Corpyard Phase II - Connex Structural Anchoring & Welding
Solicitation number
26-065-ITB
Issued by
Yolo County, California

About this file

Corpyard Phase II - Connex Structural Anchoring & Welding

This is an Invitation to Bid (ITB #26-065-ITB) issued by the City of West Sacramento for construction services to anchor 14 Conex storage containers to an existing foundation. The project involves permanently securing both 20-foot and 40-foot Conex units to a combined Hot Mix Asphalt (HMA) and Cement-Treated Base (CTB) foundation through structural anchoring and welding. Work includes drilling anchor holes through asphalt into the cement base, setting high-strength threaded rods using structural epoxy, installing heavy steel base plates, and field-welding plates to container corner castings. All welding must be performed by an AWS D1.1 certified welder and verified by a third-party special inspector in compliance with the 2022 California Building Code and ASCE 7-22 standards. The project requires a minimum of four structural anchors per container, totaling 56 anchor points across all units. The release date is July 10, 2026, with a non-mandatory pre-proposal meeting on July 16, 2026 at 10:00 a.m. The deadline for submitting questions is July 21, 2026 at 4:00 p.m., with question responses due July 23, 2026. Sealed bid responses must be submitted electronically through the City's OpenGov procurement portal no later than July 28, 2026 at 2:00 p.m. The anticipated contract award date is September 2, 2026. Responses must remain valid for at least 90 business days after the proposal deadline.

The City anticipates a project value of $26,500. Bidders must comply with California prevailing wage requirements and register with the Department of Industrial Relations. All contractors and subcontractors must hold valid California contractor licenses and necessary professional certifications. Proposers must submit a signed W-9 form, complete a certification regarding debarment status, provide a bid bond, and meet all insurance requirements outlined in the Insurance Checklist attachment. Bidding is open to all responsive and responsible bidders. The contract will be awarded to the lowest responsive, responsible bidder whose bid complies with all ITB requirements. The City reserves the right to reject any or all bids, waive variances, or award the contract based on the base bid alone or in combination with additive alternate items as deemed in the City's best interest. Bidders must use the City's Virtual Project Manager (VPM) system for project administration, which includes daily logs, change orders, transmittals, submittals, and requests for information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

26-065-ITB

CORPYARD PHASE II - CONNEX STRUCTURAL ANCHORING &

WELDING

City of West Sacramento

1110 W Capitol Ave

West Sacramento, CA 95691

RELEASE DATE: July 10, 2026

DEADLINE FOR QUESTIONS: July 21, 2026

RESPONSE DEADLINE: July 28, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d

City of West Sacramento

INVITATION TO BID

Corpyard Phase II - Connex Structural Anchoring & Welding

I. Introduction II. Project Details

III. Terms and Conditions IV. Bid Submittal V. Cost Table

VI. Contract Award

Attachments:

A - Construction_Bid_Packet_(MasterTemplate_3.10.26)_Connex_Anchoring_Rev3

B - Approved 2026-03-18 HSA 225-001 CA Container Anchorage-Stamped DWG

C - Approved 2025-10-28_ConnexResubmittalStructuralCalcs_25-0

D - Insurance Checklist

Invitation to Bid #26-065-ITB Title: Corpyard Phase II - Connex Structural Anchoring & Welding

1. Introduction

1.1. Summary

The City of West Sacramento is accepting sealed responses for Contruction services to anchor 14 Conex containers to the existing Cement-Treated Base (CTB) and Hot Mix Asphalt (HMA) foundation, per engineered drawings to be received no later than Tuesday, July 28, 2026 at 2:00 pm.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full

1.2. Background

The City of West Sacramento's Public Works Operations Department purchased 14 Connex storage containers, with seven (7) shed structures mounted between the storages. The purpose of the Connex containers is for storing tools, equipment and minor charging of battery powered equipment. It is now required that these Connex containers be anchored to the ground per approved engineers drawings.

1.3. Contact Information

Mubusi Muhapi

Project Manager II

1110 West Capitol Avenue

1st Floor - Construction Management & Facilities Development

West Sacramento, CA 95691

Email: mubusim@cityofwestsacramento.org

Phone: (916) 617-4803

Department:

Capital Projects - Construction

1.4. Timeline

Release Project Date July 10, 2026

Pre-Proposal Meeting (Non-Mandatory) July 16, 2026, 10:00am

4300 West Capitol Avenue, West Sacramento CA

Question Submission Deadline July 21, 2026, 4:00pm

Question Response Deadline July 23, 2026, 4:00pm

Proposal Submission Deadline July 28, 2026, 2:00pm https://secure.procurenow.com/portal/cityofwestsacramento/projects/276918/document?section=undefined mailto:mubusim@cityofwestsacramento.org tel:(916)617-4803

Contract Award Date (Non-Mandatory) September 2, 2026

Microsoft Teams meeting

Join:

https://teams.microsoft.com/meet/227941361012

10?p=lKcfNGxcs1bsXPzp2y

Meeting ID:

227 941 361 012 10

Passcode:

ad25Bo7C https://teams.microsoft.com/meet/22794136101210?p=lKcfNGxcs1bsXPzp2y https://teams.microsoft.com/meet/22794136101210?p=lKcfNGxcs1bsXPzp2y

2. Project Details

2.1. Important Instructions for Electronic Submittal

The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full

2.2. Project Scope

This project involves permanently securing 14 Conex containers (both 20-foot and 40-foot units) to a combined Hot Mix Asphalt (HMA) and Cement-Treated Base (CTB) foundation. To resolve outstanding structural comments under City Plan Check No. 25-05-080E, a contractor must drill anchor holes past the asphalt into the solid cement base, set high-strength threaded rods using structural epoxy, and field-weld heavy steel base plates directly to the containers' corner castings. All work must be executed by an

AWS D1.1 certified welder, verified by a third-party special inspector, and completed in strict compliance with the 2022 California Building Code and ASCE 7-22 environmental design criteria for high-wind and high-seismic zones. Each Conex unit requires a minimum of four (4) structural anchors, with one heavy-duty chemical anchor rod assemblies and steel base plates installed at each of the container's four main castings, totaling 56 anchor points across all 14 units to ensure code-compliant wind and seismic stability

Project Identification

[Drill to Base Layer] ──> [Epoxy Threaded Rods] ──> [Bolt & Torque Plates] ──> [Weld to Corners]

1. Drilling & Base Layer Anchor Placement

• Drilling: Core drill anchor holes completely through the Hot Mix Asphalt (HMA) finish layer.

• Embedment: Extend all holes deep into the underlying load-bearing Cement-Treated Base (CTB).

• Cleaning: Blow out all concrete dust and aggregate debris from the holes using compressed air.

• Anchors: Insert high-strength all-thread steel rods into holes using code-approved structural anchoring epoxy.

• Curing: Allow the epoxy to cure fully according to the manufacturer’s data sheet prior to loading.

https://secure.procurenow.com/portal/cityofwestsacramento/projects/276918/document?section=undefined

2. Base Plate Fabrication & Field Welding

• Hardware: Install thick structural steel plates or steel angle assemblies over the cured anchor rods.

• Torque: Secure the steel assemblies using heavy washers and nuts torqued to structural specifications.

• Welding: Field-weld the bolted steel assemblies directly to the heavy corner castings of the

Conex containers.

• Rust Prevention: Wire-brush all finished welds and coat all raw steel elements with zinc-rich cold galvanizing spray.

3. Permit Final and Inspection compliance

• Final punchlist items: Ensure the work matches the details approved in the plans/drawings, and corrections of any discrepancies are completed.

• Call for Final Inspection: The project is already permitted. Once work is complete, a final inspection must be called for and permit finalled.

2.3. Project Estimate

The City anticipates a project value of: $26,500.

3. Terms and Conditions

3.1. Prevailing Wages

A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this

ITB is subject to compliance monitoring and enforcement by the DIR.

B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification.

3.2. Statement of Offer

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

3.3. Project Management Documentation & Administration

Virtual Project Manager (VPM)

The City anticipates using an online cloud-based project management system to manage, assign, and coordinate specific tasks with the City's selected Contractor within the Scope of Work. By way of this section, the City reserves the right to utilize an online cloud-based project management system. By submitting a bid, bidder acknowledges and agrees that they are prepared to use the system, as may be required by the City. The City's specific system is Virtual Project Manager (VPM). VPM allows for paperless documentation and project administration. For more information on VPM, go to www.virtual-pm.com

A. Submittal Procedures and Construction Progress Documentation for requirements for administering and using VPM.

1. The Contractor shall submit the items associated with this section via Virtual Project

Manager (VPM), an online cloud-based project management system, as specified below.

2. Virtual Project Manager (VPM) allows for paperless documentation and project administration. All posted information is available to all personnel involved with the project at any time using the internet.

3. The use of VPM by the Contractor is mandatory. Access to VPM will be provided at no cost to the contractor.

4. In order to utilize VPM, the contractor needs a computer, internet access, a digital camera, and a scanner. For more information, go to www.virtual-pm.com. To Login, from the homepage, select LOGIN and enter the Username and Password that will be provided to you by the agency.

B. The contractor shall use the following features:

1. Daily Logs: Contractor’s daily reports shall be entered electronically via VPM.

2. Change Order Manager: Contractor requests for change order shall be submitted electronically via VPM.

3. Transmittals: Schedules, Pay applications, etc. shall be submitted electronically via VPM.

4. Submittals: Submittals requiring approval shall be submitted electronically via VPM.

5. RFIs: Requests for information (RFIs) shall be submitted electronically via VPM.

C. Technical Submittals

1. Submittal Procedure

a. The Contractor shall utilize the agency’s online cloud-based project management system

(Virtual Project Manager) for submittals.

3.4. Questions and/or Objections

It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).

A Proposer may submit Questions related to this ITB to the City through the City’s e-Procurement Portal at or before:

Tuesday, July 21, 2026 at 4:00 pm.

Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.

3.5. Amendment and Cancellation

The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications.

https://secure.procurenow.com/portal/CityofWestSacramento

3.6. Right of Rejection

A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety.

B. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected.

C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.

D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.

3.7. Prohibition of Respondent Terms and Conditions

A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB.

3.8. Joint Ventures and Partnering

A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:

A. The Proposal shall respond to each section and subsection of this ITB.

B. The Proposal shall clearly set forth the respective responsibilities and functions that each

Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB.

C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB.

D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.

3.9. Proposal of Alternate Services

A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected.

3.10. Proposal of Additional Services

A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the

Contract before execution.

3.11. Severability

If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and

Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid.

3.12. Licensure and Special Certification

Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all

Proposers to submit evidence of proper licensure and certifications.

3.13. Disclosure of Proposal Contents

All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals shall be open for review by the public to the extent required by the California Public

Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.

Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

3.14. Conflict of Interest and Restrictions

By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB.

3.15. Proprietary Information

A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.

Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.

Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.

4. Bid Submittal

4.1. Please upload a signed W-9 form*

Please download the IRS 2024 Form W-9 and upload a completed, signed copy. Acceptable signatures include either a handwritten (wet) signature or a valid electronic signature.

• W-9_Form_ver._2024_-_BLANK.pdf

*Response required

4.2. Please enter Legal Company Name and related DBA*

Please state your company name and any related DBA's based on your California Secretary of State

Filing.

*Response required

4.3. Response*

Please upload your complete response here including all required forms into one (1) PDF document

*Response required

4.4. Cost Proposal using Electronic Pricing Table*

The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder.

☐ Please confirm

*Response required

4.5. Statement of Offer*

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

☐ Please confirm

*Response required

4.6. Bid Bond*

Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs

*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/4713e161-0e9b-428f-be7a-2b0ae306a414_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4ISMN3A7Y%2F20260710%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260710T204647Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIBYSqrzj%2FsHn%2FIyhaBw3UFYJW0SWCJfzjHUUu8eZHRIyAiAnhHJGXAsm43P9Du%2Bpbb%2BXg78BuBphHQN65x56SLcIMyqVBQi9%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMejsA3V%2FfyAyFyur%2BKukElcelQTA9dTewJ0WyF17J%2FoFVJgQ3gJOd3t44UKj1%2F5wVDkTBhHA4p%2BaqvOAXOk%2FZq7Vjut7XQMCLE2%2B2j%2Fs%2B2LPDqSAFsK%2BOSoP7Ueh4T5vGCnqp7srfw%2BZJ0vQ0PmYMI4omYuxzcbU1VDTPidKyEpzL4nM5aE5e4hTMMQzr1pZ02Z4jJglCoKKAMlBR7PyV5m1NJnMciWRRoAAUjRBFOsHLNJX86o6K4CzCT293OVij9%2FGCD7UOimCDvm%2FvXk%2FPq8fmq%2Bi9%2BOT1ex8Fm2Nm2u1ljW5MtR%2FYqflE4MeGzMZ8TsuDZPgqQJRObetpP9Vc9FS4kCJjbL6EoKhWlVgTKttwRykhwnZ5gudDAACRan1DMdwqanuSr0%2F%2FJ%2FMRnzPtobMf6H8CpCsLAGjiBozsH27eK4nEsPnIaJCjWoYEuBJnRrmcGyEBvG6IUw%2BVvICOgWG4laFqZyYIkUONZ7BiWxbqMVEFetSXW25qhL84AEVRegOmjYZvjW83KyyvCTrbdz3ZwHWmYk5%2B8kgeDk4qLLG6VyC8tE6EXyaHccFfR7Z5AqGwG2feHLuuUaVyTuHOwwXsZgm%2B4BTBi7VunoPlj4fGsWnoylMCowRiuw0S2FnW2FFzyMxm8XC2xdiTDX77EZi7qC4PfZRHWf0FF4EbkoYCTaxzMco4vUlczVUC7A1H%2B2SaG99Sa25onc1SfVrmMqSYAau08YIQjpPuWLDKO7K0vaTqgAEg%2B647SlY7qNADJ6LGsm62iWTwoVN01yYtLLcolV6LzxtLFRPBDZG1CXzZyj44vfYrb7Hfz%2FvZPwR02H08VS2xu30wopfF0gY6mgERLpfl9oX4YWrclpgog4x4o6wh1vCFHvVp%2BIfre3RiqKM412c8UeE7cAriQlh3uVJdC2LR9%2BZh1EUpFBhDxUfvfCfaX3owmxPWJX8I6mSbHQbjoPG6jlZ0WFCCi2o5%2Fixe%2B%2FSamSh2y0LsaXINrbOfmxxsWCzAhOGbV99oYPgLtbc4Z4PEP7Ps%2BCucceE7iSrP3fDj6FDI71Pr&X-Amz-Signature=7abe32a59043eabbf2c7d23ff204d07a5bb1b8ddb59346e54f4d09a29750b798&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/276918/document?section=2672445

4.7. California Contractors State License Board

Please enter your contractor license number for verification.

4.8. Certification regarding Debarment

The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.

A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.

Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.

For all other proposers, the completed form is sufficient.

• Certification_Regarding_Deb...

4.9. City Contract *

The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract.

☐ Yes

☐ No

*Response required

4.10. Insurance Requirements*

The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the

Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.

☐ Yes

☐ No

*Response required

4.11. Authorized Contract Signer *

Please provide the name, title and email address of the authorized contract signer.

*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/7fbcd8f3-7d1e-4b79-a50c-03f71fe54e62_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4ISMN3A7Y%2F20260710%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260710T204647Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEPT%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIBYSqrzj%2FsHn%2FIyhaBw3UFYJW0SWCJfzjHUUu8eZHRIyAiAnhHJGXAsm43P9Du%2Bpbb%2BXg78BuBphHQN65x56SLcIMyqVBQi9%2F%2F%2F%2F%2F%2F%2F%2F%2F%2F8BEAIaDDg5MjM2NDY4NzY3MiIMejsA3V%2FfyAyFyur%2BKukElcelQTA9dTewJ0WyF17J%2FoFVJgQ3gJOd3t44UKj1%2F5wVDkTBhHA4p%2BaqvOAXOk%2FZq7Vjut7XQMCLE2%2B2j%2Fs%2B2LPDqSAFsK%2BOSoP7Ueh4T5vGCnqp7srfw%2BZJ0vQ0PmYMI4omYuxzcbU1VDTPidKyEpzL4nM5aE5e4hTMMQzr1pZ02Z4jJglCoKKAMlBR7PyV5m1NJnMciWRRoAAUjRBFOsHLNJX86o6K4CzCT293OVij9%2FGCD7UOimCDvm%2FvXk%2FPq8fmq%2Bi9%2BOT1ex8Fm2Nm2u1ljW5MtR%2FYqflE4MeGzMZ8TsuDZPgqQJRObetpP9Vc9FS4kCJjbL6EoKhWlVgTKttwRykhwnZ5gudDAACRan1DMdwqanuSr0%2F%2FJ%2FMRnzPtobMf6H8CpCsLAGjiBozsH27eK4nEsPnIaJCjWoYEuBJnRrmcGyEBvG6IUw%2BVvICOgWG4laFqZyYIkUONZ7BiWxbqMVEFetSXW25qhL84AEVRegOmjYZvjW83KyyvCTrbdz3ZwHWmYk5%2B8kgeDk4qLLG6VyC8tE6EXyaHccFfR7Z5AqGwG2feHLuuUaVyTuHOwwXsZgm%2B4BTBi7VunoPlj4fGsWnoylMCowRiuw0S2FnW2FFzyMxm8XC2xdiTDX77EZi7qC4PfZRHWf0FF4EbkoYCTaxzMco4vUlczVUC7A1H%2B2SaG99Sa25onc1SfVrmMqSYAau08YIQjpPuWLDKO7K0vaTqgAEg%2B647SlY7qNADJ6LGsm62iWTwoVN01yYtLLcolV6LzxtLFRPBDZG1CXzZyj44vfYrb7Hfz%2FvZPwR02H08VS2xu30wopfF0gY6mgERLpfl9oX4YWrclpgog4x4o6wh1vCFHvVp%2BIfre3RiqKM412c8UeE7cAriQlh3uVJdC2LR9%2BZh1EUpFBhDxUfvfCfaX3owmxPWJX8I6mSbHQbjoPG6jlZ0WFCCi2o5%2Fixe%2B%2FSamSh2y0LsaXINrbOfmxxsWCzAhOGbV99oYPgLtbc4Z4PEP7Ps%2BCucceE7iSrP3fDj6FDI71Pr&X-Amz-Signature=05a7ced7c78d03f82e5d890c8be2d363b6e6a329ca8806771aa1f3c453c3282a&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/276918/document?section=undefined

5. Cost Table

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Layout, Equipment & Mobilization 1 LS

2 Anchoring: Drilling & checmical Epoxy

Setting per drawings

56 EA

3 Structural Base Plates(ASTM A36 Steel

Angles/Plates)

56 EA

4 Metal Fabrication & AWS

Welding(Secure plates to Conex

Corner Castings)

56 EA

5 Rust Mitigation & Coating (Zinc-Rich

Cold Galvanizing Spray) and cleanup

14 EA

6 Special Inspection and Testing, and

CloseOut

1 LS

TOTAL

6. Contract Award

6.1. Opening & Award of Contract

Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders.

Bid Summaries may be made available to Bidders after the Bid Date.

The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001

The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids.

Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection.

Award of Contract

The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose

Bid complies with the requirements set forth herein. The City reserves the right to award the Contract based on the Base Bid alone or the Base Bid plus any combination of Additive Alternate Bid items, in any order, as determined to be in the best interest of the City.

The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of

Award”) shall be deemed the Award of Contract.

6.2. Bid Protests

The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the

City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure.

Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the

City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening.

(a) The initial protest document must contain a complete statement of the basis for the protest, and all supporting documentation.

(b) The party filing the protest must have actually submitted a Bid for the Work. A Subcontractor of a party submitting a Bid for the Work may not submit a Bid protest. A party may not rely on the Bid protest submitted by another Bidder, but must timely pursue its own protest.

(c) The protest must refer to the specific portion of the Contract Documents which forms the basis for the protest.

(d) The protest must include the name, address and telephone number of the person representing the protesting party.

(e) The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

(f) The City will give the protested Bidder five (5) working days after the receipt of the protest to submit a written response. The responding Bidder shall transmit the response to the protesting Bidder concurrent with delivery to the City.

(g) The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest. The Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government

Code Claim or legal proceedings.

(h) If the City determines that a protest is frivolous, the protesting Bidder may be determined to be non-responsible and that Bidder may be determined to be ineligible for future contract awards.

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Project Details
2.1. Important Instructions for Electronic Submittal
2.2. Project Scope
2.3. Project Estimate
3. Terms and Conditions
3.1. Prevailing Wages
3.2. Statement of Offer
3.3. Project Management Documentation & Administration
3.4. Questions and/or Objections
3.5. Amendment and Cancellation
3.6. Right of Rejection
3.7. Prohibition of Respondent Terms and Conditions
3.8. Joint Ventures and Partnering
3.9. Proposal of Alternate Services
3.10. Proposal of Additional Services
3.11. Severability
3.12. Licensure and Special Certification
3.13. Disclosure of Proposal Contents
3.14. Conflict of Interest and Restrictions
3.15. Proprietary Information
4. Bid Submittal
4.1. Please upload a signed W-9 form*
4.2. Please enter Legal Company Name and related DBA*
4.3. Response*
4.4. Cost Proposal using Electronic Pricing Table*
4.5. Statement of Offer*
4.6. Bid Bond*
4.7. California Contractors State License Board
4.8. Certification regarding Debarment
4.9. City Contract *
4.10. Insurance Requirements*
4.11. Authorized Contract Signer *
5. Cost Table
6. Contract Award
6.1. Opening & Award of Contract
6.2. Bid Protests

File details come from the government source that posted it. Updated .