Approved_2026-03-18_HSA_225-001_CA_Container_Anchorage-Stamped_DWG.pdf
PDF 1 MB Posted
- Solicitation number
- 26-065-ITB
- Issued by
- Yolo County, California
About this file
This is an engineered drawing document for the City of West Sacramento, California, detailing structural anchoring specifications for Conex containers. The project, titled "Corpyard Phase II - Connex Structural Anchoring & Welding," involves anchoring 14 Conex containers to an existing Cement-Treated Base (CTB) and Hot Mix Asphalt (HMA) foundation. The sealed bid responses are due no later than Tuesday, July 28, 2026 at 2:00 pm. The stamped drawing provides the technical specifications and engineered design requirements necessary for contractors to prepare accurate bids and execute the construction services in compliance with the established standards.
The drawing serves as the primary technical reference document for bidders and includes detailed anchor placement, welding specifications, and structural design parameters required for proper installation of the container anchoring system. Contractors responding to this opportunity must adhere to the engineered specifications shown in this document and the accompanying bid specifications provided by the City. No additional pricing terms, set-asides, incumbent information, or funding sources are specified within this drawing file itself; such information would be contained in the associated bid specifications and project documents referenced in the contract opportunity notice.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S1
GENERAL STRUCTURAL
NOTES
Ayyappan.S 3/17/2026 11:43 PM 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg.dwg
Re vi sio n
Ta bl e M
AR
K
DE
SC
RI
PT
IO
N
DA
TE
250 Main St. Suite A Klamath Falls, OR 97601 www.structure1.com Phone: (541) 850-6300 info@structure1.com
Project:
Container Anchorage
4300 Capital Avenue, West Sacramento, CA 95691.
TH
E
DO
CU
M
EN
TS
, I
DE
AS
A N
D
DE
SI
G
N S
IN
CO
RP
O
RA
TE
D H
ER
EI
N , I
S
TH
E
PR
O
PE
RT
Y
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
A
N D
IS
N
O T
TO
B
E U
SE
D, IN
W
H O
LE
O
R
PA
RT
, F
O R
AN
Y
O
TH
ER
P
RO
JE
CT
W
IT
H
O U
T
TH
E W
RI
TT
EN
P
ER
M
IS
SI
O N
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
Page:
Title:
Project #:
DRAWN BY: AYPN
DESIGNED BY: ISL
CHECKED BY: N.T.
Date: March-17-2026
Owner:
CITY OF WEST
SACRAMENTO
Haynes Studio Arch. 225-001
PSE
Consulting Engineers, Inc.
Stamp:
Structural details for this project are for illustration only. They are not drawn to scale unless noted otherwise. Contractor must verify all dimensions before fabrication or construction. Do not scale drawings.
A. DESIGN SCOPE BY PSE CONSULTING ENGINEERING (PSE):
1. Design Shown on drawings by PSE is for the following items.
a. Anchor Bolt Analysis For Container Only.
2. Design Shown on PSE drawings does not include: Fabric Truss & any other Roof, Fabric Truss to Container Connection, Container, Foundation, finishes, architectural items, windows, doors, moisture barriers, water proofing, mechanical units, plumbing, or electrical items.
B. GENERAL REQUIREMENT:
1. Furnish all labor, materials, and equipment necessary to complete the work shown or inferred by these drawings.
2. Where construction details are not shown or noted for any part of the work, such details shall be the same as for similar work shown on the drawings.
3. Notes and details on the drawings take precedence over the general notes and typical details in case of conflict.
4. Provide manufacturer's approved product evaluation reports (ICC reports) and a list of all proposed substitutions to the Engineer for review and written approval before fabrication.
5. Pipes, ducts, sleeves, chases, etc. shall not be placed in slabs, beams, or walls unless specifically shown or noted nor shall any structural member be cut for pipe, ducts, etc., unless specifically shown. Obtain prior written approval for installation of any additional holes, ducts, etc.
