ConstructionRFP_FAC2020_04_01152020.docx

DOCX document 227 KB Posted

Attached to
Norway Beach Sewer System Replacement Federal contract opportunity
Solicitation number
12639220R0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

This solicitation is for a construction project to replace the sewer system at Norway Beach Recreation Area. The project involves constructing individual sanitary sewer systems for campground loops and the Visitor Information Center to replace an existing combined sewer treatment plant. The solicitation number is 12639220R0004 and is issued by the USDA Forest Service Eastern Region. Offerors must submit pricing for all line items by June 8, 2020. The project completion deadline is 360 calendar days after award. The government's estimated price range for the work is between $500,000 to $1,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Norway Beach Sewer System Replacement, newest first.
File Type Posted
1.5a_Section B-ScheduleofItems.doc DOC document
2.2a_SpecificationAddendum-NorwayPhase2.pdf PDF
1.5b_SOV_BidForm-NWBPhase2.xlsx XLSX spreadsheet
1.4_STATEMENT OF WORK.docx DOCX document
2.2_Specivications-Coversheet.pdf PDF
2.1_Drawings-SignedCoversheet.pdf PDF
2.2_Specifications-NorwayPhase2.pdf PDF
2.1_Drawings-NorwayPhase2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction RFPSolicitation Number 12639220R0004
Norway Beach Rec. Area Reconstruction – Phase 2
Page 58 of 60

SOLICITATION, OFFER, AND AWARD Comment by Johnson, Melissa A -FS: This template can be for a stand alone construction project or an IDIQ depending on the clauses you choose. Remove the comments before posting. If a clause doesn’t have a comment, leave it in.

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

12639220R0004

2. TYPE OF SOLICITATION SEALED BID (IFB) X XNEGOTIATED (RFP)
3. DATE ISSUED

05/06/2020

PAGE
1 OF
48 PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER

7. ISSUED BY CODE

8. ADDRESS OFFER TO

Mn Shared Services Contracting Unit 8901 Grand Avenue Place Duluth, MN 55808

Mn Shared Services Contracting Unit 8901 Grand Avenue Place Duluth, MN 55808

9. FOR INFORMATION CALL:
a. NAME

Clark Bartelt

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS) 218-626-4353

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Norway Beach Recreation Area Reconstruction – Phase 2 Project consists of construction of individual sanitary sewer systems for campground loops and the Visitor Information Center. The new individual systems will replace the existing combined sanitary sewer treatment plant.

11. The contractor shall begin performance within 10 calendar days and complete it within 360 calendar days after receiving award, X notice to proceed. This performance period is mandatory negotiable.

(See ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 2:00 (hour) local time

06/08/2020 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee

X is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE
20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) (5 ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE
30c. DATE
31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS Comment by Melissa Conn: Insert your schedule of items here

ITEM NO.
DESCRIPTION
METHOD OF MEASUREMENT
UNIT

ESTIMATED QUANTITY

UNIT PRICE

TOTAL

Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _______________________________________________________________. Comment by Melissa Conn: Include this statement below the schedule of items.

Contractor Notes:

1. Contractor must be registered in www.sam.gov in order to submit an offer on this project. THIS IS A FREE REGISTRATION.

2. A pre-bid meeting at the site can be scheduled by contacting Jay Smrekar at 218-335-8684. Comment by Melissa Conn: If you want to highlight the pre-bid meeting documented in Section L you can include it here.

3. This is a construction project which has the following bonding requirements: Comment by Melissa Conn: You edit and include this to highlight the bonding requirements here if you want.

20% bid bond for offers over $150,000 required with offer submission. 100% performance and payment bonds for offers over $150,000 upon award. See Section I for details.

4. Award will be made to one contractor. You must submit pricing for all items, including any option items. Comment by Melissa Conn: If you want to award to more than one contractor (ie: by item) make note of it here.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK Comment by Melissa Conn: Add your specs in this section or as an attachment in Section J.

Scope of Contract Comment by Melissa Conn: Add your scope

Project Location Comment by Melissa Conn: Add directions to the site

The Government's estimate is: Between $500,000 and $1,000,000. Comment by Johnson, Melissa A -FS: Enter the estimated price range.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988) Comment by PCxx:

**NOTE** [USE IF APPLICABLE] use if you are attaching your SOW/specs in Section J rather than putting them directly into section C

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988) Comment by PCxx:

**NOTE** [USE IF APPLICABLE] Use if you have any other attachments in section J like wage determination, drawings, etc

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.1 Sustainable Acquisitions Comment by Melissa Conn: If the specs/statement of work don’t already address biobased, epa, recycled, etc, include something like this. Tailor to the type of project and products. This is required for construction projects The Contractor shall comply with FAR Part 23 Sustainable Acquisition Policy and all associated laws, rules, regulations, and executive orders referenced therein. Contracts that include the supply of products and for the acquisition of services (including construction) that include the supply of products, require that the products provided are—

(1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)-designated); (applicable if FAR Clause 52.223-15 is included)

(2) Water-efficient; (applicable if FAR Clause 52.223-15 is included)

(3) Biobased; (applicable if FAR Clause 52.223-2 is included)

(4) Environmentally preferable (e.g., EPEAT®-registered, or non-toxic or less toxic alternatives); (applicable if FAR Clause 52.223-13,14, or 16 are included)

(5) Non-ozone depleting; (applicable if FAR clause 52.223-11,12,20, or 21 are included), and/or

(6) Made with recovered materials (EPA-Designated products) (applicable if FAR clause 52.223-9 or 17 is included).

(b) The required products in the contract actions for services include products that are—

(1) Delivered to the Government during performance;

(2) Acquired by the contractor for use in performing services at a Federally-controlled facility; or

(3) Furnished by the contractor for use by the Government.

C1.1 Sustainable products identified for this solicitation: Comment by Brenda Anderson: CO – technical personnel should provide an updated list of products relevant to this project.

The following is a list of sustainable products that that may be used in the performance of this contract. The list is not all inclusive; the Contractor shall research for available products.

C1.1.1 Energy-efficient and Water-efficient Products ENERGY STAR® at http://www.energystar.gov/; and FEMP at https://www.energy.gov/eere/femp/search-energy-efficient-products www.epa.gov/watersense Roofing Products, low flow toilets, faucets, appliances

C1.1.2 Biobased Products: (requires reporting at www.sam.gov by 10/31 each year) http://www.biopreferred.gov a Diesel Fuel Additives

(1) Any substance, other than one composed solely of carbon and/or hydrogen, that is intentionally added to diesel fuel (including any added to a motor vehicle's fuel system) and that is not intentionally removed prior to sale or use.

(2) Neat biodiesel, also referred to as B100, when used as an additive. Diesel fuel additive does not mean neat biodiesel when used as a fuel or blended biodiesel fuel (e.g., B20). 90% - Minimum Biobased Content.

b Hydraulic Fluids - Mobile Equipment Hydraulic fluids formulated for general use in nonstationary equipment, such as tractors, end loaders, or backhoes. 44% - Minimum Biobased Content.

c Penetrating Lubricants Products formulated to provide light lubrication and corrosion resistance in close tolerant internal and external applications including frozen nuts and bolts, power tools, gears, valves, chains, and cables. 68% - Minimum Biobased Content.

d Greases - Truck Lubricants composed of oils thickened to a semisolid or solid consistency using soaps, polymers or other solids, or other thickeners. Lubricants that are designed for use on the fifth wheel of tractor trailer trucks onto which the semi-trailer rests and pivots. 71% - Minimum Biobased Content.

e Gear Lubricants Products, such as greases or oils, that are designed to reduce friction when applied to a toothed machine part (such as a wheel or cylinder) that meshes with another toothed part to transmit motion or to change speed or direction. 58% - Minimum Biobased Content.

f Fuel Conditioners Products formulated to improve the performance and efficiency of engines by providing benefits such as removing accumulated deposits, increasing lubricity, removing moisture, increasing the cetane number, and/or preventing microbial growths within the fuel system. 64% - Minimum Biobased Content.

g Erosion Control Woven or non-woven fiber materials manufactured for use on construction, demolition, or other sites to prevent wind or water erosion of loose earth surfaces, which may be combined with seed and/or fertilizer to promote growth. 77% - Minimum Biobased Content.

h 2-Cycle Engine Oils Lubricants designed for use in 2-cycle engines to provide lubrication, decreased spark plug fouling, reduced deposit formation, and/or reduced engine wear. 34% - Minimum Biobased Content.

C1.1.3 Environmentally Preferable Products:

www.epa.gov/epeat.

None

C1.1.4 Non-ozone Depleting Products:

http://www.epa.gov/snap

Foams, refrigeration products, air conditioning products

C1.1.5 EPA Designated Products:

https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program

Plastic trash bags, printer ribbons, toner cartridges, print & writing papers, Traffic Barricades, Traffic Cones, Engine Coolants, Rebuilt Vehicular Parts, Re-refined lubricating oils, retread tires, manual grade strapping, signage, sorbents.

C.2 SAFETY AND HEALTH Comment by Melissa Conn: If the specs don’t address safety, include something like this. Construction projects should require a written safety plan.

