CTR064455_Contract_Amendment_Summary_Three__3_.pdf
PDF 418 KB Posted
- Attached to
- Master Agreement AZ|CTR064455
- Contract number
- CTR064455
- Issued by
- Arizona
About this file
This document is a Contract Amendment Summary issued by the Arizona Department of Transportation (ADOT) Procurement division, located in Phoenix, Arizona. The amendment involves Empire Southwest as the contractor and pertains to a contract for Tunnel High Voltage Switch and Controls, specifically Amendment Number Three.
The amendment adds a new price line item to the contract, CTR064455-7 Environmental Fee, as referenced in section 5.6 of the contract. All other terms, conditions, and provisions of the original contract remain unchanged. The document is dated with a revision in April 2020 and follows ADOT's standard contract amendment procedures under the Uniform Terms and Conditions, Section 5, which governs contract changes.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARIZONA DEPARTMENT OF TRANSPORTATION
1655 W. Jackson Street, MD 100P
Phoenix, AZ 85007
Contract Amendment Summary CONTRACTOR: Empire Southwest AMENDMENT NO.: Three (3)
DESCRIPTION: Tunnel High Voltage Switch and Controls
Rev. 04/2020
Procurement
Pursuant to the Uniform Terms and Conditions, Section 5, Contract Changes, the above referenced contract is amended. Summary of changes is as follows:
1. The following price line item has been added to the contract.
CTR064455-7 Environmental Fee per section 5.6.
2. All other terms, conditions and provisions of this contract remain unchanged.
javascript:void('0') javascript:void('0')
File details come from the government source that posted it. Updated .