6. Locate and protect underground or concealed conduit, plumbing or other utilities where new work is being performed.
7. The contract drawings and specifications represent the finished structure and do not indicate methods, procedures or sequence of construction. The contractor shall take necessary precautions to maintain and insure the integrity of the new and any existing structures during construction. The design stresses shall not be exceeded during construction based on the age of each element . Neither the owner nor Architect/Engineer will enforce safety measure regulations. Contractor shall design, construct and maintain all safety devices, including shoring and bracing for the new and any existing structures and shall be solely responsible for conforming to all local, state and federal safety and health standards, laws and regulations. Observation visits to the site by the engineer shall not include inspection of the above items.
8. Obtain prior written approval for any changes to the drawings.
9. The contractor shall review and compare the structural drawings with all other Construction Documents, such as Architectural, Mechanical and Electrical drawings, specifications, etc. Do not scale drawings. The contractor shall verify dimensions, elevations and all information. Report, in writing, any inconsistencies, errors, or omissions to the Architect/Engineer of record before proceeding with the work.
10. All existing constructions shown are schematic only. Contractor is responsible to verify actual conditions and allow for them in his bid. Notify the Architect/Engineer, in writing, in case of any discrepancy between actual conditions and what is shown on the structural drawings before proceeding with the work.
11. See Architectural, Mechanical, Electrical and other drawings for embedded items.
12. Camber shall be provided for all members with 30 feet or more of span. Check beam table and contact the Structural Engineer for the amount of camber.
13. Submit seismic anchorage calculations stamped by a licensed Professional Engineer for all equipment and components weighing more than 400 lb.
14. Submit structural drawings signed and sealed by a professional Engineer licensed in the State where the project is located for any structural member needed for this project that is not designed by P.S.E.
15. Any substitutions for structural members, hardware or details shall be reviewed by the Architect and Structural Engineer. Such review will be billed on a time and materials basis to the General Contractor with no guarantee that the substitution will be allowed.
16. All communication shall be in writing. No verbal communications, decisions, instructions or approvals shall be valid.
LIVE LOAD
MATERIAL
MAXIMUM
MACHINE BOLT
MANUFACTURER
MINIMUM
METAL
NUMBER
NEAR SIDE
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OREGON RESIDENTIAL
SPECIALTY CODE
OPPOSITE HAND
ORIENTED STRAND BOARD
OREGON STRUCTURAL
SPECIALTY CODE
ON SITE VERIFY
OUT TO OUT OF BEARING
PERPENDICULAR
PLATE
POUND PER LINEAR FOOT
PSE CONSULTING ENGINEERS,
INC.
PRESSURE TREATED
PLATE WASHER
REFERENCE
ROOF EDGE NAILING
REINFORCEMENT
AB
ADDL
ALT
APA
ARCH
B
BLKG
BN
BOF
IBC
CJ
CL
CLR
CONN
CONT
DBL
DIM
DL
DO
DWG
DWL
E
EA
EF
EL
EMBED
EN
EOR
ANCHOR BOLT
ADDITIONAL
ALTERNATE
AMERICAN PLYWOOD
ASSOCIATION
ARCHITECTURAL
BOTTOM
BLOCKING
BOUNDARY NAIL
BOTTOM OF FOOTING
INTERNATIONAL BUILDING
CODE
CONSTRUCTION JOINT
OR CONTROL JOINT
CENTER LINE
CLEAR
CONNECTION
CONTINUOUS
DOUBLE
DIMENSION
DEAD LOAD
DITTO (REPEAT)
DRAWING
DOWEL
EXISTING
EACH
EACH FACE
ELEVATION
EMBEDMENT
EDGE NAIL
ENGINEER OF RECORD
EQUAL
EACH SIDE
EACH WAY
FRAMING ANCHOR
FROST DEPTH
FLOOR EDGE NAILING
FINISHED FLOOR
FIELD/INTERMEDIATE
NAILING
FAR SIDE
FOOTING
GALVANIZED
GENERAL CONTRACTOR
GEOTECHNICAL INVESTIGATION
REPORT
GLUED LAMINATED BEAM
GRADE
HEADER
HANGER
HORIZONTAL
HORIZONTALLY SLOTTED HOLES
INTERNATIONAL BUILDING
CODE
INTERNATIONAL CODE COUNCIL
INSIDE DIAMETER
INTERIOR
JOINT
LEDGER
LIGHT GAUGE STEEL,
COLD-FORMED STEEL
EQ
ES
EW
FA
FD
FEN
FF
FN
FS
FTG
GALV
GC
GIR
GLB
GR
HDR
HGR
HORIZ
HSH
IBC
ICC
ID
INT
JT
LDGR
LGST
LL
MATL
MAX
MB
MFR
MIN.
