Sheet1
| Norway Beach Recreation Area Reconstruction - Phase 2: Sanitary Sewer System Replacement |
| Bid Form - Schedule of Values (SOV) |
Instructions: - Enter all fields highlighted in YELLOW.
- Form computation is thought to be accurate, but Offerors shall perform their own check for accuracy.
- Enter any notes in the fields at the bottom of the form
| Item Number | Work Item Description | QTY | Unit of Measure | Item |
| Unit Price | Item | | | | |
Total Price
| ITEM 1: DIVISION 1 - GENERAL REQUIREMENTS | | | | |
| 1.01 | GEN - Mobilization | 1 | LS | $0.00 |
| 1.02 | GEN -Construction Surveying and Staking | 1 | LS | $0.00 |
| 1.03 | GEN -Contractor Sampling and Testing | 1 | LS | $0.00 |
| 1.04 | GEN -Temporary Erosion Control (silt barrier) | 1 | LS | $0.00 |
| 1.05 | GEN -Temporary Facilities and Traffic Control | 1 | LS | $0.00 |
| 1.06 | GEN - Closeout Procedures - Includes Record Drawings Submittal, O&M Manuals, Materials Submittals, and Final Cleaning. | 1 | LS | $0.00 |
| 1 | TOTALS FOR ITEM NUMBER 1 | 1 | LS | $0.00 |
| ITEM 2: VISITOR INFORMATION CENTER (VIC) PROJECT AREA | | | | |
| 2.01 | VIC - Salvage and re-install log rail barrier. | 1 | LS | $0.00 |
| 2.02 | VIC - Removals including front entry wood stoop, concrete sidewalk, sanitary manhole #5 and CIP sewer pipe. | 1 | LS | $0.00 |
| 2.03 | VIC - Furnish and Install 3,000 gallon concrete septic holding tank. | 1 | LS | $0.00 |
| 2.04 | VIC - Construct 4" Dia. Schedule 40 PVC sanitary gravity sewer. | 1 | LS | $0.00 |
| 2.05 | VIC - Construct 4" PVC sanitary clean-out incl. marker post. | 1 | LS | $0.00 |
| 2.06 | VIC - Construct septic alarm system including new electrical power circuit w/breaker from VIC building and UG power in conduit to alarm panel. | 1 | LS | $0.00 |
| 2.07 | VIC - Construct VIC basement sump pump drain system including new interior piping, 4" Schedule 40 PVC storm sewer gravity drain and 4' dia. concrete filtration catch basin. | 1 | LS | $0.00 |
| 2.08 | VIC - Construct front entry wood deck/stoop including hand railings (in kind). | 1 | LS | $0.00 |
| 2.09 | VIC - Construct 4" concrete sidewalk on 6" aggregate base. | 1 | LS | $0.00 |
| 2.10 | VIC - Site Restoration. | 1 | LS | $0.00 |
| 2.11 | VIC - Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| 2 | TOTALS FOR ITEM NUMBER 2 | 1 | LS | $0.00 |
| ITEM 3: NORWAY BEACH CG - WEST LOOP PROJECT AREA | | | | |
| 3.01 | NWB-West - Salvage light pole and fixture. | 1 | LS | $0.00 |
| 3.02 | NWB West - Removals including sanitary manhole #8, CIP sewer pipe, abandoned septic tank and concrete light base. | 1 | LS | $0.00 |
| 3.03 | NWB West - Remove asphalt paving | 1 | LS | $0.00 |
| 3.04 | NWB West - Drain field area vegetation clearing and surface preparation. | 1 | LS | $0.00 |
| 3.05 | NWB West - Clearing and Grubbing general construction limits. | 1 | LS | $0.00 |
| 3.06 | NWB West - Furnish and Install concrete 3,600 gallon/1,200 gallon septic/pump combination tank. | 1 | LS | $0.00 |
| 3.07 | NWB West - Construct 4" PVC gravity sewer to tank. | 1 | LS | $0.00 |
| 3.08 | NWB West - Construct 4" PVC sanitary clean-out incl. marker post. | 1 | LS | $0.00 |
| 3.09 | NWB West - Connect to existing sanitary manhole. | 1 | LS | $0.00 |
| 3.10 | NWB West - Furnish and Install lift station pumps and piping systems. | 1 | LS | $0.00 |
| 3.11 | NWB West - Furnish and install septic system control and float system and wiring including new electrical power circuit w/breaker from existing distribution panel and UG wiring in conduit to control panel. | 1 | LS | $0.00 |
| 3.12 | NWB West - Construct 2" Dia. HDPE forcemain sewer. | 1 | LS | $0.00 |
| 3.13 | NWB West - Construct mound system drain field with 2,000 SF absorbtion area. | 1 | LS | $0.00 |
| 3.14 | NWB West Loop - Construct 3" asphalt patch on 8" aggregate base. | 1 | LS | $0.00 |
| 3.15 | NWB West - Site Restoration. | 1 | LS | $0.00 |
| 3.16 | NWB West - Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| 3 | TOTAL FOR ITEM 3 - NORWAY BEACH WEST | 1 | LS | $0.00 |
| ITEM 4: NORWAY BEACH CG - EAST LOOP PROJECT AREA | | | | |
| 4.01 | NWB East - Reconstruct siphon manhole #2 | 1 | LS | $0.00 |
| 4.02 | NWB East - Drain field area vegetation clearing and surface preparation. | 1 | LS | $0.00 |
| 4.03 | NWB East - Clearing and Grubbing general construction limits. | 1 | LS | $0.00 |
| 4.04 | NWB East Loop - Furnish and Install concrete 6,000 gallon/2,000 gallon septic/pump combination tank. | 1 | LS | $0.00 |
| 4.05 | NWB East - Construct 4" PVC gravity sewer to tank. | 1 | LS | $0.00 |
| 4.06 | NWB East - Connect to existing sanitary manhole. | 1 | LS | $0.00 |
| 4.07 | NWB East - Furnish and Install lift station pumps and piping systems. | 1 | LS | $0.00 |
| 4.08 | NWB East - Furnish and install septic system control and float system and wiring including new 100 amp distribution panel, electrical power circuit w/breaker and UG wiring in conduit to control panel. | 1 | LS | $0.00 |
| 4.09 | NWB - Construct 2" Dia. HDPE forcemain sewer. | 1 | LS | $0.00 |
| 4.10 | NWB East Loop - Construct double mound system drain field with 3,200 SF absorbtion area. | 1 | LS | $0.00 |
| 4.11 | NWB East - Site Restoration. | 1 | LS | $0.00 |
| 4.12 | NWB East - Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| 4 | TOTAL FOR ITEM 4 - NORWAY BEACH EAST | 1 | LS | $0.00 |
| ITEM 5: CHIPPEWA CG - WEST LOOP PROJECT AREA | | | | |
| 5.01 | CHIP WEST - Removals including sanitary manhole #2, CIP sewer pipe | 1 | LS | $0.00 |
| 5.02 | CHIP WEST - Drain field area vegetation clearing and surface preparation. | 1 | LS | $0.00 |
| 5.03 | CHIP WEST - Clearing and Grubbing general construction limits. | 1 | LS | $0.00 |
| 5.04 | CHIP WEST - Furnish and Install concrete 3,600 gallon/1,200 gallon septic/pump combination tank. | 1 | LS | $0.00 |
| 5.05 | CHIP WEST - Construct sanitary inside drop section manhole. | 1 | LS | $0.00 |
| 5.06 | CHIP WEST - Construct 4" Dia. Schedule 40 PVC sanitary gravity sewer. | 1 | LS | $0.00 |
| 5.07 | CHIP WEST - Connect to existing CIP sanitary sewer pipe. | 1 | LS | $0.00 |
| 5.08 | CHIP WEST - Furnish and Install lift station pumps and piping systems. | 1 | LS | $0.00 |
| 5.09 | CHIP WEST - Furnish and install septic system control and float system and wiring including new electrical UG power in conduit from existing junction box and disconnect at the control panel. | 1 | LS | $0.00 |
| 5.10 | CHIP WEST - Construct 2" Dia. HDPE forcemain sewer. | 1 | LS | $0.00 |
| 5.11 | CHIP WEST - Construct mound system drain field with 2,000 SF absorbtion area. | 1 | LS | $0.00 |
| 5.12 | CHIP WEST - Site Restoration. | 1 | LS | $0.00 |
| 5.13 | CHIP WEST - Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| 5 | TOTALS FOR ITEM 5 - CHIPPEWA CG - WEST LOOP | 1 | LS | $0.00 |
| ITEM 6: CHIPPEWA CG - EAST LOOP PROJECT AREA | | | | |
| 6.01 | CHIP EAST - Salvage light pole and fixture. | 1 | LS | $0.00 |
| 6.02 | CHIP EAST - Removals including CIP sewer pipe and concrete light base. | 1 | LS | $0.00 |
| 6.03 | CHIP EAST - Drain field area vegetation clearing and surface preparation. | 1 | LS | $0.00 |
| 6.04 | CHIP EAST - Clearing and Grubbing general construction limits. | 1 | LS | $0.00 |
| 6.05 | CHIP EAST - Furnish and Install concrete 3,600 gallon septic tank. | 1 | LS | $0.00 |
| 6.06 | CHIP EAST - Furnish and Install concrete 1,200 gallon pump tank. | 1 | LS | $0.00 |
| 6.07 | CHIP EAST- Construct 4" Dia. Schedule 40 PVC sanitary gravity sewer. | 1 | LS | $0.00 |
| 6.08 | CHIP EAST - Construct 4" PVC sanitary clean-out incl. marker post. | 1 | LS | $0.00 |
| 6.09 | CHIP EAST- Connect to existing CIP sanitary sewer pipe. | 1 | LS | $0.00 |
| 6.10 | CHIP EAST - Furnish and Install lift station pumps and piping systems. | 1 | LS | $0.00 |
| 6.11 | CHIP EAST - Furnish and install septic system control and float system and wiring including new 100 amp distribution panel, electrical power circuit w/breaker and UG wiring in conduit to control panel. | 1 | LS | $0.00 |
| 6.12 | CHIP EAST - Construct 2" Dia. HDPE forcemain sewer (directional drilling). | 1 | LS | $0.00 |
| 6.13 | CHIP EAST - Construct mound system drain field with 2,000 SF absorbtion area. | 1 | LS | $0.00 |
| 6.14 | CHIP EAST- Site Restoration. | 1 | LS | $0.00 |
| 6.15 | CHIP EAST- Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| 6 | TOTALS FOR ITEM 6 - CHIPPEWA CG - EAST LOOP | 1 | LS | $0.00 |
| ITEM - GOV. OPTION A: WANAKI CAMPGROUND LOOPS - PRIMARY ELECTRICAL IMPROVEMENTS | | | | |
| A.01 | WAN-OPT A - Primary Electrical Improvements including associated mobilization, vegetation clearing, terminations at existing transformer, UG primary conductors, road crossing, pad mount 1-phase transformer, concrete pad, meter base, meter and associated site restoration. | 1 | LS | $0.00 |
| OPT A | TOTAL FOR ITEM - GOV. OPTION A | 1 | LS | $0.00 |
| ITEM - GOV. OPTION B: WANAKI CAMPGROUND LOOPS PROJECT AREA | | | | |
| B.01 | WAN-OPT B - Mobilization (all B110:B133work except primary electric). | 1 | LS | $0.00 |
| B.02 | WAN-OPT B - Construction Surveying and Staking | 1 | LS | $0.00 |
| B.03 | WAN-OPT B - Contractor Sampling and Testing | 1 | LS | $0.00 |
| B.04 | WAN-OPT B - Temporary Erosion Control (silt barrier) | 1 | LS | $0.00 |
| B.05 | WAN-OPT B - Temporary Facilities and Traffic Control | 1 | LS | $0.00 |
| B.06 | WAN-OPT B - Closeout Procedures - Includes Record Drawings Submittal, Operation & Maintenance Manuals and Materials Submittal and Final Cleaning. | 1 | LS | $0.00 |
| B.07 | WAN-OPT B - Removals including sanitary manholes #1, #2 and #3, CIP sewer pipe and concrete sidewalk. | 1 | LS | $0.00 |
| B.08 | WAN-OPT B East Loop - Drain field area vegetation clearing and surface preparation. | 1 | LS | $0.00 |
| B.09 | WAN-OPT B - Clearing and Grubbing general construction limits. | 1 | LS | $0.00 |
| B.10 | WAN-OPT B East Loop - Furnish and Install concrete 3,600 gallon/1,200 gallon septic/pump combination tank. | 1 | LS | $0.00 |
| B.11 | WAN-OPT B West Loop - Furnish and Install concrete 600 gallon grinder pump tank. | 1 | LS | $0.00 |
| B.12 | WAN-OPT B West Loop - Construct sanitary manhole. | 1 | LS | $0.00 |
| B.13 | WAN-OPT B - Construct 4" Dia. Schedule 40 PVC sanitary gravity sewer. | 1 | LS | $0.00 |
| B.14 | WAN-OPT B West Loop - Construct 4" PVC sanitary clean-out incl. marker post. | 1 | EACH | $0.00 |
| B.15 | WAN-OPT B - Connect to existing CIP sanitary sewer pipe. | 2 | EACH | $0.00 |
| B.16 | WAN-OPT B West Loop - Furnish and Install lift station grinder pumps and piping systems. | 1 | LS | $0.00 |
| B.17 | WAN-OPT B East Loop - Furnish and Install lift station pumps and piping systems. | 1 | LS | $0.00 |
| B.18 | WAN-OPT B Electrical - Furnish and Install post mounted distribution panel at the location of the proposed 1-phase transformer/meter. | 1 | LS | $0.00 |
| B.19 | WAN-OPT B Electrical - Furnish and Install empty 2" HDPE conduit/innerduct. | 1 | LS | $0.00 |
| B.20 | WAN-OPT B West Loop Electrical - Furnish and install septic system control and float system and wiring including new electrical UG power in conduit/innerduct from proposed junction box and disconnect at the control panel. | 1 | LS | $0.00 |
| B.21 | WAN-OPT B East Loop Electrical - Furnish and install septic system control and float system and wiring including new electrical UG power in conduit/innerduct from proposed junction box and disconnect at the control panel. | 1 | LS | $0.00 |
| B.22 | WAN-OPT B - Construct 1.5" Dia. HDPE forcemain sewer. | 1 | LS | $0.00 |
| B.23 | WAN-OPT B - Construct 2" Dia. HDPE forcemain sewer. | 1 | LS | $0.00 |
| B.24 | WAN-OPT B West Loop - Construct mound system drain field with 2,000 SF absorbtion area. | 1 | LS | $0.00 |
| B.25 | WAN-OPT B - Site Restoration. | 1 | LS | $0.00 |
| B.26 | WAN-OPT B - Systems Commissioning and Staff Training. | 1 | LS | $0.00 |
| OPT B | TOTAL FOR ITEM - GOV. OPTION B | 1 | LS | $0.00 |
| SUMMARY OF BID | | |
| Contract Item | Description | Bid Price |
| 1 | DIVISION 1 - GENERAL REQUIREMENTS | $0.00 |
| 2 | VISITOR INFORMATION CENTER (VIC) PROJECT AREA | $0.00 |
| 3 | NORWAY BEACH CG - WEST LOOP PROJECT AREA | $0.00 |
| 4 | NORWAY BEACH CG - EAST LOOP PROJECT AREA | $0.00 |
| 5 | CHIPPEWA CG - WEST LOOP PROJECT AREA | $0.00 |
| 6 | CHIPPEWA CG - EAST LOOP PROJECT AREA | $0.00 |
BASE BID ITEMS: $0.00
Gov.Option A WANAKI CG - BOTH LOOPS PRIMARY ELECTRICAL IMPROVEMENTS GOV. OPTION A: $0.00
Gov.Option B WANAKI CG - BOTH LOOPS PROJECT AREA GOV. OPTION B: $0.00
NOTES:
| Contact/Phone | Signature: |
| Date: |
Norway Beach Recreation Area Reconstruction Phase 2 Page &P of &N