rev. 12/2020

The offeror should use the space below to identify the maximum price increase percentage that they may want to request at the time of renewal if ADOT exercises its option per the applicable provisions under any resultant contract(s).

1st Renewal Period __________3_________% Maximum Increase

2nd Renewal Period ___________6________% Maximum Increase

3rd Renewal Period __________9_________% Maximum Increase

4th Renewal Period __________12_________% Maximum Increase

The offeror is cautioned that each renewal period’s increase percentage shall be computed against the

ORIGINAL contract price. If information is not provided in the space above, prices shall remain the same as the original contract term. Please see the following example for further clarification.

Example: If the offeror anticipates requesting a 2% increase at each renewal period per Special

Terms and Conditions, they should enter 2%, 4%, 6%, and 8% in the attachment. Each percentage increase is calculated using the original contract price. See example in table below.

Renewal Period

% Maximum Increase from Attachment

Original Contract

Price

Maximum Increase Allowed

Maximum Contract

Price

1 2% $100.00 $2.00 $102.00

2 4% $100.00 $4.00 $104.00

3 6% $100.00 $6.00 $106.00

4 8% $100.00 $8.00 $108.00

Furthermore, the offeror is advised that the State of Arizona does not automatically grant any increase when renewing the contract. If an increase is requested, documentation of need must be provided at the time of renewal.

https://appstate.az.gov/

File details come from the government source that posted it. Updated .