This document is a Professional Services Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) District 4, located in Fort Lauderdale, for intersection improvement services. The project involves Jacobs Engineering Group Inc., Keith and Associates, Inc., and AtkinsRealis USA Inc. as the shortlisted consultants. The procurement is specifically for improvements to the SR-5/US-1 at SR-838/Sunrise Boulevard intersection in Broward County, Florida, with involvement from local agencies including the City of Fort Lauderdale, Broward County Transit, and the Broward Metropolitan Planning Organization.

The contract is for comprehensive professional engineering services with a maximum project duration of 24 months and a contract term of 10 years. The total contract amount is $1,800,988, with Jacobs Engineering Group Inc. being ranked first in the final selection. The project scope includes roadway reconstruction, drainage system improvements, intersection lighting, vehicular and pedestrian signalization, shared use path construction, sidewalk reconstruction, utility impact management, and signing and pavement markings. The Department has established a Disadvantaged Business Enterprise (DBE) participation goal of 10.54% and an additional 3% for non-DBE small businesses. Professional liability insurance of $1,000,000 is required, and the project involves multiple optional service components that may be negotiated separately.

View the file

Other files

File Type Posted
CN-550000-C9O60-00020000.pdf PDF
ContractBudgetExport.csv CSV file
CN-550000-C9O60-S0020000.pdf PDF
CN-550000-C9O60-S0040100.pdf PDF
CN-550000-C9O60.pdf PDF
CN-550000-C9O60-00030000.pdf PDF
CN-550000-C9O60-00040000.pdf PDF
CN-550000-C9O60-00050000.pdf PDF
CN-550000-C9O60-S0010000.pdf PDF
CN-550000-C9O60-S0030000.pdf PDF
CN-550000-C9O60-S0040000.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Procurement Office Home Page (http://www.fdot.gov/procurement/)

Pursuant to Section 120.57(3), Florida Statutes, and Rule Chapter 28-110, Florida Administrative Code, any person adversely affected by the agency decision or intended decision shall file with the agency both a notice of protest in writing and bond, where applicable, within 72 hours after the posting of the notice of decision or intended decision, or posting of the solicitation with respect to a protest of the terms, conditions, and specifications contained in a solicitation and will file a formal written protest within ten days after the filing of the notice of protest. The required notice of protest and bond, and formal written protest must each be timely filed with the Florida Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee St, Mail Station 58, Tallahassee FL 32399. Failure to file a notice of protest or formal written protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes.

IMPORTANT NOTICE !!

All Prime Consultants and all Subvendors/subconsultants/subcontractors must register with the State's web-based e-Procurement system - "MyFloridaMarketPlace." (http://dms.myflorida.com/mfmp) Professional Services acquired in accordance with Chapter 287.055 Florida Statutes, are exempt from the 1% transaction fee. You can also sign up to attend a vendor registration training session or call 1-866-352- 3776 for assistance.

07/08/2024 03:14 PM

Advertisement

Professional Services Advertisement - 25429

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required)

District : 04

Major Work :

3.2— Major Highway Design

Minor Work :

3.1— Minor Highway Design 4.1.1— Miscellaneous Structures 6.3.1— Intelligent Trans Systems Analysis & Design 7.1— Signing, Pavement Marking & Channelization 7.2— Lighting 7.3— Signalization 8.1— Control Surveying 8.2— Design, Right of Way, Construction Surveying 8.3— Photogrammetric Mapping 8.4— Right of Way Mapping 9.1— Soil Exploration 9.2— Geotechnical Classification Lab Testing 9.4.1— Standard Foundation Studies 15.0— Landscape Architect

Selection Method : Letter of Response and Interview

Professional Liability Insurance : $1,000,000.00

Project Description : SR-5/US-1 at SR-838/Sunrise Blvd.

Plain Language Description :

Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd.

Project Manager : Kris McKirdy http://www.fdot.gov/procurement/ http://www.fdot.gov/procurement/ http://dms.myflorida.com/mfmp

Number of contracts that may be awarded from this advertisement : 1

Contract Amount/Limit : $1,800,988.00

TRC Members (Subject to Change) :

Claudia Vinitskiy-Calvo Henry Oaikhena Kris McKirdy

See Standard Notes List :

Type Note

Standard Note 9

Standard Note 9 - It is the policy of FDOT to encourage the participation of small businesses and disadvantaged business enterprises ("DBE") in all facets of the business activities of FDOT, consistent with applicable laws and regulations. FDOT has established an aspiration goal of 10.54% DBE usage and an additional 3% non-DBE Small Business usage for the subject Project. Firms proposing for this Project shall aspire to have 10.54% or more of the total contract costs performed by DBEs, and an additional three percent (3%) or more of the total contract costs performed by non-DBE small businesses. Although not a contract requirement, FDOT believes that the aforementioned aspiration goal can realistically be achieved based on current availability of DBEs and small businesses. FDOT further believes that the 13.54% overall goal can be achieved through race neutral means, using standard competitive procurement processes. Pursuant to the provisions of Section 339.0805, Florida Statutes, and Rule 14.78.005, Florida Administrative Code, FDOT has adopted rules to provide certified DBEs opportunities to participate in the business activities of FDOT as vendors, contractors, subcontractors, and consultants. FDOT has adopted the DBE definition set forth in Code 49 of Federal Regulations Section 26.5. The Department's DBE directory may be found at the following website: Equal Opportunity Office Business Directory. Firms agree to apply their best efforts to utilize qualified non- DBE small businesses as vendors, contractors, subcontractors, and consultants for the Project. Qualifications for small businesses may be found at the following website: Equal Opportunity Office Size Standards Firms will submit the Professional Services Commitment form as required by the advertisement when selecting from Expanded Letters of Response, otherwise it will be required with the Request for Proposal. DBE listing for Professional Services (Check DBE & Small Business column for status): Professional Services Report Non-DBE Small Business listing for Professional Services (Check DBE & Small Business column for status): Professional Services Reports

Notes :

Type Note

Advertisement Description

Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd.

