2.2_Specivications-Coversheet.pdf

PDF 46 KB Posted

Attached to
Norway Beach Sewer System Replacement Federal contract opportunity
Solicitation number
12639220R0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

This document contains technical specifications for a federal construction project to replace the sanitary sewer system at the Norway Beach Recreation Area. The project consists of constructing individual sanitary sewer systems to serve campground loops and a visitor information center, replacing an existing combined sanitary sewer treatment plant. The specifications cover site clearing, earth moving, dewatering, turf and grasses, and stormwater conveyance. Also included are sections on selective demolition, facility septic tanks and associated piping/pumps/drain fields, and basic electrical materials and methods for wastewater utilities. The solicitation is for the Norway Beach Sewer System Replacement project being conducted by the Department of Agriculture Forest Service R9-Eastern Region. Project number 12639220R0004 seeks to replace the existing sewer infrastructure according to the technical specifications provided.

View the file

Other files for this federal contract opportunity

Other files attached to Norway Beach Sewer System Replacement, newest first.
File Type Posted
ConstructionRFP_FAC2020_04_01152020.docx DOCX document
1.5a_Section B-ScheduleofItems.doc DOC document
2.2a_SpecificationAddendum-NorwayPhase2.pdf PDF
1.5b_SOV_BidForm-NWBPhase2.xlsx XLSX spreadsheet
1.4_STATEMENT OF WORK.docx DOCX document
2.1_Drawings-SignedCoversheet.pdf PDF
2.2_Specifications-NorwayPhase2.pdf PDF
2.1_Drawings-NorwayPhase2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C

SPECIFICATIONS

NORWAY BEACH RECREATION AREA RECONSTRUCTION - PHASE 2

SANITARY SEWER SYSTEM REPLACEMENT

Project No. CH 10619

DATED 3-06-2020

SECTION 011000 - SUMMARY

SECTION 012700 - MEASUREMENT AND PAYMENT

SECTION 012800 - MOBILIZATION

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014000 - QUALITY CONTROL

SECTION 014100 – CONSTRUCTION SURVEYING AND STAKING

SECTION 014200 - REFERENCES

SECTION 015000 - TEMPORARY FACILITIES AND TRAFFIC CONTROL

SECTION 017000 - EXECUTION REQUIREMENTS

SECTION 017700 - CLOSEOUT PROCEDURES

SECTION 024119 - SELECTIVE DEMOLITION

SECTION 221353 - FACILITY SEPTIC/ PUMP TANKS, PIPE, PUMPS & DRAIN FIELD

SECTION 260500 - BASIC ELECTRICAL MATERIALS AND METHODS – WASTEWATER UTILITIES

SECTION 311100 - SITE CLEARING

SECTION 312000 - EARTH MOVING

SECTION 312319 - DEWATERING

SECTION 329200 - TURF AND GRASSES

SECTION 334200 - STORMWATER CONVEYANCE

File details come from the government source that posted it. Updated .