CTR061240_Pricing_Document_-_Amendment_3_Updated_11-8-2024.xlsx

XLSX spreadsheet 450 KB Posted

Attached to
Master Agreement AZ|CTR061240
Contract number
CTR061240
Issued by
Arizona

About this file

This document is a comprehensive pricing attachment for the State of Arizona's Human Resources Information System (HRIS) Replacement project, involving CGI as the primary contractor. The document is specifically identified as CTR061240_Pricing_Document_-_Amendment_3, updated on 11-8-2024, and contains detailed pricing worksheets, implementation phases, and contract specifications for a state-wide HRIS technology solution.

The contract is structured as a 15-year indefinite delivery vehicle with multiple implementation phases, including Phase 1A, Phase 1B, Phase 2A, and Phase 2B. The total base contract value is $72,734,800, with pricing broken down across project management, implementation, and hosting services. Key components include a Software-as-a-Service (SaaS) solution for human resources management, with hosting, implementation, and ongoing maintenance services. The pricing includes comprehensive implementation costs, hosting for years 1-15, operations and maintenance labor rates, and travel expenses. Optional pricing is also provided for additional environments, database storage, and user licenses. The contract includes escalation provisions with annual rate adjustments based on the Consumer Price Index and allows for potential rate increases and additional service expansions.

View the file

Other files

File Type Posted
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_2.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_7.pdf PDF
CTR061240_CGI_Technologies_and_Solutions_-_Amendment_3.pdf PDF
CTR061240_CGI_Technologies_and_Solutions_-_Amendment_4.pdf PDF
CTR061240_Change_Request_-_CR024_Adopt_FIN_Unit_Structure_State_View.pdf PDF
CGI-AZ__HRIS__insurance_certificate__GL-Auto-WC-EO__06252024.pdf PDF
CGI-Arizona_insurance_certificate_for_HRIS_CTR061240__GL-Auto-WC-EO__06042025.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2024.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_1.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_10.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_6.pdf PDF
CTR061240_Contract_Documents_-_Amendment_1.pdf PDF
CTR061240_Pricing_Document_-_Amendment_4_Updated_3-4-2025.xlsx XLSX spreadsheet
Attachment_20_-_Arizona_HRIS_Additional_Reports___Amendment_2.pdf PDF
BAFO_Attachment_12___Arizona_HRIS_Pricing_Document_-_Amendment_2.xlsx XLSX spreadsheet
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_5.pdf PDF
CTR061240_CGI_Technologies_and_Solutions_-_Amendment_5.pdf PDF
CTR061240_Contract_Amendment_2.pdf PDF
Attachment_12_-_Revised_Pricing_Document_-_Amendment_5.xlsx XLSX spreadsheet
BAFO_Attachment_12_Arizona_HRIS_Pricing_Attachment_-_Amendment_1.xlsx XLSX spreadsheet
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_3.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_4.pdf PDF
CGI_Certificate_of_Insurance_-_Epires_6-1-2025_Part_9.pdf PDF
CTR061240_Contract_Amendment_1.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions CTR061240 Pricing Document

1.) Arizona HRIS Pricing Document is a spreadsheet containing the following tabs:
- Summary Level Pricing
- Year 1 - Phase 1A Detail
- Year 2 - Phase 1A Detail
- Year 3 - Phase 1B Detail
- Year 3 - Phase 2A
- Year 4 - Phase 2B
- Hosting Worksheet Years 1-5
- Hosting Worksheet Years 6-10
- Hosting Worksheet Years 11-15
- O&M - Labor Hour Worksheet
- Travel
2.) To facilitate completion of the Pricing Document, the spreadsheet contains formulas to calculate subtotals and totals, and to link related information between tabs. The Contractor bears ultimate responsibility
for ensuring the spreadsheet is properly populated with pricing information, and for verifying and validating the completeness and accuracy of all information, including all formulas. Any omissions or errors
in the Pricing Document as submitted with the Contractor's proposal are the Contractor's exclusive responsibility.
3.) Instructions by tab:
a. Summary Level Pricing
i. This tab consists of the FFF tasks applicable to the Base Period, as well as the Option Periods.
ii. No pricing information shall be identified for the O&M Labor Hour tasks for Option Periods 2 through 9 on this tab. A ceiling price for the optional Labor Hour tasks will be established
by the State at the time of award.
iii. The State requests that Contractors include assumptions to support the entire effort
b.Year 1 - Phase 1A Detail
i. This tab consists of the list of deliverables required for the contract period.
ii. In this tab, the Contractor shall identify the proposed billable milestone amounts for each deliverable and the proposed monthly price for other required PM and Implementation activities.
iii. The billable milestone amounts represent the payment the contractor would receive after State inspection and acceptance of the corresponding deliverable.
iv. The State invites the Contractor to add additional deliverables to this page, as the Contractor sees fit, to align with the methodology proposed. If there are deliverables
on the Phase 1A Detail tab that should be brought over to the Base Period, the Contractor should make those suggestions as well.
v. The State requests that Contractors include assumptions related to this phase.
c. Year 2 - Phase 1A Detail
i. This tab consists of the list of deliverables required for the contract period.
ii. In this tab, the Contractor shall identify the proposed billable milestone amounts for each deliverable and the proposed monthly price for other required PM and Implementation activities.
iii. The billable milestone amounts represent the payment the contractor would receive after State inspection and acceptance of the corresponding deliverable.
iv. The State invites the Contractor to add additional deliverables to this page, as the Contractor sees fit, to align with the methodology proposed.
v. The State requests that Contractors include assumptions related to this phase.
Year 3 - Phase 1B Detail
i. This tab consists of the list of deliverables required for the contract period.
ii. In this tab, the Contractor shall identify the proposed billable milestone amounts for each deliverable and the proposed monthly price for other required PM and Implementation activities.
iii. The billable milestone amounts represent the payment the contractor would receive after State inspection and acceptance of the corresponding deliverable.
iv. The State invites the Contractor to add additional deliverables to this page, as the Contractor sees fit, to align with the methodology proposed.
v. The State requests that Contractors include assumptions related to this phase.
Year 3 - Phase 2A
i. This tab requests the cost for 3 months of HyperCare Support, directly following the Phase 1A implementation. The State reserves the right to extend for an additional three months.
ii. The State requests that Contractors include assumptions related to this phase.
Year 4 - Phase 2B
i. This tab requests the cost for 3 months of HyperCare Support, directly following the Phase 1B implementation. The State reserves the right to extend for an additional three months.
ii. The State requests that Contractors include assumptions related to this phase.
Hosting Worksheet Years 1-5
i. This tab requests the cost for hosting/managed services for the Years 1-5, other than the Hosting Deliverables specified in the Detail tabs.
ii. Contractors shall identify their proposal price breakdown for all required hosting activities across the 4 price elements in the table. If there are services included in Subscription pricing
that are not listed in the table, add those services in the Comments.
iii. The State requests that Contractors include assumptions related to this phase.
Hosting Worksheet Years 6-10
i. This tab requests the cost for hosting/managed services for Years 6-10, other than the Hosting Deliverables specified in the Detail tabs.
ii. Contractors shall identify their proposal price breakdown for all required hosting activities across the 4 price elements in the table. If there are services included in Subscription pricing
that are not listed in the table, add those services in the Comments.
iii. The State requests that Contractors include assumptions related to this phase.
Hosting Worksheet Years 11-15
i. This tab requests the cost for hosting/managed services for Years 11-15, other than the Hosting Deliverables specified in the Detail tabs.
ii. Contractors shall identify their proposal price breakdown for all required hosting activities across the 4 price elements in the table. If there are services included in Subscription pricing
that are not listed in the table, add those services in the Comments.
iii. The State requests that Contractors include assumptions related to this phase.
O&M - Labor Hour Worksheet
i. This tab consists of fully burdened, hourly labor rates applicable to the Labor Categories who may perform work on a Labor Hour basis under the Contract.
ii. Contractors shall insert their fully burdened, hourly labor rate for Option Periods 2 through 9 for each Labor Category.
iii. The hourly rates proposed will be incorporated into the resulting contract and will be binding on the work performed on a Labor Hour basis over the life of the Contract.
Travel
i. This tab is for Contractors to propose total travel costs for the effort.
ii. The State requests that Contractors include assumptions related to this phase.

