2.2_Specivications-Coversheet.pdf
PDF 46 KB Posted
- Attached to
- Norway Beach Sewer System Replacement Federal contract opportunity
- Solicitation number
- 12639220R0004
About this file
This document contains technical specifications for a federal construction project to replace the sanitary sewer system at the Norway Beach Recreation Area. The project consists of constructing individual sanitary sewer systems to serve campground loops and a visitor information center, replacing an existing combined sanitary sewer treatment plant. The specifications cover site clearing, earth moving, dewatering, turf and grasses, and stormwater conveyance. Also included are sections on selective demolition, facility septic tanks and associated piping/pumps/drain fields, and basic electrical materials and methods for wastewater utilities. The solicitation is for the Norway Beach Sewer System Replacement project being conducted by the Department of Agriculture Forest Service R9-Eastern Region. Project number 12639220R0004 seeks to replace the existing sewer infrastructure according to the technical specifications provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ConstructionRFP_FAC2020_04_01152020.docx | DOCX document | |
| 1.5a_Section B-ScheduleofItems.doc | DOC document | |
| 2.2a_SpecificationAddendum-NorwayPhase2.pdf | ||
| 1.5b_SOV_BidForm-NWBPhase2.xlsx | XLSX spreadsheet | |
| 1.4_STATEMENT OF WORK.docx | DOCX document | |
| 2.1_Drawings-SignedCoversheet.pdf | ||
| 2.2_Specifications-NorwayPhase2.pdf | ||
| 2.1_Drawings-NorwayPhase2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C
SPECIFICATIONS
NORWAY BEACH RECREATION AREA RECONSTRUCTION - PHASE 2
SANITARY SEWER SYSTEM REPLACEMENT
Project No. CH 10619
DATED 3-06-2020
SECTION 011000 - SUMMARY
SECTION 012700 - MEASUREMENT AND PAYMENT
SECTION 012800 - MOBILIZATION
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 014000 - QUALITY CONTROL
SECTION 014100 – CONSTRUCTION SURVEYING AND STAKING
SECTION 014200 - REFERENCES
SECTION 015000 - TEMPORARY FACILITIES AND TRAFFIC CONTROL
SECTION 017000 - EXECUTION REQUIREMENTS
SECTION 017700 - CLOSEOUT PROCEDURES
SECTION 024119 - SELECTIVE DEMOLITION
SECTION 221353 - FACILITY SEPTIC/ PUMP TANKS, PIPE, PUMPS & DRAIN FIELD
SECTION 260500 - BASIC ELECTRICAL MATERIALS AND METHODS – WASTEWATER UTILITIES
SECTION 311100 - SITE CLEARING
SECTION 312000 - EARTH MOVING
SECTION 312319 - DEWATERING
SECTION 329200 - TURF AND GRASSES
SECTION 334200 - STORMWATER CONVEYANCE