CTR057885_Contract_Administation.pdf

PDF 148 KB Posted

Attached to
Master Agreement AZ|CTR057885
Contract number
CTR057885
Issued by
Arizona

About this file

This document is a Vendor Performance Report from the Arizona Department of Transportation (ADOT) Procurement Group, located in Phoenix, Arizona. The report involves ADOT's Multimodal Planning Division and HDR Engineering, Inc. as the vendor. The specific contract is identified with the number CTR057885 HDR, and the document serves as an interim vendor performance review.

The project is for Grant Writing Services for the I-10 Corridor through Gila River Indian Community (GRIC), with a PO number of PO000424339. As of the report date (5/12/2022), the invoicing requirements have been met, project delivery is within the agreed-upon schedule, and project objectives have been achieved. The initial performance of the team is noted as being within expected standards. The vendor contact is Michael LaBianca from HDR Engineering, Inc., and the invoice date corresponds with the report date.

View the file

Other files

File Type Posted
2022 Q1 Usage Report.xlsx XLSX spreadsheet
2023 Q1 Usage Report.xlsx XLSX spreadsheet
2024 Q1 Usage Report.xlsx XLSX spreadsheet
CTR057885_Contract_Amendment_Summary_One__1_.pdf PDF
CTR057885_Quarterly Usage Report_Q2_April2024-June2024.xlsx XLSX spreadsheet
CTR057885_Contract_Amendment_Summary_Five__5_.pdf PDF
2022 Q2 Usage Report.xlsx XLSX spreadsheet
2022 Q3 Usage Report.xlsx XLSX spreadsheet
2022 Q4 Usage Report.xlsx XLSX spreadsheet
2022-06-01 COI GL AL WC.pdf PDF
2022-06-01 COI PL.pdf PDF
2023 Q2 Usage Report.xlsx XLSX spreadsheet
2023-06-01 COI GL AL WC.pdf PDF
CTR057885_Contract_Documents.pdf PDF
2021 Q4 Usage Report.xlsx XLSX spreadsheet
2023 Q3 Usage Report.xlsx XLSX spreadsheet
2023-06-01 COI PL.pdf PDF
2024 Q2 Usage Report.xlsx XLSX spreadsheet
2024-06-01 COI PL.pdf PDF
2025-06-01 COI PL.pdf PDF
CTR057885_Contract_Administration.pdf PDF
CTR057885_Contract_Amendment_Summary_Four__4_.pdf PDF
CTR057885_Contract_Amendment_Summary_Two__2_.pdf PDF
SPO_Form_205_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
2023 Q4 Usage Report.xlsx XLSX spreadsheet
2024-06-01 COI GL AL WC.pdf PDF
2025-06-01 COI GL AL WC.pdf PDF
CTR057885_Contract_Amendment_3.pdf PDF
CTR057885_Quarterly Usage Report_Q3_July2024-Sept2024.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency/ORG Agency Address

ADOT Contact Telephone Contact Address

Vendor Vendor Contact

Contract No. Date 5/2/2022

Invoice 1200428138

Date 5/2/2022

Project Title Interim VPR

Action Taken:

Reporting incident, no action requested.

Specific action requested:

Signature of Agency Representative Date

PART 2 – ADOT PROCUREMENT ACTION

Date of Action

Vendor Performance Report Arizona Department of Transportation

Procurement Group

1739 W. Jackson Street, 100P

Phoenix, AZ 85007

Facsimile: 602.712.3717

This document should be used to document positive or negative performance by a contractor and to state whether corrective action is required.

Please complete & return to ADOT Procurement.

PART 1 AGENCY REPORT

Arizona Department of Transportation / Multimodal Planning Division Mail Drop 310B, 206 S. 17th Avenue, Phoenix, AZ 85007

HDR Engineering, Inc. Michael LaBianca / michael.labianca@hdrinc.com

CTR057885 HDR

Engineering, Inc.

PO Number

PO 0000424339

Describe the performance issue. Be accurate, complete and factual. Use an attachment if necessary.

MPD Tracking Number MPD0108-22 Grant Writing Services for I-10 Corridor through Gila River Indian Community (GRIC)

Describe Compliance with

Invoicing Requirements:

Describe Project Delivery Compared with Schedule:

Describe Project Outcomes Compared with Objectives:

Describe Vendor Performance

Contract Officer Date

DocuSign Envelope ID: C1337F91-AFD5-460E-BC6C-70A9C56DC002

6027128239

Initial performance of the team is within expected standards.

Project delivery is within the agreed upon schedule.

Kohinoor Kar

Project objectives have been met.

X

Invoicing requirements have been met.

5/12/2022

05/12/2022

206 S. 17th Avenue, Mail Drop 310B, Phoenix, AZ 85007

File details come from the government source that posted it. Updated .