MTL
NO.
NS
NTS
OC
OD
ORSC
OH
OSB
OSSC
OSV
OTOB
PERP
PL
PLF
PSE
PT
PW
REF
REN
REINF
G. ABBREVIATIONS:
RFT
SGN
SEP
SIM
SN
SNL
SPEC
STD
STGR
STIFF
T
TB
TD
TG
THK
TN
TOB
TOF
TOW
TYP
UON
VERT
VSH
WD
WEN
WWM
W/ W/O
RAFTERS
STRUCTURAL GENERAL NOTES
SEPARATION
SIMILAR
SHEAR NAIL
SNOW LOAD
SPECIFICATION
STANDARD
STAGGER
STIFFENERS
TOP
TOP & BOTTOM
TYPICAL DETAILS
TONGUE & GROOVE
THICKNESS/THICK
TOENAIL
TOP OF BEAM
TOP OF FOOTING
TOP OF WALL
TYPICAL
UNLESS OTHERWISE NOTED
VERTICAL
VERTICAL SLOTTED HOLES
WOOD
WALL EDGE NAILING
WELDED WIRE MESH
WITH
WITHOUT
D. INSPECTION:
1. All construction shall be inspected by the building officials according to the above Code.
2. It is recommended that the owner or the contractor hire PSE or other Qualified Licensed inspectors to provide inspection during construction.
GENERAL STRUCTURAL NOTES & DETAILS
SHEET INDEX:
S1
REV.
TYPICAL FRAMING DETAILS
S2
E. STRUCTURAL STEEL:
1. Unless noted otherwise on plans, all structural steel shall be per Table 2-3 of AISC Manual of Steel Construction, Fourteenth Edition & AISC Specification 360-10, as shown below:
Shape Steel, Typ Yield Strength Fy, KSI
W-shape A 992 50 Angles A 36 36 Rectangular Tube, HSS A 500, Gr.C 50 Round Tube, HSS A 500, Gr.C 46 Pipe A53, Gr.B 35
2. Fabrication and erection shall be in accordance with the American Institute of Steel Construction (AISC).
3. All beam connections shall be bolted or shop welded as detailed on the drawing or designed by fabricator per AISC Manual of Steel Construction allowable
Stress Design, "Framed Beam Connections." Bolts shall be 3/4 inch. diameter ASTM A325, load indicator bolts. All bolts shall be tightened to the minimum tension specified in the specification for structural joints using A325 or A490 bolts.
4. All welding shall conform to the current American Welding Society (AWS) Specifications and be performed by certified welders.
5. Column anchor bolts shall have minimum yield strength of 36 KSI.
6. Metal deck shall be the type as indicated on the drawings. The deck shall be welded to the supporting members per manufacturer's recommendations or as indicated on the drawings whichever is more restricting or stringent.
7. All openings in metal deck to have 4" X 4" X ¼" angle frames set between joists.
8. All structural steel and bar joists shall have one shop coat of rust inhibitor primer paint conforming to specification. Field touch up all unpainted areas and weld areas.
9. Grout for base plates shall be nonmetallic, non-shrinkage cementitious grout having a minimum 3-days compressive strength of 4000 PSI.
10. Reference specifications for additional requirements.
F. SHIPPING / CARGO CONTAINER SPECIFICATION:
1. The shipping / cargo container(s) shall be:
a) Undamaged (Free of rust, dents, cracks, et cetera that affect the structural integrity of the container).
b) Made from steel.
c) Design and tested according to the International Organization for Standardization (ISO) specifications.
d) Certified for compliance to the Rules for Certification of Cargo Containers and the International Convention for Safe Containers (CSC) for use as shipping containers by the American Bureau of Shipping (ABS) or other approved Certified Inspection and Testing Agency (CITA).
e) Container shall have a CSC safety approval placard (CSC Plate) and CITA logo prior to any modification.
f) Walls and roof are continuously welded around its entire periphery and is itself made from sheets of corrugated 14ga. Cor-Ten steel also continuously welded together. This steel, also used for the side and end walls has a minimum yield strength of 50ksi and tensile of 70ksi.