_x000D_#000000 Confidential

Worksheet Notes & Assumptions

BAFO clarifications are highlighted in red.
CGI has added this sheet to describe our approach for completing Pricing Document.
Attributes Common Across All CTR061240 Pricing Document:

• CGI's is proposing a firm fixed-price for the scope described in our proposal.

• All dollar values are rounded to the number of decimal places displayed. There are no hidden decimals to distort the simple calculations for sums of rows or columns of numbers.

• Although elements of our solution are subject to state, county, and city Transaction Privilege Tax (sales tax), per ref # 89 from the State's Q&A response from 11/29/21, the amounts presented in Pricing Document do not include these taxes. A tax line item will be included in the awarded contract.

Notes for Summary Level Pricing:

• We have modified the duration shown for Phase 1B from 12 months to 9 months, consistent our project plan.

• We have modified the placement of the Phase 2B HyperCare entries from Year 4 to Year 3, consistent with our project plan.

Approach & Notes for the Alt Year 1 & Alt Year 2 Phase 1A Detail Worksheets:

• We revised the deliverables list provided in this template to align with the deliverables presented in the multiple deliverables tables provided in Sections 5 through 16 of the Solicitation Requirements document (spanning pages 9-30 of the document).

• We have provided both a Draft and Final version of each deliverable where applicable per our work plan

– The "DRAFT" version of a deliverable is its Deliverable Expectation Document (DED), which will define the deliverable in sufficient detail, including an outline of the contents of the deliverable and its acceptance criteria.

– The "FINAL" version of a deliverable is the completed deliverable presented to the State for acceptance for Phase 1A.

• Our numbering scheme provided as part of the PWS Deliverable Name includes:

– Indication if the deliverable is Draft or Final.

– Abbreviation of the deliverable table from the Solicitation Requirements document that was the source for the deliverable (PM = Project Management; IP = Implementation Planning; BPR = Business Process Review; FGP = Fit-Gap Process and Requirements Traceability Matrix; SD = Solution Design; INT = Interfaces; RPT = Reporting; ENH = Customization/Enhancements/Extensions; CONV = Data Conversion; DEPLOY = Deployment; TEST = Testing; GL = Production Transfer (Go Live); OCM-TRN = Change Management & Testing).

– Entry number from the source table.

– Deliverable name from the source table.

• In addition to the deliverables from the tables in the Solicitation Requirements document, we have added a project management deliverable for the Project Kickoff Presentation, which is numbered "0".

• We have included deliverables for weekly and monthly Project Management Status Reports. The PWS Deliverable Name indicates how many of the respective reports fall in each year of Phase 1A and the fixed fee for each report. The value presented in the Billable Milestone Amount column is the grand total price for the number or reports indicated.

• The deliverables have been assigned to Year 1 and Year 2 based on the schedule from our work plan.

• Our fixed price for Phase 1A was allocated to this revised deliverables list that's consistent with the Solicitation Requirements document. During contract negotiations we look forward developing a more simplified list that aligns with our hybrid-agile development methodology with the goal of developing a performance-based payment schedule for implementation.

• PWS #25 and #26 on the Year 1 worksheet are the Quality Management Plan deliverables, which are listed twice in the Project Management Deliverables table in Section 5.1.1 of the Solicitation Requirements document. We assume there should be just a single instance of this deliverable. The PWS Deliverable Name uses both entry numbers (PM-11,16).