Advertisement Special Notes

NOTE: The Advertisement Description was updated on 7/8/2024.

Reconstruction of signalized intersection on Sunrise Blvd and US 1 (Gateway) to increase capacity and provide new pedestrian facilities (wide sidewalks). Milling and resurfacing of intersection approaches extending to NE 17th Way on the west, Middle River Dr. on the east and NE 13th Street on the north. Includes intersection lighting to meet current design criteria and drainage improvements to accommodate the reconstructed intersection footprint and the additional impervious areas.

PD&E preferred alternative is the Eastbound Triple Left Signalized At-Grade T Intersection. Full reconstruction of the intersection. Adding turns lanes for SB to EB (dual to triple), SB to WB (dual to triple), WB to NB (single to dual) and extending the EB to NB existing triple LTs. New shared use path throughout project limits to accommodate bicycles and pedestrians.

Audit Package

Please be advised if you are awarded this contract the cutoff date for the Professional Services Audit package and payroll registers shall be due on the Negotiation Period Begin date as referenced on the Advertisement Schedule. Firms that are interested in competing are advised of these deadlines. The awarded Consultant shall also provide Professional Liability Insurance (PLI) by conclusion date for negotiation or earlier.

Financial Management Number(s)

441955-1-32-01

Type Note

Advertisement tentative date note

Advertisement Tentative Dates

Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times.

Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: September 3, 2024

Tentative Interview Date: September 4, 2024

Automated Fee Proposal Due Date: October 2, 2024

Scope of Services / Attachments :

Scope of Services.pdf

Schedule - The times displayed are automatically adjusted for the time zone of your system :

Type Date - Time Advertisement Date 7/01/2024 Response Deadline Date/Time 7/16/2024 05:00 pm Longlist Date/Time 8/01/2024 03:00 pm Shortlist Selection Date/Time 8/12/2024 09:30 am Phase II Submittal Deadline Date/Time 9/03/2024 03:00 pm Consultant Interviews Date/Time 9/04/2024 Technical Review Committee Meeting 1 Date/Time 9/05/2024 10:30 am Final Selection Date/Time 9/23/2024 09:30 am Negotiations Period Begin Date 9/27/2024 Negotiations Period Ending Date 11/30/2024

Note: Oral Presentations and Consultant Interviews are exempt meetings. Times will be available in the RFP issued to Shortlisted firms.

Respond To :

Attn.: Kereisha Ottey Submittals must be sent to: d4.profserv@dot.state.fl.us Phone: 954-777-4685 Physical Address:

3400 West Commercial Blvd.

Fort Lauderdale , FL 33309

BACK TO TOP

Service Desk:

fdot.servicedesk@dot.state.fl.us (mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement Development Application (PDA) Question)

Or call 1-866-955-4357(HELP)

Accessibility Statement (http://www.fdot.gov/agencyresources/notices/accessibility.shtm) Grid Help Web Policies & Notices (https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm) MyFlorida.com (http://www.myFlorida.com) mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement%20Development%20Application%20(PDA)%20Question mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement%20Development%20Application%20(PDA)%20Question http://www.fdot.gov/agencyresources/notices/accessibility.shtm http://www.fdot.gov/agencyresources/notices/accessibility.shtm https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm http://www.myflorida.com/

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROFESSIONAL SERVICES LETTER OF RESPONSE

375-030-22

PROCUREMENT

04/18

Advertisement No.: 25429 DOT FM Number: 441955-1-32-01

Submittal Date: 7/16/2024 Project Name: SR 5/US 1 at SR 838/Sunrise Blvd.

Consultant’s Name: Jacobs Engineering Group Inc.

(Firm must use the name shown on the Consultant’s qualification letter.)

Street Address: 550 W Cypress Creek Road, Suite 400

City: Fort Lauderdale State: FL Zip: 33309

Office Location: Fort Lauderdale Contact person: Joseph Martin, PE

Phone: 954.513.1543 Contact email: joseph.martin@jacobs.com By submittal of this letter the Consultant certifies that all information provided in the letter is true and accurate. The Consultant further certifies that staff proposed are currently employed by the firm(s) identified, or the Consultant shall provide a statement indicating when staff will become employed by the identified firm(s).

The Letter of Response should address the following information:

• Proposed approach and understanding of critical issues.

• Relevant project experience – Similar type of work experience.

• Other content provided by firm.

• Proposed key personnel and their proposed roles (do not include resumes).

Consultants: Please be aware that all font (including font in graphics, tables, and captions on photos) must be standard Arial Narrow, 11 point, single line spacing with no modification of font or spacing allowed. ½” clear margin on all sides must be maintained on all pages. It is the Consultant’s responsibility, due to font and format restrictions within this form, to work within the constraints of the form and its format. Character styling such as use of color, bold, and italics is allowed. Use of a table is recommended for text boxes. The page layout may be modified to add columns, tables, graphics, and photos. All graphics and photos must be created in a clean, blank word document and the “text wrapping square” option applied before cutting and pasting into this form. Consultants may add their logo at the top of the first page (directly underneath the header), however, the Consultant shall not extend the form beyond the pages allocated for the Letter to accommodate insertion of the logo. Consultants are not permitted to insert any other information in the header other than the logo. After pasting your letter into this form, highlight all text and ensure the font size of Arial Narrow, 11 point was retained. Once your content is inserted, delete any additional blank pages that are generated by pressing your delete key after the last word in the Letter of Response. Recreation of the form in another software application to modify the form format is not permitted. This form works best when saved with a .docx extension. *Please retain the source document as it may be requested at a later date in the procurement, to verify adherence with aforementioned restrictions. Note: You may begin typing on this page.