2. Prior to construction/modification, Client / Owner / Contractor shall:
a) Provide pictures of high/good quality to PSE showing the following of each container:
- All four sides
- Roof
- Under framing
- Top Rails
- Bottom Rails
- Interior
- CSC Plate
b) Visually inspect all existing welds for consistency and undamaged.
c) Confirm existing plywood floor sheathing is:
- Not damaged, cracked, deformed, delaminated, or showing any other signs that structural integrity has been compromised
- Free of hazardous materials, liquids, and/or stains, or shall be encapsulated.
- Fully fastened to container floor joists per original construction.
- If existing plywood floor sheathing needs to be replaced, inform PSE prior to replacing with equivalent pressure/preservative treated OSB or 14" steel plate with equivalent or better fastening to container floor joists.
d) If possible, provide manufacturer drawings of container to PSE.
C. CODE AND LOADS:
1. All design, material, and construction work for this project shall conform to the CALIFORNIA BUILDING CODE 2022, based on the 2021 International Building Code (IBC).
2. Design parameters: (REFER STRUCTURAL CALCULATION REPORT PAGES FROM DOTEC CORP. FROM OWNER FOR FURTHER DETAILS)
a. Floor Live Load = 312.5 psf. b. Floor Dead Load = 10 psf.
c. Roof Live Load = 5-12 psf. d. Roof dead load = 3 psf.
e. Ground Snow Load, Pg = 6 psf. f. Flat Roof snow load = N/A psf.
g. Snow Exposure Factor, Ce = 1.0 h. Snow Load Importance Factor, Is = 1.0
i. Thermal Factor, Ct = 1.2 j. Basic Wind Speed (3 second gust) = 93 mph
k. Risk Category = II l. Wind Exposure = C
m. Internal Pressure Coefficient = +/- 0.55 n. Components and Cladding studs = N/A psf
o. Seismic Importance Factor, Ie = 1.0 p. Site Class = D
q. Ss = 0.720 r. S1 = 0.250
s. Sms = 1.050 t. Sm1 = 0.660
u. Sds = 0.700 v. Sd1 = 0.450
w. Seismic Design Category = D x. Basic Seismic Force Resisting System = STEEL MODULAR CONTAINER
y. Design Base Shear = 0.35 * W z. Approximate Fundamental Period, T = 0.108
aa. Response Modification Factor, R = 2 bb. Analysis Procedure Used = Equivalent Lateral Force Procedure
S2.1
ANCHOR LAYOUT PLAN & DETAILS
SPECIAL INSPECTION NOTESS1.1
Fabric Shelters and Containers Engineering is NOT included in PSE's scope of service.
Refer to Cushing Terrell stamped engineering package for Fabric Shelters by Mr. Sushil Shenoy, P.E.
Refer to DOTec Corp. stamped engineering package for Containers engineering by Mr. Ali Elawadi, P.E.
SPECIAL INSPECTION, MATERIAL TESTING
& STRUCTURAL OBSERVATION ITEMS
REQUIRED BY CHAPTER 17 OF THE 2021 IBC
Indicate items requiring special inspection, structural testing, or structural observations by checking the appropriate box. All items not requiring inspection/testing should be removed from the form. For items requiring continuous inspection, a special inspector must be present onsite during the performance of that task. In most cases �periodic� inspections/tests shall be performed prior to commencing the task, intermittently during the task, and at the completion of the task. The Detailed Instructions & Frequency� provides a description of the presumed requirements for tasks requiring �periodic� inspections. The design professional in responsible should revise the requirements as needed on a project-specific basis.
SPECIAL INSPECTION OF FABRICATED ITEMS (IBC 1704.2.5)
Approved Fabricator Yes No Unapproved Fabricator Yes No
Fabricators Name:
Fabricators plant location Required In-plant Inspections
Steel Construction Cold-formed Construction
Concrete Construction Other: _
Wood Construction Other:
STRUCTURAL STEEL (IBC 1705.2.1, 1705.12.1 & 1705.13.1)
Item Detailed Instructions and Frequencies
PRIOR TO WELDING (TABLE N5.4-1, AISC 360-16):
Verify weldingprocedures (WPS) and consumable certificates
Continuous Periodic
Material identification Continuous Periodic Verify type and gradeof material.
Welder identification Continuous Periodic A systemshallbe maintainedby whicha welder who has welded a joint or member can be identified.
Fit- upgroovewelds Continuous Periodic Verify joint preparation, dimensions, cleanliness, tacking, and backing.
Fit- upof fillet welds Continuous Periodic Verify alignment,gaps at root, cleanlinessof steel surfaces, and tack weld quality and location.
DURING WELDING (TABLE N5.4-2, AISC 360-16):
Useof qualified welders Continuous Periodic Verify that weldersare appropriatelyqualified.
Control and handlingof welding consumables
Continuous Periodic Verify packagingand exposurecontrol.
Crackedtackwelds Continuous Periodic Verify that weldingdoes not occur over cracked tack welds.
Environmental conditions Continuous Periodic Verify winspeed is withinlimitsas well as precipitationand temperature.
WPSfollowed Continuous Periodic Verify itemssuchas settings on weldingequipment, travel speed, welding materials, shielding gas type/flow rate, preheat applied, interpass temperature maintained, and proper position.
Weldingtechniques Continuous Periodic Verify interpassand final cleaning,eachpass is within profile limitations, and quality of each pass.
AFTER WELDING (TABLE N5.4-3, AISC 360-16):
Welds cleaned Continuous Periodic Verify that welds have been propylcleaned.
Size, length, and locationof welds Continuous Periodic Welds meet visual acceptance criteria
Continuous Periodic
Arcstrikes Continuous Periodic k-area Continuous Periodic Backing & weldtabs removed Continuous Periodic Repair activities Continuous Periodic Document acceptanceor rejection of welded joint/member
Continuous Periodic
NONDESTRUCTIVE TESTING (SECTION N5.5, AISC 360-16):
CJ P welds (Risk Cat. II) Continuous Periodic Ultrasonictesting shall be performed on 10%of CJP groove welds in butt, T- and corner joints subject to transversely applied tension loading in materials 5/16-inch thick or greater. Testing rate must be increased if > 5% of welds tested have unacceptable defects.
CJP welds (Risk Cat. III or IV) Continuous Periodic A reduction in the rate of ultrasonic testing is allowed per Section N5.5e.
PRIOR TO BOLTING(TABLEN5.6-1, AISC 360-16):
Not required if only snug-tight joints are specified [per Section N5.6(1) of AISC 360-16].
Certificationsof fasteners Continuous Periodic Fasteners marked Continuous Periodic Verify that fastenershave been marked in accordance with ASTM requirements.
Proper fastenersfor joint Continuous Periodic Verify grade, type, and boltlengthif threads are excluded from the shear plane.
Proper bolting procedure Continuous Periodic Verify proper procedure is used for the joint detail.
Connectingelements Continuous Periodic Verify appropriatefaying surfaceconditionand hole preparation, if specified, meet requirements.
Pre-installation verification testing
Continuous Periodic Observe and document verification testing by installation personnel for fastener assemblies and methods used.
Proper storage Continuous Periodic Verify proper storageof bolts, nuts, washers, and other fastener components.
DURING BOLTING (TABLE N5.6-2, AISC 360-16):
Not required if only snug-tight joints are specified [per Section N5.6(1) of AISC 360-16].
Not required for pretensioned joints using turn-of-the-nut method with match-marking, direct-tension-indicators, or twist-off type tension control method [per Section N5.6(2) of AISC 360-16].
Fastener assemblies Continuous Periodic Verify that fastener assemblies are of suitable condition, paced in all holes, and washers are positioned as required.
Snug-tight prior topretensioning Continuous Periodic Verify that jointsarebrought tosnug-tight condition prior to pretensioning operation.
Fastener component Continuous Periodic Verify that fastener component is not turned by wrench prevented from rotating.
Pretensionedfasteners Continuous Periodic Verify that fastenersarePretensionedin accordance with RCSC Specification, progressing systematically from the most rigid point toward the free edges.
AFTER BOLTING (TABLE N5.6-3, AISC 360-16):
Document acceptanceor rejection of bolted connections
Continuous Periodic
OTHER STEEL INSPECTIONS (SECTION N5.7, AISC 360-16; Tables J8-1 & J10-1, AISC 341-16):
Structural steel details Continuous Periodic Allfabricated steel or steel frames shall be inspected to verify compliance with the details shown in the construction documents, such as braces, stiffeners, member locations, and proper application of joint details at each connection.
Anchorrods and other embedments supporting structural steel
Continuous Periodic Shall be on the premises during the placement of anchor rods and other embedments supporting structural steel for compliance with construction documents. Verify the diameter, grade, type, and length of the anchor rod or embedded item, and the extent or depth of embedment prior to placement of concrete.
Special Inspectors Shall:
Be approved by the Building Official prior to performing any duties;
Provide proof of licensure as a special inspector by the State where the project is located for each type of inspection;
Inspection reports are to meet the requirements of IBC 1704.2.4 and State or Municipality standards;
Inspection reports are to be submitted to the code consultant, architect, Engineer of Record, and the State or local Building Official within 48 hours of performing inspections;
A final inspection report shall be submitted following completion of the project documenting the types of special inspections performed and a statement indicating that the structure is in compliance with the approved construction documents and applicable codes (see IBC 1704.2.4).
S1.1
SPECIAL INSPECTION
NOTES
Re vi sio n
Ta bl e M
AR
K
DE
SC
RI
PT
IO
N
DA
TE
250 Main St. Suite A Klamath Falls, OR 97601 www.structure1.com Phone: (541) 850-6300 info@structure1.com
Project:
Container Anchorage
4300 Capital Avenue, West Sacramento, CA 95691.
TH
E
DO
CU
M
EN
TS
, I
DE
AS
A N
D
DE
SI
G
N S
IN
CO
RP
O
RA
TE
D H
ER
EI
N , I
S
TH
E
PR
O
PE
RT
Y
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
A
N D
IS
N
O T
TO
B
E U
SE
D, IN
W
H O
LE
O
R
PA
RT
, F
O R
AN
Y
O
TH
ER
P
RO
JE
CT
W
IT
H
O U
T
TH
E W
RI
TT
EN
P
ER
M
IS
SI
O N
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
Page:
Title:
Project #:
DRAWN BY: AYPN
DESIGNED BY: ISL
CHECKED BY: N.T.
Date: March-17-2026
Owner:
CITY OF WEST
SACRAMENTO
Haynes Studio Arch. 225-001
PSE
Consulting Engineers, Inc.
Stamp:
Structural details for this project are for illustration only. They are not drawn to scale unless noted otherwise. Contractor must verify all dimensions before fabrication or construction. Do not scale drawings.
Ayyappan.S 3/17/2026 11:43 PM 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg.dwg
A
D
2 3 4 5 6 7 8
A
D
1 2 3 4 5 6 7 8
B B
C C
'-6
7'
-0
'-6
8'-0" 36'-7" 25'-7" 8'-0"8'-0" 36'-7" 8'-0"
8'-0" 36'-7" 25'-7" 8'-0"8'-0" 36'-7" 8'-0"
'-0
'-6
7'
-0
'-6
'-0
ANCHOR LAYOUT PLAN
Approximate Scale: 3/16" = 1'-0"1
S2
ANCHOR LAYOUT PLAN
Re vi sio n
Ta bl e M
AR
K
DE
SC
RI
PT
IO
N
DA
TE
250 Main St. Suite A Klamath Falls, OR 97601 www.structure1.com Phone: (541) 850-6300 info@structure1.com
Project:
Container Anchorage
4300 Capital Avenue, West Sacramento, CA 95691.
TH
E
DO
CU
M
EN
TS
, I
DE
AS
A N
D
DE
SI
G
N S
IN
CO
RP
O
RA
TE
D H
ER
EI
N , I
S
TH
E
PR
O
PE
RT
Y
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
A
N D
IS
N
O T
TO
B
E U
SE
D, IN
W
H O
LE
O
R
PA
RT
, F
O R
AN
Y
O
TH
ER
P
RO
JE
CT
W
IT
H
O U
T
TH
E W
RI
TT
EN
P
ER
M
IS
SI
O N
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
Page:
Title:
Project #:
DRAWN BY: AYPN
DESIGNED BY: ISL
CHECKED BY: N.T.
Date: March-17-2026
Owner:
CITY OF WEST
SACRAMENTO
Haynes Studio Arch. 225-001
PSE
Consulting Engineers, Inc.
Stamp:
Structural details for this project are for illustration only. They are not drawn to scale unless noted otherwise. Contractor must verify all dimensions before fabrication or construction. Do not scale drawings.
Ayyappan.S 3/17/2026 11:43 PM 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg.dwg
LEGEND:
NUMERICAL VALUE, 1, 2, 3 ETC.
INDICATES SHEET NOTES.n n
SHEET NOTES:
REFER TO S1 FOR STRUCTURAL GENERAL NOTES AND TO
OTHER SHEETS FOR DETAILS.
VERIFY ALL DIMENSIONS WITH THE ARCHITECTURAL
DRAWINGS. DO NOT SCALE DRAWINGS. [[[DIMENSIONS
PROVIDED MAY BE THE NOMINAL DIMENSIONS OF THE
CONTAINER. CONTRACTOR/FABRICATOR, OWNER,
AND/OR ARCHITECT TO VERIFY ACTUAL DIMENSION
BEFORE CONSTRUCTION]]].
BOLTHOLD ASPHALT ANCHORS SHALL BE INSTALLED AS
PER MANUFACTURER PROCEDURE
18" DEEP - CEMENT TREATED ASPHALT FOUNDATION BY
OTHERS.
SCOPE OF SERVICE BY PSE DOES NOT INCLUDE
CONTAINER ENGINEERING. AND THE FRAMING DETAILS IN
THE CONTAINER WAS NOT SHOWN HERE. REFER OTHER
ARCH & STRUCTURAL PLANS FROM OWNER.
Scale: N/A
ANCHOR BOLT SCHEDULE 2
ANCHOR
SPECIFICATION NOTESCONNECTING
MEMBER
ANHOR
CALLOUT
INDICATES ANCHOR BOLT MARK, REFER TO
ANCHOR BOLT SCHEDULE.
AA-n
SEE 3/S2.1.L-ANGLE WITH STIFFENERS AS BASE PLATE
& CONTAINER BOTTOM RAILAA-1 (4)-BOLTHOLD SP58
ASPHALT ANCHORS, TYP.
ANCHOR - PLAN
Scale: NTS5
CONTAINER BASE ATTACHMENT DETAIL
NTS
CONTAINER
6" x 6" x 3/8" x 16" LONG A36 GRADE
STEEL ANGLE PER PLAN & DETAILS
3/8" STIFFENERS AS PER
DETAIL 5/2.1, TYPICAL
(N) STEEL ANGLE BASE TO (E)
CONTAINER BOTTOM RAIL ON
ACCESSIBLE SIDES, TYPICAL.3/16"
CONTAINER
6"x6"x3 8" x 16" LONG STEEL ANGLE, W/ 3/8" STIFFENERS @ MIDDLE
BOTTOM SIDE RAIL PER PLAN
NTS
CONTAINER TO ANCHORS AT MIDDLE
S2.1
AA1 BOLTHOLD ASPHALT
ANCHORS PER PLAN, TYP.
S2.1
CONTAINER(E) CONTAINER CORNER CASTING
6"x6"x3 8" x 16" LONG STEEL ANGLE, W/ 38"
STIFFENERS @ CONTAINER ENDS PER PLAN
NTS3 CONTAINERS TO ANCHORS AT CORNERS
AA-1 BOLTHOLD ASPHALT
ANCHORS PER PLAN, TYP.
S2.1
CEMENT TREATED 18" DEEP
ASPHALT BY OTHERS
CEMENT TREATED 18" DEEP
ASPHALT BY OTHERS
RISER/BLOCK PER OWNER,
CONTRACTOR TO VERIFY
HEIGHT DIFFERENCE
BEFORE INSTALLING THE
ANCHORS & ANGLES
CONTRACTOR TO VERIFY
HEIGHT DIFFERENCE
BEFORE INSTALLING THE
ANCHORS & ANGLES
CONTRACTOR TO VERIFY
HEIGHT DIFFERENCE
BEFORE INSTALLING THE
ANCHORS & ANGLES
ANCHOR - SECTION, TYPICAL
Scale: NTS4
3/16"
(N) L-ANGLE TO (E) CONTAINER
BOTTOM RAIL ON ACCESSIBLE
SIDES, TYPICAL
(N) L-ANGLE PER PLAN
MIN. 18" DEEP CEMENT TREATED
EXISTING ASPHALT, BY OTHERS
(N) 3/8" THICK A36 GRADE STEEL
STIFFENERS WELDED TO L-ANGLE
STEEL SHIM PLATE TO MATCH THE LEVEL
AS NEEDED, CONTRACTOR TO VERIFY.
CONTAINER SIDE BOTTOM RAIL
CONTRACTOR TO VERIFY HEIGHT
DIFFERENCE BEFORE INSTALLING
THE ANCHORS & ANGLES
6"X6"X3/8" THICK, 16" LONG
A36 GRADE STEEL L-ANGLE
(N) 3/8" STIFFENER PLATES A36 GRADE, WITH
3/16" CONTINUOUS FILLET WELD ALONG ALL
CONTACT EDGES, U.N.O. TYPICAL
AA1 BOLTHOLD
ANCHORS PER PLAN
4"
2"
4" 4"
2"
AA1 BOLTHOLD ANCHORS PER PLAN MIN. 18" DEEP CEMENT TREATED
EXISTING ASPHALT, BY OTHERS
AA-1 BOLTHOLD ASPHALT ANCHORS IN
TRANSVERSE DIRECTION PER PLAN, TYP.
(E) CONTAINER LONGER
SIDE BOTTOM RAIL
S2.1
TYPICAL FRAMING
DETAILS
Re vi sio n
Ta bl e M
AR
K
DE
SC
RI
PT
IO
N
DA
TE
250 Main St. Suite A Klamath Falls, OR 97601 www.structure1.com Phone: (541) 850-6300 info@structure1.com
Project:
Container Anchorage
4300 Capital Avenue, West Sacramento, CA 95691.
TH
E
DO
CU
M
EN
TS
, I
DE
AS
A N
D
DE
SI
G
N S
IN
CO
RP
O
RA
TE
D H
ER
EI
N , I
S
TH
E
PR
O
PE
RT
Y
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
A
N D
IS
N
O T
TO
B
E U
SE
D, IN
W
H O
LE
O
R
PA
RT
, F
O R
AN
Y
O
TH
ER
P
RO
JE
CT
W
IT
H
O U
T
TH
E W
RI
TT
EN
P
ER
M
IS
SI
O N
O F
PS
E
CO
N
SU
LT
IN
G
E N
G
IN
EE
RS
, I N
C.
Page:
Title:
Project #:
DRAWN BY: AYPN
DESIGNED BY: ISL
CHECKED BY: N.T.
Date: March-17-2026
Owner:
CITY OF WEST
SACRAMENTO
Haynes Studio Arch. 225-001
PSE
Consulting Engineers, Inc.
Stamp:
Structural details for this project are for illustration only. They are not drawn to scale unless noted otherwise. Contractor must verify all dimensions before fabrication or construction. Do not scale drawings.
Ayyappan.S 3/17/2026 11:43 PM 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg.dwg
| Sheets and Views |
| 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg-S1 |
| 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg-S1.1 |
| 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg-S2 |
| 2026-03-17_Haynes Studio Arch_225-001_CA_Container Anchorage_Struct dwg-S2.1 |
File details come from the government source that posted it. Updated .