2.1.1 SUMMARY

A. References: In addition to publications referenced in the Contract and FAR 52.236-13, the following Code of Federal Regulations (CFR) publications designate and define hazardous materials and conditions, and establish procedures for handling these materials and conditions.

1. 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards.

2. 29 CFR, Part 1926: OSHA Construction Industry Standards.

3. 40 CFR, Part 61: National Emission Standards for Hazardous Air Pollutants.

4. 40 CFR, Part 261: Environmental Protection Agency (EPA) Characteristics of Hazardous Waste.

5. 40 CFR, Part 761, EPA Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use Prohibitions.

B. Acquisition of Publications: Referenced CFR publications may be purchased from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402.

2.1.2 SAFETY MEETING

A. Prior to commencing construction, representatives of the Contractor, including the Superintendent, shall meet with the Government to review the Contract's safety and health requirements.

B. The Contractor's safety and health program shall be reviewed, and implementation of safety and health provisions pertinent to the Work shall be discussed.

2.1.3 COMPLIANCE WITH REGULATIONS

A. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable codes, standards and regulations pertaining to the health and safety of personnel during execution of the Work. The Contractor shall have written safety and health programs in compliance with 29 CFR Parts 1910 and 1926.

2.1.4 SUBMITTALS

A. Safety and Health Programs: The Contractor shall submit, for approval, copies of the project safety and health programs, as applicable to the work scope, or required as a result of the safety meeting, including but not necessarily limited to the following:

1. Occupational Noise Exposure.

2. Fall Protection.

3. Personnel Protective Equipment.

4. Control of Hazardous Energy.

5. Electrical Safety Related Work Practices.

6. Lead.

7. Respirator Protection.

8. Confined spaces.

9. Heavy Equipment Operation

PART 2 - PRODUCTS

2.2.1 PERSONNEL PROTECTIVE EQUIPMENT

A. Special facilities, devices, equipment and similar items used by the Contractor in execution of the Work shall comply with 29 CFR Part 1910, Subpart I and other applicable regulations.

PART 3 - EXECUTION

2.3.1 EMERGENCY SUSPENSION OF WORK

A. In accordance with FAR 52.236-13, when the Contractor is notified by the Government, of noncompliance with safety or health provisions of the Contract, the Contractor shall immediately, correct the unsafe or unhealthy condition. In accordance with FAR 52.236-13 if the Contractor fails to comply promptly, all or part of the Work will be stopped by Government notice. The Contractor shall not be allowed any extension of time or compensation for damages in connection with a work stoppage for unsafe or unhealthy conditions.

2.3.2 PROTECTION OF PERSONNEL

A. The Contractor shall take all necessary precautions to prevent injury to the public, occupants, or damage to property of others.

2.3.3 ENVIRONMENTAL PROTECTION

A. Dispose of solid, liquid and gaseous contaminants in accordance with local codes, laws, ordinances and regulations.

B. Comply with applicable federal, state and local noise control laws, ordinances and regulations, including but not limited to 29 CFR 1910.95 and 29 CFR 1926.52.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996) Comment by Melissa Conn: Use in all > SAT. Optional use below SAT.

SECTION F--DELIVERIES OR PERFORMANCE

52.242-14 Suspension of Work (APR 1984) Comment by Melissa Conn: Include in all fixed price construction contracts or A&E contracts.

52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984) Comment by PCxx:

**NOTE** [USE IF THE COMPLETION DATE IS EXPRESSED AS A SPECIFIC CALENDAR DATE, COMPUTED ON THE BASIS OF THE CONTRACTOR RECEIVING THE NOTICE TO PROCEED BY A CERTAIN DAY; FILL IN THE BLANKS]

The Contractor shall be required to (a) commence work under this contract within _10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ____360_calendar days. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by__July 6, 2020. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. Comment by Johnson, Melissa A -FS: This is the paragraph associated with Alt 1. If you don’t need this, delete it and take the Alternate I off the clause label

52.211-12 Liquidated Damages—Construction. (SEP 2000) Comment by Melissa Conn: Use when the time of delivery or timely performance is so important that the Government may reasonably expect to suffer damage if the delivery or performance is delinquent; and (2) The extent or amount of such damage would be difficult or impossible to estimate accurately or prove. These are not punitive charges. See FAR 11.501 before using this clause. You can revise the clause to show more than one completion date if different items must be done by different times.

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ___$500.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.211-13 Time Extensions (SEP 2000) Comment by Johnson, Melissa A -FS: Include if using 52.211-12 and there is more than one completion date for the work in the contract.

Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.

SECTION G--CONTRACT ADMINISTRATION DATA

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

AGAR 452.215-73 Post Award Conference (NOV 1996) Comment by Melissa Conn: Use if you’re requiring a pre-work meeting. Could use 52.236-26 that is in Section I if you don’t know the dates and locations of the meeting

A post award conference with the successful offeror is required. It will be scheduled and held within ___10___ days after the date of contract award. The conference will be held at __TBD_________.

G.1 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE Comment by Melissa Conn: This is not required but it does provide good info on the roles that the COR (vs CO) have in the contract.

The contracting Officer will designate a Contracting Officer's Representative(COR) at the time of award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal for a contract claim.

G.2 GOVERNMENT-FURNISHED PROPERTY Comment by PCxx:

**NOTE** [DELETE IF NO GFP; OTHERWISE LIST THE GFP HERE]

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

G.3 INVOICING

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Your company must register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account in order to submit an invoice on this project.

G.5 FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the final amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed invoice; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

RELEASE OF CLAIMS

To be submitted with final invoice Contract Number:

For and in consideration of payment and pursuant to the terms of the contract cited above, the government of the United States, its officers, agents, and employees are hereby released and discharged from all liabilities, demands, obligations, and claims arising under or by virtue of said contract.

Signature: ________________________________

Printed Name: ________________________________

Title: ________________________________

Company: ________________________________

Date: ________________________________

G.6 INCIDENTAL PAYMENT ITEMS Comment by Johnson, Melissa A -FS: If this is an IDIQ, you can delete this or modify it to apply to the task orders.

The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

G.7 CONTRACTOR CERTIFICATION

Contractor will submit certification with every progress invoice

CONTRACTOR CERTIFICATION

Page
of
Unit (Region, Forest, District)
Project:
Contract No.
Name of Contractor:
Invoice No.
Invoice Date:

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

SECTION H--SPECIAL CONTRACT REQUIREMENTS

52.236-4 Physical Data (APR 1984) Comment by PCxx:

**NOTE** [DELETE THE CLAUSE IN ITS ENTIRETY IF THERE IS NO PHYSICAL DATA TO FURNISH]

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) Weather conditions _Project is located in Northern Minnesota weather conditions can vary greatly from other areas of the United States.

H.1 EQUIPMENT CLEANING Comment by Melissa Conn: Insert your forest’s clause on equipment cleaning

All soil moving equipment shall be thoroughly cleaned to make it free of soil, noxious weed seeds, vegetative matter or other debris that could contain or hold seeds prior to being delivered to the project site. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the C.O.R., prior to the equipment being delivered to the site, does not disclose such material present. Disassembly of equipment components is not required. The Contractor shall notify the Forest Service at least five (5) working days prior to moving each piece of soil moving equipment onto the project site, unless otherwise agreed.

The Contractor shall thoroughly clean all soil moving equipment prior to moving them off a project site or between work areas on a project site that are known to be infested with noxious weed species of concern and other work areas, if any, that are free of noxious weed species of concern. Areas known to be infested with specific noxious weed species of concern to the Forest Service shall be noted in the Schedule of Work. The Contractor and the Forest Service shall agree on the methods of cleaning, location for the cleaning and control of off-site impacts, if any.

When new areas of infestation of noxious weeds of concern to the Forest Service are identified on the project site by either the Forest Service or Contractor they shall be promptly reported to the other party.

H.2CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEMComment by Johnson, Melissa A -FS: *(Reference FAR 42.15; AGAR 442.15; FSAR 4G42.1503 & AGAR Advisory 96 – Applicable for Construction Contract/Order >$700,000)
(a)General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Reference (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS).
(b)Contact Information. Upon award, the name and email address of the Contractor Representative responsible for reviewing the CPARS evaluations will be required.
(c)Assessment. Upon completion of the work associated with the contract/delivery orders, or at the end of the year if the contract exceeds one year, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for review of the evaluation. The contractor will review the government’s evaluation and either concur or disagree and route the evaluation back to the Contracting Officer (Assessing Official). If the evaluation recevied contractor concurrence, it will be finalized by the Assessing Offical. If there is disagreement, further discussion will be intiated prior to finalization.
H.3UTILITY SERVICESComment by PCxx:

**NOTE** [DELETE IF NO UTILITY SERVICES; OTHERWISE, LIST ANY APPLICABLE UTILITY SERVICES AND CHARGES] this may be discussed in the specs, if so, delete this.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1Definitions (NOV 2013)Comment by teresacorse: Use if >SAT
52.203-3Gratuities (APR 1984)Comment by teresacorse: Use if >SAT
52.203-5Covenant Against Contingent Fees (MAY 2014)Comment by teresacorse: Use if >SAT
52.203-6Restrictions on Subcontractor Sales to the Government (SEP 2006)Comment by Melissa Conn: Required over SAT
52.203-7Anti-Kickback Procedures (MAY 2014)Comment by teresacorse: Use if >SAT

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal

or Improper Activity (MAY 2014)Comment by teresacorse: Use if >SAT
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014)Comment by teresacorse: Use if >SAT
52.203-12Limitation on Payments to Influence Certain Federal Transactions (OCT 2010)Comment by teresacorse: Use if >SAT
52.203-13Contractor Code of Business Ethics and Conduct (OCT 2015)Comment by Melissa Conn: Use if value > $5,500,000 and period is > 120 days
52.203-14Display of Hotline Poster(s) (OCT 2015)Comment by Melissa Conn: Use if agency has a fraud hotline and value is over $5.5 million
52.203-17Contractor Employee Whistleblower Rights & Requirements to Inform Employees of Whistleblower Rights (APR 2014)Comment by USDA Forest Service: All > SAT
52.203-19Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)Comment by Johnson, Melissa A -FS: Include in all except personal services contracts with an individual who will be performing all the work themselves.
52.204-4Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011)Comment by Melissa Conn: Use if > SAT
52.204-9Personal Identity Verification of Contractor Personnel. (JAN 2011)Comment by Melissa Conn: Include when contract performance requires contractors to have routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system. This prob wont’ apply to construction projects
52.204-10Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018)Comment by Melissa Conn: Use if > $30000 Requires contractor to report subcontract information to http://www.fsrs.gov
52.204-13System for Award Management Maintenance (OCT 2018)Comment by Melissa Conn: Use in all if using 204-7
52.204-14Service Contract Reporting Requirements (OCT 2016)Comment by USDA Forest Service: Choose 1. Use in ffp const if over over $500K (over SAT if TM/LH). Use 204-15 if it’s an IDIQ with TOs that could be exceed these thresholds. Requirs contractor to do a service contract report in SAM
52.204-15Service Contract Reporting Requirements for Indefinite Delivery Contracts (OCT 2016)
52.204-18Commercial and Government Entity Code Maintenance (JUL 2016)Comment by USDA Forest Service: Use in all if requiring contractor to register in SAM (204-7)
52.204-19Incorporation by Reference of Representations and Certifications (DEC 2014)
52.204-23Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018)Comment by Johnson, Melissa A -FS: Use in all
52.204-25Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019)Comment by Johnson, Melissa A -FS: Use in all.

52.209-6 Protecting the Government's Interest when Subcontracting

with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015)Comment by teresacorse: Use when >$35,000
52.209-9Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018)Comment by Johnson, Melissa A -FS: Use when > $550,000 and contractor has check the box > $10 million in 209-7
52.209-10Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015)
52.210-1Market Research (APR 2011)Comment by Melissa Conn: Use if > $5,500,000
52.211-18Variation in Estimated Quantity (APR 1984)Comment by Melissa Conn: Use in all RFQ’s if any variation in quantities on the schedule of items is authorized. (ie: if quantities are estimated).
52.215-2Audit and Records -- Negotiation (AUG 2016)Comment by Melissa Conn: Use if > SAT
52.215-10Price Reduction for Defective Certified Cost or Pricing Data (AUG 2011)Comment by Johnson, Melissa A -FS: If requiring cost and pricing data…. needed in the case of a sole source procurement > $750,000. (ie: 8a sole source) Not required if there is adequate price competition, prices are set by law, or when acquiring a commercial item. For IDIQ’s include if single award and expect task orders to exceed $750,000. This threshold raises to $2M on 7/1/18.
52.215-11Price Reduction for Defective Certified Cost or Pricing Data-Modifications (AUG 2011)
52.215-12Subcontractor Certified Cost or Pricing Data (OCT 2010)
52.215-13Subcontractor Certified Cost or Pricing Data (OCT 2010)
52.215-14Integrity of Unit Prices (OCT 2010) Alt 1 (OCT 1997)
52.215-15Pension Adjustments and Asset Reversions (OCT 2010)
52.215-18Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other Than Pensions (JUL 2005)
52.215-19Notification of Ownership Changes (OCT 1997)
52.215-20Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (OCT 2010)
52.215-21Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications (OCT 2010)

52.217-8 Option to Extend Services (NOV 1999) Comment by Johnson, Melissa A -FS: This gives you the ability to extend 6 months past end date of the contract.