Jacobs, led by Joseph “Joe” Martin, PE, has assembled a team of dedicated, available, and highly qualified professionals to deliver the SR 5/US 1 at SR 838/Sunrise Blvd. (Gateway) project. With a thorough knowledge of District 4’s (D4) goals and objectives, we developed a strategic approach that leverages our experience, innovative solutions, and unwavering dedication to quality.

Approach/Understanding of Critical Issues The Gateway reconstruction project increases intersection capacity, accommodates multimodal travel demand, enhances pedestrian crossing safety by reducing crossing lengths, and provides enhanced pedestrian and bicycle features. The preferred alternative maintains the 3 EB left turn lanes (while lengthening the queue), adds a SB to EB turn lane (providing a triple turning movement), and adds a WB to NB turn lane (providing a dual turning movement). Beyond the reconstruction limits, the roadway will be milled and resurfaced, west to NE 17th Way, east to Middle River Dr., and north to NE 13th St. The predominant typical section consists of a 6-lane, Divided Urban Principal Arterial with raised medians, 10' to 11' travel lanes, shared outside lane, curb and gutter, and a minimum 5' sidewalk on both sides, and shared use paths in the reconstruction area. The posted speed for the Sunrise Blvd. corridor is 35 MPH with a context classification of C4-Urban General. The SB approach of SR 5 to the Gateway intersection has a 45 MPH posted speed. As the target speed within the Gateway improvement is 35 MPH, a transition speed reduction to 40 MPH should be considered on SB SR 5. Through the reconstruction limits, the proposed roadway alignment is shifted to the north to avoid impacts to the existing Gateway Theater. We’ll reconfigure the curve radii and superelevation to accommodate the additional lanes in the shift. Based on lessons learned from urban projects, superelevation through plateau intersections requires detailed grading and holding the back of walk elevations to minimize encroachments and reduce harmonization limits. We identified several substandard pedestrian ramps in the resurfacing areas during our field review (some will be replaced with the ongoing 3R project on SR 5), as well as substandard bridge railing leading end

375-030-22

PROCUREMENT

treatment in the EB direction with no protection of the water main, substandard slope end, and no water hazard shielding. As there is an existing driveway just west of the bridge, a variation may be justified for the end treatment to remain. Additional variations needed include sidewalk (5’ to remain), border width, lateral offset, and median width. To ensure mobility, we’ll coordinate with Broward County Transit (BCT) to accommodate transit routes on the corridor to confirm requested upgrades to their features are documented with MMOA and LFAs. Temporary Traffic Control Plan (TTCP):

Our Level II TTCP will promote safety, minimize disruptions, and be developed in close coordination with D4, the City of Ft Lauderdale, the community, stakeholders, and first responders. Our lane closure analysis and our TTCP scheme will limit lane closures to non-peak hours. We’ll work closely with the community to maintain pedestrian and bicycle continuity within our TTCP phases while ensuring transit routes are operational during construction. We’ll phase sidewalk closures to maintain accessibility to transit stops at all times using a combination of pedestrian detours and pedestrian LCDs.

Drainage & Permitting: The project will be exempt from permitting per F.A.C. 62-330.051 since this improvement is a safety and operational enhancement. Based on our field review during and after rain events, we documented one isolated ponding location that falls within the intersection reconstruction that will be resolved during design. Signing & Pavement Marking (S&PM): Our design will comply with the latest editions of the FDM, Standard Plans, MUTCD, and FHWA, and incorporate sharrows for bikes and high emphasis crosswalks for pedestrians. We’ll design overhead guide signs to reflect new lane assignments to provide guidance without creating visual clutter. We’ll apply lessons learned and use skip guidelines through the intersection, and directional arrows, with color route shields approaching the intersection to ensure drivers have proper guidance and enhanced safety. On the eastern resurfacing limits, we’ll coordinate the existing stamped asphalt early with the City to confirm proper LFA and MMOAs are executed if they will be replaced. Misc. Structures: We’ll evaluate and design new signal mast arms and existing overhead sign trusses per AASHTO LRFD LTS and the associated SDM with a design wind speed of 170 MPH. If the existing sign structures were designed for a 50% increase in panel area, and the proposed signage does not exceed the 50%, the trusses may remain. Signals: Two traffic signal mast arms will remain at NE 17th Way and NE 20th Ave.;

however, flexible backplates will be added where missing (NW 20th Ave.). The use of flexible backplates eliminates the need to evaluate the structure, providing cost savings to D4. We’ll evaluate all pedestrian facilities and upgrade substandard/non-ADA-compliant features such as push buttons and pedestrian signals at NW 20th Ave. The Gateway intersection signal reconstruction will accommodate travel demand and enhance safety. Our design uses MUTCD standards ensuring ADA compliance, especially in restricted R/W locations such as the SE corner of NW 20th Ave. As a value add, we’ll explore and coordinate the use of existing conduit with Broward County Traffic Engineering Division (BCTED). We’ll closely coordinate signal work, including verification of timings such as red and yellow intervals, with Charlie Zhu and Jean Laraque of

BCTED. We’ll also coordinate vehicle detection with BCTED to ensure proper detection is proposed, and confirm that existing cabinets have spare lead-in conduit to accommodate the pedestrian signal upgrades at all signalized intersections, applying lessons learned from SW 184th/Miramar (FM 441579-1). During our field review, we identified traffic monitoring site (860446) and will coordinate the replacement of loops impacted due to milling operations. Lighting: Existing lighting along the corridor mainly consists of HPS luminaires mounted predominantly on conventional FDOT light poles and concrete FPL utility poles. In conjunction with HPS-to-LED retrofits, we’ll incorporate intersection retrofits at the signalized intersections of NE 17th Way and NE 20th Ave. to meet current standards (FDM Table 231.2.1). Lighting will meet the new construction lighting criteria at the reconstructed Gateway intersection. We’ll compile and submit a Lighting Design Analysis Report, that will include manufacturer luminaire specification sheets, voltage drop calculations, and Photometric Plans. This will be coordinated with D4 Traffic Design (Omid Fallahinejad; Tonya Estwick) as well as the City of Fort Lauderdale Facilities Manager, Corey Callier. During the scoping phase, we’ll identify any necessary PPC and LFAs that may require funding coordination.

The existing lighting MOA between the City and D4 will be updated to match new luminaire placement. Modifications or new luminaires on FPL poles will require an MOA between the City and FPL. ITS:

There are several D4 and Broward County ITS devices within the project limits, including a CCTV camera pole with a BlueTooth Vehicle Detector and fiber optic communication infrastructure. BCT also has Opticom® preemption sensors on the mast arms at three signalized intersections. We’ll conduct detailed field investigations to assess the impacts of the improvements on the existing ITS infrastructure. We’ll coordinate with the D4 RTMC and BCTED to verify continued operation of existing ITS devices during construction and document with a Maintenance of Communication plan. Utilities: There are 14 UAO’s identified by design ticket within the corridor. We’ll effectively communicate with UAO’s, request SUE, and avoid adjustments. Utility work schedules will document UAO commitments for required adjustments with utility certification being completed prior to the biddability submittal.

Surveying/SUE/Mapping: Manuel G. Vera & Associates, Inc.

(MGV) will apply the work from their FM 441955-1 (PD&E Phase) project and enhance it by incorporating LiDAR with conventional surveying. They’ll provide SUE with Quality Level B designations for mapping and Quality Level A locates for conflict resolution as necessary. We’ll validate the previously identified R/W acquisition and provide R/W needs prior to the Initial Engineering submittal.

Based on our lessons learned on Atlantic Ave. (FM 229658-4), it is crucial to identify R/W needs and costs early for project success.

We’ll verify the identified R/W to be taken under the preliminary Maintenance Map meets criteria as parcels that fall under building overhangs will not be eligible. Geotechincal: We will use the information gathered during the PD&E Phase. The past work will be supplemented with D4 Geotechnical Office coordination and a slightly increased number of borings in the widening areas to reduce the risk of unsuitable material. Public Information (PI): Our Level

3 CAP will provide requisite project information to ensure transparency and bolster trust. Quest Corporation of America, Inc.

(QCA) will build on their knowledge gained from the PD&E Phase, addressing issues such as bicycle/pedestrian safety, signal pole damage and placement impacting walkways, driveway and median closures, and impacts to City landscaping. We’ll perform grassroots coordination with stakeholders, including hybrid public meetings, ensuring all parties are aware of the project scope and construction schedule. Landscaping: We’ll perform an inventory of the existing landscape along the project corridor. Roadway plans will incorporate coordinated tree disposition plans and landscape protection as needed. Design will include irrigation and sod only.

Proposed Key Personnel/Roles As PM, Joe Martin, PE will apply his 36 years of design and construction management experience to lead our team. Lead designer, Houman Assari, PE, brings 32 years of urban reconstruction and 3R design experience ensuring a quality product is delivered on time and within budget. Jacobs will provide project management and deliver roadway, drainage, TTCP and SP&M. Our team is enhanced by trusted subconsultants that we have worked with on numerous projects including ASA Consultants, Inc.

(DBE/SB) for misc. structures; Cyriacks Environmental Consulting Services, Inc. (CECOS) (DBE/SB) for environmental;

Florida ITS Engineers LLC (FITS) (DBE/SB) for ITS; MGV (DBE) for survey/mapping/SUE/utility coordination; Miller, Legg & Assoc., Inc. (MLA) for landscaping; Quest Communication Assoc., (QCA) (DBE) for PI support; Scalar Consulting Group Inc. (SCG) (DBE) for signals/lighting; and TSF (DBE) for geotechnical. We are committed to meeting D4’s DBE/SB goals.

Key Team Member Role Yrs Avail Joseph Martin, PE1 Project Manager 36 80% Houman Assari, PE1 Roadway 32 85% Morteza Alian, PE1 QA/QC Manager 44 45% Darren Dyer, PE1 Drainage 16 75% Jawara Jarrett, PE1 S&PM/TTCP 11 75% Maria Missena, PE6 Signals/Lighting 7 70% Soheila Sadough, PE2 Misc. Structures 34 65% Mark Sowers, PSM3 Survey/Mapping 36 80% Garth Thompson3 Utility Coordination 17 70% Brian Shore, RLA4 Landscape 24 60% Raj Krishnasamy, PE7 Geotechnical 37 30% Amy Lee Diel5 PIO 23 80% Jacobs1; ASA2; MGV3; MLA4; QCA5; SCG6; TSF7

Relevant Project Experience FM 229658-4: SR 806/Atlantic Ave. from W of SR 7/US 441 to E of Lyons Rd. Joe is the PM for reconstruction of SR 806 to a 4-lane divided facility which includes canal relocation, R/W acquisition, and extensive stakeholder and utility coordination. Project let in 5/2024 (D4 PM Thuc Le, thuc.le@dot.state.fl.us) | FM 437835-1: SR 5 from N of Hypoluxo Rd to Dixie Hwy. Joe was the post-design PM for the 3R project including roadway, TTCP, S&PM, signal, and ADA upgrades enhancing safety. (D4 PM Henry Oaikhena, henry.oaikhena@dot.state.fl.us) | FM 450866-1, 450867-1, 450868-1: West Lake Dr Bridge Replacements. Joe is the PM under the D4 CSC LAP contract recently completing phase 1 of a 2-phase bridge replacement including concept study, preliminary roadway, TTCP, and S&PM. This phase was delivered with extensive coordination with City of Fort Lauderdale engineering staff as the facility’s owner. (D4 PM Sabrina Aubery, sabrina.aubery@dot.state.fl.us).

Other Content | Project Management Approach We are committed to delivering a successful project that meets D4’s project objectives, schedule, and budget while mitigating risks. As the single point-of-contact, Joe has four main goals: 1) proactively monitor project status and resolve issues; 2) deliver a high-quality product; 3) ensure on-time milestone delivery; and 4) maintain the project within design and construction budgets. Joe will develop a Project Work Plan (PWP) that will be available within 10 days of NTP. It will illustrate the project’s efficient, organized, and timely completion per the schedule, budget, and contract requirements and will detail the scope, define the work product, establish lines of communication, resource allocation, task sequencing, budget, schedule, and quality control procedures. The PWP is a “living document” updated regularly to make sure project issues are documented, monitored, and resolved promptly to eliminate impacts to the project delivery. Joe will run all team meetings and communicate with project discipline leads to confirm expectations are met. Monthly progress meetings will be held with Kris McKirdy, PE, to ensure proper coordination of the project scope, schedule, and budget. Our approach includes risk assessment, proactively addressing issues, and minimizing the involvement of D4’s PM.

Schedule discovery will be performed at NTP to verify all activities are in conformance with the scope and sequenced properly. Any schedule change recommendations will be coordinated through the PM with D4 scheduling staff. Our PSEE project schedule will be monitored and updated weekly to eliminate the potential for negative float on any activity. Our design budget will be monitored monthly using the Earned Value Method to make sure our invoices reflect our progress. We’ll monitor the construction budget using LRE updates through initial engineering and detailed engineer estimates based on quantities uploaded to Designer Interface starting at the constructability submittal. LREs and cost estimates will be updated at progress submittals, work program update cycles, or when the scope changes. Our project-specific QA/QC plan is an integral process that begins with contract execution, continues through design, and ends when construction is completed. We are responsible for the quality of all documents prepared by our team.

Our plan will follow FDOT procedures, use checklists, require constructability reviews, and incorporate lessons learned from our past design/construction experience.

Your Trusted Partner Jacobs has built a strong relationship with D4 based on transparency, accountability, and mutual respect, providing an environment of trust and cooperation. Joe is a skilled PM with expertise in D4 requirements, and our committed team has the requisite management, design, and construction experience to serve you in a proactive, collaborative, and innovative manner.

Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work:

Consultant Name Project Advertised Major & Minor Work Types

3.2 3.1 4.1.1 6.3.1 7.1 7.2 7.3 8.1 8.2 8.3 DBE SB UU

Prime Jacobs Engineering Group Inc.

Su bc on su lta nt s

ASA Consultants, Inc.

Cyriacks Environmental Consulting Services, Inc.

(CECOS)

Florida ITS Engineers LLC Manuel G. Vera & Associates, Inc.

Miller, Legg & Associates, Inc.

Quest Corporation of America, Inc.

Scalar Consulting Group Inc.

Tierra South Florida, Inc.

SB = Small Business UU = Under-utilized work type; subconsultant is a professional services firm and is prequalified in the Under-Utilized Work Group. Refer to the advertisement for applicability.

My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.

https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance

Prequalification of Prime Consultant and any proposed Subconsultants by advertised type(s) of work:

Consultant Name Project Advertised Major & Minor Work Types

8.4 9.1 9.2 9.4.1 15.0 DBE SB UU

Prime Jacobs Engineering Group Inc.

Su bc on su lta nt s

ASA Consultants, Inc.

Cyriacks Environmental Consulting Services, Inc.

(CECOS)

Florida ITS Engineers LLC Manuel G. Vera & Associates, Inc.

Miller, Legg & Associates, Inc.

Quest Corporation of America, Inc.

Scalar Consulting Group Inc.

Tierra South Florida, Inc.

SB = Small Business UU = Under-utilized work type; subconsultant is a professional services firm and is prequalified in the Under-Utilized Work Group. Refer to the advertisement for applicability.

My firm has submitted a Bid Opportunity List through the Equal Opportunity Compliance System for this project.

https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance

Procurement Office Home Page (http://www.fdot.gov/procurement/)

Pursuant to Section 120.57(3), Florida Statutes, and Rule Chapter 28-110, Florida Administrative Code, any person adversely affected by the agency decision or intended decision shall file with the agency both a notice of protest in writing and bond, where applicable, within 72 hours after the posting of the notice of decision or intended decision, or posting of the solicitation with respect to a protest of the terms, conditions, and specifications contained in a solicitation and will file a formal written protest within ten days after the filing of the notice of protest. The required notice of protest and bond, and formal written protest must each be timely filed with the Florida Department of Transportation, Clerk of Agency Proceedings, 605 Suwannee St, Mail Station 58, Tallahassee FL 32399. Failure to file a notice of protest or formal written protest within the time prescribed in section 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120 Florida Statutes.

IMPORTANT NOTICE !!

All Prime Consultants and all Subvendors/subconsultants/subcontractors must register with the State's web-based e-Procurement system - "MyFloridaMarketPlace." (http://dms.myflorida.com/mfmp) Professional Services acquired in accordance with Chapter 287.055 Florida Statutes, are exempt from the 1% transaction fee. You can also sign up to attend a vendor registration training session or call 1-866-352- 3776 for assistance.

09/30/2024 10:27 AM

Advertisement Selection Results

Professional Services - 25429

District : 04

Project Description :

SR-5/US-1 at SR-838/Sunrise Blvd.

Schedule - The times displayed are automatically adjusted for the time zone of your system :

Type Date - Time Advertisement Date 7/01/2024 Response Deadline Date/Time 7/16/2024 05:00 pm Longlist Date/Time 8/01/2024 03:00 pm Shortlist Selection Date/Time 8/12/2024 09:30 am Shortlist Posting Date/Time 8/12/2024 10:41 am Phase II Submittal Deadline Date/Time 9/03/2024 03:00 pm Consultant Interviews Date/Time 9/04/2024 Technical Review Committee Meeting 1 Date/Time 9/16/2024 02:30 pm Final Selection Date/Time 9/30/2024 09:30 am Final Selection Post Date/Time 9/30/2024 10:27 am Negotiations Period Begin Date 10/03/2024 Negotiations Period Ending Date 11/30/2024

Note: Oral Presentations and Consultant Interviews are exempt meetings. Times will be available in the RFP issued to Shortlisted firms.

Final Selection :

Rank Firm

1 JACOBS ENGINEERING GROUP INC.

2 KEITH AND ASSOCIATES, INC.

3 ATKINSREALIS USA INC.

9/30/24, 10:46 AM Procurement Development Application - Ad Detail https://pdaexternal.fdot.gov/Pub/AdvertisementPublic/AdDetail/04/13334/PS/A/S 1/2 http://www.fdot.gov/procurement/ http://www.fdot.gov/procurement/

BACK TO TOP

Service Desk:

fdot.servicedesk@dot.state.fl.us (mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement Development Application (PDA) Question)

Or call 1-866-955-4357(HELP)

Accessibility Statement (http://www.fdot.gov/agencyresources/notices/accessibility.shtm) Grid Help Web Policies & Notices (https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm) MyFlorida.com (http://www.myFlorida.com)

9/30/24, 10:46 AM Procurement Development Application - Ad Detail https://pdaexternal.fdot.gov/Pub/AdvertisementPublic/AdDetail/04/13334/PS/A/S 2/2 mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement%20Development%20Application%20(PDA)%20Question mailto:fdot.servicedesk@dot.state.fl.us?subject=Procurement%20Development%20Application%20(PDA)%20Question http://www.fdot.gov/agencyresources/notices/accessibility.shtm http://www.fdot.gov/agencyresources/notices/accessibility.shtm https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm https://www.fdot.gov/agencyresources/webpoliciesandnotices.shtm

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION

PROFESSIONAL SERVICES - RFP

August 12, 2024

Edwin.Mojena@atkinsrealis.com joseph.martin@jacobs.com ltreviranus@KEITHteam.com

Re: Request for Proposal - 25429: Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd.

Dear Consultant:

I am pleased to advise you that your firm has been shortlisted for the 25429: Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd. To enable the Department to complete the evaluation of your firm, you are requested to prepare resumes, an organization chart or staffing chart, and to participate in an interview with the technical review committee. The resumes and organization chart or staffing chart must be prepared in accordance with the enclosed information, which includes a scope of services. Resumes, required forms, and organization chart or staffing chart shall be e-mailed to d4.profserv@dot.state.fl.us. All documents are due by 3:00 PM, September 3, 2024.

The interviews are scheduled for September 4, 2024 in Manatee Conference Room at the District 4 Headquarters.

Note: All times listed in this letter and attached documents are Eastern Time Zone unless specifically noted otherwise.

Sincerely, Patrick Nash, Contract Analyst II Procurement Office

Attachments CC: Kris McKirdy, P.E.

PF415PN

NASH

Request For Proposals For

25429: Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd.

1. Purpose:

2. Scope of Consultant Services:

3. Length of Consultant Services:

4. Contract Restrictions & Proposed Method of Compensation:

5. Staffing Requirements:

6. Scope of Services Meeting:

7. Deadline for Questions:

8. Resumes, Organization Chart or Staffing Chart, Required Certification, and Forms:

9. Consultant Interviews:

10. Consultant Selection:

11. Contract Negotiations:

12. Schedule:

Attachment A – Scope of Services

Attachment B – Standard Professional Services Agreement Terms

Attachment C – Interview Evaluation Form

Attachment D – Required Certifications

Request For Proposals

1. Purpose:

The Florida Department of Transportation requires professional services for the project known as 25429: Intersection Improvements for SR-5/US-1 at SR-838/Sunrise Blvd..

Additional information is necessary to complete the evaluation of each shortlisted consultant’s ability to provide the desired services. As a result, each shortlisted consultant is requested to provide resumes, organization chart or staffing chart, required certification, forms, and to participate in an interview to discuss qualifications for the project.

Shortlisted Consultants:

AtkinsRéalis USA Inc.

Jacobs Engineering Group Inc.

Keith and Associates, Inc.

2. Scope of Consultant Services:

For a detailed description of the required consultant services, refer to Attachment A, Scope of Services.

3. Length of Consultant Services:

The consultant services are scheduled for a maximum period of 24 months. The consultant services shall begin only upon the receipt of a written Notice to Proceed (NTP) from the Department. The term of the contract is 10 years.

4. Contract Restrictions & Proposed Method of Compensation:

A standard consultant contract will be executed with the selected consultant for this project. The standard contract terms are provided as Attachment B. The following additional information is furnished to the consultant firm for consideration:

4.1 Professional Liability Insurance Requirement: $1,000,000.00. For purposes of contracting, only Professional Liability Insurance from a company or companies authorized to do business in the State of Florida is acceptable. The selected prime consultant shall submit proof of Professional Liability Insurance coverage in the minimum threshold amount designated above, prior to contracting. The policy/ies and coverage described herein may be subject to a deductible. Pay all deductibles as required by the policy. The Department shall be notified in writing within ten days of any cancellation, notice of cancellation, lapse, renewal, or proposed change to any policy or coverage described herein. The Department’s approval or failure to disapprove any policy/ies, coverage, or ACORD Certificates shall not relieve or excuse any obligation to procure and maintain the insurance required herein, nor serve as a waiver of any rights or defenses the Department may have. No policy/ies or coverage described herein may contain or be subject to a Retention or a Self-Insured Retention. A commitment letter from a financial institution is also not acceptable for purposes of contracting.

4.2 Computer Usage: The selected Consultant firm may desire to use the

Department's mainframe computer (not CADD) for project related tasks.

Requested computer services will be considered during the contract negotiations.

4.3 Subconsultant Services: Services assigned to subconsultants must be approved in advance by the Department. Subconsultants performing the standard types of work covered by Rule Chapter 14-75, F.A.C., must be technically prequalified with the Department or have an application for prequalification under review at the time that they are proposed.

Subconsultants with fees less than $500,000, and/or performing specialty services

(non-standard types of work), a self-certified overhead statement may be accepted. These overhead statements must be sent to Central Office for review and approval.

Private attorney services may not be utilized on Department contracts without advance approval from the Attorney General’s Office. The advance approval may only be requested by Agency General Counsel (FDOT), and not the consultant firm. Since approval cannot be assumed, consultant firms shall refrain from proposing legal firms as part of the professional services consultant team in their procurement response and proposal documents. As referenced in Section 287.059(3), F.S.:

“An agency requesting approval for the use of private attorney services shall first offer to contract with the Department of Legal Affairs for such attorney services at a cost pursuant to mutual agreement. The Attorney General shall decide on a case-by-case basis to accept or decline to provide such attorney services as staffing, expertise, or other legal or economic considerations warrant. If the Attorney General declines to provide the requested attorney services, the Attorney General’s written approval shall include a statement that the private attorney services requested cannot be provided by the office of the Attorney General or that such private attorney services are cost-effective in the opinion of the Attorney General. The Attorney General shall not consider political affiliation in making such decision. The office of the Attorney General shall respond to the request of an agency for prior written approval within 10 working days after receiving such request. The Attorney General may request additional information necessary for evaluation of a request. The Attorney General shall respond to the request within 10 working days after receipt of the requested information.”

When universities or colleges are needed to perform services, the Department’s Project Manager shall procure such services by means of either a University http://www.fdot.gov/procurement/pdf/Rule%2014-75.pdf

Master Agreement task work order, a governmental agency contract, or a competitive solicitation for contractual services, as appropriate (reference Section 287.057(21), F.S.). Universities proposed as subconsultants will not be added to the professional services contract.

4.4 DBE/Small Business Participation:

The Department encourages DBE and small business firms to compete for professional services projects, and also encourages all other firms to use DBE and small business consultants as subconsultants. However, use of DBE and small business subconsultants is not mandatory and no preference points will be given during the selection process for DBE and/or small business participation.

Consultants shall complete Form No. 375-030-83 to indicate commitments anticipated for the project.

Federal law requires states to maintain a database of all firms that are participating or attempting to participate in DOT-assisted contracts. To assist the Department in this endeavor, consultants should have already submitted their Bid Opportunity List through the Department’s Equal Opportunity Compliance System found at the following link (https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?

ReturnUrl=%2fEqualOpportunityCompliance). If you have not yet completed your bid opportunity list through this online application, please do so at this time. Prime Consultants can obtain access to the new EOC system by filling out the Contractors and Consultants New Users Access Form. Please complete the form and submit it to EOOHelp@dot.state.fl.us.

Consultants please be reminded that if you are selected on this project, you need to enter your DBE commitments in the Equal Opportunity website after contract execution. Also, if you are awarded supplemental agreements as part of this project, the DBE commitments will also need to be reported.

4.5 Method of Compensation:

The Department anticipates a lump sum with limiting amounts will be established for this contract. A Total Maximum Limiting Amount shall be established based upon final negotiations and shall compensate the consultant for costs associated with the project.

4.6 Public Entity Crimes: A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity;

may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be https://pdl.fdot.gov/api/form/downloadAttachment/10980573 https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance https://fdotwp1.dot.state.fl.us/EqualOpportunityCompliance/Account.aspx/LogIn?ReturnUrl=%2fEqualOpportunityCompliance https://gcc01.safelinks.protection.outlook.com/?url=https%3A%2F%2Ffdotwww.blob.core.windows.net%2Fsitefinity%2Fdocs%2Fdefault-source%2Fequalopporunity%2Feoc-rcs-user-manual%2Feoc-system-access-request-form.pdf%3Fsfvrsn%3D899539b3_0&data=02%7C01%7CKelly.Walls%40dot.state.fl.us%7C72c061ab81c841be0eb408d703d68c8a%7Cdb21de5dbc9c420c8f3f8f08f85b5ada%7C0%7C0%7C636982092320368962&sdata=KYy0%2FLjCiK5oF%2F2PSqs662Qm%2BB%2F63Kw7%2BzUYl%2BDqe0Q%3D&reserved=0 mailto:EOOHELP@dot.state.fl.us awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity in excess of the threshold amount provided in s. 287.017 for CATEGORY TWO ($35,000) for a period of 36 months following the date of being placed on the convicted vendor list.

Antitrust Vendor Violator Contract Language: Pursuant to section

287.137(2)(a), Florida Statutes, a person or an affiliate who has been placed on the antitrust violator vendor list following a conviction or being held civilly liable for an antitrust violation may not submit a bid, proposal, or reply for any new contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply for a new contract with a public entity for the construction or repair of a public building or public work; may not submit a bid, proposal, or reply on new leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a new contract with a public entity; and may not transact a new business with a public entity.

Affidavit Regarding Labor and Services: Prior to contract execution, extension or renewal, the Department shall notify the Contract awardee of the need to download, complete and submit FDOT Form No. 375-030-31. Please have the form signed and notarized and send a scanned copy to the Department. The nongovernmental entity (Contract awardee) must maintain the original copy in accordance with other provisions of this Agreement or Contract, and in accordance with Florida law.

4.7 Vendor Registration through E-PROCUREMENT: As per Rule 60A-1.030, all consultants doing business with the State shall register in the MyFloridaMarketPlace system. Information about the registration process is available, and registration may be completed by linking to the following web address: https://vendor.myfloridamarketplace.com

NOTE: Contracts procured under s. 287.055, Florida Statutes are exempt from the 1% transaction fee. Interested persons lacking internet access may request assistance from MyFloridaMarketPlace Customer Services at (866) FLA-EPRO (352-3776) or State Purchasing, 4050 Esplanade Drive, Suite 300, Tallahassee, Florida 32399.

4.8 Inspector General: The Consultant agrees to comply with section 20.055(5), Florida Statutes, and to incorporate in all subcontracts the obligation to comply with section 20.055(5), Florida Statutes.

5. Staffing Requirements:

After submittal of Letters and up through contract execution, proposed subconsultants/subcontractors/sub-vendors, teaming arrangements, or key staff of the Consultant cannot be changed or substituted except in instances of force majeure or in https://pdl.fdot.gov/api/form/downloadAttachment/17378449 https://vendor.myfloridamarketplace.com/ the event of circumstances that cannot reasonably be anticipated and/or are beyond the control of the prime consultant. In such cases, changes or substitutions are subject to the discretion of the Department, and cannot be made without written approval of the Department. All such requests made during the contract procurement must be routed and coordinated through PSU only, as the official point of contact during contract procurement. After contract execution, subconsultant/subcontractor/sub-vendor, teaming arrangement, or key staff changes/substitutions require pre-approval of the Department’s Project Manager before implementing. All qualification/certification requirements of the original advertisement shall govern, where applicable.

6. Scope of Services Meeting:

A Scope of Services meeting is not required for this project.

7. Deadline for Questions:

Any technical or administrative questions shall be addressed to the following:

Patrick Nash, Procurement Office, MS Florida Department of Transportation, 3400 West Commercial Blvd., Fort Lauderdale FL, 33309, Phone: 954-777-4466, E-mail address: d4.profserv@dot.state.fl.us

NOTE: The shortlisted consultant teams shall not have any conversations concerning this project with the project manager, technical review committee, selection committee, or any other persons regarding issues related to this project other than the specified procurement office personnel identified above.

The deadline for technical questions is September 3, 2024.

There is no deadline for contract or administrative questions.

8. Resumes, Organization Chart or Staffing Chart, Required Certification, and Forms:

Please note that there is no requirement for submittal of technical proposals.

The firms being considered for this project are required to electronically submit resumes, organization chart or staffing chart, required certification, and forms. Resumes must be no longer than 2 pages per resume per person. The organization chart or staffing chart is limited to a one page chart which can be either 8 ½” x 11” or 11” x 17”, at the discretion of the Consultant. A maximum (2) page schedule (11” x 17”) shall be submitted. The proposed schedule shall illustrate the sequence of events for highway improvements (roadway design, surveys, drainage, traffic operations plans, and utility adjustment plans, etc.). To be consistent, also please type your proposed schedule in months (example:

16 months). Font size of 11, with ½ inch margins are recommended for clarity, but not required for Consultant submittals. The Consultant firm may elect to submit an organization chart OR staffing chart, not both. Examples of acceptable and unacceptable content for organization charts, staffing charts, staff hour estimate charts, and a link to the Construction Training and Qualification Program (CTQP) system can be found at this link. Organization, staffing, or staff hour estimate charts containing extra narrative content (not in conformance with examples) will be deemed unacceptable, at the sole discretion of the Procurement Office, and will not be passed on to the Technical Review Committee for review and evaluation with the other submittals.

Resumes and organization chart or staffing chart shall include sufficient information to enable the Department to evaluate the technical capability of the firms to provide the desired services. Resumes shall be included only of persons who will actually be playing key roles in the project, if selected.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .