The document is a Vendor Response Template for a Magnetic Tape Library solicitation (CR-367706) issued by Fermi National Accelerator Laboratory. The template requires vendors to provide comprehensive technical details across multiple sections, including company information, hardware specifications, high availability features, data center environment requirements, VESDA detector installation procedures, and software documentation.

Key technical requirements include a tape library with 171PB total storage capacity, 100 I/O slots, 2 tape arm robots, 10 tape drives, enterprise-grade tapes with 19TB raw capacity, and 8 total frames/racks. The library must operate within specific environmental conditions: temperatures between 50-90°F, relative humidity of 30-70%, and cooling requirements of 27,000 BTU. Vendors must also provide detailed documentation on system requirements, drivers, APIs, command line interfaces, and graphical user interfaces for managing the library. Additional components like a custom management server and vendor-specific operating system are expected, with associated yearly licensing costs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CR-367706

Attachment D Vendor Response Template

Magnetic Tape Library March 05, 2025

Instructions For each of the following sections, please provide the requested information. Include any assumptions made in order to arrive at the answers.

1.1 Management Approach

Company Summary.

Company name and address.

Company location.

Company web page.

Company sales representative name, phone, and email.

Is this a public or private company?

How many years has the company been in business?

How many people does the company employ?

1.2 Management Approach - Additional Information

Please provide the following information being as specific as possible:

1.1. Product roadmap.

1.2. Warranty and terms.

1.3. Remarkable capabilities, features, or services beyond the requirements

1.4. References from other national labs of similar scale library installation used for storage of scientific data.

1.5. Number of new installations of comparable size over the last three years.

1.6. Acceptance testing procedures.

1.3 Hardware Information

Please complete the following table with the requested technical specifications.

Note: The examples provided in italic font are placeholders and do not reflect actual technical expectations.

They are included solely to illustrate how to properly fill out the table.

SECTION PROPOSAL INFORMATION

Tape Library

Model Fermilab Example-ABC0123 Total Storage Capacity 171PB Total I/O Slots 100 Total Tape Arm Robots 2 Total Tape Drives Included 10 Total Tape Drives Capacity 42 Proposal Connection Interfaces FC-16Gbps (Tape Drives)

1GbE (controllers & internal servers) Total Dimensions W-240in, D-45in, H-75in Estimated Power Consumption (full load, all components/capacity)

Continuous (Max): 7500W Peak: 7800W

Reference to Documentation ABC0123.pdf

Tapes

Type (LTO/Enterprise) Enterprise Model Fermi-TapeExample – TFNAL-10 Capacity (RAW) 19TB Tape Slots in Library 9,000 Reference to Documentation TFNAL-10.pdf (pages: 1, 10, 27)

Tape Drives

Model Fermi-Drive-DFNAL-10 Included Connection Interfaces 1 x 10GbE

1 x FC-16Gpbs 1 x SAS-12Gbps

Transfer Rate (RAW) 550MBps Power Consumption Continuous (Max): 70W

Peak: 75W Reference to Documentation DFNAL-10 (pages: 2, 7)

Frames/Racks

Total 8 Models (Include quantity) 1 x FNAL – A

3 x FNAL – B 4 x FNAL – C

Shared Tape/Drive/IO Slots?

(Does the availability of one kind of slots affects the availability of the other kind of slots?

If the slot amount is fixed within a frame type/model answer “No”)

No

Included Sensors Temperature Humidity

Max. Power consumption by a single rack/frame

Continuous (Max): 1500W Peak: 1700W

Max. Weight by a single frame 1,400lb Reference to Documentation ABC0123.pdf (pages: 30, 31, 32)

1.4 High Availability (HA) Information

List all components in the library that provide high availability (HA) along with their specific functions within the system. Expand the table with additional rows as necessary to ensure all relevant components are included.

Note: The examples provided in italic font are placeholders and do not reflect actual technical expectations.

COMPONENT DESCRIPTION

Tape Arm Robots Counts with two robots which function is to move tapes from/to the slots from/to the drives. Each robot can grab up to 2 tapes.

These robots have automatic fail over and provide a 90% redundancy since if one of them fails a small section where the failed robot is parked becomes inaccessible for the other robot.

Power Supply Units Counts with dual PSU’s in the internal library management servers with automatic failover that provides protection in case a power source/PSU fails.

1.5 Additional Hardware/Software Information

List any additional hardware or software not included in the proposal cost but required for managing the library (e.g., vendor-supplied computers, operating systems, etc.). Add more rows to the table as needed to ensure all necessary components are covered.

Note: The examples provided in italic font are placeholders and do not reflect actual technical expectations.

COMPONENT DESCRIPTION COST

Management Server The library requires a custom vendor supplied server to be managed. This server must also have a custom setup with proprietary software that is included below.

$3,000 USD

Vendor OS The management server must have this custom vendor operative system in order to operate the library management software. The license must be renewed in a yearly basis.

$1,000 USD to be billed yearly

1.6 Data Center and Environment Information

Please provide a rack/frame distribution diagram (similar to the example below) that clearly indicates the dimensions of each tape library frame. Specify which frames have power connections, the type of connectors used, and the corresponding power requirements. Complete the following tables as needed.

Note: The examples provided in italic font are placeholders and do not reflect actual technical expectations.

Rack/Frame distribution aerial view (Frame #/Frame Type) (Diagrams can be personalized but must depict at least the same info)

Racks/Frames with external power connections:

RACK CABLE

QTY PER

RACK1

RECEPTACLE

TYPE

CABLE

ELECTRICAL

SPECS.

CABLE

LENGTH

POWER

CONSUMPTION

(MAX) PER RACK2

1 2 (in HA)1 9C33U0 200-240V ac, 32A 14ft Continuous: 1700W Peak: 1800W

3, 5, 7 2 (in HA)1 Nema l6-30r 200-240V ac, 30A 14ft Continuous: 829W Peak: 858W

1.- Please specify if one of the cables is for Power High Availability (HA) 2.- If the rack shares power with other racks, please put the maximum total power at full load (all drives/components present) this cable is going to grab

Racks/Frames with external network connections:

RACK CABLE QTY

PER RACK

PORT TYPE

1 4 10GBASE-T

3, 5, 7 2 10GBASE-T

Racks/Frames with external tape drive connections (including unoccupied tape drive slots):

RACK TAPE DRIVE CAPACITY

PER RACK

CONNECTION

INTERFACE

3, 5, 7 14 FC-16Gpbs

Library floor requirements:

MAX POINT LOAD MAX OVERALL

LOAD

MAX ALLOWABLE

VARIANCE

MAX OUT-OF-LEVEL

CONDITION

70lb per square inch 45lb per square foot .3in per 3in 2in for all library length

240in

#1

FNAL-A

#2

FNAL-C

#3

FNAL-B

#4

FNAL-C

#5

FNAL-B

#6

FNAL-C

#7

FNAL-B

#8

FNAL-C 45

in

Library cooling requirements (Whatever is more restrictive: tape/library):

FULL LOAD - TOTAL

LIBRARY COOLING

(BTU)

OPERATING

TEMPERATURE

OPERATING

RELATIVE HUMIDITY

OPERATING

MAX WET BULB

TEMPERATURE

27,000 50 – 90°F 30 – 70% 80°F

Library air flow - Frame/Rack Side View (Diagrams can be personalized but must depict at least the same info)

1.7 VESDA Detector Information

Provide complete documentation (or references to it) outlining the procedure for installing VESDA detectors, including the required clearance areas for proper installation. Clearly specify all requirements necessary to ensure the correct operation of the tape library and prevent any potential interference caused by the VESDA detectors.

1.8 Software Information

Provide the following documentation by including it directly or providing a reference to it:

1. System requirements (OS, memory, CPU, storage, etc.) to run the management software.

2. Drivers documentation and requirements. Include all components that require drivers differentiating those that are compatible with Linux generic drivers/apps

Si de

Fr on t

Re ar from those that require proprietary drivers (for these include their respective documentation or reference to it).

3. Application programming interfaces (API) documentation that are independent of the interfaces exposed by the drivers (like REST APIs) that can help in the development of tools for interacting with the library and its components.

4. Documentation regarding any command line interfaces (CLI) that can help in the administration of the library.

5. Documentation regarding any graphical user interfaces (GUI) for managing the library.

1.2 Management Approach - Additional Information
1.6 Data Center and Environment Information
10GBASE-T
10GBASE-T
1.7 VESDA Detector Information
1.8 Software Information