52.219-3 Notice of Total HUBZone Set-Aside or Sole Source Award (NOV 2011) Comment by PCxx:

**NOTE** [DELETE IF NOT SET ASIDE FOR HUBZONE SMALL BUSINESS]

52.219-4Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)Comment by Johnson, Melissa A -FS: Include if advertised as full and open (no set aside for small business) Use with Alt 1 if you are waiving the requirement for the prime to do 50% of the work themselvesComment by FSDefaultUser: **NOTE** [USE IF FULL AND OPEN COMPETITION] and > SAT. Hubzones get at 10% price preference against a large business unless they waive it in section H.
52.219-6Notice of Total Small Business Set-Aside (NOV 2011)Comment by PCxx:

**NOTE** [DELETE IF NOT SET ASIDE FOR SMALL BUSINESS] Use alt I if SBA has granted a non-manufacturers waiver. Use alt II if FPI is included in competition.

52.219-8Utilization of Small Business Concerns (OCT 2018)Comment by Melissa Conn: Use if > SAT but not for personal services contract or outside US Says contractor will carry out the gov’t goal of using small businesses for any subcontracts.
52.219-9Small Business Subcontracting Plan (AUG 2018) (Applicable if > $1.5 Million)Comment by PCxx:

**NOTE**Use in contracts over $1.5 million. [ADD ALTERNATE II IF THE PLAN IS TO BE SUBMITTED WITH THE PROPOSAL] Alternate II (NOV 2016)

52.219-10Incentive Subcontracting Program (OCT 2014)Comment by Melissa Conn: Use if including 52.219-9 and you want to include monetary incentive for subcontracting goals.
52.219-11Special 8(a) Contact Conditions (JAN 2017)Comment by Johnson, Melissa A -FS: Include if doing an 8a sole source. Get SBA permission first
52.219-14Limitations on Subcontracting (JAN 2017)Comment by PCxx:

**NOTE** [USE IF ANY PORTION IS SET ASIDE FOR SMALL BUSINESS] and amount is > SAT. include in all 8a contracts.

52.219-16Liquidated Damages --Subcontracting Plan (JAN 1999) (Applicable if > $1.5 Million)Comment by Melissa Conn: Use if clause 52.219-9 is used
52.219-27Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (OCT 2019)Comment by Johnson, Melissa A -FS: Delete if not set aside for SDVOSBComment by FSDefaultUser:

**NOTE** [DELETE IF NOT SET ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS]

52.219-28Post Award Small Business Program Rerepresentation (JUL 2013)Comment by teresacorse: Use if >micro purchase threshold and in US.
52.219-29Notice of Total Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (DEC 2015)Comment by Melissa Conn: Use if setting aside for EDWOSB or WOSB. This can only be used with those NAICS codes in which SBA has determined that women-owned small business concerns are underrepresented or substantially underrepresented in Federal procurement, as specified on SBA’s Web site at http://www.sba.gov/WOSB. Delete if not set aside
52.219-30Notice of Total Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (DEC 2015)
52.222-3Convict Labor (JUN 2003)Comment by Melissa Conn: Use if > micro purchase threshold
52.222-4Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018)Comment by Melissa Conn: Use if > SAT and work involves mechanics or laborers and is not a commercial item
52.222-6Construction Wage Rate Requirement (AUG 2018)Comment by Melissa Conn: Use if > $2,000
52.222-7Withholding of Funds (MAY 2014)
52.222-8Payrolls and Basic Records (AUG 2018)
52.222-9Apprentices and Trainees (JUL 2005)
52.222-10Compliance with Copeland Act Requirements (FEB 1988)
52.222-11Subcontracts (Labor Standards) (MAY 2014)
52.222-12Contract Termination - Debarment (MAY 2014)
52.222-13Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014)
52.222-14Disputes Concerning Labor Standards (FEB 1988)
52.222-15Certification of Eligibility (MAY 2014)
52.222-20Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014)Comment by Melissa Conn: If furnishing supplies over $15,000
52.222-21Prohibition of Segregated Facilities (APR 2015)Comment by Melissa Conn: Use if including clause 52.222-26
52.222-26Equal Opportunity (APR 2016)Comment by Johnson, Melissa A -FS: Use if > $10,000
52.222-27Affirmative Action Compliance Requirements for Construction (APR 2015)Comment by teresacorse: Use if including clause 52.222-26
52.222-30Construction Wage Requirements– Price Adjustment (None or Separately Specified Method) (AUG 2018)Comment by Melissa Conn: Use if contract contains option years and you want them to include expected wage rate increases in their bid prices. Other clauses that could be used instead are 52.222-31 and 32.
52.222-35Equal Opportunity for Veterans (OCT 2015)Comment by Melissa Conn: Use if > $150,000
52.222-36Equal Opportunity for Workers with Disabilities (JUL 2014)Comment by Melissa Conn: Use if > $15,000
52.222-37Employment Reports on Veterans (FEB 2016)Comment by Johnson, Melissa A -FS: Include if using 222-35
52.222-40Notification of Employee Rights Under National Labor Relations Act (DEC 2010)Comment by Melissa Conn: Use if > SAT. Use in IDIQ’s if orders will be > SAT in a calendar year.
52.222-50Combating Trafficking in Persons (JAN 2019)Comment by Melissa Conn: Include in all solicitations
52.222-54Employment Eligibility Verification (OCT 2015)Comment by teresacorse: Use if >SAT and >120 days performance period. Says they have to use EVERIFY to make sure their workers are in the US legally.
52.222-55Minimum Wages Under Executive Order 13658 (DEC 2015)Comment by Johnson, Melissa A -FS: Include if using 222-6
52.222-62Paid Sick Leave Under Executive Order 13706 (Jan 2017)Comment by Johnson, Melissa A -FS: Use if including 222-6 or 222-41 and performance is in US
52.223-2Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)Comment by Melissa Conn: Use if requiring use of bio-based products from http://www.usda.gov/biopreferred

Products that apply should be listed in the specs/statement of work section C. Contractors have to submit a report each year.

52.223-3Hazardous Material Identification and Material Safety Data Alt 1 (Jan 1997)Comment by Melissa Conn: Use if contract involves the delivery and use of hazardous materials
52.223-5Pollution Prevention and Right-to-Know Information (MAY 2011)Comment by PCxx:

**NOTE** [USE IF PERFORMANCE, IN WHOLE OR IN PART, IS ON A FEDERAL FACILITY]

52.223-6Drug-Free Workplace (MAY 2001)Comment by Melissa Conn: Use in all solicitations to individuals and for all other contracts over SAT
52.223-12Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016)Comment by Melissa Conn: contracts that include the maintenance, service, repair, or disposal of—

(1) Refrigeration equipment, such as refrigerators, chillers, or freezers; or

(2) Air conditioners, including air conditioning systems in motor vehicles.

52.223-15 Energy Efficiency in Energy Consuming Products (DEC 2007) Comment by teresacorse: Use if buying energy consuming products as part of the project

(1) ENERGY STAR® at http://www.energystar.gov/products; and

(2) FEMP at http://www1.eere.energy.gov/femp/procurement/eep_requirements.html.

52.223-17Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (AUG 2018)Comment by Melissa Conn: Use unless the contract will not involve the use of EPA-designated items. http://www.epa.gov/cpg/products.htm. There are construction, landscaping, and park & rec products on this site. Make sure products that apply are indicated in Sec C – specs/SOW.
52.223-18Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)Comment by Melissa Conn: Use in all
52.225-13Restrictions on Certain Foreign Purchases (JUN 2008)Comment by Melissa Conn: Use in all
52.226-1Utilization of Indian Organizations and Indian-Owned Economic Enterprises (June 2000)Comment by Melissa Conn: Use if there is subcontracting opportunities for Indian owned businesses and there are funds to pay the incentive associated with using them. Incentive is 5% of the subcontract amount
52.227-1Authorization and Consent (DEC 2007)Comment by Melissa Conn: Use if > SAT. Optional below SAT. Says that any US patented invention can be used in the performance of this contract.
52.227-2Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007)Comment by Melissa Conn: Use if including 52.227-1
52.227-4Patent Indemnity -- Construction Contracts (DEC 2007)Comment by teresacorse: Use in all construction contracts
52.228-2Additional Bond Security (OCT 1997)Comment by Melissa Conn: Use in all construction contracts where bonds are required
52.228-5Insurance – Work on a Government Installation (JAN 1997)Comment by teresacorse: Use if >SAT and work is on gov’t property
52.228-11Pledges of Assets (AUG 2018)Comment by Johnson, Melissa A -FS: Use if bonds are required
52.228-12Prospective Subcontractor Requests for Bonds (MAY 2014)Comment by teresacorse: Use if a payment bond is required
52.228-14Irrevocable Letter of Credit (NOV 2014)Comment by Melissa Conn: Use if bonds are required
52.228-15Performance and Payment Bonds—Construction (OCT 2010) (Applicable over $150,000)Comment by Melissa Conn: Use in construction contracts >$150K.
52.229-3Federal, State, and Local Taxes (FEB 2013)Comment by Melissa Conn: Use in Fixed Price contracts > SAT. Use 229-4 instead if it’s a non-competitive FP contract > SAT
52.229-4Federal, State,and Local Taxes (State and Local Adjustments) (FEB 2013)Comment by Johnson, Melissa A -FS: Include in non-competitive FP> SAT if price would otherwise include inappropriate contingency for post award changes in local and state taxes.
52.232-5Payments Under Fixed-Price Construction Contracts (MAY 2014)Comment by Melissa Conn: Use in all
52.232-17Interest (MAY 2014)Comment by teresacorse: Use if >SAT. Optional below SAT. Says what interest rate we will charge the contractor if he ends up owing us money.
52.232-18Availability of Funds (APR 1984)Comment by PCxx:

**NOTE** [USE IF FUNDS ARE FOR THE NEXT FY AND ARE NOT YET AVAILABLE]

52.232-23Assignment of Claims (MAY 2014)Comment by Melissa Conn: Use if over micro and you allow an assignment of claims
52.232-27 Prompt Payment for Construction Contracts (JAN 2017)Comment by Melissa Conn: Use in all construction contracts
52.232-33Payment by Electronic Funds Transfer – System for Award Management (OCT 2018)Comment by Melissa Conn: Use if including 52.204-7. This clause required contractors to register in sam
52.232-39Unenforceability of Unauthorized Obligations (JUN 2013)Comment by Melissa Conn: All
52.232-40Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)Comment by USDA Forest Service: ALL
52.233-1Disputes (MAY 2014) Alt 1 (DEC 1991)Comment by Melissa Conn: Use in all. Use Alt 1 (DEC 1991) if continued performance is required during dispute resolution.
52.233-3Protest After Award (AUG 1996)Comment by Melissa Conn: Use in all
52.233-4Applicable Law for Breach of Contract Claim (OCT 2004)Comment by Melissa Conn: Use in all
52.236-2Differing Site Conditions (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional below SAT. Addresses sub surface conditions.
52.236-3Site Investigation and Conditions Affecting the Work (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional below SAT. Says contractor will inspect the work site before bidding
52.236-5Material and Workmanship (APR 1984)Comment by Melissa Conn: Use in all. Says work will be professional and materials will be unused.
52.236-6Superintendence by the Contractor (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says contractor will have a superintendent on site while work is being performed.
52.236-7Permits and Responsibilities (NOV 1991)Comment by Melissa Conn: Include in all. Says contractor is responsible for any permits needed.
52.236-8Other Contracts (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says the contractor will cooperator with other contractors in the area.
52.236-9Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says contractor is liable for any damages he causes.
52.236-10Operations and Storage Areas (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says contractor will get prior approval for all storage areas
52.236-11Use and Possession Prior to Completion (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says the gov’t can take possession of any work prior to completion
52.236-12Cleaning Up (APR 1984)Comment by Melissa Conn: Use if > SAT. Optional under SAT. Says site must be left in a clean condition
52.236-13Accident Prevention (NOV 1991)Comment by PCxx:

**NOTE** Use if > SAT . [USE ALTERNATE I IF A WRITTEN SAFETY PLAN IS REQUIRED]. Optional under SAT Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) Comment by PCxx:

Use if gov’t utilities are available for contractor use. Discuss available utilities and any charge for those utilities in Section H

52.236-15Schedules for Construction Contracts (APR 1984)Comment by Melissa Conn: Use if > SAT and contract term is > 60 days. Optional below 60 days. Says contractor will submit a construction schedule within 5 days after work commences.
52.236-16Quantity Surveys (APR 1984) Alt 1 (APR 1984)Comment by Melissa Conn: Use if requiring quantity surveys for unit priced items. Use with alt 1 if contractor will perform quantity surveys (this needs approved at level above CO)
52.236-17Layout of Work (APR 1984)Comment by Melissa Conn: Use if contractor is responsible for on the ground layout of work (ie: staking, grades, etc)
52.236-21Specifications and Drawings for Construction (FEB 1997)Comment by PCxx: >SAT

**NOTE** [USE ALTERNATE I WHEN RECORD SHOP DRAWINGS ARE REQUIRED AND REPRODUCIBLE SHOP DRAWINGS ARE NEEDED. USE ALTERNATE II WHEN RECORD SHOP DRAWINGS ARE REQUIRED AND REPRODUCIBLE SHOP DRAWINGS ARE NOT NEEDED] Optional under SAT Alternate I (APR 1984) Alternate II (APR 1984)

52.236-26Preconstruction Conference (FEB 1995)Comment by Melissa Conn: Include if you expect to have a pre-work meeting but don’t have the details to include in your solicitation. You can delete this one if you’re including AGAR 452.215-73 in section G.
52.242-5Payments to Small Business Subcontractors (JAN 2017)Comment by Johnson, Melissa A -FS: Include if using clause 219-9
52.242-13Bankruptcy (JUL 1995)Comment by Melissa Conn: Use in all > SAT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .