1.5a_Section B-ScheduleofItems.doc
DOC document 40 KB Posted
- Attached to
- Norway Beach Sewer System Replacement Federal contract opportunity
- Solicitation number
- 12639220R0004
About this file
This document contains a Section B schedule of items for a federal construction contract solicitation to replace sanitary sewer systems at the Norway Beach Recreation Area in the Chippewa National Forest in Minnesota. The solicitation seeks lump sum pricing for six base bid items to replace individual sanitary sewer systems serving the Visitor Information Center, Norway Beach campground loops, and Chippewa campground loops. It also contains two optional bid items for primary electrical improvements and sewer system replacement at the Wanaki campground. Contractors must provide pricing for all items to be considered for award. The government intends to award a contract for the base bid items alone or in combination with optional items, and reserves the right to award all, part, or none of the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1.5b_SOV_BidForm-NWBPhase2.xlsx | XLSX spreadsheet | |
| 1.4_STATEMENT OF WORK.docx | DOCX document | |
| 2.2_Specivications-Coversheet.pdf | ||
| 2.1_Drawings-SignedCoversheet.pdf | ||
| ConstructionRFP_FAC2020_04_01152020.docx | DOCX document | |
| 2.2a_SpecificationAddendum-NorwayPhase2.pdf | ||
| 2.2_Specifications-NorwayPhase2.pdf | ||
| 2.1_Drawings-NorwayPhase2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B – SERVICES AND PRICES
CH10619
NORWAY BEACH RECREATION AREA RECONSTRUCTION – PHASE 2
SANITARY SEWER SYSTEM REPLACEMENT
CHIPPEWA NATIONAL FOREST
CASS COUNTY, MINNESOTA
B-1 - SCHEDULE OF ITEMS:
BASE BID PAY ITEMS:
| Item # |
| Description |
| QTY |
| Method of Measure |
| Pay Unit |
| Unit Price |
| Total Price |
| 1 |
| Division 1 – General Requirements: Mobilization, Surveying and Staking, Sampling and Testing, Temp. Erosion Control, Temp. Facilities, Traffic Control, Closeout Procedures, ALL INCEDENTAL WORK NOT INCLUDED IN OTHER ITEMS |
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 2 |
| Visitor Information Center (VIC) |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 3 |
| Norway Beach CG-WEST Loop |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 4 |
| Norway Beach CG-EAST Loop |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 5 |
| Chippewa CG-WEST Loop |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| 6 |
| Chippewa CG-EAST Loop |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| BASE BID ITEMS TOTAL: |
| $ |
GOVERNMENT OPTION PAY ITEMS:
| Item # |
| Description |
| QTY |
| Method of Measure |
| Pay Unit |
| Unit Price |
| Total Price |
| OPT A |
| Wanaki CG- BOTH Loops |
Primary Electrical Improvements
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| OPT B |
| Wanaki CG-BOTH Loops |
Sanitary Sewer System Replacement
| 1 |
| LSQ |
| LS |
| $ |
| $ |
| OPTIONAL BID ITEMS TOTAL: |
| $ |
B-2 - NOTES:
Contractors submitting price proposals are required to complete the Schedule of Values (SOV) Form provided by the Government as part of the solicitation documents. The completed SOV Form is considered part of Section B and Contractors must enter an amount for each line item to be considered for award.
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Item 1 (Mobilization).
All pay quantities are Lump Sum Quantities as defined in the specifications.
The Government intends to award one contract to the Contractor who provides the best overall value to the Government. The Government reserves the right to award a contract to base bid items alone or base bid plus any combination of optional bid items. The Government reserves the right to award all, part or none of the contract. Contractors must enter an amount for each item on all base and optional bid items to be considered for award.
END OF SECTION B