• PWS #76 (Year 1) and #6 (Year 2) for Custom Report Code is shown as $0. The Solicitation Requirements document specifies that the contractor will only be performing report design.

• We have modified the captions in the Hosting section at the bottom of each worksheet that brings forward the hosting costs for the year to indicate a quantity of "1" and a unit of "YEAR".

Approach & Notes for Alt Year 3 - Phase 1B Detail (included in Alt Year 3 - Phase 1B, 2A & 2B Worksheet):

• We used the same approach described above for the Phase 1B deliverables list.

• The Phase 1B deliverables will consist of updates to the final Phase 1A deliverables. As such the deliverable naming reflects "UPDATED" instead of "DRAFT" or "FINAL".

• PWS Deliverable # 11 FINAL: DEPLOY-3 Disaster Recovery Plan Completed is strictly a Phase 1A deliverable. It will not be updated during Phase 1B and is not included on this deliverable list

• The number of Project Management Status Report deliverables is consistent with the 9-month duration of Phase 1B.

• PWS #13 is the update of the Quality Management Plan deliverables, which is listed twice in the Project Management Deliverables table in Section 5.1.1 of the Solicitation Requirements document. We assume there should be just a single instance of this deliverable. The PWS Deliverable Name uses both entry numbers (PM-11,16).

• PWS #55 for Custom Report Code is shown as $0. The Solicitation Requirements document specifies that the contractor will only be performing report design.

• We have modified the captions in the Hosting section at the bottom of each worksheet that brings forward the hosting costs for the year to indicate a quantity of "1" and a unit of "YEAR".

Notes for Alt Year 3 - Phase 2A & Phase 2B (included in Alt Year 3 - Phase 1B, 2A & 2B Worksheet):

• We renamed the tab for Phase 2B to reflect that it's scheduled for Year 3 in our work plan.

• If the State exercises its option to extend either or both HyperCare phases, CGI would look forward to also right-sizing the HyperCare team to align with the State's support needs.

Notes for Hosting Worksheets:

• Our SaaS subscription is a comprehensive bundled offering based on the discrete applications necessary to meet your RFP requirements. Our proposed subscription price is driven by your full-time employee counts, which in turn drive the solution sizing.

• We have merged the annual pricing cells throughout the hosting worksheets and have provided a single subscription amount for each of the 15 years of the project.

• Our SaaS fees ramp-up during the initial deployment period of the project, which provides for full State user usage by year 3 when the solution is enabled in production; once deployed in production, the SaaS fees reflect the State's requested solution. Additionally to assist the State with their annual budgeting process, we are offering the State leveled SaaS fees for each year of the second five-year segment, followed by a single escalation and then leveled SaaS fees for each year of the 3rd five-year segment.

Notes for O&M - Labor Hour Worksheet:

• The O&M rate card provides hourly rates commencing in year 3 of the contract. Year 3 rates (starting July 2024) remain constant for year 4. Thereafter our rates escalate once every three years based on an expectation of an annual COLA increase of 1.5%. Starting on July 1, 2025 and annually thereafter, CGI may request an increase in rates by a percentage amount equal to the percentage increase as provided by the Consumer Price Index for All Urban Consumers (“CPI-U”) for the Phoenix, Arizona area as published by the Bureau of Labor Statistics minus 1.5% if the CPI-U exceeds the planned 1.5% annual basis.

• As described in our response to Question 6 Technical/Ops and Maintenance Services, CGI can provide a flexible capacity-based model to help sustain continuous business improvement after the implementation. These local support services (LSS) are customized to meet your needs. Examples of services that can be provided through the capacity-based model include:

– Leveraging new innovations that are regularly delivered as part of ASIA's Advantage Cloud SaaS subscription.

– Streamlining business processes.

– Increasing efficiencies, and improving decision making (e.g., through applying analytics and predictive modeling) for greater HRM enterprise efficiencies.

– Assisting with the analysis of impacts from regulatory changes and determining how best to address those regulatory changes.

• We can offer discounts from the rates provided for a long-term LSS commitment.

Notes Travel Worksheet:

• For planning purposes, we have modified the travel cost table to provide travel estimates based on a standard basis per traveler. Our experience has shown that short term travel into the Phoenix area averages $1,500 per traveler per week for short term travel (up to 2 weeks per trip) and $5,000 per month for longer durations.

• During project execution, we will get pre-approval from the State for any required billable travel and will use the State's guidelines and expense limits for the billing of the approved travel back to the State.

Optional Pricing:

• Additional non-prod environments:

– One-time fees = $62,000

– Ongoing annual fees = $103,000

• Additional DB storage for production environments: per 100GB monthly fees = $200. 100GB of production data equates to 1.26 TB of storage across production and non-production environments.

Each 100GB includes storage for the production and two non-production databases.

• Additional DB storage storage for non-prod environments: per 100GB monthly fees = $43

• Additional licenses of LMS periodic non-State workers is available in blocks of 1000 users starting at $2,000 with annual escalations

• Additional licenses of Recruiting and LMS based on State user usage is available in blocks of 1000 users starting at $19,000 with annual escalations

Pricing Assumptions:

• Our solution price is based on award of the scope of work described in our proposal. Changes to the scope work may require recasting the price of our solution.

• While our detailed deliverable pricing is consistent with the guidance in the RFP, we would like to revise the detailed pricing tabs during negotiations to align with our hybrid-agile development approach, with the goal of developing a performance-based payment schedule for implementation. Refer to Pricing Document Alternative Approach for our proposed performance-based milestone schedule.

• In the State's commitment to keep AFIS technology current, our proposal assumes the contract for the AFIS Advantage 4 upgrade, scheduled to start in April 2022, will be fully executed by March 2022.

• When in-person implementation activities are needed and have been mutually agreed to, the State will establish a suitable work environment for CGI staff. This work environment usually includes accommodations and workspace for CGI personnel who will work onsite, internet, and computer systems connectivity, and any hardware and/or software resources required for the project.

• Our solution pricing and scope of work described in our proposal assumes the State will perform the necessary report and analytics development; CGI assumes the design for 20 reports and 20 analytics.

• To achieve the Stated goals of a modern solution, CGI price includes the configuration of up to 30 business roles, home pages, widgets will meet the State's user experience objectives.

• Our Advantage Insight supports up to 900 concurrent users, across the State, that would benefit from the use the solution's embedded analytics for data driven decisions.

• The State would be responsible to acquire Power BI Pro Commercial licensing to support the State's report development (required to publish, schedule, and perform administrative actions).

• Our solution includes Advantage Sofia, which is our self-learning, virtual assistant to which we have assumed pricing at 5% of the State's FTEs concurrent usage.

• Our proposal timeline, implementing in two (2) phases, is consistent with the State's RFP. As part of our implementation, a Disaster Recovery Exercise (DRE) will be performed to test the connectivity, test the process, and provide knowledge transfer and experience to the State. Our proposed plan includes one successful DRE test prior to Phase 1A go-live.

• To achieve the Stated goals of a modern solution, CGI has assumed pricing for ten (10) file based extensions to meet the unique State user experience needs.

• Out of the box, Advantage HRM provides ten (10) pre-existing Advantage forms (i.e., paycheck, remittance notice, W2, etc.). Our pricing assumes CGI will modify up to 10 forms with the State's branding requirements.

• As part of our SaaS solution, CGI Advantage provides storage that includes the initial conversion of data and accounts for annual growth typical of our HR clients with similar size and complexity, taking the number of State employees (36,000) and number of transactions (average of 15 pay details and 20 deduction details per paycheck) into account. Our proposal includes the migration of the State's 2.5TB legacy data warehouse. Cornerstone storage for LMS and Recruiting is unlimited.

• For the proposed LMS and Recruiting solution, our pricing provides for full State user usage (34,000 36,000) by year 3, when the solution is enabled in production. Our pricing also provides for up to 34,000 non-state workers for periodic LMS usage. Annually non-State workers usage of the Learning platform will be evaluated and reset for the next annual period. See optional pricing. Increases to the State employee or non-state worker user base may increase SaaS fees.

• For the proposed Advantage Benefits solution, CGI assumes the State's retirees will only be accessing the application during open enrollment and life events.

• For the proposed Advantage Benefits solution, CGI confirms the State's Universities will send benefits information for their employees from their Peoplesoft system; their employees will not have access to the HRIS Replacement solution.

• The State will provide a hosted SFTP server to support the transmission of data to and from external systems.

• For our LMS and recruiting solution, CGI assumes that centralized processes and configuration meetings will occur with only one set of stakeholders

• As part of our overall solution, CGI assumes that Business Process Alignment, Governance and Change Management Workshops will be facilitated once to identified key stakeholders and that the workshops will not be repeated for different groups.

• Our LMS and recruiting solution includes system Admin training sessions for up to 10 system administrators (this includes train the trainer)

• Our LMS and recruiting solution includes the migration and import of up to 1,000,000 historical training transcript records from legacy systems

• Our LMS and recruiting solution includes the migration of up to 1,000,000 job requisitions, candidate, and application records

• One LMS self registration and landing page will be configured for the periodic non-State workers to access LMS.

_x000D_#000000 Confidential

Alt Pricing Explanation

ComponentDescription
Milestone Number12 quarterly milestones planned for the HRIS implementation and the associated Hypercare services.
Performance Period
(Start and End Dates)Each performance milestone period is 3 months in duration commencing at the start of the quarter and ending at the conclusion of that quarter.
Milestone Tasks & ActivitiesEach performance milestone will include the completion of the planned project activities performed during the performance period. The goals will be identified and finalized as part of the planning process.
Invoice DateInvoice date for the completion of the planned goals/accomplishments during the performance period.
Milestone AmountEach of the 12 milestones will have an invoice amount associated with the completion of the accomplishments within that performance period.

_x000D_#000000 Confidential

CGI Response for Performance-Based Payment Schedule

RFP # BPM003932 for the State of Arizona’s Human Resources Information System (HRIS) Replacement project, instructed the proposers to provide the price for project deliverables identified by the State via Attachment 8 (Arizona HRIS Pricing Attachment). While our proposal included the detailed deliverable pricing consistent with the guidance defined by the RFP, we had requested an opportunity to revise the detailed pricing worksheets during negotiations to better align with our hybrid-agile development approach, with the goal of presenting a performance-based milestone payment schedule for the implementation phases.

During the negotiations for the HRIS Project, the State requested CGI present our performance-based milestone payment schedule for consideration. In this document, we present our proposed performance-based milestone payment schedule based on the following criteria:

• Our proposed AdaptiveSI implementation methodology has evolved and been incrementally improved upon over the past 40 years of state and local government implementations, resulting in an evolution of repeatable processes, accelerated delivery, enabled agility, strong governance, and organizational change that successfully broke-down barriers and fostered adoption. By employing our methodologies, the State will achieve the following benefits:

- Enhanced team collaboration and project efficiency – The integrated State and CGI team share the same goals, objectives, and mutual expectations, establishing a more collaborative project culture supported by strong governance for effective decision making and risk mitigation. An integrated project team that leverages common, reusable project assets and accelerators, ultimately improving their overall productivity while lowering labor costs.

- End-user adoption and cultural change – A combination of organizational change management and human-centered design disciplines focus on the needs of the State's stakeholders, collaborative engagement, effective communication, and promoting acceptance of the changes to come, thus creating a conduit for helping stakeholders understand, engage, adopt, and endorse the new HRIS solution.

- Cultivated agility and transparency – This agile implementation process makes it possible to accommodate change, to obtain feedback early and often, pivot quickly, if needed, and deliver additional functionality with each next iteration, reducing risk early and adjusting the process dynamically with early hands-on access to the solution as it is being configured.

- Improved quality – The iterative process addresses quality throughout the project lifecycle and is particularly adapted to achieving the highest quality by offering consistent progress and value measurements and corrective opportunities to achieve product excellence, data accuracy, and most importantly user satisfaction.

• Our price for the HRIS implementation project remains unchanged, i.e., there is no difference between the price included in our proposal consistent with the State’s guidance in the RFP and the performance-based payment schedule in this document.

• Our performance-based milestone payment schedule will significantly reduce the number of HRIS project deliverables and associated deliverable expectation documents (DED), thereby, reducing the time and effort required by the State to administer the processes required for the review and approval for each of the HRIS project deliverables. In exchange for deliverables, CGI will provide less formal, more collaborative documentation in the form of work products and wrapper documents.

Our performance-based milestone payment includes the following information:

NOTES:

1. The tasks and activities will result in the creation of the project deliverables identified in the RFP

2. Acceptance Criteria for the project deliverables will be established during the Sprints planning process

3. Each sprint will include components of the HRIS application functionality to be implemented per the project plan

4. Project Management Services will include:

Project schedule updates Issue Management Risk Management Decision Logs Action Item Logs Bi-weekly status reports Monthly status reports

5. Each Sprint will include one or more of the following activities:

Status Reporting Project Management Services Reporting and Analytics Services Forms and Extension Services Business Roles and Application Security Services Application Configuration Services OCM Services Training Services Testing Services Cutover Services Please refer to the Alt Year 1 - Phase 1A, Alt Year 2 - Phase 1A and Alt Year 3 - Phase 1B, 2A & 2B worksheets for the performance-based milestone payment schedules, as well as the Alt Summary Level Pricing worksheet (Worksheets with LIGHT GREEN colored tabs). These performance-based milestone payment schedules and pricing summary will replace the following worksheets in BAFO - Attachment 8 (Arizona HRIS Pricing Attachment) in their entirety (Worksheets with RED colored tabs):

• Summary Level Pricing

• Year 1 - Phase 1A Detail

• Year 2 - Phase 1A Detail

• Year 3 - Phase 1B Detail

• Year 3 - Phase 2A

• Year 3 - Phase 2B

The detailed performance-based milestone payment schedule may be recasted based on planning outcomes of the first quarter.

Alt Summary Level Pricing

Anticipated Period of PerformanceOriginal Firm Fixed FeeBAFO (Smooth)Amendment 1 Firm Fixed FeeAmendment 2 Firm Fixed FeeAmendment 3 Firm Fixed Fee
Year 1
Project Management Services (Phase 1A)12 Months$ 8,501,000$ 6,187,693$ 7,650,900$ 7,650,900$ 7,650,900
Implementation (Phase 1A)
Hosting12 Months$ 2,554,000$ 2,394,000$ 2,394,000$ 2,394,000
Total$ 11,055,000$ 10,044,900$ 10,044,900$ 10,044,900
Year 2
Project Management Services (Phase 1A)12 Months$ 3,555,000$ 6,068,307$ 3,980,050$ 7,880,050$ 7,880,050
Implementation (Phase 1A)
Hosting12 Months$ 2,564,000$ 2,724,000$ 2,724,000$ 2,724,000
Total$ 6,119,000$ 6,704,050$ 10,604,050$ 10,604,050
Year 3 / Year 4 Implementation
HyperCare (Phase 2A)3 months$ 4,138,800$ 4,208,800$ 4,563,850$ 8,848,850$ 8,980,850
Project Management Services (Phase 1B)9 Months
Implementation (Phase 1B)
HyperCare (Phase 2B)3 months
Hosting12 Months$ 2,921,000$ 2,921,000$ 2,921,000$ 2,921,000
Total$ 7,059,800$ 7,484,850$ 11,769,850$ 11,901,850
Year 4
Hosting12 Months$ 2,843,000$ 2,843,000$ 2,843,000$ 2,843,000
Total$ 2,843,000$ 2,843,000$ 2,843,000$ 2,843,000
Year 5
Hosting12 Months$ 3,101,000$ 3,101,000$ 3,101,000$ 3,101,000
Year 6
Hosting12 Months$ 3,256,000$ 3,256,000$ 3,256,000$ 3,256,000
Year 7
Hosting12 Months$ 3,256,000$ 3,256,000$ 3,256,000$ 3,256,000
Year 8
Hosting12 Months$ 3,256,000$ 3,256,000$ 3,256,000$ 3,256,000
Year 9
Hosting12 Months$ 3,256,000$ 3,256,000$ 3,256,000$ 3,256,000
Year 10
Hosting12 Months$ 3,256,000$ 3,256,000$ 3,256,000$ 3,256,000
Year 11
Hosting12 Months$ 3,592,000$ 3,592,000$ 3,592,000$ 3,592,000
Year 12
Hosting12 Months$ 3,592,000$ 3,592,000$ 3,592,000$ 3,592,000
Year 13
Hosting12 Months$ 3,592,000$ 3,592,000$ 3,592,000$ 3,592,000
Year 14
Hosting12 Months$ 3,592,000$ 3,592,000$ 3,592,000$ 3,592,000
Year 15
Hosting12 Months$ 3,592,000$ 3,592,000$ 3,592,000$ 3,592,000
Base Plus All Option Periods FFF Combined$ 64,417,800$ 64,417,800$ 72,602,800$ 72,734,800
app
Travel Estimate for Planning Purposes$ 193,000$ 193,000

Note: Labor Hour rates for Operations and Maintenance services are on the O&M - Labor Hour Worksheet

Please see the Worksheet Notes & Assumptions sheet.

_x000D_#000000 Confidential

Alt Year 1 - Phase 1A

Milestone #Performance PeriodMilestone Tasks & ActivitiesInvoice DateMilestone Amount (Contract)Milestone Amount
(Amend #1)DeltaMilestone Amount (Amend #2)Total Invoice Amount
Start DateEnd Date
18/1/229/30/2210/31/22$ 2,125,250$ 1,275,150$ (850,100)n/a$ 1,275,150
• Conduct Project Start-up/Kick-off/Initiation
• Establish Project Management Plans
• Master Project Schedule
• Provision Sandbox Environment
• Provide PM Services
210/1/2212/31/221/31/23$ 2,125,250$ 2,125,250$ - 0n/a$ 2,125,250
• Organization Change Management Plan
• Conduct OCM activities
• Provide PM Services
• Provision NPD Environment
• Conduct BPR & HCD activities
• Develop Implementation Strategy & Plan
• Develop Data Conversion Strategy & Plan
• Develop Project Team Training Materials
• Conduct Project Team Training
• Develop Security Management Plan
• Conduct system security analysis
31/1/233/31/234/30/23$ 2,125,250$ 2,125,250$ - 0n/a$ 2,125,250
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 1-2
• Complete Sprints 1-2
• Configure application & application & workflow security
• Conduct OCM activities
• Provide PM Services
• Provision NPD Environment
• Conduct BPR & HCD activities
• Develop Training Plan and Strategy
• Conduct system security analysis & testing
• Design Interfaces, Forms, Reports
• Design conversion scripts
44/1/236/30/237/31/23$ 2,125,250$ 2,125,250$ - 0n/a$ 2,125,250
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 3-5
• Complete Sprints 3-5
• Analyze & Configure business roles & security
• Configure application & application workflow & security
• Conduct OCM activities
• Provide PM Services
• Provision PRD/UAT Environment
• Complete BPR & HCD activities
• Develop training materials
• Conduct system security analysis & testing
• Design & Develop Interfaces & Forms, Report & Analytics
• Design & Develop Conversion scripts
• Execute trial mock data conversion
Total$ 8,501,000$ 7,650,900$ (850,100)$ 7,650,900
Hosting7/1/226/30/237/31/23$ 160,000$ (160,000)n/a
• Data Archiving Strategy and Plan
• Concept of Operations
Hosting Services
10/1/229/30/23All Other Required Hosting Activities (reference data from "Hosting Worksheet Years 1-5" Tab)10/1/22$ 2,394,000$ 2,394,000$ - 0n/a$ 2,394,000
Total$ 2,554,000$ 2,394,000$ (160,000)$ 2,394,000

Total Base Period -Year 1 $ 11,055,000 $ 10,044,900 $ (1,010,100) $ 10,044,900

Please see the Worksheet Notes & Assumptions sheet.Milestone Amount (Contract)Milestone Amount
(Amend #1)Delta
(Amend #1)Milestone Amount Added (Amend #2)Total Invoice Amount
Year 1$ 11,055,000$ 10,044,900$ (1,010,100)$ 10,044,900
Year 2$ 6,119,000$ 6,704,050$ 585,050$ 3,900,000$ 10,604,050
Year 3$ 7,059,800$ 7,484,850$ 425,050$ 4,285,000$ 11,901,850

Total Year 1-3 $ 24,233,800 $ 24,233,800 $ - 0 $ 8,185,000 $ 32,550,800

_x000D_#000000 Confidential

Hosting Worksheet Years 1-5

DescriptionPeriod of PerformanceCost CategoryCommentsAmount
Hosting (All other required hosting activities)Year 1Application Subscription (Implementation Phase)Our subscription fee is a bundled offering$ 2,394,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 2,394,000
Hosting (All other required hosting activities)Year 2Application Subscription (Implementation Phase)Our subscription fee is a bundled offering$ 2,564,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 2,564,000
Hosting (All other required hosting activities)Year 3Application Subscription (Implementation Phase)Our subscription fee is a bundled offering$ 2,843,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 2,843,000
Hosting (All other required hosting activities)Year 4Application SubscriptionOur subscription fee is a bundled offering$ 2,843,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 2,843,000
Hosting (All other required hosting activities)Year 5Application SubscriptionOur subscription fee is a bundled offering$ 3,101,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 3,101,000

$ 13,745,000

Please see the Worksheet Notes & Assumptions sheet.

1331L519R13OS0005 Hosting Worksheet Base Option Periods 1-4 Attachment J.12

&P of_x000D_#000000 Confidential

Alt Year 2 - Phase 1A

Milestone #Performance PeriodMilestone Tasks & ActivitiesInvoice DateMilestone AmountMilestone Amount
(Amend #1)Milestone Amount (Amend #2)Total Invoice Amount
Start DateEnd DateMove to:
57/1/239/30/2310/31/23$ 1,066,500$ 1,066,500n/a$ 1,066,500
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 6-8
• Complete Sprints 6-8
• Configure business roles & security
• Configure application & application workflow & security
• Conduct OCM activities
• Provide PM Services
• Conduct Parallel Payroll Testing
• Develop training materials
• Conduct power user training workshops
• Develop User Experience Analysis & Plan
• Develop Test Plan & Strategy
• Conduct system security analysis & testing
• Develop & Deploy Interfaces & Forms, Report & Analytics to support IST
• Develop Conversion scripts
• Execute conversion scripts to support Payroll Testing
610/1/2312/31/231/31/24$ 1,066,500$ 1,066,500n/a$ 1,066,500
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 9-11
• Complete Sprints 9-11
• Conduct OCM activities

• Provide PM Services

• Conduct IST for configured user stories & system functionality
• Conduct Parallel Payroll Testing
• Support State’s UAT script development activities Support State's UAT activities
• Develop training materials
• Conduct UAT tester training workshopsMilestone 9
• Conduct system security analysis & testing
• Develop Performance Test Scripts & Plan
• Develop Conversion scripts
• Execute conversion scripts to support Payroll Testing & IST
• Execute trial conversion scriptsMilestone 9
• Deploy system to IST & UATMilestone 9
71/1/243/31/244/30/24$ 888,750$ 923,525n/a$ 923,525
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 12-14 12-15
• Complete Sprints 12-14 12-15
• Conduct OCM activities
• Provide PM Services
• Conduct Parallel Payroll TestingMilestone 9 & 9.1
• Conduct System Performance TestingMilestone 9 & 9.1
• Support State’s UAT script development & testing activities
• Conduct UAT tester training workshopsMilestone 9.1
• Develop training materials
• Conduct system security analysis & testing
• Develop Conversion scripts
• Execute conversion scripts to support Payroll Testing, UAT, & IST
• Execute trial conversion scriptsMilestone 9 & 9.1
• Deploy system to IST & UAT
84/1/246/30/247/31/24$ 533,250$ 923,525$ 900,000$ 1,823,525
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 15-17 16-18
• Complete Sprints 15-17 16-18
• Conduct OCM activities
• Provide PM Services
• Conduct Parallel Payroll Testing
• Support State’s UAT testing activities
• Conduct End-User and Trainer training workshopsMilestone 9.2
• Conduct system security analysis & testing
• Develop Conversion scripts
• Execute conversion scripts to support Payroll Testing & UAT
• Execute trial conversion scriptsMilestone 9 & 9.1
• Deploy system to UAT
8.16/1/246/1/24In accordance with MA Q4 Hosting - Exhibit A - CGI Advantage® Cloud – State Use Terms, Section 4.2, (State Responsibility to Provide State Materials, Information, and Approvals), the State and CGI have agreed upon this milestone settlement. The settlement amount includes CGI costs to extend its staff from August 2023 through May 2024 due to State delays in satisfying its responsibilities under the Contract, which impacted the CGI's ability to deliver the Services.6/1/24n/an/a$ 3,000,000$ 3,000,000
Total$ 3,555,000$ 3,980,050$ 3,900,000$ 7,880,050
Hosting1/1/243/31/24• Develop Data Archiving Strategy & Plan

• Develop Concept of Operations Plan (Operational Framework)

• Provision additional non-prod environmentMilestone 9.1$ 160,000$ 160,000
Hosting Services
10/1/239/30/24All Other Required Hosting Activities (reference data from "Hosting Worksheet Years 1-5" Tab)10/1/23$ 2,564,000$ 2,564,000$ 2,564,000
Total$ 2,564,000$ 2,724,000$ - 0$ 2,724,000

Total - Year 2 $ 6,119,000 $ 6,704,050 $ 3,900,000 $ 10,604,050

Please see the Worksheet Notes & Assumptions sheet.

_x000D_#000000 Confidential

Alt Year 3-4- Phase 1B, 2A & 2B

Milestone #Performance PeriodAmendment 2
Performance PeriodMilestone Tasks & ActivitiesPerformance Criteria
(Amend #2)Invoice DateMilestone AmountMilestone Amount
(Amend #1)Milestone Amount (Amend #2) AdditionMilestone Total (Amend #2)Amend #3 TotalTotal Invoice Amount
Start DateEnd DateStart DateEnd DateMove to:
97/1/249/30/247/1/249/30/24Phase 1A activities10/31/24$ 1,367,000$ 1,367,000$ 300,000$ 450,000$ 1,817,000
• Conduct Sprints Planning to establish priority order of user
stories to executeReview and approval of monthly status reports
• Develop Plan for Sprints 18-20 (Change to 19-21)
• Complete Sprints 18-20 (Change to 19-21)
• Conduct OCM activities
• Provide PM Services
• Develop DRE Plan & Conduct Exercise
• Conduct system security analysis & testing
• Conduct Performance Testing
• Conduct End-User and Trainer training workshops
• Perform State and CGI Readiness Assessments
• Develop Cutover Plans (Playbook, Contingency, Continuity)
• Perform final production conversion & initiate live product

system operations for Phase 1A

• Execute trial conversion scripts
• Deploy system to IST & UAT
Activities Completed
Completion of ISTPublished IST Tests in Jira have been executed and 80% of executed IST Tests have passed.10/31/24$ - 0$ - 0$ 50,000
Completion of Mock Conversion 1All reference tables and transactions loaded into environment with >= 70% success rate10/31/24$ 25,000
Completion of Mock Conversion 2All reference tables and transactions loaded into environment with >= 80% success rate10/31/24$ 25,000
Completion of Parallel Payroll 170% matching Payroll with totals having explainable differences10/31/24$ 50,000
9.1n/an/a10/1/2412/31/24Phase 1A activities1/31/25$ - 0$ - 0$ 1,450,000$ 1,700,000$ 107,000$ 1,807,000
• Conduct Sprints Planning to establish priority order of user
stories to executeReview and approval of monthly status reports
• Develop Plan for Sprints 22-24
• Complete Sprints 22-24
• Conduct OCM activities
• Provide PM Services
• Conduct Parallel Payroll Testing
• Conduct Batch System Performance Testing
• Execute trial conversion scripts
• Conduct UAT tester training workshops
Activities Completed
• Completion of End-to-End TestingPublished E2E Tests in Jira have been executed and 80% of executed E2E Tests have passed1/31/25$ 50,000
• Completion of Mock Conversion 3All reference tables and transactions loaded into environment with >= 90% success rate1/31/25$ 25,000
• Completion of Mock Conversion 4All reference tables and transactions loaded into environment with >= 95% success rate1/31/25$ 25,000
• Completion of Parallel Payroll 280% matching Payroll with totals having explainable differences1/31/25$ 50,000
• Completion of Parallel Payroll 390% matching Payroll with totals having explainable differences1/31/25$ 50,000
• Completion of Batch Performance TestingCompletion of performance test and metrics shared with the State1/31/25$ 50,000
• Completion of CR024NewUser stories related to Epic 19943 completed1/31/25$ 84,500
• Benefits SMENewReview and approval of monthly status reports1/31/25$ 22,500
9.2n/an/a1/1/253/31/25Phase 1A activities4/30/25$ - 0$ - 0$ 1,585,000$ 1,685,000$ 25,000$ 1,710,000
• Conduct Sprints Planning to establish priority order of user
stories to executeReview and approval of monthly status reports
• Develop Plan for Sprints 25-27
• Complete Sprints 25-27
• Conduct OCM activities
• Provide PM Services
• Conduct End-User and Trainer training workshops
• Conduct Parallel Payroll Testing
• Develop Cutover Plans (Playbook, Contingency, Continuity)
• Conduct Online System Performance Testing
Activities Completed
• Completion of Parallel Payroll 495% matching Payroll with totals having explainable differences4/30/25$ 50,000
• Completion of Online Performance TestingCompletion of performance test and metrics shared with the State4/30/25$ 50,000
• Benefits SMENewReview and approval of monthly status reports1/31/25$ 25,000
1010/1/2412/31/244/1/256/30/25Phase 1A activities7/30/25$ 1,283,000$ 1,283,000$ 50,000$ 350,000$ 1,633,000
• Provide PM ServicesReview and approval of monthly status reports
• Perform State and CGI Readiness Assessments
• Perform final production conversion & initiate live product

system operations for Phase 1A

Activities Completed
• Completion of Go-LiveHRIS is Live on Advantage Cloud7/30/25$ 300,000
Phase 2A activities
• Provide 3 months of HyperCare supportReview and approval of monthly status reports7/30/25
Phase 1B activities (Starting 6/1)
• Conduct Sprints Planning to establish priority order of user

stories to execute

• Develop Plan for Sprints 1-3
• Conduct OCM activities
• Provide PM Services
• Provision NPD Environment
• Conduct BPR, alignment, requirements & analysis
• Configure business roles and security
• Develop Project Team Training Materials
• Conduct Project Team Training
• Design Conversion scripts
111/1/253/31/257/1/259/30/25Phase 1B activities10/30/25$ 1,181,000$ 1,181,000$ - 0$ 1,181,000
• Conduct Sprints Planning to establish priority order of user
stories to executeReview and approval of monthly status reports
• Develop Plan for Sprints 4-6
• Complete Sprints 1-3
• Conduct OCM activities
• Provide PM Services
• Conduct BPR, alignment, requirements & analysis
• Configure business roles and security
• Configure application & application & workflow security
• Execute training management data load
• Configure single sign-on
• Configure Welcome page
• Develop training materials
• Conduct Power User & UAT Tester Training workshops
• Design & Develop Interfaces, Forms, Reports & Analytics
• Design & Develop conversion scripts
• Execute trial mock conversion to support IST & UAT
• Conduct IST for configured stories and system functionality
• Support State’s UAT testing & script development activities
124/1/256/30/2510/1/2512/31/25Phase 1B activities1/31/26$ 307,800$ 432,850$ - 0$ 432,850
• Conduct Sprints Planning to establish priority order of user
stories to executeReview and approval of monthly status reports
• Develop Plan for Sprints 7-8
• Complete Sprints 4-6
• Conduct OCM activities
• Provide PM Services
• Develop training materials
• Conduct End-User & Train-the-Trainer workshops
• Execute trial mock conversion to support UAT
• Develop & Deploy Interfaces, Forms, Reports & Analytics
• Develop & Deploy conversion scripts
137/1/259/30/251/1/263/31/26Phase 1B activities4/30/26$ 300,000$ - 0$ 300,000
• Complete Sprints 7-8
• Perform State and CGI Readiness Assessments
• Update Cutover Plan
• Provision PRD Environment
• Perform final production conversion & initiate live product
system operationsReview and approval of monthly status reports
Phase 2B activities
• Provide 1st month of Hypercare support (Phase 2B)
14n/an/a4/1/265/31/26Phase 2B activities6/30/26$ 100,000$ 100,000$ 100,000
• Provide remaining 2 months of Hypercare support (Phase 2B)Review and approval of monthly status reports
Total$ 4,138,800$ 4,563,850$ 4,285,000$ 4,285,000$ 132,000$ 8,980,850
Hosting10/1/246/30/2510/1/246/30/25• Concept of Operations Completed (Operational Framework)7/31/25$ 78,000$ 78,000$ - 0$ 78,000
• Data Archiving Strategy and Plan Completed
Hosting Services
10/1/249/30/2510/1/249/30/25All Other Required Hosting Activities (reference data from "Hosting Worksheet Years 1-5" Tab)10/1/24$ 2,843,000$ 2,843,000$ - 0$ 2,843,000
Total$ 2,921,000$ 2,921,000$ 2,921,000

Total - Year 3 $ 7,059,800 $ 7,484,850 $ 4,285,000 $ 4,285,000 $ 132,000 $ 11,901,850

Please see the Worksheet Notes & Assumptions sheet.

_x000D_#000000 Confidential

Hosting Worksheet Years 6-10

DescriptionPeriod of PerformanceCost CategoryCommentsAmount
Hosting (All other required hosting activities)Year 6Application SubscriptionOur subscription fee is a bundled offering$ 3,256,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 3,256,000
Hosting (All other required hosting activities)Year 7Application SubscriptionOur subscription fee is a bundled offering$ 3,256,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 3,256,000
Hosting (All other required hosting activities)Year 8Application SubscriptionOur subscription fee is a bundled offering$ 3,256,000
Hardware/Infrastructure Design/Test/Deploy
Networking Design/Test/Deploy
Access Management Design/Test/Deploy
Environment Test/Deploy (Test, Train Production)
$ 3,256,000

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .